Aarav Parkville
PRAJNASHREE BUILDERS LLP · Hyderabad · RERA P02500007352
AARAV PARKVILLE is a residential apartment project in Maredpally, Maredpally mandal, Hyderabad district. The registered promoter is PRAJNASHREE BUILDERS LLP. The project has a total plot area of 458.71 sq. m and one residential building with 1 stilt + 5 upper floors, comprising 12 3BHK units. It is registered under TG-RERA as P02500007352, with a proposed completion deadline of 4 September 2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | AARAV PARKVILLE RERA record |
| Project type / use | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately identified; registration relates to the project at Plot No. 10-3-85/5, Plot No. 74/3 |
| TG-RERA registration | P02500007352 |
| Registration validity | 8 December 2023 to 4 September 2026; registration validity is distinct from completion and occupancy status |
| Registered promoter | PRAJNASHREE BUILDERS LLP RERA record Corporate record |
| RERA status | Registered. The supplied certificate gives the validity period above and does not record an extension |
Land and geographic identity
| Field | Record |
|---|---|
| Registered locality | Maredpally, Hyderabad |
| Revenue village | Maredpally in the project identity record; the title and approval documents also use East Marredpally / Marredpally. Exact revenue-village reconciliation is not established in the supplied records RERA record Land records |
| Mandal / district / PIN | Maredpally / Hyderabad / 500026 RERA record |
| Plot and house identifiers | Plot No. 74/3; House No. 10-3-85/5 and 10-3-85/5/1 appear in the occupancy certificate |
| Survey number / subdivision | Not disclosed in the supplied project identity or approval records; the property is identified by plot and house numbers Land records |
| Registered site extent | Total plot area 458.71 sq. m; road-affected area 69.68 sq. m; net site area 389.03 sq. m |
| Boundaries in project record | North: PLOT; South: PLOT; East: PLOT; West: ROAD RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building permit | 3238/GHMC/SEC/2023-BP, approved 04 September 2023 |
| Building configuration | One residential building: 1 stilt + 5 upper floors; no cellar or ground floor recorded in the occupancy certificate |
| Height | 14.99 metres sanctioned and recorded at completion |
| Approved built-up area | 1,152.10 sq. m sanctioned |
| Completion-record built-up area | 1,182.79 sq. m, with 30.69 sq. m recorded as deviated built-up area |
| Units | 12 units in the TG-RERA unit record; the approval extract does not state a separate sanctioned unit count RERA unit table RERA unit details |
| Parking | Stilt parking area: 213.7 sq. m sanctioned and recorded at completion; approved parking area is not a count of parking spaces |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | 3BHK; 12 units RERA unit details |
| RERA-filed saleable area | 67.0 sq. m per unit RERA unit details |
| Booking snapshot | 0 booked and 12 available in the supplied TG-RERA unit record; no as-of date is supplied, so counts are indicative RERA unit table |
| Declared completion deadline | 4 September 2026 in the project record RERA record |
| Occupancy certificate | GHMC OC 007485/GHMC/03504/SWOC/SEC1/2025, dated 06 November 2025, for the residential building identified in the certificate as Building 1 |
| Completion evidence | Architect’s Form 1A dated 26 May 2026 certifies project completion; the supplied OC records completion inspection and fitness for occupation |
2. The project story
AARAV PARKVILLE is a single-building residential apartment project registered under TG-RERA as P02500007352. Its records identify the site as Plot No. 74/3 at Maredpally, Hyderabad, with House Nos. 10-3-85/5 and 10-3-85/5/1 also appearing in the occupancy certificate. The site record distinguishes a total plot area of 458.71 sq. m, a 69.68 sq. m road-affected portion, and a net site area of 389.03 sq. m.
The building permit describes one residential building with a stilt and five upper floors. TG-RERA’s unit record lists twelve 3BHK apartments. An occupancy certificate was issued for Building 1, and an architect’s Form 1A records the project as completed. These are documentary completion and occupancy records; no independent site inspection or physical verification is supplied here. RERA unit table
3. Master plan, architecture & building design
The GHMC building permit sanctions a residential building named Building A (Proposed), comprising one stilt and five upper floors, with a stated height of 14.99 metres. The occupancy certificate records one building with the same floor configuration and height. The permit states an approved built-up area of 1,152.10 sq. m; the occupancy certificate records 1,182.79 sq. m at completion and 30.69 sq. m as deviated built-up area. These are the figures stated in the respective records; no further area classification is supplied.
The site area is recorded as 458.71 sq. m, including 69.68 sq. m affected by road widening, leaving a net site area of 389.03 sq. m. The permit records a stilt parking area of 213.7 sq. m and one rainwater-harvesting pit; the occupancy certificate records both at the same stated areas/quantity as completed.
No usable floor-plan measurement of individual apartment designs, room layouts, flats per floor, lift or stair arrangement, circulation, or common-area distribution is supplied. The available floor-plan record reports no measured flat designs for the 3BHK configuration. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 12 | 0 | 12 | 67.0 sq. m | Not available | Not supplied |
The unit counts, booking snapshot and saleable area are from the TG-RERA unit record; the record has no as-of date, so the booking and availability figures are indicative. RERA unit details RERA unit table
The supplied drawing-review data reports two drawings measured but no measured 3BHK flat designs. It therefore provides no software-measured carpet area or room dimensions to report. RERA-filed saleable area and drawing-measured carpet area are different measures; no carpet-area figure or loading figure is available here. Floor plans
5. Parking & vehicle circulation
The GHMC permit records 213.7 sq. m of stilt parking area, and the occupancy certificate records 213.7 sq. m at completion. The building has one stilt level; the approval record identifies no cellar floors. The documents do not establish the number of parking spaces, visitor or accessible parking provision, unit-wise parking allocation, driveway or ramp arrangement, pedestrian separation, or EV-charging installation.
The building-permit conditions state that approved stilt parking is to be used exclusively for vehicle parking and refer to EV-charging infrastructure in building parking places. These are approval conditions, not evidence that a particular EV-charging facility or unit-specific parking allocation has been installed or assigned.
6. Amenities, recreation & open spaces
The supplied RERA amenity record lists project infrastructure and records 0% progress for the listed items. Its “YES” entries indicate availability in that record, not independent confirmation of completion. The building permit and occupancy certificate separately record one rainwater-harvesting pit. RERA amenities
| Description / size | No size supplied |
|---|---|
| Evidence source | RERA amenity record; building-permit conditions refer to a tot lot and perimeter greenery RERA amenities |
| Declared progress / verified status | Marked “YES” in RERA amenity record; 0% progress recorded. No independent completion verification supplied. |
| Description / size | No size or capacity supplied |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | 0% progress recorded; completion not established. |
| Description / size | No dimensions supplied |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | 0% progress recorded; completion not established. |
| Description / size | No quantity or specification supplied |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | 0% progress recorded; completion not established. |
| Description / size | One pit |
|---|---|
| Evidence source | GHMC permit and occupancy certificate |
| Declared progress / verified status | One pit recorded as sanctioned and completed in the occupancy certificate. |
| Description / size | No further system details supplied |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | Marked “YES”; 0% progress recorded. |
| Description / size | Promoter-vendor listings; no sizes supplied |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Marketing/vendor claims only; no corresponding completion verification supplied. |
7. Utilities, building services & safety
The GHMC building permit lists water supply, sewerage and sewage treatment/disposal, storm-water drains, solid-waste management, energy management, fire protection, and an electrical meter room/substation/receiving station among the project infrastructure categories. The RERA amenity record marks water supply as “YES” but records 0% progress; it also records 0% progress for sewerage, storm-water drainage, sewage treatment/disposal, solid-waste management, energy management, fire safety and electrical facilities. The supplied records do not state capacities, water sources, storage, treatment arrangements, backup power, lift specifications, or CCTV and access-control systems. RERA amenities
The building permit requires a rainwater-harvesting structure, transformer space and a garbage house, and sets out conditions concerning fire safety, means of escape, qualified technical supervision and an occupancy Fire NOC before issue of the occupancy certificate. The occupancy certificate records one rainwater-harvesting pit as completed. The documents supplied here do not separately evidence the detailed installed fire systems, lift provision, accessibility arrangements, or service capacities.
8. Location, access & connectivity
The registered project location is Maredpally, Hyderabad, PIN 500026. The property is identified in the building and occupancy records as Plot No. 74/3, House Nos. 10-3-85/5 and 10-3-85/5/1, East Marredpally / Marredpally. The permit references an 18-metre road and records the project’s west boundary as ROAD. RERA record RERA filing
The supplied location data lists Financial District (Nanakramguda) at 1.2 km from the recorded parcel-centroid location. No public-transport routes, additional measured distances, or verified travel times are provided. Location record
9. Developer & development status
The registered promoter is PRAJNASHREE BUILDERS LLP, an LLP. The supplied corporate identifier is GSTIN 36ABCFP5740R1ZM. The project record lists authorized signatories Sheetal Bhalla and Amar Bharat Shah. The supplied registration certificate gives a promoter-office entry of “Village: Mandal: District: Hyderabad, Pin: 500027”; a complete office street address, official contact details and official website are not established in the supplied records. Corporate record Parties record
The project’s registered completion deadline is 4 September 2026. Separately, the GHMC occupancy certificate is dated 6 November 2025, records completion on 22 September 2025, and the architect’s Form 1A dated 26 May 2026 certifies completion of the registered project. These documents identify a single building; the supplied records do not identify separate phases or towers. Documentary certification does not amount to an independent physical inspection. RERA record
10. Approvals, official records & documents
| Identifier / date | P02500007352; issued 8 December 2023; validity to 4 September 2026 |
|---|---|
| Scope and source | Form C for AARAV PARKVILLE and PRAJNASHREE BUILDERS LLP |
| Identifier / date | 3238/GHMC/SEC/2023-BP; 4 September 2023; file No. 002537/GHMC/1251/SEC1/2023-BP |
|---|---|
| Scope and source | Residential building permit; one stilt + five upper floors |
| Identifier / date | 007485/GHMC/03504/SWOC/SEC1/2025; 6 November 2025 |
|---|---|
| Scope and source | Occupancy certificate for the residential building identified as Building 1 at Plot No. 74/3 |
| Identifier / date | Dated 26 May 2026; cites the GHMC OC above |
|---|---|
| Scope and source | Architect certifies completion of AARAV PARKVILLE |
| Identifier / date | Declaration date is illegible/truncated in the extraction |
|---|---|
| Scope and source | Promoter declaration concerning title, encumbrances, funds, approvals and completion undertaking |
| Identifier / date | Layout-plan document listed; extraction unavailable |
|---|---|
| Scope and source | The supplied record does not provide an extracted layout plan for review Document index |
| Identifier / date | 3BHK; 12 units |
|---|---|
| Scope and source | Filed configuration and area information RERA unit details |
The detailed building-permit conditions and completion-record particulars are described above; this index identifies the principal project records supplied for the overview.
1. Project at a glance
Project identity
Registered project name: AARAV PARKVILLE
Project type / use: Residential apartment project
Phase / registered portion: Phase not separately identified; registration relates to the project at Plot No. 10-3-85/5, Plot No. 74/3
TG-RERA registration: P02500007352
Registration validity: 8 December 2023 to 4 September 2026; registration validity is distinct from completion and occupancy status
Registered promoter: PRAJNASHREE BUILDERS LLP
RERA status: Registered. The supplied certificate gives the validity period above and does not record an extension
Land and geographic identity
Registered locality: Maredpally, Hyderabad
Revenue village: Maredpally in the project identity record; the title and approval documents also use East Marredpally / Marredpally. Exact revenue-village reconciliation is not established in the supplied records
Mandal / district / PIN: Maredpally / Hyderabad / 500026
Plot and house identifiers: Plot No. 74/3; House No. 10-3-85/5 and 10-3-85/5/1 appear in the occupancy certificate
Survey number / subdivision: Not disclosed in the supplied project identity or approval records; the property is identified by plot and house numbers
Registered site extent: Total plot area 458.71 sq. m; road-affected area 69.68 sq. m; net site area 389.03 sq. m
Boundaries in project record: North: PLOT; South: PLOT; East: PLOT; West: ROAD
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building permit: 3238/GHMC/SEC/2023-BP, approved 04 September 2023
Building configuration: One residential building: 1 stilt + 5 upper floors; no cellar or ground floor recorded in the occupancy certificate
Height: 14.99 metres sanctioned and recorded at completion
Approved built-up area: 1,152.10 sq. m sanctioned
Completion-record built-up area: 1,182.79 sq. m, with 30.69 sq. m recorded as deviated built-up area
Units: 12 units in the TG-RERA unit record; the approval extract does not state a separate sanctioned unit count
Parking: Stilt parking area: 213.7 sq. m sanctioned and recorded at completion; approved parking area is not a count of parking spaces
Offering and status
RERA-filed configuration: 3BHK; 12 units
RERA-filed saleable area: 67.0 sq. m per unit
Booking snapshot: 0 booked and 12 available in the supplied TG-RERA unit record; no as-of date is supplied, so counts are indicative
Declared completion deadline: 4 September 2026 in the project record
Occupancy certificate: GHMC OC 007485/GHMC/03504/SWOC/SEC1/2025, dated 06 November 2025, for the residential building identified in the certificate as Building 1
Completion evidence: Architect’s Form 1A dated 26 May 2026 certifies project completion; the supplied OC records completion inspection and fitness for occupation
2. The project story
AARAV PARKVILLE is a single-building residential apartment project registered under TG-RERA as P02500007352. Its records identify the site as Plot No. 74/3 at Maredpally, Hyderabad, with House Nos. 10-3-85/5 and 10-3-85/5/1 also appearing in the occupancy certificate. The site record distinguishes a total plot area of 458.71 sq. m, a 69.68 sq. m road-affected portion, and a net site area of 389.03 sq. m.
The building permit describes one residential building with a stilt and five upper floors. TG-RERA’s unit record lists twelve 3BHK apartments. An occupancy certificate was issued for Building 1, and an architect’s Form 1A records the project as completed. These are documentary completion and occupancy records; no independent site inspection or physical verification is supplied here.
3. Master plan, architecture & building design
The GHMC building permit sanctions a residential building named Building A (Proposed), comprising one stilt and five upper floors, with a stated height of 14.99 metres. The occupancy certificate records one building with the same floor configuration and height. The permit states an approved built-up area of 1,152.10 sq. m; the occupancy certificate records 1,182.79 sq. m at completion and 30.69 sq. m as deviated built-up area. These are the figures stated in the respective records; no further area classification is supplied.
The site area is recorded as 458.71 sq. m, including 69.68 sq. m affected by road widening, leaving a net site area of 389.03 sq. m. The permit records a stilt parking area of 213.7 sq. m and one rainwater-harvesting pit; the occupancy certificate records both at the same stated areas/quantity as completed.
No usable floor-plan measurement of individual apartment designs, room layouts, flats per floor, lift or stair arrangement, circulation, or common-area distribution is supplied. The available floor-plan record reports no measured flat designs for the 3BHK configuration.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 12 | 0 | 12 | 67.0 sq. m | Not available | Not supplied |
The unit counts, booking snapshot and saleable area are from the TG-RERA unit record; the record has no as-of date, so the booking and availability figures are indicative.
The supplied drawing-review data reports two drawings measured but no measured 3BHK flat designs. It therefore provides no software-measured carpet area or room dimensions to report. RERA-filed saleable area and drawing-measured carpet area are different measures; no carpet-area figure or loading figure is available here.
5. Parking & vehicle circulation
The GHMC permit records 213.7 sq. m of stilt parking area, and the occupancy certificate records 213.7 sq. m at completion. The building has one stilt level; the approval record identifies no cellar floors. The documents do not establish the number of parking spaces, visitor or accessible parking provision, unit-wise parking allocation, driveway or ramp arrangement, pedestrian separation, or EV-charging installation.
The building-permit conditions state that approved stilt parking is to be used exclusively for vehicle parking and refer to EV-charging infrastructure in building parking places. These are approval conditions, not evidence that a particular EV-charging facility or unit-specific parking allocation has been installed or assigned.
6. Amenities, recreation & open spaces
The supplied RERA amenity record lists project infrastructure and records 0% progress for the listed items. Its “YES” entries indicate availability in that record, not independent confirmation of completion. The building permit and occupancy certificate separately record one rainwater-harvesting pit.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | No size supplied | RERA amenity record; building-permit conditions refer to a tot lot and perimeter greenery | Marked “YES” in RERA amenity record; 0% progress recorded. No independent completion verification supplied. |
| Community buildings | No size or capacity supplied | RERA amenity record | 0% progress recorded; completion not established. |
| Internal roads and footpaths | No dimensions supplied | RERA amenity record | 0% progress recorded; completion not established. |
| Street lighting | No quantity or specification supplied | RERA amenity record | 0% progress recorded; completion not established. |
| Rainwater harvesting | One pit | GHMC permit and occupancy certificate | One pit recorded as sanctioned and completed in the occupancy certificate. |
| Water conservation / rainwater harvesting | No further system details supplied | RERA amenity record | Marked “YES”; 0% progress recorded. |
| Swimming pool, gym, clubhouse, indoor games, children’s play area, yoga area, landscape garden and tree planting | Promoter-vendor listings; no sizes supplied | Marketing/vendor claims only; no corresponding completion verification supplied. |
7. Utilities, building services & safety
The GHMC building permit lists water supply, sewerage and sewage treatment/disposal, storm-water drains, solid-waste management, energy management, fire protection, and an electrical meter room/substation/receiving station among the project infrastructure categories. The RERA amenity record marks water supply as “YES” but records 0% progress; it also records 0% progress for sewerage, storm-water drainage, sewage treatment/disposal, solid-waste management, energy management, fire safety and electrical facilities. The supplied records do not state capacities, water sources, storage, treatment arrangements, backup power, lift specifications, or CCTV and access-control systems.
The building permit requires a rainwater-harvesting structure, transformer space and a garbage house, and sets out conditions concerning fire safety, means of escape, qualified technical supervision and an occupancy Fire NOC before issue of the occupancy certificate. The occupancy certificate records one rainwater-harvesting pit as completed. The documents supplied here do not separately evidence the detailed installed fire systems, lift provision, accessibility arrangements, or service capacities.
8. Location, access & connectivity
The registered project location is Maredpally, Hyderabad, PIN 500026. The property is identified in the building and occupancy records as Plot No. 74/3, House Nos. 10-3-85/5 and 10-3-85/5/1, East Marredpally / Marredpally. The permit references an 18-metre road and records the project’s west boundary as ROAD.
The supplied location data lists Financial District (Nanakramguda) at 1.2 km from the recorded parcel-centroid location. No public-transport routes, additional measured distances, or verified travel times are provided.
9. Developer & development status
The registered promoter is PRAJNASHREE BUILDERS LLP, an LLP. The supplied corporate identifier is GSTIN 36ABCFP5740R1ZM. The project record lists authorized signatories Sheetal Bhalla and Amar Bharat Shah. The supplied registration certificate gives a promoter-office entry of “Village: Mandal: District: Hyderabad, Pin: 500027”; a complete office street address, official contact details and official website are not established in the supplied records.
The project’s registered completion deadline is 4 September 2026. Separately, the GHMC occupancy certificate is dated 6 November 2025, records completion on 22 September 2025, and the architect’s Form 1A dated 26 May 2026 certifies completion of the registered project. These documents identify a single building; the supplied records do not identify separate phases or towers. Documentary certification does not amount to an independent physical inspection.
10. Approvals, official records & documents
| Identifier / date | P02500007352; issued 8 December 2023; validity to 4 September 2026 |
|---|---|
| Scope and source | Form C for AARAV PARKVILLE and PRAJNASHREE BUILDERS LLP |
| Identifier / date | 3238/GHMC/SEC/2023-BP; 4 September 2023; file No. 002537/GHMC/1251/SEC1/2023-BP |
|---|---|
| Scope and source | Residential building permit; one stilt + five upper floors |
| Identifier / date | 007485/GHMC/03504/SWOC/SEC1/2025; 6 November 2025 |
|---|---|
| Scope and source | Occupancy certificate for the residential building identified as Building 1 at Plot No. 74/3 |
| Identifier / date | Dated 26 May 2026; cites the GHMC OC above |
|---|---|
| Scope and source | Architect certifies completion of AARAV PARKVILLE |
| Identifier / date | Declaration date is illegible/truncated in the extraction |
|---|---|
| Scope and source | Promoter declaration concerning title, encumbrances, funds, approvals and completion undertaking |
| Identifier / date | Layout-plan document listed; extraction unavailable |
|---|---|
| Scope and source | The supplied record does not provide an extracted layout plan for review |
| Identifier / date | 3BHK; 12 units |
|---|---|
| Scope and source | Filed configuration and area information |
The detailed building-permit conditions and completion-record particulars are described above; this index identifies the principal project records supplied for the overview.
Frequently asked questions
Is AARAV PARKVILLE registered with Telangana RERA?
Yes. AARAV PARKVILLE is registered with the Telangana Real Estate Regulatory Authority as P02500007352; the registration status is New Project.
Who is the developer of AARAV PARKVILLE?
The promoter named in the RERA registration is PRAJNASHREE BUILDERS LLP.
Where is AARAV PARKVILLE located?
AARAV PARKVILLE is in Maredpally, Hyderabad, Telangana (500026).
When will AARAV PARKVILLE be completed?
The promoter's proposed date of completion filed with RERA is 04/09/2026. This is the promoter's declaration, not a guarantee.
More projects in Maredpally







