ANJANI RESIDENCY is a residential apartment project in MAKTHA MAHABOOB PETA,SERILINGAMPALLE, Maredpally, Hyderabad. The registered promoter is HIMALAYA CONSTRUCTIONS. The project covers 520.79 sq. m and comprises one building with 1 Stilt + 5 upper floors and 10 units: 5 2BHK units and 5 3BHK units. It is registered under TG-RERA number P02500002955, with a proposed completion date of 19/02/2026.

More from Himalaya Constructions · 12 projects →

01What we found

Period endedTG-RERA registration ran to 19 Feb 2026 - check its extension on TG-RERA
10documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from housing.comPhoto from housing.com
▦ View all 2 photos
Maktha Mahaboob Peta, Maredpally, Hyderabad · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameANJANI RESIDENCY RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo separate phase name is stated. The RERA record identifies one building and a site in Survey No. 1; confirm the precise registered scope against the filed plans. Land records
TG-RERA registrationP02500002955 Approvals record
Registration validityCertificate states validity from 17/05/2021 to 19/02/2026; the supplied record says it is not extended. Registration validity is distinct from the completion deadline. Approvals record
Registered promoterHIMALAYA CONSTRUCTIONS, recorded as a partnership Parties record Corporate record
RERA status shown in the recordRegistered; current status after the recorded expiry date is not established by the supplied evidence. Approvals record

Land and geographic identity

FieldRecord
LocalityMAKT​HA MAHABOOB PETA, SERILINGAMPALLE (as recorded: “MAKTHA MAHABOOB PETA,SERILINGAMPALLE”) RERA record RERA filing
Revenue villageMaktha Mahaboob Peta; the building-permit extraction identifies the locality as MAKTHAMAHOOB PETA and the village as SERILINGAMPALLE. RERA record Land records
Mandal / district / PINMaredpally / Hyderabad / 500016 RERA record
Survey number(s)Survey No. 1; no subdivision is supplied. Land records
Site extentRERA land record: total and net area 520.79 sq. m. The building-permit extraction separately states site area 520.79 sq. m and net area 498.75 sq. m. Land records RERA filing
Boundaries in RERA land recordNorth: ROAD WIDTH 9; West: ROAD WIDTH 9; East and South: OTHER LAND. Land records

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building-permit approval2/C21/02696/2021, approved 19 February 2021; related file number 2/C21/07510/2020. Approvals record
Approved built-up areaRERA project fields record approved built-up area of 1424.54 sq. m. The permit extraction separately itemizes 1,187.10 m² residential upper-floor area and 223.29 m² stilt parking area; these are the extracted permit components, not a substitute for the filed approved-built-up figure. RERA filing
Building count / configurationOne building, Building - PROP-1; the GHMC permit states 1 Stilt + 5 upper floors, height 14.9 m. RERA filing
Parking levelOne stilt parking floor is recorded in the permit. A separate RERA field records mortgage area of 121.17 sq. m. RERA filing
Unit count10 units recorded in RERA unit data; the permit document states that the sanctioned number of units must not be increased without prior GHMC approval, but the supplied extraction does not give a sanctioned unit count. RERA unit table RERA unit table

Offering and status

FieldRecord
RERA-filed configurations2BHK: 5 units, saleable area 57.33 sq. m each; 3BHK: 5 units, saleable area 118.25 sq. m each. RERA unit table RERA unit table
Booked / availableRERA portal figures read: 2BHK 0 booked / 5 available; 3BHK 0 booked / 5 available. The portal record has no as-of date, so these counts are indicative rather than current confirmation. RERA unit table RERA unit table
Construction stageNo independently verified construction-stage evidence is supplied. RERA amenity-progress entries show 0% for the listed items; they do not establish overall building progress. RERA amenities
Completion deadlineThe promoter’s Form B declaration states 19/02/2026. This is the completion undertaking, not the registration-validity period.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The GHMC permit says an occupancy certificate is required before occupation. Document index

2. The project story

ANJANI RESIDENCY is recorded with TG-RERA as a residential apartment project in Survey No. 1, Maktha Mahaboob Peta, with the permit extraction locating the proposed building at Makthamahboob Peta, Serilingampalle. The RERA land record gives a site area of 520.79 sq. m and identifies one building and ten proposed units. RERA record Land records RERA unit table

The GHMC building permit describes Building - PROP-1 as a residential building of one stilt level and five upper floors, with a stated height of 14.9 m. The RERA unit schedule lists five 2BHK and five 3BHK units. No supplied evidence independently verifies construction progress, handover, or occupancy certification; the promoter’s declared completion date was 19/02/2026. RERA unit table

3. Master plan, architecture & building design

The permit extraction gives a site area of 520.79 m², net area of 498.75 m², residential upper-floor area of 1,187.10 m², and stilt parking area of 223.29 m². The RERA project fields separately report approved built-up area of 1424.54 sq. m. These figures are retained under their respective source labels; the supplied materials do not provide a verified FSI-counted area or carpet-area schedule. RERA filing

The permit lists a 70.14 m² tot-lot, 5 RWHPs, and 25 trees, and requires provision for a transformer, garbage house and ETP. It also requires a 3.5 m setback in the extracted permit data. No supplied drawing extraction establishes the building footprint, typical floor arrangement, flats per floor, number of lifts or stairs, internal circulation, or the detailed location of the tot-lot and open areas.

The RERA layout-plan document is listed, but its contents were not extracted. Accordingly, this overview cannot describe the detailed approved layout or independently verify the arrangement of building, open space and access. Document index

4. Homes, configurations & floor plans

The booking and availability figures below are the last portal figures supplied; no as-of date is attached. No drawing-based carpet measurements are available: the two floor-plan records are unmeasured scans, so room dimensions and carpet areas cannot be reported. RERA unit table RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK50557.33 sq. m eachNot measured in supplied drawingsNot supplied
3BHK505118.25 sq. m eachNot measured in supplied drawingsNot supplied

The figures above are RERA-filed saleable areas. Carpet area is a different measurement; the supplied floor-plan data contains no software-measured values, and no loading figure is provided. RERA unit table Floor plans

5. Parking & vehicle circulation

The GHMC permit records one stilt parking floor and 223.29 m² of stilt parking area. It requires the approved cellar/stilt parking spaces to be used exclusively for vehicle parking and not partitioned, shuttered or converted to another use. The supplied permit extraction does not state the number of car or two-wheeler spaces, visitor or accessible parking provision, or parking allocation to individual units. A unit-level allocation or exclusive entitlement is therefore not established here.

6. Amenities, recreation & open spaces

The GHMC permit records a tot-lot and trees, while the RERA amenity schedule lists the facilities below with 0% progress where a percentage is shown. “Available: YES” is a filed availability entry, not independent confirmation of installation or operation. RERA amenities

Green strip / tot-lot / park
Description / sizeGHMC permit specifies tot-lot 70.14 m² and requires it to be fenced and maintained as greenery before occupancy certificate.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity progress 0%; not independently verified complete.
Recreational open space
Description / sizeListed in the RERA amenity schedule; no size is supplied there.
Evidence sourceRERA amenities
Declared progress / verified status0% recorded; not independently verified complete.
Community buildings
Description / sizeListed in the RERA amenity schedule; no size or capacity supplied.
Evidence sourceRERA amenities
Declared progress / verified status0% recorded; not independently verified complete.
Internal roads and footpaths
Description / sizeListed in the RERA amenity schedule; no dimensions supplied.
Evidence sourceRERA amenities
Declared progress / verified status0% recorded; not independently verified complete.

No project-specific TG-RERA evidence supplied here confirms a clubhouse, gym, swimming pool or indoor recreation facility. RERA amenities Document index

7. Utilities, building services & safety

The GHMC permit requires five rainwater-harvesting structures (RWHPs), a transformer space, a garbage house and an ETP. The RERA amenity schedule marks water supply, sewerage, storm-water drains, rainwater harvesting, and electrical meter room/sub-station/receiving station as “YES”; it records 0% progress for each listed amenity. These are filed entries and permit conditions, not independent confirmation that systems are installed or operating. RERA amenities

The permit requires a fire NOC from the Director (EV&DM) before issue of the occupancy certificate and states that an occupancy certificate is compulsory before occupation. The supplied documents do not include the fire NOC or occupancy certificate. The available records also do not establish water-source or storage capacities, treatment capacity, electrical backup capacity, lift number or capacity, CCTV/security arrangements, waste-handling performance, or accessible circulation. Document index

8. Location, access & connectivity

The registered project record identifies Maktha Mahaboob Peta, Serilingampalle, Maredpally, Hyderabad, PIN 500016, and Survey No. 1. The cadastral parcel-centroid coordinate supplied is 17.41528, 78.35459. The RERA land record lists road-width boundaries to the north and west, each recorded as “ROAD WIDTH 9”; no road name or verified transport connection is provided in the project record. RERA record RERA filing Land records Location record

The evidence supplied does not establish project-specific distances to public transport or landmarks. The project’s official revenue location is the basis for this overview. RERA record Location record

9. Developer & development status

The registered promoter is HIMALAYA CONSTRUCTIONS, recorded as a partnership, with GSTIN 36AAIFH3683CIZF. The RERA record lists the promoter’s address as Cyberspace Apartments, Puppalaguda, Maktha Village Road, Maktha Mahaboob Peta, Serilingampalle, Maredpally, Hyderabad, 500016. It identifies AMBATI VENKATA NARASA REDDY as authorized signatory and AMBATI SIRISHA as partner. No official promoter website or contact details are supplied. Parties record Corporate record

The promoter’s Form B declaration states a completion deadline of 19/02/2026 and includes undertakings concerning project funds, approvals and allottee non-discrimination. These are promoter declarations. The supplied evidence does not independently establish construction progress, completion, or occupancy. RERA amenities

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02500002955; issued 17/05/2021; stated validity to 19/02/2026
What the supplied record establishesForm C registration for ANJANI RESIDENCY; certificate states a four-year validity period and includes a separate-account condition.
GHMC building permit order
Identifier / dateApproval 2/C21/02696/2021; approved 19 February, 2021; file 2/C21/07510/2020
What the supplied record establishesPermit extraction identifies Building - PROP-1 and a configuration of 1 Stilt + 5 upper floors, subject to listed conditions.
Form B promoter declaration
Identifier / dateCompletion undertaking 19/02/2026
What the supplied record establishesPromoter declaration concerning completion, title basis, project funds and other undertakings. The declaration date is partially illegible in the supplied extraction.
Encumbrance statement filed with RERA
Identifier / dateStatement 54870676
What the supplied record establishesFiled record lists a Development Agreement-cum-GPA and a sale-deed entry for Survey No. 1. Document index
Legal title records filed with RERA
Identifier / dateTitle report documents 154310, 160166, 160167
What the supplied record establishesFiled title-related documents, including a sale-deed record, an advocate’s title note and a development agreement-cum-GPA. Document index
Layout plan
Identifier / dateDocument 154312
What the supplied record establishesListed as a layout-plan document; contents were not extracted in the supplied evidence. Document index
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesNo project occupancy or completion certificate is included in the supplied document set. Document index

The GHMC permit lists, among its conditions, a completion notice and occupancy certificate before occupation, and a fire NOC before issue of the occupancy certificate. This overview records those permit requirements but does not determine whether they have been satisfied.

Frequently asked questions

Is ANJANI RESIDENCY registered with Telangana RERA?

Yes. ANJANI RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02500002955; the registration status is New Project.

Who is the developer of ANJANI RESIDENCY?

The promoter named in the RERA registration is HIMALAYA CONSTRUCTIONS.

Where is ANJANI RESIDENCY located?

ANJANI RESIDENCY is in MAKTHA MAHABOOB PETA,SERILINGAMPALLE, Maredpally, Hyderabad, Telangana (500016).

When will ANJANI RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 19/02/2026. This is the promoter's declaration, not a guarantee.

More projects in Maredpally