Sign in

Gayathri Nilayam

B V R HOUSING PROJECTS · Rangareddy · RERA P02400005047

GAYATHRI NILAYAM is a residential apartment project in Karmanghat, Saroornagar mandal, Ranga Reddy district, developed by registered promoter B V R HOUSING PROJECTS, a partnership. The registered site extent is 2495.26 sq. m., and the project comprises one tower, Building A-1, with 1 Cellar + Stilt + 5 upper floors and 40 homes: 15 2BHK and 25 3BHK apartments. Its TG-RERA registration number is P02400005047, and the promoter-declared completion date is 07/05/2025.

01What we found

Period endedTG-RERA registration ran to 7 May 2025 - check its extension on TG-RERA
14documents on file - each fact links to its page
1court case on this project's land (survey 206, Karmanghat)
3items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

3 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from magicbricks.comPhoto from 99acres.com
▦ View all 2 photos
Karmanghat, Saroornagar, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemTG-RERA record
Registered nameGAYATHRI NILAYAM
Project typeResidential apartment project
Phase / registered portionPhase not separately identified; registered record describes Building A-1 (RESI)
TG-RERA registrationP02400005047
Registration validity13/09/2022 to 07/05/2025; certificate states registration is valid unless extended by the Authority. No extension is recorded in the supplied certificate.
Registered promoterB V R HOUSING PROJECTS, a partnership
RERA statusCertificate records registration under section 5. Its stated validity ended on 07/05/2025; current registration status is not established by the supplied certificate.

RERA record RERA filing Corporate record

Land and geographic identity

ItemTG-RERA record
LocalityKarmanghat; Padma Nagar is also named in the building-permit record
Revenue villageKarmanghat (the building-permit record spells this “Kharmanghat”)
Mandal / district / PINSaroornagar / Ranga Reddy / 500079
Project survey number(s)Survey No. 206; no project subdivision is specified in the filing
Plot identification5 N/PART, 6 AND 7
Registered site extent2495.26 sq. m. (2495.26 m² in the permit extraction); the permit also records net area 2495.26 m²
BoundariesEast: ROAD WIDTH 9; West: LAND OF KRISHNA REDDY; North: NEIGHBOURS LAND; South: PLOT NO 5 SOUTHERN PLOT

RERA filing RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building approvalNo. 1/C4/06145/2021, dated 07 May 2021
Building configurationBuilding A-1 (RESI): 1 Cellar + Stilt + 5 upper floors
Sanctioned height14.88 m
Approved built-up area8378.13 sq. m. in the TG-RERA project information; the permit extraction separately lists “Proposed Covered builtup area 447,040.00” without a clear unit in the supplied extract.
Building / tower countOne building in the sanctioned permit record; one tower in the RERA unit summary
Units40 units in the RERA filing summary. The permit says sanctioned unit count must not be increased without prior GHMC approval, but the supplied permit extract does not state a sanctioned unit count.

RERA record RERA filing RERA unit table Approvals record

Offering and status

ItemTG-RERA record
Configurations2BHK: 15 units; 3BHK: 25 units
RERA-filed saleable area2BHK: 113.65 sq. m.; 3BHK: 169.91 sq. m.
Booked / available0 booked and 15 available 2BHK; 0 booked and 25 available 3BHK. Portal counts have no supplied as-of date and are indicative.
Promoter-declared completion date07/05/2025 in Form B
Building-permit completion date“Construction to be Completed Before 07 May, 2027”
Construction stageNo independently verified site-progress information is supplied. RERA infrastructure progress figures are reported separately below.
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied records; status is unverified.

RERA unit table RERA unit details Document index

2. The project story

GAYATHRI NILAYAM is registered as a residential apartment project on Survey No. 206 in Karmanghat village, Saroornagar mandal, Ranga Reddy district. The RERA filing identifies plots 5 N/PART, 6 and 7 and a site extent of 2495.26 sq. m. The GHMC building-permit record describes one residential building, Building A-1, with a cellar, stilt and five upper floors. RERA filing

The RERA unit summary lists 40 homes: 15 two-bedroom and 25 three-bedroom apartments. The portal-derived booking figures show all 40 as available and none booked, but the record does not provide an “as of” date. That snapshot should therefore be treated as indicative, not as a current inventory confirmation. RERA unit table RERA unit details

The promoter’s Form B declares completion by 07/05/2025. Separately, the GHMC permit extraction states that construction is to be completed before 07 May, 2027. These are recorded timelines, not evidence of completion. No supplied record establishes the project’s current physical construction stage or an issued occupancy certificate. Document index

3. Master plan, architecture & building design

The filed project information identifies a site area of 2495.26 sq. m. and approved built-up area of 8378.13 sq. m. The GHMC building-permit extraction describes Building A-1 (RESI), with a cellar, stilt and five upper floors and a sanctioned height of 14.88 m. It records 5,515.40 m² as upper-floor residential area, 1,277.21 m² as cellar area and 1,011.22 m² as stilt area. The permit extraction also records a first-floor area of 576.17; its unit is not stated in the supplied extract. RERA filing RERA filing

The approved-plan document lists a tot-lot of 245.53 m² and 120 trees. It also identifies rainwater-harvesting structures, transformer space, a garbage house and an ETP as plan-related provisions. The drawing record is not sufficient here to describe flat-per-floor arrangements, building footprint, lift or stair counts, entrances, internal circulation, or a broader open-space plan.

The 8378.13 sq. m. figure is the approved built-up area in the project information. It should not be read as apartment saleable area or carpet area. Carpet and saleable measurements are set out separately below. RERA filing Floor plans

4. Homes, configurations & floor plans

RERA records 15 two-bedroom and 25 three-bedroom apartments. The floor-plan drawings were software-measured for carpet area; these measurements are not RERA-filed areas and are flagged for review. The RERA-filed saleable area is a different measure: it includes the home’s share of common areas, whereas carpet area measures usable space within the apartment; balconies and utility areas are excluded from the drawing-based carpet measurement. RERA unit table Floor plans RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaSoftware-measured carpet areaLoading (supplied)
2BHK15015113.65 sq. m.67.4–89.2 sq. m.; median 75.5 sq. m.34%
3BHK25025169.91 sq. m.96.4–127.5 sq. m.; median 113.7 sq. m.33%

RERA unit table RERA unit details Floor plans

The measured 2BHK drawing example includes living, dining, kitchen, two bedrooms, toilets, balconies and a utility area. The measured 3BHK example includes living, dining/family, kitchen, three bedrooms, toilets and balconies. Room dimensions are drawn from individual sample plans, not a statement that every unit of that configuration has the same layout. RERA unit details

5. Parking & vehicle circulation

The building permit describes the cellar and stilt as approved for parking and requires them to be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit extraction does not give parking-space counts or identify resident, visitor or accessible spaces. The supplied records also do not establish unit-specific parking allocations, mechanical parking, EV charging, ramps or pedestrian separation. RERA filing

6. Amenities, recreation & open spaces

The following progress figures are RERA-recorded project disclosures; they are not independent verification of completion. The permit also identifies certain site provisions, noted separately in the evidence column. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot245.53 m²; permit requires it to be fenced and maintained as greenery before occupancy certificateGHMC building-permit extractionRERA “Green Strip/TOT LOT/Park”: 0%; completion not independently verified
Trees120 trees listed in the permit extractionGHMC building-permit extractionNo progress or completed status supplied
Internal roads & footpathsNo dimensions suppliedRERA infrastructure disclosure0%; not independently verified
Community buildingsNo size or capacity suppliedRERA infrastructure disclosure0%; not independently verified
Aggregate recreational open spaceNo area suppliedRERA infrastructure disclosure0%; not independently verified
Water supplyNo source, storage capacity or treatment details suppliedRERA infrastructure disclosure“YES”, 50%; not independently verified

RERA amenities

7. Utilities, building services & safety

RERA’s infrastructure disclosure records sewerage (including chamber, lines, septic tank and STP) as “YES” at 100%, storm-water drains as “YES” at 45%, rainwater harvesting/water conservation as “YES” at 30%, and electrical meter room/sub-station/receiving station as “YES” at 40%. These are disclosed progress figures, not independent completion checks. RERA amenities

The building-permit extraction lists 13 rainwater-harvesting pits, transformer space, a garbage house and an ETP. It also requires an occupancy fire NOC before issue of an occupancy certificate, and identifies construction-related requirements including worker safety and insurance. No supplied evidence establishes that the required systems or clearances have been completed or issued.

The supplied records do not establish water source or storage capacity, sewage-treatment capacity or reuse arrangements, electrical backup, lift count or capacity, firefighting equipment details, CCTV/security systems, waste-segregation arrangements, or accessibility provisions. RERA amenities

8. Location, access & connectivity

The official project record locates the site in Karmanghat village, Saroornagar mandal, Ranga Reddy district, PIN 500079. The permit identifies Padma Nagar as the locality. The supplied location record gives one sampled connection point: the nearest sampled Outer Ring Road interchange is approximately 10.0 km away. No additional measured distances, public-transport details or travel times are supplied. RERA record RERA filing Location record

9. Developer & development status

The TG-RERA registered promoter is B V R HOUSING PROJECTS, identified in the filing as a partnership. Its GSTIN is 36AAZFB2153N1ZU. The supplied promoter address is Sri Laxmi Nilayam, Central Bank Colony, Padma Nagar Karmanghat, Karmanghat, Saroornagar, Ranga Reddy, 500079. The RERA record names P. Venkat Rao as authorized signatory and lists Pagidipally Sanjay Kumar, Pagidipally Bhavani and Gunuganti Abhimanyu as partners. Corporate record Parties record

10. Approvals, official records & documents

TG-RERA registration
Supplied evidenceForm C certificate, P02400005047; validity stated as 13/09/2022–07/05/2025
Scope / noteGAYATHRI NILAYAM; certificate includes a separate-account condition. No extension is recorded in this certificate.
GHMC building permit
Supplied evidenceApproval No. 1/C4/06145/2021, dated 07 May, 2021; file No. 1/C4/23098/2019
Scope / noteBuilding A-1 (RESI), cellar + stilt + five upper floors.
Approved drawing
Supplied evidenceDrawing document 249324; stamp read from drawing text layer as 1/C4/06145/2021, dated 04-05-2021
Scope / noteDrawing stamp is recorded as needing review.
Form B declaration
Supplied evidencePromoter declaration by P. Venkat Rao as authorized signatory
Scope / noteIncludes promoter declarations about land title, encumbrances, funds and completion date; these are declarations, not independent verification.
Layout approval / plan record
Supplied evidenceRERA filing contains a layout-plan document entry, but the supplied record does not provide an extracted layout approval
Scope / noteApproval status and layout details are not established by the supplied extraction.
Occupancy / completion certificate
Supplied evidenceNot identified in the supplied documents
Scope / noteCurrent certificate status is unverified. Document index

Frequently asked questions

Is GAYATHRI NILAYAM registered with Telangana RERA?

Yes. GAYATHRI NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02400005047; the registration status is New Project.

Who is the developer of GAYATHRI NILAYAM?

The promoter named in the RERA registration is B V R HOUSING PROJECTS.

Where is GAYATHRI NILAYAM located?

GAYATHRI NILAYAM is in KARMANGHAT, Saroornagar, Rangareddy, Telangana (500079).

When will GAYATHRI NILAYAM be completed?

The promoter's proposed date of completion filed with RERA is 07/05/2025. This is the promoter's declaration, not a guarantee.

More projects in Karmanghat