Sign in

Gk S Majestic

G K CONSTRUCTIONS COMPANY · Medchal-Malkajgiri · RERA P02200003128

GK S MAJESTIC is a residential apartment project in Yapral, Alwal mandal, Medchal-Malkajgiri district, developed by registered promoter G K Constructions Company. The project covers 545 m² and comprises one residential building, Building A, with 1 stilt + 5 upper floors. The TG-RERA filing lists 10 3BHK units, each with a saleable area of 78.78 m². Its TG-RERA registration is P02200003128, and its proposed completion date is 04/02/2025.

More from G K Constructions Company · 2 projects →

01What we found

Period endedTG-RERA registration ran to 4 Feb 2025 - check its extension on TG-RERA
15documents on file - each fact links to its page
4court cases on this project's land (survey 198, 199, Yapral)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemProject record
Registered project nameGK S MAJESTIC
Project type / registered portionResidential apartment project; one registered project/building is identified. No separate phase name is disclosed. RERA record
TG-RERA registrationP02200003128; valid from 24/07/2021 to 04/02/2025. The certificate records no extension.
Registered promoterG K Constructions Company; entity type recorded as Partnership. Corporate record RERA filing
Registration statusTG-RERA certificate states registration for three years ending 04/02/2025 unless extended. The supplied record contains no extension. Registration validity is distinct from the project’s occupancy-certificate status.

Land and geographic identity

ItemProject record
Locality / revenue villageYapral; the supplied records identify Yapral Village. RERA record Land records
Mandal / district / PINAlwal / Medchal-Malkajgiri / 500087. RERA record
Project survey numbersSy. Nos. 198 and 199; the supplied project records do not state subdivisions. Land records
Plot referencePlot Nos. 174 part, 175. RERA filing
Registered site extent545 m² (also recorded as 545.00 m²); net area 545 m².
Boundaries in the RERA filingNorth: ROAD WIDTH 9; South: PLOT NO 147 148PART; East: PLOT NO 172; West: PLOT NO 173 174. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC).
Principal building approvalBuilding Permit No. 2/C28/02086/2019, dated 04 February, 2019. The permit also identifies File No. 2/C28/00210/2019.
Approved built-up/floor areaThe permit records 1,377.25 m² for five residential upper floors and 264.82 m² for the stilt; it separately records the approved built-up area in the project filing as 1,652.70 m². These are reported as recorded, not recalculated. RERA filing
Building and floorsOne building, Building A: 1 stilt + 5 upper floors, residential; sanctioned height 15.00 m. No basement/cellar floor is recorded in the permit parameters.
Approved versus RERA-declared unitsGHMC sanction records that the number of units must not be increased without prior approval, but the supplied permit extract does not give a unit count. The RERA record lists 10 units. RERA unit table
ParkingThe permit conditions say the approved stilt and any cellar are to be used exclusively for vehicle parking; the supplied extract does not establish a parking-space count or unit allocations.

Offering and status

ItemProject record
RERA-filed configuration3BHK; 10 units; RERA-filed saleable area 78.78 m² per unit. RERA unit table RERA unit details
Booked / available10 booked, 0 available, as last read from the TG-RERA portal; the portal record has no as-of date, so counts are indicative. RERA unit table
Completion timelineTG-RERA certificate and Form B record a completion date of 04/02/2025. The building permit also states completion before 04 February, 2025.
Occupancy certificateGHMC occupancy-certificate records identify the building at Plot Nos. 174 part, 175, Sy. Nos. 198 and 199, Yapral, as fit for occupation; the certificate record is dated 18/05/2022. The supplied OC documents describe the single stilt-plus-five-floor building, rather than a multi-tower phase.

The project story

GK S MAJESTIC is registered with TG-RERA as a residential apartment project in Yapral, on Plot Nos. 174 part and 175, Sy. Nos. 198 and 199. The GHMC building permit describes one residential building, Building A, with a stilt and five upper floors. The RERA filing lists 10 3BHK units. RERA record Land records RERA unit table

The supplied GHMC occupancy-certificate records state that the inspected stilt-plus-five-floor building was fit for occupation, with an OC dated 18/05/2022. This is documentary evidence of an occupancy-certified building, not an independent current-site inspection. The TG-RERA registration certificate records a completion deadline of 04/02/2025 and validity ending on that date unless extended; no extension is present in the supplied record.

Master plan, architecture & building design

The project record identifies a 545 m² site and one sanctioned residential building. The GHMC permit describes a 15.00 m-high building with one stilt and five upper floors. The permit records 1,377.25 m² for the residential upper floors and 264.82 m² for the stilt; the RERA filing separately reports approved built-up area of 1,652.70 m². These are distinct recorded area figures; the supplied materials do not provide a verified FSI-counted area, carpet-area schedule or detailed floor-by-floor plan description. RERA filing

The permit conditions require the sanctioned plan to be followed and prior approval for modifications. They also specify a tot-lot and peripheral greenery conditions, but the permit’s listed tot-lot area is 0 m². The supplied evidence does not establish a building arrangement beyond the single-building description, nor does it provide verified details of flats per floor, lift/stair configuration, internal circulation or landscaped/open-space area.

Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1010078.78 m²Not established from the supplied drawing-measurement recordNot supplied

The unit count, booking status and saleable area are TG-RERA filing values; the booking record has no as-of date. Although two drawings are recorded as measured, the supplied floor-plan data reports no measured 3BHK flat designs, so no drawing-based carpet area or room dimensions can be stated. Carpet area and RERA saleable area are different measures; the supplied evidence does not give a verified loading figure. RERA unit table RERA unit details Floor plans

Parking & vehicle circulation

The GHMC permit requires the approved stilt and any cellar parking area to be used exclusively for vehicle parking and not partitioned or converted to another use. The permit parameters record 0 cellar parking-floor area; the supplied records do not provide the number of sanctioned bays, visitor or accessible spaces, or unit-wise parking allocations.

A vendor listing describes covered car parking and wide parking driveways, but these are vendor-reported details, not a documented bay count or legal allocation. The vendor also mentions an EV charging point at extra cost; the supplied permit and RERA records do not establish its installation. Promoter website

Amenities, recreation & open spaces

Tot-lot / greenery
Description / sizeGHMC permit condition calls for a fenced tot-lot maintained as greenery; recorded tot-lot area is 0 m².
Declared progress / verified statusRequired by permit condition; delivery not independently verified.
Peripheral tree planting
Description / sizePermit records 25 trees and requires tree planting along the periphery and in front of the premises.
Declared progress / verified statusPermit record; current planting status not verified.
Rainwater harvesting
Description / sizePercolation pit required by the permit; the OC record also lists rainwater harvesting.
Declared progress / verified statusIncluded in approval/OC records; operation not independently verified.
Water supply, sewerage and storm-water drains
Description / sizeRERA amenity record marks each “YES” at 100%; an OC-related record also lists water supply, sewerage and storm-water drains.
Evidence sourceRERA amenities
Declared progress / verified statusPortal-declared completion and document-listed services; not independently inspected.
Electrical meter room / substation / receiving station
Description / sizeRERA amenity record marks “YES” at 100%; the permit requires space for a transformer.
Evidence sourceRERA amenities
Declared progress / verified statusPortal-declared completion; not independently inspected.
CCTV, gated community, lift, covered parking and common-area backup
Description / sizeVendor-listed amenities.
Evidence sourcePromoter website
Declared progress / verified statusMarketing/vendor claims; delivery not verified in the supplied project records.

Utilities, building services & safety

The RERA amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting, and electrical meter room/substation/receiving station as available at 100%. This is a portal-reported status, not an independent operational test. RERA amenities

The GHMC permit requires an ETP, a rainwater-harvesting percolation pit, transformer space and a garbage house. It also specifies fire-safety measures, including a manual alarm system, hose reel/down-comer, emergency lighting, fire extinguishers, separate underground and terrace water tanks of 25,000 litres each, and a sprinkler system if basement area exceeds 200 m². These are permit conditions; the supplied material does not independently verify installation or capacities on site.

The permit requires one entry and one exit, each with minimum width of 4.5 m and height clearance of 5 m, and fire-resistant swing doors for collapsible lifts. The vendor separately describes passenger and service lifts, generator backup, CCTV, intercom and accessibility ramps, but these are vendor claims and are not confirmed as installed by the supplied approval records. Promoter website

Location, access & connectivity

The official project location is Yapral, Alwal Mandal, Medchal-Malkajgiri District, PIN 500087; the registered land references are Plot Nos. 174 part and 175 in Sy. Nos. 198 and 199. RERA record Land records

The supplied location record places the project parcel centroid at 17.50889, 78.53670 and lists the nearest sampled Outer Ring Road interchange at approximately 4.3 km. The vendor listing describes the project as behind Wipro SEZ, just off Yapral; that is a vendor-provided location description. No other verified road, public-transport or landmark distances are supplied. Location record Promoter website

Developer & development status

The registered promoter is G K Constructions Company, recorded as a partnership. The RERA filing lists partners Deepa Ramaswami Darvin and Ramaswamy Mallaya Darwin, and authorized signatory Hanumantha Rao Katikaneni. The supplied registration certificate gives a promoter-office PIN of 500094; the project PIN is 500087. A complete registered-office street address and official contact details are not established in the supplied evidence. Corporate record Parties record

TG-RERA records 10 units, all booked and none available, but the portal record has no as-of date. The GHMC occupancy-certificate record identifies a single stilt-plus-five-floor building as fit for occupation, with the certificate dated 18/05/2022. No current construction-progress inspection is supplied. RERA unit table

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200003128; issued 24/07/2021; validity recorded through 04/02/2025 unless extended
Scope and evidenceGK S MAJESTIC; registered promoter G K Constructions Company; certificate records no extension.
GHMC building permit order
Identifier / dateApproval No. 2/C28/02086/2019; 04 February, 2019; File No. 2/C28/00210/2019
Scope and evidenceBuilding A, residential, Sy. Nos. 198 and 199, Yapral; one stilt plus five upper floors.
GHMC occupancy certificate
Identifier / dateApplication No. 004358/GHMC/2217/SEC2/2022-OC; Proceedings No. 1466/GHMC/SEC/2022-OC; 18/05/2022
Scope and evidenceIdentifies Plot Nos. 174 part, 175 and Sy. Nos. 198 and 199, Yapral; records the building as fit for occupation.
RERA-filed title report
Identifier / date25 May 2021
Scope and evidenceConcerns Plot Nos. 174 part and 175, 652.00 sq. yards in Sy. Nos. 198 and 199, Yapral.
RERA-filed development agreement-cum-GPA
Identifier / dateDocument No. 2002 of 2020; 20 March 2020
Scope and evidenceDescribes a development arrangement concerning 652 sq. yards in Plot Nos. 174 part and 175, Sy. Nos. 198 and 199, Yapral.
RERA-filed layout plan
Identifier / dateDocument 163234
Scope and evidenceListed in the filing, but not extracted as a readable plan in the supplied record.

Frequently asked questions

Is GK S MAJESTIC registered with Telangana RERA?

Yes. GK S MAJESTIC is registered with the Telangana Real Estate Regulatory Authority as P02200003128; the registration status is New Project.

Who is the developer of GK S MAJESTIC?

The promoter named in the RERA registration is G K CONSTRUCTIONS COMPANY.

Where is GK S MAJESTIC located?

GK S MAJESTIC is in YAPRAL, Alwal, Medchal-Malkajgiri, Telangana (500087).

When will GK S MAJESTIC be completed?

The promoter's proposed date of completion filed with RERA is 04/02/2025. This is the promoter's declaration, not a guarantee.

More projects in Yapral