Sign in

Aarav Parkville

PRAJNASHREE BUILDERS LLP · Hyderabad · RERA P02500007352

AARAV PARKVILLE is a residential apartment project in Maredpally, Maredpally mandal, Hyderabad district. The registered promoter is PRAJNASHREE BUILDERS LLP. The project has a total plot area of 458.71 sq. m and one residential building with 1 stilt + 5 upper floors, comprising 12 3BHK units. It is registered under TG-RERA as P02500007352, with a proposed completion deadline of 4 September 2026.

01What we found

Period endedTG-RERA registration ran to 4 Sep 2026 - check its extension on TG-RERA
18documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameAARAV PARKVILLE RERA record
Project type / useResidential apartment project RERA record
Phase / registered portionPhase not separately identified; registration relates to the project at Plot No. 10-3-85/5, Plot No. 74/3
TG-RERA registrationP02500007352
Registration validity8 December 2023 to 4 September 2026; registration validity is distinct from completion and occupancy status
Registered promoterPRAJNASHREE BUILDERS LLP RERA record Corporate record
RERA statusRegistered. The supplied certificate gives the validity period above and does not record an extension

Land and geographic identity

FieldRecord
Registered localityMaredpally, Hyderabad
Revenue villageMaredpally in the project identity record; the title and approval documents also use East Marredpally / Marredpally. Exact revenue-village reconciliation is not established in the supplied records RERA record Land records
Mandal / district / PINMaredpally / Hyderabad / 500026 RERA record
Plot and house identifiersPlot No. 74/3; House No. 10-3-85/5 and 10-3-85/5/1 appear in the occupancy certificate
Survey number / subdivisionNot disclosed in the supplied project identity or approval records; the property is identified by plot and house numbers Land records
Registered site extentTotal plot area 458.71 sq. m; road-affected area 69.68 sq. m; net site area 389.03 sq. m
Boundaries in project recordNorth: PLOT; South: PLOT; East: PLOT; West: ROAD RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building permit3238/GHMC/SEC/2023-BP, approved 04 September 2023
Building configurationOne residential building: 1 stilt + 5 upper floors; no cellar or ground floor recorded in the occupancy certificate
Height14.99 metres sanctioned and recorded at completion
Approved built-up area1,152.10 sq. m sanctioned
Completion-record built-up area1,182.79 sq. m, with 30.69 sq. m recorded as deviated built-up area
Units12 units in the TG-RERA unit record; the approval extract does not state a separate sanctioned unit count RERA unit table RERA unit details
ParkingStilt parking area: 213.7 sq. m sanctioned and recorded at completion; approved parking area is not a count of parking spaces

Offering and status

FieldRecord
RERA-filed configuration3BHK; 12 units RERA unit details
RERA-filed saleable area67.0 sq. m per unit RERA unit details
Booking snapshot0 booked and 12 available in the supplied TG-RERA unit record; no as-of date is supplied, so counts are indicative RERA unit table
Declared completion deadline4 September 2026 in the project record RERA record
Occupancy certificateGHMC OC 007485/GHMC/03504/SWOC/SEC1/2025, dated 06 November 2025, for the residential building identified in the certificate as Building 1
Completion evidenceArchitect’s Form 1A dated 26 May 2026 certifies project completion; the supplied OC records completion inspection and fitness for occupation

2. The project story

AARAV PARKVILLE is a single-building residential apartment project registered under TG-RERA as P02500007352. Its records identify the site as Plot No. 74/3 at Maredpally, Hyderabad, with House Nos. 10-3-85/5 and 10-3-85/5/1 also appearing in the occupancy certificate. The site record distinguishes a total plot area of 458.71 sq. m, a 69.68 sq. m road-affected portion, and a net site area of 389.03 sq. m.

The building permit describes one residential building with a stilt and five upper floors. TG-RERA’s unit record lists twelve 3BHK apartments. An occupancy certificate was issued for Building 1, and an architect’s Form 1A records the project as completed. These are documentary completion and occupancy records; no independent site inspection or physical verification is supplied here. RERA unit table

3. Master plan, architecture & building design

The GHMC building permit sanctions a residential building named Building A (Proposed), comprising one stilt and five upper floors, with a stated height of 14.99 metres. The occupancy certificate records one building with the same floor configuration and height. The permit states an approved built-up area of 1,152.10 sq. m; the occupancy certificate records 1,182.79 sq. m at completion and 30.69 sq. m as deviated built-up area. These are the figures stated in the respective records; no further area classification is supplied.

The site area is recorded as 458.71 sq. m, including 69.68 sq. m affected by road widening, leaving a net site area of 389.03 sq. m. The permit records a stilt parking area of 213.7 sq. m and one rainwater-harvesting pit; the occupancy certificate records both at the same stated areas/quantity as completed.

No usable floor-plan measurement of individual apartment designs, room layouts, flats per floor, lift or stair arrangement, circulation, or common-area distribution is supplied. The available floor-plan record reports no measured flat designs for the 3BHK configuration. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1201267.0 sq. mNot availableNot supplied

The unit counts, booking snapshot and saleable area are from the TG-RERA unit record; the record has no as-of date, so the booking and availability figures are indicative. RERA unit details RERA unit table

The supplied drawing-review data reports two drawings measured but no measured 3BHK flat designs. It therefore provides no software-measured carpet area or room dimensions to report. RERA-filed saleable area and drawing-measured carpet area are different measures; no carpet-area figure or loading figure is available here. Floor plans

5. Parking & vehicle circulation

The GHMC permit records 213.7 sq. m of stilt parking area, and the occupancy certificate records 213.7 sq. m at completion. The building has one stilt level; the approval record identifies no cellar floors. The documents do not establish the number of parking spaces, visitor or accessible parking provision, unit-wise parking allocation, driveway or ramp arrangement, pedestrian separation, or EV-charging installation.

The building-permit conditions state that approved stilt parking is to be used exclusively for vehicle parking and refer to EV-charging infrastructure in building parking places. These are approval conditions, not evidence that a particular EV-charging facility or unit-specific parking allocation has been installed or assigned.

6. Amenities, recreation & open spaces

The supplied RERA amenity record lists project infrastructure and records 0% progress for the listed items. Its “YES” entries indicate availability in that record, not independent confirmation of completion. The building permit and occupancy certificate separately record one rainwater-harvesting pit. RERA amenities

Green strip / tot lot / park
Description / sizeNo size supplied
Evidence sourceRERA amenity record; building-permit conditions refer to a tot lot and perimeter greenery RERA amenities
Declared progress / verified statusMarked “YES” in RERA amenity record; 0% progress recorded. No independent completion verification supplied.
Community buildings
Description / sizeNo size or capacity supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified status0% progress recorded; completion not established.
Internal roads and footpaths
Description / sizeNo dimensions supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified status0% progress recorded; completion not established.
Street lighting
Description / sizeNo quantity or specification supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified status0% progress recorded; completion not established.
Rainwater harvesting
Description / sizeOne pit
Evidence sourceGHMC permit and occupancy certificate
Declared progress / verified statusOne pit recorded as sanctioned and completed in the occupancy certificate.
Water conservation / rainwater harvesting
Description / sizeNo further system details supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusMarked “YES”; 0% progress recorded.
Swimming pool, gym, clubhouse, indoor games, children’s play area, yoga area, landscape garden and tree planting
Description / sizePromoter-vendor listings; no sizes supplied
Evidence sourcePromoter website
Declared progress / verified statusMarketing/vendor claims only; no corresponding completion verification supplied.

7. Utilities, building services & safety

The GHMC building permit lists water supply, sewerage and sewage treatment/disposal, storm-water drains, solid-waste management, energy management, fire protection, and an electrical meter room/substation/receiving station among the project infrastructure categories. The RERA amenity record marks water supply as “YES” but records 0% progress; it also records 0% progress for sewerage, storm-water drainage, sewage treatment/disposal, solid-waste management, energy management, fire safety and electrical facilities. The supplied records do not state capacities, water sources, storage, treatment arrangements, backup power, lift specifications, or CCTV and access-control systems. RERA amenities

The building permit requires a rainwater-harvesting structure, transformer space and a garbage house, and sets out conditions concerning fire safety, means of escape, qualified technical supervision and an occupancy Fire NOC before issue of the occupancy certificate. The occupancy certificate records one rainwater-harvesting pit as completed. The documents supplied here do not separately evidence the detailed installed fire systems, lift provision, accessibility arrangements, or service capacities.

8. Location, access & connectivity

The registered project location is Maredpally, Hyderabad, PIN 500026. The property is identified in the building and occupancy records as Plot No. 74/3, House Nos. 10-3-85/5 and 10-3-85/5/1, East Marredpally / Marredpally. The permit references an 18-metre road and records the project’s west boundary as ROAD. RERA record RERA filing

The supplied location data lists Financial District (Nanakramguda) at 1.2 km from the recorded parcel-centroid location. No public-transport routes, additional measured distances, or verified travel times are provided. Location record

9. Developer & development status

The registered promoter is PRAJNASHREE BUILDERS LLP, an LLP. The supplied corporate identifier is GSTIN 36ABCFP5740R1ZM. The project record lists authorized signatories Sheetal Bhalla and Amar Bharat Shah. The supplied registration certificate gives a promoter-office entry of “Village: Mandal: District: Hyderabad, Pin: 500027”; a complete office street address, official contact details and official website are not established in the supplied records. Corporate record Parties record

The project’s registered completion deadline is 4 September 2026. Separately, the GHMC occupancy certificate is dated 6 November 2025, records completion on 22 September 2025, and the architect’s Form 1A dated 26 May 2026 certifies completion of the registered project. These documents identify a single building; the supplied records do not identify separate phases or towers. Documentary certification does not amount to an independent physical inspection. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02500007352; issued 8 December 2023; validity to 4 September 2026
Scope and sourceForm C for AARAV PARKVILLE and PRAJNASHREE BUILDERS LLP
GHMC building permit
Identifier / date3238/GHMC/SEC/2023-BP; 4 September 2023; file No. 002537/GHMC/1251/SEC1/2023-BP
Scope and sourceResidential building permit; one stilt + five upper floors
GHMC occupancy certificate
Identifier / date007485/GHMC/03504/SWOC/SEC1/2025; 6 November 2025
Scope and sourceOccupancy certificate for the residential building identified as Building 1 at Plot No. 74/3
Architect’s completion certificate (Form 1A)
Identifier / dateDated 26 May 2026; cites the GHMC OC above
Scope and sourceArchitect certifies completion of AARAV PARKVILLE
RERA Form B declaration
Identifier / dateDeclaration date is illegible/truncated in the extraction
Scope and sourcePromoter declaration concerning title, encumbrances, funds, approvals and completion undertaking
Approved layout plan
Identifier / dateLayout-plan document listed; extraction unavailable
Scope and sourceThe supplied record does not provide an extracted layout plan for review Document index
RERA unit record
Identifier / date3BHK; 12 units
Scope and sourceFiled configuration and area information RERA unit details

The detailed building-permit conditions and completion-record particulars are described above; this index identifies the principal project records supplied for the overview.

Frequently asked questions

Is AARAV PARKVILLE registered with Telangana RERA?

Yes. AARAV PARKVILLE is registered with the Telangana Real Estate Regulatory Authority as P02500007352; the registration status is New Project.

Who is the developer of AARAV PARKVILLE?

The promoter named in the RERA registration is PRAJNASHREE BUILDERS LLP.

Where is AARAV PARKVILLE located?

AARAV PARKVILLE is in Maredpally, Hyderabad, Telangana (500026).

When will AARAV PARKVILLE be completed?

The promoter's proposed date of completion filed with RERA is 04/09/2026. This is the promoter's declaration, not a guarantee.

More projects in Maredpally