Sign in

Madhavaram Serenity

MADHAVARAM CONSTRUCTIONS · Rangareddy · RERA P02400000204

MADHAVARAM SERENITY is a residential apartment project in L.B.NAGAR, Saroornagar mandal, Ranga Reddy district, developed by the registered promoter MADHAVARAM CONSTRUCTIONS. The registered site area is 15,852.67 sq.m.; the development comprises five residential blocks, A–E, each Ground + 7 upper floors, and an amenities block with Ground + 6 floors, with 389 apartments. TG-RERA records 1BHK, 2BHK and 3BHK configurations, with saleable areas of 67.72 sq.m., 78.94 sq.m. and 136.16 sq.m., respectively. Its TG-RERA registration number is P02400000204, and the registered completion date is 26/03/2023.

01What we found

Period endedTG-RERA registration ran to 26 Mar 2023 - check its extension on TG-RERA
27documents on file - each fact links to its page
3court cases on this project's land (survey 42, 44, L.B.Nagar)
12items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameMADHAVARAM SERENITY RERA record
Project typeResidential apartment project RERA filing
Phase / registered portionNo separate phase name is disclosed. The registration and building-permit record describe the development on the site, including five residential blocks and an amenities block. RERA record
TG-RERA registrationP02400000204 RERA record
Registration validity21/01/2019 to 26/03/2023; the supplied certificate records no extension. This is registration validity, not the completion deadline or an occupancy certificate.
Registered promoterMADHAVARAM CONSTRUCTIONS RERA filing
RERA status in supplied recordOn-Going Project; registration validity ended on 26/03/2023. RERA record

Land and geographic identity

FieldProject record
LocalityL.B.NAGAR RERA record RERA filing
Revenue villageLingojiguda village is named in the title-report record; the RERA identity fields list L.b.nagar. Confirm the revenue-village identity against current land records. Land records
Mandal / district / PINSaroornagar / Ranga Reddy / 500035 RERA record RERA filing
Project survey numbersSy.Nos. 42, 43 and 44; the GHMC permit and RERA record also render these collectively as “42 TO 44.” No subdivision is specified in the project identity. Land records
Registered site extent15,852.67 sq.m. (also filed as 15852.67 m²) RERA filing
Net / total areaNet area 15,852.67 sq.m.; total area 15,852.67 sq.m. RERA filing
BoundariesEast: neighbours’ land in Sy.No.42; West: Janaki Enclave; North: road; South: neighbours’ lands in Sy.No.44 and 40 feet road. RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building-permit approvalPermit No. 53142/HO/EZ/Cir-3/2016; approved 27 03 2017. File No. 80788/23/05/2016/HO. Approvals record
Approved area figuresApproved built-up area: 57,328.65 sq.m. RERA filing. The permit extraction separately labels 57,328.65 as “Gross F.S.I.”; these labels are retained as filed, not treated as interchangeable measures.
Buildings and floorsFive residential blocks, A–E, each Ground + 7 upper floors; one amenities block, Ground + 6 floors.
Parking levelsThe permit records 2-Cellars and says cellar and stilts approved for parking; it does not provide a parking-space count in the supplied extraction.
Unit counts389 units in the permit and RERA record; five proposed building units in the RERA land details. RERA unit table RERA filing

Offering and status

FieldProject record
RERA-filed configurations1BHK: 1 unit; 2BHK: 118 units; 3BHK: 270 units. RERA unit table RERA unit details
RERA-filed saleable areas1BHK: 67.72 sq.m.; 2BHK: 78.94 sq.m.; 3BHK: 136.16 sq.m. RERA unit table RERA unit details
Booked / available307 booked and 82 available in total, as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative. RERA unit table
Construction stageThe portal labels the project “On-Going Project” and reports 90% completeness; the supplied record does not state the date of that completeness figure or independently verify site progress. RERA record
Original / revised completion date26/03/2023 / 26/03/2023. RERA record
Occupancy certificate (OC)No OC or completion certificate is included in the supplied project documents. The GHMC permit requires an OC before occupation; the permit extraction records completion certified as false.

2. The project story

Madhavaram Serenity is a residential apartment development recorded by TG-RERA at L.B.NAGAR, Saroornagar, Ranga Reddy district, on land identified as Sy.Nos.42, 43 and 44. The building-permit record describes five residential blocks, A–E, with Ground + 7 upper floors, alongside a separate amenities block with Ground + 6 floors. The registered development comprises 389 apartments. RERA record Land records

The filing records 307 units booked and 82 available, but supplies no count date; these are therefore indicative portal figures rather than a current sales confirmation. TG-RERA labels the project ongoing and records 90% completeness, without an as-of date or independent site verification. The registered completion date was 26/03/2023, while the certificate’s registration validity also ended on that date; those are separate dates and neither establishes that the project has an OC. No OC is included in the supplied documents. RERA unit table RERA record

3. Master plan, architecture & building design

The filed site area is 15,852.67 sq.m., with the same figure recorded as net area. The GHMC permit extraction lists 57,328.65 as approved built-up area in the RERA fields and separately labels 57,328.65 “Gross F.S.I.” in the permit extraction; the supplied material does not provide a separate, independently measured FSI-counted area. RERA filing RERA filing

The approved arrangement is five residential blocks (A–E), each Ground + 7 upper floors, plus an amenities block of Ground + 6 floors. The permit records two cellars and says cellar and stilt areas approved for parking must be used exclusively for vehicle parking. It also records 1,585.26 sq.m. as “Tot-lot” and requires it to be fenced and maintained as greenery before an OC is issued.

The supplied extraction does not provide detailed floor plans, building footprints, flats per floor, lift or stair layouts, internal-road geometry, or a phase-wise development plan. The available drawing record says 18 drawings are pending scan and none have been software-measured. Floor plans

4. Homes, configurations & floor plans

TG-RERA records 389 apartments across three configurations. The saleable areas below are the filed figures; the source calls them saleable area and does not provide carpet-area measurements. The floor-plan review has no measured drawings available, so software-measured carpet area and loading cannot be reported. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
1BHK (filed as SINGLE BEDROOM)10167.72 sq.m.Not measuredNot supplied
2BHK (filed as DOUBLE BEDROOM)1181021678.94 sq.m.Not measuredNot supplied
3BHK (filed as TRIPLE BEDROOM)27020565136.16 sq.m.Not measuredNot supplied

Saleable area and carpet area are different measures; the supplied floor-plan methodology notes that saleable area includes the home’s share of common areas and is larger than carpet area. No drawing-based room dimensions, balcony or utility measurements, or typical-floor arrangements are available because the 18 drawings remain unmeasured. Floor plans

5. Parking & vehicle circulation

The GHMC permit records two cellars and states that cellar and stilt areas approved for parking must be used only for vehicle parking, without partition walls or rolling shutters, and must not be converted to another use. The supplied permit extraction does not give the number of car or two-wheeler spaces, visitor or accessible parking provision, ramp arrangement, or parking allocation by apartment.

The RERA filing records a mortgage area of 5,522.10 sq.m.; the supplied record does not specify parking-space allocation or establish exclusive parking rights for any individual unit. RERA filing Land records

6. Amenities, recreation & open spaces

The GHMC permit and RERA amenity records support the facilities below. The portal percentages are recorded declarations, not independent confirmation that the facilities are complete or operational. The permit describes proposed or required provision, including conditions to be met before OC. RERA amenities

Tot-lot / green strip
Description / sizePermit records 1,585.26 sq.m. as Tot-lot and requires fencing and maintenance as greenery; RERA amenity record lists Green Strip/TOT LOT/Park.
Evidence sourceRERA amenities
Declared progress / verified statusRERA portal lists 100%; independent completion not verified.
Community buildings
Description / sizeListed in the RERA amenity record; the permit includes a separate amenities block, Ground + 6 floors.
Evidence sourceRERA amenities
Declared progress / verified statusRERA portal lists 100%; independent completion not verified.
Internal roads and footpaths
Description / sizeListed in the RERA amenity record.
Evidence sourceRERA amenities
Declared progress / verified statusRERA portal lists 100%; independent completion not verified.
Street lighting
Description / sizeListed in the RERA amenity record.
Evidence sourceRERA amenities
Declared progress / verified statusRERA portal lists 100%; independent completion not verified.
Storm-water drains
Description / sizeListed in the RERA amenity record; portal progress is 0%.
Evidence sourceRERA amenities
Declared progress / verified status0% declared; independent status not verified.
Aggregate recreational open space
Description / sizePortal progress is 0%; permit separately identifies the Tot-lot area above.
Evidence sourceRERA amenities
Declared progress / verified status0% declared; independent status not verified.

A third-party/vendor listing names clubhouse, swimming pool, banquet and multipurpose halls, gymnasium, indoor games, aerobics room, kids’ play area, visitor and reserved parking, and other features. These are vendor-listed, not established as GHMC-sanctioned or delivered in the supplied project record. Promoter website

7. Utilities, building services & safety

The RERA amenity record lists water supply, sewerage (including chambers, lines, septic tank and STP), treatment and disposal of sewage and sullage, solid-waste management, rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station at 100%. These are portal declarations; the supplied evidence does not independently confirm completion, capacity or operational status. RERA amenities

The GHMC permit requires a water-recycling plant before an OC, a rainwater-harvesting percolation pit, a transformer space, a garbage house, storm-water disposal and other service utilities. It also requires the building to obtain an OC before occupation and states that fire-safety, lifts, sanitation, plumbing and electrical installations are to be executed under qualified technical supervision. These are permit conditions, not evidence that the works or clearances have been completed.

The supplied records do not state water-source quantities or storage capacity, STP capacity or reuse volumes, electrical or backup capacity, lift count or capacity in the GHMC permit extraction, or detailed accessibility and security arrangements. A vendor listing describes 13 six-passenger lifts, 100% flat power backup except ACs and geysers, intercom and CCTV; these are vendor claims and are not verified here as sanctioned or delivered. Promoter website

8. Location, access & connectivity

The registered location is L.B.NAGAR, Saroornagar mandal, Ranga Reddy district, PIN 500035; the GHMC permit describes the site as Saroor Nagar, L.B. Nagar, and identifies a road to the north and a 40 feet road along the southern boundary. The permit also refers to an 18 mt. road width for the site condition concerning the front compound wall. RERA record RERA filing RERA filing

The supplied geocoded location is identified as a cadastral parcel centroid, at 17.41528, 78.35459. The separate connectivity dataset lists the Financial District (Nanakramguda) at 1.2 km, IndusInd Bank at 0.4 km, an unnamed bus station at 2.2 km, Manuu Polytechnic Hyderabad at 1.6 km, Sankaraya Eye Hospital at 1.6 km, ADP at 0.0 km, South India Shopping Mall at 2.6 km, an unnamed park at 1.2 km, and Nanakramguda Government Primary School at 0.5 km. These are supplied location-dataset distances, not travel times. Location record

9. Developer & development status

The registered promoter is MADHAVARAM CONSTRUCTIONS, identified in the RERA record as a partnership. Ranga Rao Madhavaram is listed as an authorized signatory, and the Form B declaration identifies M. Ranga Rao as Managing Partner and promoter representative. The supplied record lists the promoter address as APAU COLONY, Lingojiguda, L.B.NAGAR, Saroornagar, Ranga Reddy, 500035; a masked identifier is recorded as xxxxxx375R. Corporate record Parties record

The Form B declaration dated 4 December 2018 states that the promoter has legal title to the project land, declares it free from encumbrances, and undertakes completion within 4 years 4 months “from now.” These are promoter declarations. The supplied project record separately gives the registered completion date as 26/03/2023 and the TG-RERA registration validity as 21/01/2019–26/03/2023. The portal’s 90% completeness figure has no stated as-of date and is not independently verified. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Reference and scopeForm C; P02400000204; issued 21/01/2019;
What the supplied record establishesRegistration for MADHAVARAM SERENITY, valid through 26/03/2023; certificate records no extension.
GHMC building permit
Reference and scopePermit No. 53142/HO/EZ/Cir-3/2016; File No. 80788/23/05/2016/HO; approved 27 03 2017;
What the supplied record establishesPermit for five residential blocks and an amenities block on Sy.Nos.42 to 44, subject to stated conditions, including OC before occupation.
Form B promoter declaration
Reference and scopeDated 4 December 2018;
What the supplied record establishesPromoter declarations concerning title, encumbrances, completion undertaking and project obligations.
Project title report
Reference and scopeDated 01-05-2017;
What the supplied record establishesTitle-opinion material concerning Sy.Nos.42, 43 and 44 at Lingojiguda Village; the supplied extraction does not include the advocate’s final opinion or conclusion.
Filed encumbrance declaration
Reference and scopeDated 04-12-2018;
What the supplied record establishesProject filing declares security to State Bank of India for a Project OD of Rs.15 crores.
Approved layout / drawing materials
Reference and scopeLayout-plan and floor-plan entries are listed in the RERA documents, but supplied records identify no layout approval number; drawing review reports 18 drawings pending scan. Floor plans
What the supplied record establishesDetailed layout and floor-plan contents cannot be described from the supplied material.
Occupancy / completion certificate
Reference and scopeNo certificate supplied; GHMC permit requires an OC before occupation.
What the supplied record establishesOC status is not established as issued in the supplied documents.

Frequently asked questions

Is MADHAVARAM SERENITY registered with Telangana RERA?

Yes. MADHAVARAM SERENITY is registered with the Telangana Real Estate Regulatory Authority as P02400000204; the registration status is On-Going Project.

Who is the developer of MADHAVARAM SERENITY?

The promoter named in the RERA registration is MADHAVARAM CONSTRUCTIONS.

Where is MADHAVARAM SERENITY located?

MADHAVARAM SERENITY is in L.B.NAGAR, Saroornagar, Rangareddy, Telangana (500035).

When will MADHAVARAM SERENITY be completed?

The promoter's proposed date of completion filed with RERA is 26/03/2023. This is the promoter's declaration, not a guarantee.

More projects in Lb Nagar