Sign in

Navnit Nirman Hmt Arcade

NAVNIT NIRMAN · Rangareddy · RERA P02400003482

NAVNIT NIRMAN HMT ARCADE is a residential apartment project in Vanasthalipuram, Hayathnagar Mandal, Ranga Reddy District. It is being developed by the registered promoter NAVNIT NIRMAN on a site of 669.05 sq m, with one residential building comprising 1 Stilt + 5 upper floors. The TG-RERA filing records 15 3BHK units, each with a saleable area of 88.04 sq m. Its TG-RERA registration number is P02400003482, and its proposed completion date is 30/11/2026.

01What we found

Period endedTG-RERA registration ran to 1 Jul 2026 - check its extension on TG-RERA
13documents on file - each fact links to its page
62court cases on this project's land (survey 2, 3, 4, 6, 7, 8, Saheb Nagar)
12items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameNAVNIT NIRMAN HMT ARCADE RERA record
Project type / phaseResidential apartment project; phase or registered-portion designation is not disclosed. RERA record RERA filing
TG-RERA registrationP02400003482; certificate issued 24/09/2021; certificate states validity from 24/09/2021 to 01/07/2026 and records no extension. This is registration validity, not the completion deadline. The record does not establish the project’s current registration status after 01/07/2026.
Registered promoterNAVNIT NIRMAN (also styled M/s. NAVNIT NIRMAN in filed documents); RERA record identifies the organization type as a partnership. RERA record RERA filing

Land and geographic identity

ItemProject record
Locality / site descriptionVanasthalipuram; Andhra Kesari Nagar is the locality stated in the GHMC building permit. RERA record
Revenue villageSAHEB NAGAR in the project identity; the RERA certificate and permit refer to SAHEBNAGAR KALAN. RERA record
Mandal / district / PINHayathnagar / Ranga Reddy / 500070. RERA record RERA filing
Project survey numbers2, 3, 4, 5, 6, 7-PART & 8-PART. RERA record Land records
Plot identificationPlot Nos. 139-EASTREN & WESTREN PART, 140-EASTREN & WESTREN PART AND 141 (as recorded in the RERA certificate). RERA filing
Site extentRERA land details: total area 669.05 sq m, net area 669.05 sq m. GHMC permit: site area 669.05 sq m, net area 666.4 sq m. RERA filing
Boundaries in RERA filingEast: Plot No. 142; West: road width 9; North: Sy. No. 8 Part; South: road width 9. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC).
Principal building approvalBuilding Permit No. 2/C3/08190/2021; File No. 2/C3/05432/2021; dated 02 July, 2021. Approvals record
Building / floorsOne proposed residential building; sanctioned configuration is 1 Stilt + 5 upper floors. The permit states height 15 m.
Approved area figuresPermit states upper-floor residential area 1,592.85 sq m, stilt parking area 305.59 sq m, site area 669.05 sq m, and net area 666.4 sq m. The permit also contains the extracted figures “Proposed Covered builtup area 111,500.00” and “TOTAL: 1,551,858.00”; their meaning or units are not clear in the supplied extraction.
Unit countsGHMC condition: sanctioned unit count must not be increased without prior approval; the extracted permit does not give a legible count. TG-RERA filing records 15 units. RERA unit table

Offering and status

ItemProject record
RERA-filed configuration and saleable area3BHK; 88.04 sq m saleable area per unit. RERA unit table RERA unit table
Booked / availableRERA portal record: 0 booked; 15 available. No as-of date is supplied for these counts, so they are indicative rather than a current inventory confirmation. RERA unit table
Construction stageCurrent independently verified site progress is not supplied. The RERA amenity record shows 0% progress for listed infrastructure items; this is a filed progress record, not an independent site inspection. RERA amenities
Completion datesForm B promoter declaration: completion by 14.06.2025. Project identity/RERA filing: proposed completion 30/11/2026. The supplied evidence does not establish an approved extension or reconcile the dates. RERA filing
Occupancy / completion certificateNo occupancy certificate or completion certificate is included in the supplied project documents. The GHMC permit requires completion notice and an occupancy certificate before occupation.

2. The project story

NAVNIT NIRMAN HMT ARCADE is recorded with TG-RERA as a residential apartment project on land identified as Plot Nos. 139, 140 and 141, in revenue village Saheb Nagar / Sahebnagar Kalan, Hayathnagar Mandal, Ranga Reddy District. The project parcel is associated in the records with Survey Nos. 2, 3, 4, 5, 6, 7-PART & 8-PART. RERA record RERA filing

The GHMC permit describes one proposed residential building with a stilt and five upper floors. TG-RERA records 15 units, all listed as 3BHK, with 88.04 sq m saleable area per unit. The approved permit is conditional and includes construction, parking and completion requirements; it is not evidence that construction has been completed. Current physical progress and any occupancy certification are not established by the supplied records. RERA unit table RERA unit table

3. Master plan, architecture & building design

The GHMC building permit records a single residential building, 1 Stilt + 5 upper floors, with a stated height of 15 m. It lists upper-floor residential area as 1,592.85 sq m and stilt parking area as 305.59 sq m. It records the site area as 669.05 sq m and net area as 666.4 sq m. These are permit-extracted figures; the meaning of the separate “Proposed Covered builtup area 111,500.00” and “TOTAL: 1,551,858.00” entries is not clear from the supplied extraction and they are not treated here as interpretable area measures.

The RERA filing records 15 units, but the supplied approved-drawing extraction does not establish a reliable floor-by-floor apartment arrangement, number of flats per floor, lift or stair details, or internal circulation. No phase-wise building organization is disclosed. The project’s filed layout-plan item is not extracted as an approval drawing in the supplied record. RERA unit table Document index

The permit lists 30 trees, 2 rainwater-harvesting structures, transformer space, a garbage house, an ETP and a rainwater-harvesting percolation pit. Its conditions also require the tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate. The permit extraction gives the tot-lot area as 0 m²; no further open-space plan or drawing-based landscape detail is supplied.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1501588.04 sq mNot measured in supplied drawingsNot supplied

The configuration, unit count and saleable area above are from the TG-RERA filing. Booking and availability counts have no stated as-of date. RERA unit table RERA unit table

The supplied software-measurement record contains 1BHK and 2BHK drawing measurements, but those configurations are not present in the TG-RERA unit schedule; they are therefore not presented as RERA-filed offerings. The supplied drawings do not provide a measured carpet-area figure for the filed 3BHK configuration. Drawing-based carpet area, where measured, is a software measurement rather than a RERA disclosure; carpet area is distinct from saleable area, which may include a share of common areas. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit states that the stilt is approved for parking and requires approved cellar and stilt parking areas to be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted permit lists 305.59 sq m as stilt parking area; no parking-space count, visitor or accessible-space allocation, mechanical parking, EV charging provision, ramp arrangement or unit-specific parking allocation is supplied. A drawn or permitted parking provision does not by itself establish exclusive ownership or allocation to a particular apartment.

6. Amenities, recreation & open spaces

The table distinguishes permit-listed provisions from RERA-filed progress information. The supplied RERA progress percentages are recorded as 0%; they are not independent verification of site condition.

Tot-lot / greenery
Description / sizePermit extraction lists 0 m²; permit condition requires fencing and maintenance as greenery before occupancy certificate.
Evidence sourceGHMC building permit
Declared progress / verified statusNo independent completion verification supplied.
Trees
Description / size30 listed in the permit.
Evidence sourceGHMC building permit
Declared progress / verified statusNo independent completion verification supplied.
Community / recreational open space
Description / sizeRERA infrastructure list includes “Aggregate area of recreational Open Space”; no area is supplied.
Evidence sourceTG-RERA amenity record
Declared progress / verified statusFiled progress: 0%. RERA amenities
Community buildings
Description / sizeIncluded in the RERA infrastructure list; no facility details or size supplied.
Evidence sourceTG-RERA amenity record
Declared progress / verified statusFiled progress: 0%. RERA amenities
Indoor recreation, sports, pool, gym, clubhouse and garden facilities
Description / sizeNo such facilities are established by the supplied TG-RERA amenity record or permit extraction.
Evidence sourceNot established in supplied project documents
Declared progress / verified statusNo TG-RERA project evidence of provision or completion supplied.

7. Utilities, building services & safety

Water
Evidence in the project recordTG-RERA infrastructure record marks water supply “YES”; no source, storage capacity or treatment details are supplied.
Status / limitationFiled availability entry; no independent verification supplied. RERA amenities
Sewerage / treatment
Evidence in the project recordPermit lists an ETP. TG-RERA infrastructure list includes sewerage and treatment/disposal of sewage and sullage water.
Status / limitationNo capacity, detailed system design or verified completion evidence supplied; RERA progress is recorded as 0%. RERA amenities
Storm-water / rainwater
Evidence in the project recordPermit lists 2 RWHPs and a rainwater-harvesting percolation pit; RERA infrastructure list marks water conservation/rainwater harvesting “YES.”
Status / limitationProposed/listed provision; no independent completion verification supplied. RERA amenities
Electrical
Evidence in the project recordPermit requires space for a transformer and lists an electrical meter room/sub-station/receiving station in the RERA infrastructure schedule.
Status / limitationNo transformer capacity, backup system or completed-service evidence supplied. RERA amenities
Fire and life safety
Evidence in the project recordPermit requires an occupancy Fire NOC from the Director (EV&DM) before issue of the occupancy certificate. The RERA infrastructure list includes fire protection and fire-safety requirements.
Status / limitationNo Fire NOC or completion evidence is supplied. RERA amenities
Waste
Evidence in the project recordPermit lists a garbage house; RERA infrastructure list includes solid-waste management and disposal.
Status / limitationNo operating arrangements or completion verification supplied. RERA amenities
Lifts, accessibility and security
Evidence in the project recordNo project-specific lift count/capacity, accessible circulation, CCTV or access-control details are established by the supplied TG-RERA documents or permit extraction.
Status / limitationNot disclosed in the supplied project evidence.

8. Location, access & connectivity

The registered project location is Vanasthalipuram, Saheb Nagar / Sahebnagar Kalan, Hayathnagar Mandal, Ranga Reddy District, Telangana, PIN 500070. The GHMC permit places the site at Andhra Kesari Nagar and identifies the project survey numbers as 2, 3, 4, 5, 6, 7-PART & 8-PART. The RERA filing records road boundaries to the west and south as “ROAD WIDTH 9”; the permit extraction separately refers to 18 mt. road widths. RERA record RERA filing RERA filing

The supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 5.6 km. No other measured distances or verified public-transport details are supplied. Location record

9. Developer & development status

The registered promoter is NAVNIT NIRMAN, recorded as a partnership. The RERA filing names NAVEEN PUNARIYA as authorized signatory and lists UMESH PUNJARIYA, SUNAINA PUNJARIYA and NEETIKA KIRAN as partners. The Form B declaration is signed by P. Naveen for M/s. NAVNIT NIRMAN and dated 10.08.2021. The supplied evidence does not establish a separate corporate registration number or official promoter website/contact details. RERA filing Parties record

The Form B declaration states a completion undertaking of 14.06.2025. The project information record separately states proposed completion 30/11/2026. No construction-progress inspection or occupancy certificate is supplied, so physical completion and current possession readiness cannot be confirmed from this overview evidence. RERA filing

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA registration certificateForm C registration for NAVNIT NIRMAN HMT ARCADE, No. P02400003482; issued 24/09/2021, with stated validity ending 01/07/2026.
GHMC building permitBuilding Permit No. 2/C3/08190/2021, File No. 2/C3/05432/2021, dated 02 July, 2021; one proposed residential building, 1 Stilt + 5 upper floors, with stated permit conditions.
Form B promoter declarationDeclaration for M/s. NAVNIT NIRMAN, dated 10.08.2021; includes promoter statements about title basis, encumbrances, separate account, audits and completion undertaking. These are promoter declarations.
Title report and title-related filingsAdvocate title search report dated 27/07/2021 and title-related documents are listed in the supplied project evidence; detailed title-chain review belongs in the Land & Title section.
Layout-plan filingTG-RERA document list includes a layout-plan item, but the supplied record does not contain an extracted approved layout plan establishing its details. Document index
Occupancy / completion certificateNot supplied. The permit requires completion notice and occupancy certification before occupation.
Environmental clearance / pollution-board consentNo project-specific clearance is established in the supplied overview evidence. The available regulatory note describes promoter-level matches and calls for project-specific confirmation. Regulatory record

Frequently asked questions

Is NAVNIT NIRMAN HMT ARCADE registered with Telangana RERA?

Yes. NAVNIT NIRMAN HMT ARCADE is registered with the Telangana Real Estate Regulatory Authority as P02400003482; the registration status is New Project.

Who is the developer of NAVNIT NIRMAN HMT ARCADE?

The promoter named in the RERA registration is NAVNIT NIRMAN.

Where is NAVNIT NIRMAN HMT ARCADE located?

NAVNIT NIRMAN HMT ARCADE is in VANASTHALIPURAM, SAHEB NAGAR, Hayathnagar, Rangareddy, Telangana (500070).

When will NAVNIT NIRMAN HMT ARCADE be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.

More projects in Saheb Nagar