ROCK TOWN is a residential apartment project in L.B Nagar ( Circle), Saroornagar mandal, Ranga Reddy district, developed by the registered promoter ELEMENTS, identified as a Partnership. The project occupies 1173.27 sq m and comprises one building with one cellar, a stilt level and five upper floors, with 15 3BHK apartments of 215.07 sq m saleable area per unit. It is registered with TG-RERA as P02400001119, and the promoter’s declared completion date is March 2025.

01What we found

Period endedTG-RERA registration ran to 28 Mar 2025 - check its extension on TG-RERA
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldTG-RERA record
Registered project nameROCK TOWN
Project typeResidential apartment project RERA record
Phase / registered portionPhase is not separately identified in the supplied record; the filed portion is the building at Plots 15, 16 & 17 RERA filing
TG-RERA registration numberP02400001119
Registration validity08/08/2019 to 28/03/2025; certificate states five years, unless extended by the Authority
Registered promoterELEMENTS; the filing identifies the organization type as Partnership RERA filing
RERA status in supplied recordRegistered; the certificate records the validity dates above. No extension is recorded in the supplied certificate

Land and geographic identity

FieldTG-RERA record
LocalityL.B Nagar ( Circle) RERA record
Revenue villageMansoorabad village, as stated in the filed building permit and title-report material
Mandal / district / PINSaroornagar / Ranga Reddy / 500068 RERA record RERA filing
Survey numbers and subdivisions66/14 (OLD) and 9/1 (NEW); title records also describe these as Sy.No. 66/14 Part and New Survey No. 9/1 Part RERA filing
Plots15, 16 & 17 RERA filing
Site extent1173.27 sq m total and net area in the RERA filing RERA filing
BoundariesEast: ROAD WIDTH -12; West: VACANT LAND; North: ROAD WIDTH-12; South: ROAD WIDTH-12 RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building approval1/C3/05186/2019, approved 28 March 2019
Approved built-up area3398.06 sq m is recorded in the RERA project fields. The building permit separately records residential upper-floor area of 2,665.10 sq m, cellar area of 606.01 sq m and stilt area of 623.55 sq m; these are the permit’s stated area entries RERA filing
Buildings / blocksOne building / one block RERA filing
Sanctioned floor configuration1 cellar + stilt + 5 upper floors; permit-recorded height: 14.89 m
Parking levels / provisionCellar and stilt are shown in the building permit. The permit records cellar area 606.01 sq m and stilt area 623.55 sq m; the occupancy certificate records parking area 1229.56 sq m
Unit countsRERA filing records 15 units; the project field records 1 building unit. The supplied data does not separately establish a GHMC-sanctioned apartment count RERA unit table RERA filing

Offering and status

FieldTG-RERA record
Unit type3BHK apartments RERA unit table
RERA-filed saleable area215.07 sq m per unit RERA unit table
Booked / available0 booked and 15 available, as last read from TG-RERA; the portal record has no as-of date, so counts are indicative RERA unit table
Construction stageThe GHMC occupancy certificate records the residential building as inspected and fit for occupation; it is a building-level record for the building at Plots 15, 16 & 17
Completion date declared to RERAMarch 2025 in the promoter’s affidavit-cum-declaration
RERA registration deadline28/03/2025, as stated on the registration certificate; this is distinct from the promoter’s completion undertaking
Occupancy certificateGHMC OC No. 009699/GHMC/4778/LBN1/2022-OC; proceeding No. 4684/GHMC/LBN/2022-OC, approved 19 December 2022. Certificate scope: residential building at Plots 15, 16 & 17, Survey Nos. 66/14 (OLD) and 9/1(NEW), Mansoorabad

2. The project story

ROCK TOWN is registered with TG-RERA as a residential apartment project on Plots 15, 16 and 17, associated in the project records with Survey Nos. 66/14 (OLD) and 9/1 (NEW), in Mansoorabad village, Saroornagar mandal, Ranga Reddy district. The filed site area is 1173.27 sq m. The project is organized as one residential building, permitted as one cellar, a stilt level and five upper floors. RERA record RERA filing

The RERA filing records 15 3BHK units. The filed saleable area is 215.07 sq m per unit; the portal-derived booking and availability counts show 0 booked and 15 available, but carry no as-of date and should be treated as indicative. RERA unit table

GHMC’s occupancy certificate identifies the same residential building and survey numbers and records it as inspected and fit for occupation. The certificate gives a completion date of 14 September 2022 and an approval date of 19 December 2022. This is an authority-issued building-level OC record, not a statement of current physical condition.

3. Master plan, architecture & building design

The filed development is one residential building on a 1173.27 sq m site, with one cellar, stilt and five upper floors. The GHMC building permit states a height of 14.89 m and identifies Plot No. 15 (West Part), Plot No. 15 (East Part), and Plots 16 and 17 in the supporting title and development-agreement material. RERA filing

The permit records residential upper-floor area of 2,665.10 sq m, cellar area of 606.01 sq m and stilt area of 623.55 sq m. The RERA project fields separately report approved built-up area of 3398.06 sq m. The supplied record does not provide drawing-derived details of building footprint, flats per floor, lifts, stairs, entrances, internal circulation or open-area distribution. RERA filing

The permit lists a 60.14 sq m tot-lot, 11 rainwater-harvesting pits, 55 trees, transformer space, a garbage house and an ETP. These are permit-listed provisions; the supplied evidence does not establish their current condition or completion.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK15015215.07 sq mNot measured from drawings in the supplied recordNot supplied

Unit counts, bookings, availability and saleable area are taken from the TG-RERA filing/portal record. Booking counts have no recorded as-of date and are indicative. RERA unit table RERA unit details

Four floor-plan drawings are recorded, but none has been measured; all four are pending scan review. Therefore, no software-measured carpet area, room dimensions, balcony or utility measurements, or typical floor arrangement can be reported from the supplied drawing data. Carpet area, if later measured, would be distinct from RERA-filed saleable area: the drawing-data note states that saleable area also includes the home’s share of common areas. Floor plans

5. Parking & vehicle circulation

The building permit includes one cellar and a stilt level. It records a cellar area of 606.01 sq m and a stilt area of 623.55 sq m; the GHMC occupancy certificate records a parking area of 1229.56 sq m. These are recorded areas, not counts of parking spaces.

No supplied project record establishes the number of car or two-wheeler spaces, visitor or accessible parking, EV charging, ramp or driveway arrangements, pedestrian separation, or unit-specific parking allocations. The permit says a 293.29 sq m mortgaged built-up area may be allowed for registration only after an OC is produced; it does not establish an individual buyer’s parking entitlement.

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot60.14 sq mGHMC building permitPermit-listed; current completion not established
Rainwater harvesting11 rainwater-harvesting pits; permit also requires a percolation-pit structureGHMC building permitPermit-listed; current completion not established
Trees55 treesGHMC building permitPermit-listed; current provision not independently verified
Perimeter greeneryStrip of greenery on the site perimeter is required by permitGHMC building permitPermit condition; current condition not established
Community buildingsNo progress reported in the supplied RERA amenity dataRERA amenity record RERA amenitiesRERA record shows 0%
Aggregate recreational open spaceNo area supplied; RERA amenity record reports 0%RERA amenity record RERA amenitiesRERA record shows 0%

The supplied evidence does not provide project-specific RERA or sanctioned evidence for a clubhouse, swimming pool, gym, indoor games or other promotional facilities. The RERA amenity record also reports progress figures for site infrastructure; those are portal-reported figures, not independent verification of delivery. RERA amenities

7. Utilities, building services & safety

GHMC’s permit lists rainwater harvesting, transformer space, a garbage house and an ETP, and requires provision of structural-safety and fire-safety requirements. The occupancy-certificate extraction lists rainwater harvesting and parking area. These records identify provisions or conditions; they do not establish present operating status or independently verified compliance.

The RERA amenity data marks water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, energy management, fire protection and an electrical meter room/sub-station/receiving station as available, with reported progress of 15% for water supply, 10% for sewerage and storm-water drains, 0% for rainwater harvesting, energy management and fire protection, and 15% for the electrical meter room/sub-station/receiving station. The record does not give capacities or establish independent verification. RERA amenities

No supplied project-specific evidence establishes water source or storage capacity, an STP’s capacity or reuse arrangements, backup power, lift number or capacity, CCTV, access control, waste-segregation arrangements, accessible circulation or fire-system details. RERA amenities Document index

8. Location, access & connectivity

The registered project location is L.B Nagar ( Circle), Saroornagar mandal, Ranga Reddy district, PIN 500068. Building-permit and title materials identify Mansoorabad village and the site as Plots 15, 16 and 17 in Survey Nos. 66/14 (OLD) and 9/1 (NEW). The filed boundaries describe road widths on the east, north and south sides and vacant land on the west. RERA record RERA filing RERA filing

The supplied location dataset gives these mapped distances: ADP, 0.0 km; IndusInd Bank, 0.4 km; Nanakramguda Govt primary school, 0.5 km; Financial District (Nanakramguda), 1.2 km; an unnamed park, 1.2 km; Manuu Polytechnic Hyderabad, 1.6 km; Sankaraya Eye Hospital, 1.6 km; an unnamed bus station, 2.2 km; and South india shopping mall, 2.6 km. These are supplied mapped distances, not travel-time estimates. Location record

9. Developer & development status

The registered promoter is ELEMENTS, identified in the TG-RERA filing as a partnership. The filing lists GSTIN 36AAFFE4703P1Z7. The supplied registered-office information is ELEMENTS, Road No. 14, Survey No. 66/14 (Old) and 9/1 (New), L.B Nagar ( Circle), Saroornagar, Ranga Reddy, 500068; no official contact details or promoter website are provided. RERA filing RERA filing Corporate record

The RERA filing identifies three landowners—G Padmanabha Reddy, G Venkat Reddy and G Mahender Reddy—and records revenue-share arrangements. The GHMC building permit identifies ELEMENTS as the DGPA holder/developer and names A. Chaitanya Dev as its representative. Parties record

The promoter’s 2019 declaration undertook to complete the project by March 2025. The supplied record does not provide a current independently verified construction-progress assessment. The GHMC occupancy certificate described in this Overview is the project’s building-level OC record.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400001119; issued 08/08/2019; valid through 28/03/2025 unless extended
Scope and evidenceROCK TOWN; names Plots 15, 16 & 17 and survey numbers 66/14 (OLD) and 9/1 (NEW)
GHMC building permit order
Identifier / date1/C3/05186/2019; 28 March 2019
Scope and evidenceResidential building at Mansoorabad with one cellar, stilt and five upper floors; includes listed site provisions and conditions
GHMC occupancy certificate
Identifier / date009699/GHMC/4778/LBN1/2022-OC; 19 December 2022; proceeding No. 4684/GHMC/LBN/2022-OC
Scope and evidenceResidential building at Plots 15, 16 & 17 in Survey Nos. 66/14 (OLD) and 9/1(NEW), Mansoorabad
Promoter declaration
Identifier / dateForm B affidavit-cum-declaration; verified 29-06-2019
Scope and evidencePromoter-declared March 2025 completion period and RERA undertakings
Title search report
Identifier / dateAdvocate’s report dated 05.09.2019
Scope and evidenceFiled title opinion concerning Plots 15, 16 and 17, Mansoorabad, with survey references 66/14 part and new 9/1 part
Approved layout / plan lookup
Identifier / dateLayout/Sub Divn. No. LRS16112017053834 appears in the building-permit record
Scope and evidenceA separate approved-layout plan is not available in the supplied extracted records HMDA

The building permit lists GHMC conditions concerning commencement and completion notices, occupancy before occupation, rainwater harvesting, transformer space, garbage provision, the tot-lot and greenery, and safety responsibilities. The permit’s full conditions are part of the approval record; this overview summarizes selected provisions only.

Frequently asked questions

Is ROCK TOWN registered with Telangana RERA?

Yes. ROCK TOWN is registered with the Telangana Real Estate Regulatory Authority as P02400001119; the registration status is New Project.

Who is the developer of ROCK TOWN?

The promoter named in the RERA registration is ELEMENTS.

Where is ROCK TOWN located?

ROCK TOWN is in L.B Nagar ( Circle), Saroornagar, Rangareddy, Telangana (500068).

When will ROCK TOWN be completed?

The promoter's proposed date of completion filed with RERA is 28/03/2025. This is the promoter's declaration, not a guarantee.