Sri Lakshmi Nilayam

JNR BUILDERS · Rangareddy · RERA P02400002686

SRI LAKSHMI NILAYAM is a residential apartment project in Vishweshwarayya Engineering College locality, Saroornagar Mandal, Ranga Reddy District. The registered promoter developing it is JNR BUILDERS. The project occupies 746.94 sq m and comprises one residential building with 1 Stilt + 5 upper floors and 20 proposed 2BHK units, each with a RERA-filed saleable area of 105.21 m². Its TG-RERA registration number is P02400002686, and its proposed completion date is 03/02/2026.

More from Jnr Builders · 23 projects →

01What we found

Period endedTG-RERA registration ran to 3 Feb 2026 - check its extension on TG-RERA
14documents on file - each fact links to its page
32court cases on this project's land (survey 59, Saroornagar)
9items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameSRI LAKSHMI NILAYAM RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase not specified; registration is for the project identified with Survey No. 59 PART and Plot Nos. 356, 357 and 358. RERA record Land records
TG-RERA registrationP02400002686, granted under section 5; valid 17/03/2021–03/02/2026. This is the stated registration period, not a current-validity confirmation.
Registered promoterJNR BUILDERS (also rendered “Jnr Builders” on the certificate). RERA record Corporate record
RERA project statusListed as New Project in the project information. RERA filing

Land and geographic identity

ItemProject record
LocalityVishweshwarayya Engineering College; the building-permit document describes the locality as Vishweshwarayya Engineering Colony. RERA record RERA filing
Revenue villageSaroornagar; the building-permit and OC records render it SAROOR NAGAR. The title materials also refer to Karmanghat village. RERA record Land records
Mandal / district / PINSaroornagar / Ranga Reddy / 500035. RERA record RERA filing
Survey / subdivision59 PART; also described in title records as Sy. No. 59/Part, 59 (part) and Survey No. 59 (part). Land records
Plot numbers356, 357 AND 358. Land records
Site area746.94 sq m total and 746.94 sq m net area; road-affected and nala-affected areas are each recorded as 0 in the building-permit extract. RERA filing
BoundariesNorth: Plot No. 359; South: Plot No. 355; East: road width 9; West: Plot Nos. 365, 366 and 367. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building approvalBuilding Permit No. 2/C4/01537/2021, approved 03 February, 2021; related file No. 2/C4/10947/2020. Approvals record
Building count / useOne residential building, identified in the permit extract as Building - A-1 (JN REDDY). RERA filing
Sanctioned configuration1 Stilt + 5 upper floors; stated building height 14.99 m. The permit extract records residential upper-floor area 1,756.60 m² and parking-floor area 386.66 m².
Approved built-up area1,756.60 m² (RERA-filed project information). RERA filing
Parking / site provisionStilt parking is recorded; the permit extract gives parking area as 386.66 m².
UnitsThe sanctioned unit count is not established in the supplied permit extract. The TG-RERA unit record lists 20 proposed 2BHK units. RERA unit table

Offering and status

ItemProject record
Configuration2BHK. RERA unit table
RERA-filed saleable area105.21 m² per unit. RERA unit table
Bookings / availability10 booked; 10 available, as last read from the TG-RERA portal. The record supplies no as-of date, so counts are indicative. RERA unit table
Construction stageThe supplied records do not provide a current construction-progress assessment. The GHMC OC extract records completion date 03 June, 2022 and an occupancy certificate dated 21 September, 2022 for the building identified in that certificate.
Completion timelineThe RERA project information gives proposed completion 03/02/2026; the registration certificate’s validity end date is also 03/02/2026. These are separate record fields, not evidence of an extension or of present registration validity. RERA filing
OC status and scopeAn OC is recorded for Plot Nos. 356, 357 and 358, Survey No. 59 PART, under GHMC proceedings 3294/GHMC/LBN/2022-OC.

2. The project story

SRI LAKSHMI NILAYAM is recorded with TG-RERA as a residential apartment project in Saroornagar, Ranga Reddy District, on Survey No. 59 PART, Plot Nos. 356, 357 and 358. Its filed location identifies Vishweshwarayya Engineering College; the GHMC permit extract uses Vishweshwarayya Engineering Colony. RERA record Land records

The GHMC building permit describes one residential building with stilt parking and five upper floors. The RERA unit schedule lists 20 two-bedroom apartments, with 10 booked and 10 available according to the portal reading supplied; that count has no stated as-of date. RERA unit table

The GHMC record supplied also includes an occupancy certificate for the project site, dated 21 September, 2022, and records a completion date of 03 June, 2022. The evidence pack does not include an independently verified present-day site inspection or current construction-progress report.

3. Master plan, architecture & building design

The GHMC building-permit extract records a site area and net area of 746.94 m², one residential building, stilt parking and five upper floors. It gives a building height of 14.99 m, residential upper-floor area of 1,756.60 m², parking-floor area of 386.66 m², and a Tot-lot of 81.31 m². These are figures from the permit extract; the supplied material does not separately state FSI-counted area or a carpet-area total for the building.

The permit extract describes the sanctioned configuration as 1 Stilt + 5 upper floors. The OC extract separately records “As per Sanctioned Plan: 4 floors; As per Site Building Plan: 5 Upper Floor.” The supplied material does not explain that floor-count wording; the approved-plan and OC records are indexed under 2/C4/01537/2021 and 3294/GHMC/LBN/2022-OC, respectively.

The permit extract lists four rainwater-harvesting structures, 35 trees, a transformer space, a garbage house and an ETP. The supplied evidence does not establish their present installation or operating status.

The available record does not specify flats per floor, lift or stair arrangements, building entries, circulation, landscaping beyond the listed Tot-lot and trees, or a separate phase organization. The floor-plan drawing is identified as document 152413, but its extraction is marked unavailable in the supplied documents list. Document index

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK201010105.21 m²57.6–71.3 m²; median 60.0 m²43%

Unit count, bookings, availability and saleable area are from the TG-RERA unit record; booking counts have no supplied as-of date. Carpet-area figures and loading are software measurements from approved floor-plan drawing geometry, not RERA-filed disclosures; the supplied measurement record says eight flat designs were measured and flags two for review. Verify these measurements against the drawing. RERA unit table RERA unit details Floor plans

The measured example plan identifies a bedroom, a second bedroom, two toilets and a combined living/kitchen area, with a 1.20 m-wide balcony shown. The drawing-derived room dimensions are software-measured and are not a substitute for a verified unit schedule. RERA unit details

Saleable area and carpet area are different measures: the supplied floor-plan record notes that the saleable area also includes the home’s share of common areas, while the drawing-based carpet measurement excludes balcony area. The supplied data does not provide a separately verified utility-area or unit-specific loading schedule. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit extract records stilt parking and 386.66 m² of parking area. It also states that the approved cellar/stilt parking is to be used exclusively for vehicle parking and not converted or misused. The supplied record does not establish a parking-space count, resident or visitor allocation, accessible spaces, two-wheeler capacity, vehicle-ramp arrangement, EV charging, or unit-specific parking rights. A parking area shown or permitted in the building record does not, by itself, establish an exclusive parking allocation to a particular apartment; the available documents do not provide a unit-wise parking schedule.

6. Amenities, recreation & open spaces

Tot-lot
Description / size81.31 m²; permit requires it to be fenced and maintained as greenery.
Evidence sourceGHMC building-permit extract
Declared progress / verified statusPermitted provision; completion or present condition not independently verified.
Trees / peripheral greenery
Description / size35 Trees; permit also refers to peripheral greenery.
Evidence sourceGHMC building-permit extract
Declared progress / verified statusListed in permit; planting and maintenance status not verified.
Clubhouse, swimming pool, gym, children’s play area
Description / sizeNo size or capacity supplied.
Evidence sourceThird-party/vendor listing Promoter website
Declared progress / verified statusMarketed/listed only; not established as sanctioned or delivered by the supplied project records.

The RERA amenities extract lists 14 infrastructure and common-facility categories—including internal roads and footpaths, water supply, sewerage, storm-water drains, community buildings, waste management, rainwater harvesting, fire safety, electrical facilities and recreational open space—with recorded progress of 0% for each. These entries do not establish current site status. RERA amenities

7. Utilities, building services & safety

The GHMC permit extract lists four rainwater-harvesting structures, an ETP, space for a transformer and a garbage house. The OC extract records rainwater harvesting as 2. These entries are reported as recorded in the relevant documents; the supplied material does not establish the installed systems’ current condition or operating status.

The permit lists fire-fighting installation and means-of-escape safety among the owner/developer’s responsibilities, and states that an occupancy Fire NOC is to be obtained before issue of an OC. The supplied extracts do not include the Fire NOC itself or details of fire equipment, lifts, backup power, water storage or treatment, sewerage capacity, CCTV, access control, or accessibility provisions.

8. Location, access & connectivity

The filed location is Vishweshwarayya Engineering College locality, Saroornagar, Saroornagar Mandal, Ranga Reddy District, PIN 500035. The building-permit extract calls the locality Vishweshwarayya Engineering Colony and identifies Saroor Nagar. RERA record RERA filing

The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 9.3 km from the cadastral parcel centroid. This is a mapped distance, not a travel-time estimate. The supplied data does not specify an approach road, public-transport distance, or measured distances to other landmarks. Location record

A third-party listing describes the project as near schools, airports, restaurants, bus stops and railway stations but supplies no distances; it is not a RERA-filed connectivity measurement. Promoter website

9. Developer & development status

The registered promoter is JNR BUILDERS, identified as a partnership in the project information. The supplied corporate identifier is GSTIN 36AALFJ9917E1Z1. The listed partners are POTHULA JYOTHINANDAN REDDY and POTHULA SUJATHA; Pothula Jyothinandan Reddy is also identified as authorized signatory. RERA record Corporate record Parties record

The promoter’s Form B affidavit is recorded as declaring a title basis and that the land is free from encumbrances; the OCR extract leaves the printed completion-period and verification date/place unfilled. This is a promoter declaration, not an independent verification.

The RERA project information gives proposed completion as 03/02/2026, and the registration certificate gives validity through 03/02/2026. The supplied records include a GHMC occupancy certificate for the project building dated 21 September, 2022. No current construction-progress assessment is supplied. RERA filing

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400002686; issued 17/03/2021; stated validity to 03/02/2026
What the supplied record establishesForm C registration for SRI LAKSHMI NILAYAM.
GHMC building permit
Identifier / date2/C4/01537/2021; 03 February, 2021; file No. 2/C4/10947/2020
What the supplied record establishesConditional building permission for the residential building on Survey No. 59 PART.
GHMC occupancy certificate
Identifier / dateProceedings 3294/GHMC/LBN/2022-OC; 21 September, 2022; application 007723/GHMC/3818/LBN2/2022-OC
What the supplied record establishesOC record for Plot Nos. 356, 357 and 358, Survey No. 59 PART; it records completion date 03 June, 2022.
Title report
Identifier / date155759, dated 22-02-2021
What the supplied record establishesAdvocate’s title opinion concerning Plot Nos. 356, 357 and 358 in Sy. No. 59/Part at Karmanghat.
Development agreement / title materials
Identifier / date152415, 155759, and related title documents
What the supplied record establishesFiled materials include a Development Agreement Cum GPA and cited title documents for the project land.
Floor-plan drawing
Identifier / date152413
What the supplied record establishesDrawing document is identified in the file; its extraction is marked unavailable in the supplied document list.
Form B affidavit
Identifier / date152447
What the supplied record establishesPromoter affidavit filed for JNR BUILDERS.

The supplied material does not include a separately extracted layout approval. The GHMC building-permit extract records approval 2/C4/01537/2021 and building-plan particulars; the available evidence does not identify an additional layout-plan approval document. Document index

Frequently asked questions

Is SRI LAKSHMI NILAYAM registered with Telangana RERA?

Yes. SRI LAKSHMI NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02400002686; the registration status is New Project.

Who is the developer of SRI LAKSHMI NILAYAM?

The promoter named in the RERA registration is JNR BUILDERS.

Where is SRI LAKSHMI NILAYAM located?

SRI LAKSHMI NILAYAM is in VISHWESHWARAYYA ENGINEERING COLLEGE, Saroornagar, Rangareddy, Telangana (500035).

When will SRI LAKSHMI NILAYAM be completed?

The promoter's proposed date of completion filed with RERA is 03/02/2026. This is the promoter's declaration, not a guarantee.