Godrej Epoque
GODREJ PROPERTIES LIMITED · Rangareddy · RERA P02400011291
GODREJ EPOQUE is a residential apartment project in Neopolis Layout, Gandipet Mandal, Ranga Reddy District, developed by the registered promoter GODREJ PROPERTIES LIMITED. The project covers 20,351.89 sq. m and comprises two residential towers, each with 5 common basements, a ground floor and 58 upper floors, plus a clubhouse with 5 common basements, a ground floor and 5 upper floors. It has 727 3BHK homes and 291 4BHK homes. Its TG-RERA registration number is P02400011291, and the proposed completion date is 20/08/2031.
More from Godrej Properties Ltd · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
| Project identity | Record |
|---|---|
| Registered project name | GODREJ EPOQUE RERA record |
| Project type / phase | Residential apartment project; phase or separately named registered portion is not disclosed in the supplied record. RERA record RERA filing |
| TG-RERA registration | P02400011291 |
| Registration validity | 20/08/2026 to 20/08/2031; the certificate states a five-year term. Validity is not the same as construction completion or occupancy certification. |
| Registered promoter | GODREJ PROPERTIES LIMITED, a company. RERA record Corporate record |
| RERA status | Registered; the supplied certificate is Form C. |
| Land and geographic identity | Record |
|---|---|
| Locality | NEOPOLIS LAYOUT RERA record RERA filing |
| Revenue village | Kokapet (also rendered “koKapet” in the RERA filing) RERA record |
| Mandal / district / PIN | Gandipet / Ranga Reddy / 500075 RERA record |
| Project survey numbers | 239 and 240; the supplied project records do not identify a project-held subdivision. RERA record |
| Plot reference | Plot No. 16 |
| Registered site extent | 20,351.89 sq. m |
| RERA-filed total / net area | 20,351.89 sq. m total area and 20,351.89 sq. m net area; road-widening/FTL/nala affected area is recorded as 0. RERA filing |
| Boundaries in the RERA filing | East: 45 metres wide road; West: Plot No. 20; North: Plot No. 15; South: Plot No. 17. RERA filing |
| Development identity | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) technical approval; building permit order issued by Cyberabad Municipal Corporation. Approvals record |
| Principal building approval | Permit / proceedings No. 2439/HMDA/SWBP/2026, approved 20/08/2026. Approvals record |
| Approved site area | 20,351.89 sq. m |
| Approved built-up area | 248,207.09 sq. m as recorded in the RERA project information. RERA filing |
| Building arrangement and floors | Two residential towers, each with 5 common basements, ground floor and 58 upper floors; one clubhouse with 5 common basements, ground floor and 5 upper floors. |
| Heights recorded in the permit | Tower-01: 196.5 m; Tower-02: 196.5 m; clubhouse: 30.0 m. |
| Parking provision recorded in the permit | Total parking area 82,462.58 sq. m; the supplied extraction does not provide a count of parking spaces. |
| Approved versus RERA-filed unit count | The RERA filing records 3 building units and 3 proposed building units; the unit schedule lists 1,018 homes in 3BHK/4BHK configurations, plus 8 non-home entries that are floors or common-area entries—not homes for sale. RERA filing RERA unit table |
| Offering and status | Record |
|---|---|
| RERA-filed home configurations | 3BHK: 727 homes, saleable area 221.25 sq. m each; 4BHK: 291 homes, saleable area 297.6 sq. m each. RERA unit table RERA unit details |
| Booked / available | The RERA portal data supplied lists 0 booked and 727 available 3BHKs; 0 booked and 291 available 4BHKs. These are indicative portal counts; the supplied unit record has no as-of date. RERA unit table RERA unit details |
| Construction stage | The project is recorded as a “New Project”; no independently verified construction-progress information is supplied. RERA record RERA filing |
| Completion deadline | The building permit states construction is to be completed before 20/08/2031; the Form B declaration also gives a completion undertaking for 2031, but its extracted date is rendered “0 • 08 • 2031.” |
| Occupancy / completion certificate | Not supplied. The building permit states an Occupancy Certificate is compulsory before occupation and requires the promoter to apply for one after construction. |
The project story
GODREJ EPOQUE is a registered residential apartment development at Plot No. 16 in Neopolis Layout, Kokapet, Gandipet Mandal, Ranga Reddy District. The RERA record identifies Survey Nos. 239 and 240 and describes a three-building scheme: two residential towers and a clubhouse. RERA record RERA filing
The sanctioned drawings describe two towers, each with five common basement levels, a ground floor and 58 upper floors, alongside a clubhouse with five common basements, a ground floor and five upper floors. The towers are recorded at 196.5 metres and the clubhouse at 30.0 metres. These are approval-record descriptions, not independent site measurements.
The RERA unit schedule offers 3BHK and 4BHK homes. It reports no bookings in the supplied portal snapshot, but the snapshot has no stated retrieval date, so the counts should be treated as indicative rather than current sales verification. No site-inspection evidence or verified construction-progress report is included here. RERA unit table RERA unit details
Master plan, architecture & building design
The RERA filing records a site area of 20,351.89 sq. m, with the same net area and no recorded road-widening/FTL/nala affected area. The building-permit extraction likewise records a plot area of 20,351.89 sq. m and a net plot area of 20,351.89 sq. m. RERA filing
The approved arrangement is Tower-01, Tower-02 and a clubhouse. The permit records 5 common basements beneath each structure; the towers have a ground floor and 58 upper floors, while the clubhouse has a ground floor and 5 upper floors.
| Approved use | Residential |
|---|---|
| Sanctioned floor configuration | 5 common basements + ground floor + 58 upper floors |
| Permit-recorded height | 196.5 m |
| Areas stated in permit extraction | Ground: 2,430.33 sq. m; upper floors: 134,050.65 sq. m |
| Approved use | Residential |
|---|---|
| Sanctioned floor configuration | 5 common basements + ground floor + 58 upper floors |
| Permit-recorded height | 196.5 m |
| Areas stated in permit extraction | Ground: 1,858.34 sq. m; upper floors: 104,730.85 sq. m |
| Approved use | Commercial/common facility in the permit extraction |
|---|---|
| Sanctioned floor configuration | 5 common basements + ground floor + 5 upper floors |
| Permit-recorded height | 30.0 m |
| Areas stated in permit extraction | Ground: 929.54 sq. m; upper floors: 3,970.61 sq. m |
The permit extraction records total parking area of 82,462.58 sq. m, a tot-lot of 2,284.91 sq. m, five rainwater-harvesting pits and 1,010 trees. It also requires a transformer space and a garbage house. These are approval-file particulars; the supplied data does not establish that the works have been completed.
The permit lists an approved layout reference, LC1/5550/2021. A public HMDA approved-layout lookup was unavailable in the supplied evidence, so the layout reference is reported as recorded rather than independently confirmed through that portal. HMDA
The evidence supplied does not provide a verified drawing-derived building footprint, flat-per-floor arrangement, lift or stair count, internal circulation plan, landscape/open-space distribution beyond the tot-lot, or phase-by-phase construction organization. Carpet-area measurements from drawings are also unavailable: the supplied floor-plan review reports nine drawings, with none measured, four scans pending, two with no flats and three failed. Floor plans
Homes, configurations & floor plans
The table below presents RERA-filed home counts and saleable areas. “Booked” and “Available” are portal figures as last read in the supplied data; no as-of date is provided. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 727 | 0 | 727 | 221.25 sq. m | Not available—no drawing measurements supplied | Not supplied |
| 4BHK | 291 | 0 | 291 | 297.6 sq. m | Not available—no drawing measurements supplied | Not supplied |
Saleable area is the area disclosed in the RERA unit schedule. The supplied evidence does not include a usable software-measured carpet area or a loading figure for either configuration, so these cannot be compared or inferred. The floor-plan review says its software measurements are drawing-based and are not RERA disclosures; in this project’s supplied records, no floor plan has been measured. RERA unit table Floor plans
The RERA unit table also contains six floor-label entries—ground, first through fifth floors—and two “58F Amenities” entries. These are not additional homes available for sale. RERA unit table RERA unit table RERA unit details
Parking & vehicle circulation
The building-permit extraction records 82,462.58 sq. m of total parking area. It describes five common basement levels under each tower and the clubhouse, and the Cyberabad Municipal Corporation permit states that cellar and stilt areas approved for parking must be used exclusively for vehicles.
The supplied permit extraction does not state a number of parking spaces, distinguish resident from visitor or accessible spaces, identify a mechanical-parking system, or provide a parking-allocation schedule for individual apartments. Although the permit requires parking areas in buildings to include electric-vehicle charging infrastructure, the supplied documents do not specify the number or location of charging points. A drawn or sanctioned parking provision does not, by itself, establish exclusive allocation to a particular buyer.
Amenities, recreation & open spaces
The RERA filing lists 14 amenity/service categories. Their availability is marked “YES” where shown, but the supplied progress percentages are 0; this does not establish that a facility has been completed or independently inspected. RERA amenities
| Description / size | Permitted as a separate building with 5 common basements, ground floor and 5 upper floors. |
|---|---|
| Evidence source | HMDA/Cyberabad building-permit records |
| Declared progress / verified status | Sanctioned; completion not verified. |
| Description / size | Tot-lot area recorded as 2,284.91 sq. m. |
|---|---|
| Evidence source | Building-permit extraction |
| Declared progress / verified status | Sanctioned; permit requires fencing and greenery before occupancy certificate; completion not verified. |
| Description / size | RERA amenity schedule marks available “YES”; no dimensions supplied. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | Declared in schedule; progress 0; completion not verified. |
| Description / size | Marked “YES” in the RERA amenity schedule; no further description or size supplied. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | Declared in schedule; progress 0; completion not verified. |
| Description / size | Marked “YES” in the RERA amenity schedule. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | Declared in schedule; progress 0; completion not verified. |
| Description / size | Marked “YES”; source, storage capacity and supply arrangements are not specified in the supplied amenity schedule. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | Declared in schedule; progress 0; completion not verified. |
| Description / size | RERA schedule lists sewerage and treatment/disposal of sewage and sullage water; the building permit lists an STP. No capacity is supplied. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity schedule and building-permit extraction RERA amenities |
| Declared progress / verified status | Declared / permitted; progress 0 in the amenity schedule; completion not verified. |
| Description / size | Marked “YES”; no network or capacity details supplied. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | Declared in schedule; progress 0; completion not verified. |
| Description / size | Permit records 5 rainwater-harvesting pits. |
|---|---|
| Evidence source | Building-permit extraction |
| Declared progress / verified status | Sanctioned; installation not verified. |
| Description / size | Permit records 1,010 trees. |
|---|---|
| Evidence source | Building-permit extraction |
| Declared progress / verified status | Recorded in permit; planting status not verified. |
| Description / size | Marked “YES” in the RERA amenity schedule; specifications not supplied. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | Declared in schedule; progress 0; completion not verified. |
| Description / size | Marked “YES”; permit also requires a garbage house within the premises. RERA amenities |
|---|---|
| Evidence source | TG-RERA schedule and building-permit order RERA amenities |
| Declared progress / verified status | Declared / required; progress 0 in the schedule; completion not verified. |
| Description / size | Both categories are marked “YES”; detailed equipment or capacity is not supplied in the amenity schedule. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | Declared in schedule; progress 0; completion not verified. |
| Description / size | Marked “YES” in the RERA amenity schedule; the supplied record does not establish installed systems or a final fire certificate. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | Declared in schedule; progress 0; completion not verified. |
| Description / size | Marked “YES”; the building permit requires transformer space but supplies no capacity. RERA amenities |
|---|---|
| Evidence source | TG-RERA schedule and building-permit extraction RERA amenities |
| Declared progress / verified status | Declared / required; completion not verified. |
| Description / size | The RERA schedule includes “Aggregate area of recreational Open Space,” but the supplied extract gives no area. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | No progress or verified-completion evidence supplied. |
Utilities, building services & safety
Water and drainage: The RERA amenity schedule lists water supply, sewerage, storm-water drains, sewage/sullage treatment and water conservation. The permit specifies five rainwater-harvesting pits and requires a rainwater-harvesting structure; it also requires a minimum 100 ft distance from the raw-water channel to the building line and refers to a 4.50-metre buffer belt along the channel. The supplied record does not state water source, storage or STP capacity, and does not verify installation or operation. RERA amenities
Electrical services: The amenity schedule lists an electrical meter room, substation and receiving station. The building-permit extraction requires transformer space and includes a requirement for electric-vehicle charging infrastructure in parking areas. No electrical load, transformer capacity, backup-power capacity or count of charging points is provided. RERA amenities
Vertical transportation and fire/life safety: No lift count, lift capacity, stair count or detailed escape/access arrangements are supplied. Fire protection and fire safety appear in the RERA amenity schedule, but the supplied evidence does not verify installed systems or a final fire-safety certificate. RERA amenities
Waste, security and accessibility: The RERA schedule lists solid-waste management and disposal, and the building permit requires a garbage house within the premises. The supplied project data does not specify CCTV, access-control arrangements, accessible routes or ramps. These features are therefore not confirmed by this Overview. RERA amenities
Location, access & connectivity
The registered location is Plot No. 16, Neopolis Layout, Kokapet Village, Gandipet Mandal, Ranga Reddy District, PIN 500075, Survey Nos. 239 and 240. The RERA filing records a 45-metre-wide road on the eastern boundary. RERA record RERA filing
The supplied location record gives these mapped distances; the record does not identify the measurement method or an as-of date. Location record
| Reference point | Category | Supplied distance |
|---|---|---|
| Financial District (Nanakramguda) | Anchor | 2.1 km |
| ICICI Bank | Bank | 1.1 km |
| CBIT bus stop | Bus stop | 1.4 km |
| Mahatma Gandhi Institute of Technology | College | 1.5 km |
| Continental Hospitals | Hospital | 2.0 km |
| Capgemini | IT office | 0.2 km |
| Golden Mile Park | Park | 0.8 km |
| Unnamed school | School | 1.9 km |
A cadastral parcel-centroid coordinate is supplied as 17.40282, 78.32868; it is a parcel-centroid reference, not a surveyed project entrance coordinate. Location record The supplied evidence does not give public-transport routes beyond the bus-stop distance, approach-road details beyond the eastern boundary road, or travel times.
Developer & development status
The registered promoter is GODREJ PROPERTIES LIMITED, identified as a public limited company. Its GSTIN is 36AAACG3995M2Z1. The supplied promoter address is Navayuga Vizva, Miyapur-Gachibowli Road, Neopolis, Neopolis Layout, Gandipet, Ranga Reddy, PIN 500075. Corporate record Parties record RERA filing
The RERA record identifies the project as a “New Project” and records three building units. No independent construction-progress or site-inspection evidence is supplied. The building permit sets a construction-completion deadline of 20/08/2031 and requires an Occupancy Certificate before occupation; no Occupancy Certificate is included in the supplied documents. RERA record RERA filing RERA filing
The promoter’s Form B declaration states that it has legal title to the project land, that the land is free of encumbrances, and that it will complete the project by a date extracted as “0 • 08 • 2031.” This is a promoter declaration, not independent verification of title or completion.
Approvals, official records & documents
| Supplied evidence | Form C, P02400011291, valid 20/08/2026–20/08/2031. |
|---|---|
| Scope / note | Project registration; not an Occupancy Certificate. |
| Supplied evidence | HMDA Permit No. 2439/HMDA/SWBP/2026, approved 20/08/2026; building-permit order issued by Cyberabad Municipal Corporation. |
|---|---|
| Scope / note | Covers the two residential towers and clubhouse on Plot No. 16, Survey Nos. 239 and 240. |
| Supplied evidence | HMDA approval letter forwarding technically approved plans to the Municipal Commissioner, Cyberabad Municipal Corporation, for release of proceedings and plans. |
|---|---|
| Scope / note | Technical-approval record. |
| Supplied evidence | LC1/5550/2021, recorded in the building-permit material. |
|---|---|
| Scope / note | Public HMDA approved-layout lookup is recorded as unavailable in the supplied evidence. HMDA |
| Supplied evidence | Registered sale deed material and title reports are listed in the project file. |
|---|---|
| Scope / note | Full title-chain analysis belongs in the Land & Title section. |
| Supplied evidence | Mortgage Deed No. 14131/2026, dated 13/08/2026; the building-permit material records 24,825.80 sq. m mortgaged to the Metropolitan Commissioner, HMDA. |
|---|---|
| Scope / note | Permit records the mortgaged area and restricts its registration until an Occupancy Certificate is produced. |
| Supplied evidence | SIA/TG/INFRA2/572719/2026, dated 18/06/2026 in the permit extraction. |
|---|---|
| Scope / note | The permit references this record; this Overview does not assess environmental-clearance conditions or compliance. |
| Supplied evidence | JNTU/CEH/CIVIL/PC/227/2026, dated 17.08.2026 in the permit extraction. |
|---|---|
| Scope / note | Reference recorded in the building-permit material. |
| Supplied evidence | Contractor’s All Risk Policy No. 20260380268900; Property Watch Register CS No. 14096/2026; bank-guarantee number recorded as ILLEGIBLE. |
|---|---|
| Scope / note | Listed as recorded in the permit extraction. |
No Occupancy Certificate or completion certificate is included in the supplied documents. The building permit requires an Occupancy Certificate before occupation and directs the promoter to approach HMDA for it after construction.
Project at a glance
Registered project name: GODREJ EPOQUE
Project type / phase: Residential apartment project; phase or separately named registered portion is not disclosed in the supplied record.
TG-RERA registration: P02400011291
Registration validity: 20/08/2026 to 20/08/2031; the certificate states a five-year term. Validity is not the same as construction completion or occupancy certification.
Registered promoter: GODREJ PROPERTIES LIMITED, a company.
RERA status: Registered; the supplied certificate is Form C.
Locality: NEOPOLIS LAYOUT
Revenue village: Kokapet (also rendered “koKapet” in the RERA filing)
Mandal / district / PIN: Gandipet / Ranga Reddy / 500075
Project survey numbers: 239 and 240; the supplied project records do not identify a project-held subdivision.
Plot reference: Plot No. 16
Registered site extent: 20,351.89 sq. m
RERA-filed total / net area: 20,351.89 sq. m total area and 20,351.89 sq. m net area; road-widening/FTL/nala affected area is recorded as 0.
Boundaries in the RERA filing: East: 45 metres wide road; West: Plot No. 20; North: Plot No. 15; South: Plot No. 17.
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA) technical approval; building permit order issued by Cyberabad Municipal Corporation.
Principal building approval: Permit / proceedings No. 2439/HMDA/SWBP/2026, approved 20/08/2026.
Approved site area: 20,351.89 sq. m
Approved built-up area: 248,207.09 sq. m as recorded in the RERA project information.
Building arrangement and floors: Two residential towers, each with 5 common basements, ground floor and 58 upper floors; one clubhouse with 5 common basements, ground floor and 5 upper floors.
Heights recorded in the permit: Tower-01: 196.5 m; Tower-02: 196.5 m; clubhouse: 30.0 m.
Parking provision recorded in the permit: Total parking area 82,462.58 sq. m; the supplied extraction does not provide a count of parking spaces.
Approved versus RERA-filed unit count: The RERA filing records 3 building units and 3 proposed building units; the unit schedule lists 1,018 homes in 3BHK/4BHK configurations, plus 8 non-home entries that are floors or common-area entries—not homes for sale.
RERA-filed home configurations: 3BHK: 727 homes, saleable area 221.25 sq. m each; 4BHK: 291 homes, saleable area 297.6 sq. m each.
Booked / available: The RERA portal data supplied lists 0 booked and 727 available 3BHKs; 0 booked and 291 available 4BHKs. These are indicative portal counts; the supplied unit record has no as-of date.
Construction stage: The project is recorded as a “New Project”; no independently verified construction-progress information is supplied.
Completion deadline: The building permit states construction is to be completed before 20/08/2031; the Form B declaration also gives a completion undertaking for 2031, but its extracted date is rendered “0 • 08 • 2031.”
Occupancy / completion certificate: Not supplied. The building permit states an Occupancy Certificate is compulsory before occupation and requires the promoter to apply for one after construction.
The project story
GODREJ EPOQUE is a registered residential apartment development at Plot No. 16 in Neopolis Layout, Kokapet, Gandipet Mandal, Ranga Reddy District. The RERA record identifies Survey Nos. 239 and 240 and describes a three-building scheme: two residential towers and a clubhouse.
The sanctioned drawings describe two towers, each with five common basement levels, a ground floor and 58 upper floors, alongside a clubhouse with five common basements, a ground floor and five upper floors. The towers are recorded at 196.5 metres and the clubhouse at 30.0 metres. These are approval-record descriptions, not independent site measurements.
The RERA unit schedule offers 3BHK and 4BHK homes. It reports no bookings in the supplied portal snapshot, but the snapshot has no stated retrieval date, so the counts should be treated as indicative rather than current sales verification. No site-inspection evidence or verified construction-progress report is included here.
Master plan, architecture & building design
The RERA filing records a site area of 20,351.89 sq. m, with the same net area and no recorded road-widening/FTL/nala affected area. The building-permit extraction likewise records a plot area of 20,351.89 sq. m and a net plot area of 20,351.89 sq. m.
The approved arrangement is Tower-01, Tower-02 and a clubhouse. The permit records 5 common basements beneath each structure; the towers have a ground floor and 58 upper floors, while the clubhouse has a ground floor and 5 upper floors.
| Approved use | Residential |
|---|---|
| Sanctioned floor configuration | 5 common basements + ground floor + 58 upper floors |
| Permit-recorded height | 196.5 m |
| Areas stated in permit extraction | Ground: 2,430.33 sq. m; upper floors: 134,050.65 sq. m |
| Approved use | Residential |
|---|---|
| Sanctioned floor configuration | 5 common basements + ground floor + 58 upper floors |
| Permit-recorded height | 196.5 m |
| Areas stated in permit extraction | Ground: 1,858.34 sq. m; upper floors: 104,730.85 sq. m |
| Approved use | Commercial/common facility in the permit extraction |
|---|---|
| Sanctioned floor configuration | 5 common basements + ground floor + 5 upper floors |
| Permit-recorded height | 30.0 m |
| Areas stated in permit extraction | Ground: 929.54 sq. m; upper floors: 3,970.61 sq. m |
The permit extraction records total parking area of 82,462.58 sq. m, a tot-lot of 2,284.91 sq. m, five rainwater-harvesting pits and 1,010 trees. It also requires a transformer space and a garbage house. These are approval-file particulars; the supplied data does not establish that the works have been completed.
The permit lists an approved layout reference, LC1/5550/2021. A public HMDA approved-layout lookup was unavailable in the supplied evidence, so the layout reference is reported as recorded rather than independently confirmed through that portal.
The evidence supplied does not provide a verified drawing-derived building footprint, flat-per-floor arrangement, lift or stair count, internal circulation plan, landscape/open-space distribution beyond the tot-lot, or phase-by-phase construction organization. Carpet-area measurements from drawings are also unavailable: the supplied floor-plan review reports nine drawings, with none measured, four scans pending, two with no flats and three failed.
Homes, configurations & floor plans
The table below presents RERA-filed home counts and saleable areas. “Booked” and “Available” are portal figures as last read in the supplied data; no as-of date is provided.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 727 | 0 | 727 | 221.25 sq. m | Not available—no drawing measurements supplied | Not supplied |
| 4BHK | 291 | 0 | 291 | 297.6 sq. m | Not available—no drawing measurements supplied | Not supplied |
Saleable area is the area disclosed in the RERA unit schedule. The supplied evidence does not include a usable software-measured carpet area or a loading figure for either configuration, so these cannot be compared or inferred. The floor-plan review says its software measurements are drawing-based and are not RERA disclosures; in this project’s supplied records, no floor plan has been measured.
The RERA unit table also contains six floor-label entries—ground, first through fifth floors—and two “58F Amenities” entries. These are not additional homes available for sale.
Parking & vehicle circulation
The building-permit extraction records 82,462.58 sq. m of total parking area. It describes five common basement levels under each tower and the clubhouse, and the Cyberabad Municipal Corporation permit states that cellar and stilt areas approved for parking must be used exclusively for vehicles.
The supplied permit extraction does not state a number of parking spaces, distinguish resident from visitor or accessible spaces, identify a mechanical-parking system, or provide a parking-allocation schedule for individual apartments. Although the permit requires parking areas in buildings to include electric-vehicle charging infrastructure, the supplied documents do not specify the number or location of charging points. A drawn or sanctioned parking provision does not, by itself, establish exclusive allocation to a particular buyer.
Amenities, recreation & open spaces
The RERA filing lists 14 amenity/service categories. Their availability is marked “YES” where shown, but the supplied progress percentages are 0; this does not establish that a facility has been completed or independently inspected.
| Description / size | Permitted as a separate building with 5 common basements, ground floor and 5 upper floors. |
|---|---|
| Evidence source | HMDA/Cyberabad building-permit records |
| Declared progress / verified status | Sanctioned; completion not verified. |
| Description / size | Tot-lot area recorded as 2,284.91 sq. m. |
|---|---|
| Evidence source | Building-permit extraction |
| Declared progress / verified status | Sanctioned; permit requires fencing and greenery before occupancy certificate; completion not verified. |
| Description / size | RERA amenity schedule marks available “YES”; no dimensions supplied. |
|---|---|
| Evidence source | TG-RERA amenity schedule |
| Declared progress / verified status | Declared in schedule; progress 0; completion not verified. |
| Description / size | Marked “YES” in the RERA amenity schedule; no further description or size supplied. |
|---|---|
| Evidence source | TG-RERA amenity schedule |
| Declared progress / verified status | Declared in schedule; progress 0; completion not verified. |
| Description / size | Marked “YES” in the RERA amenity schedule. |
|---|---|
| Evidence source | TG-RERA amenity schedule |
| Declared progress / verified status | Declared in schedule; progress 0; completion not verified. |
| Description / size | Marked “YES”; source, storage capacity and supply arrangements are not specified in the supplied amenity schedule. |
|---|---|
| Evidence source | TG-RERA amenity schedule |
| Declared progress / verified status | Declared in schedule; progress 0; completion not verified. |
| Description / size | RERA schedule lists sewerage and treatment/disposal of sewage and sullage water; the building permit lists an STP. No capacity is supplied. |
|---|---|
| Evidence source | TG-RERA amenity schedule and building-permit extraction |
| Declared progress / verified status | Declared / permitted; progress 0 in the amenity schedule; completion not verified. |
| Description / size | Marked “YES”; no network or capacity details supplied. |
|---|---|
| Evidence source | TG-RERA amenity schedule |
| Declared progress / verified status | Declared in schedule; progress 0; completion not verified. |
| Description / size | Permit records 5 rainwater-harvesting pits. |
|---|---|
| Evidence source | Building-permit extraction |
| Declared progress / verified status | Sanctioned; installation not verified. |
| Description / size | Permit records 1,010 trees. |
|---|---|
| Evidence source | Building-permit extraction |
| Declared progress / verified status | Recorded in permit; planting status not verified. |
| Description / size | Marked “YES” in the RERA amenity schedule; specifications not supplied. |
|---|---|
| Evidence source | TG-RERA amenity schedule |
| Declared progress / verified status | Declared in schedule; progress 0; completion not verified. |
| Description / size | Marked “YES”; permit also requires a garbage house within the premises. |
|---|---|
| Evidence source | TG-RERA schedule and building-permit order |
| Declared progress / verified status | Declared / required; progress 0 in the schedule; completion not verified. |
| Description / size | Both categories are marked “YES”; detailed equipment or capacity is not supplied in the amenity schedule. |
|---|---|
| Evidence source | TG-RERA amenity schedule |
| Declared progress / verified status | Declared in schedule; progress 0; completion not verified. |
| Description / size | Marked “YES” in the RERA amenity schedule; the supplied record does not establish installed systems or a final fire certificate. |
|---|---|
| Evidence source | TG-RERA amenity schedule |
| Declared progress / verified status | Declared in schedule; progress 0; completion not verified. |
| Description / size | Marked “YES”; the building permit requires transformer space but supplies no capacity. |
|---|---|
| Evidence source | TG-RERA schedule and building-permit extraction |
| Declared progress / verified status | Declared / required; completion not verified. |
| Description / size | The RERA schedule includes “Aggregate area of recreational Open Space,” but the supplied extract gives no area. |
|---|---|
| Evidence source | TG-RERA amenity schedule |
| Declared progress / verified status | No progress or verified-completion evidence supplied. |
Utilities, building services & safety
Water and drainage: The RERA amenity schedule lists water supply, sewerage, storm-water drains, sewage/sullage treatment and water conservation. The permit specifies five rainwater-harvesting pits and requires a rainwater-harvesting structure; it also requires a minimum 100 ft distance from the raw-water channel to the building line and refers to a 4.50-metre buffer belt along the channel. The supplied record does not state water source, storage or STP capacity, and does not verify installation or operation.
Electrical services: The amenity schedule lists an electrical meter room, substation and receiving station. The building-permit extraction requires transformer space and includes a requirement for electric-vehicle charging infrastructure in parking areas. No electrical load, transformer capacity, backup-power capacity or count of charging points is provided.
Vertical transportation and fire/life safety: No lift count, lift capacity, stair count or detailed escape/access arrangements are supplied. Fire protection and fire safety appear in the RERA amenity schedule, but the supplied evidence does not verify installed systems or a final fire-safety certificate.
Waste, security and accessibility: The RERA schedule lists solid-waste management and disposal, and the building permit requires a garbage house within the premises. The supplied project data does not specify CCTV, access-control arrangements, accessible routes or ramps. These features are therefore not confirmed by this Overview.
Location, access & connectivity
The registered location is Plot No. 16, Neopolis Layout, Kokapet Village, Gandipet Mandal, Ranga Reddy District, PIN 500075, Survey Nos. 239 and 240. The RERA filing records a 45-metre-wide road on the eastern boundary.
The supplied location record gives these mapped distances; the record does not identify the measurement method or an as-of date.
| Reference point | Category | Supplied distance |
|---|---|---|
| Financial District (Nanakramguda) | Anchor | 2.1 km |
| ICICI Bank | Bank | 1.1 km |
| CBIT bus stop | Bus stop | 1.4 km |
| Mahatma Gandhi Institute of Technology | College | 1.5 km |
| Continental Hospitals | Hospital | 2.0 km |
| Capgemini | IT office | 0.2 km |
| Golden Mile Park | Park | 0.8 km |
| Unnamed school | School | 1.9 km |
A cadastral parcel-centroid coordinate is supplied as 17.40282, 78.32868; it is a parcel-centroid reference, not a surveyed project entrance coordinate. The supplied evidence does not give public-transport routes beyond the bus-stop distance, approach-road details beyond the eastern boundary road, or travel times.
Developer & development status
The registered promoter is GODREJ PROPERTIES LIMITED, identified as a public limited company. Its GSTIN is 36AAACG3995M2Z1. The supplied promoter address is Navayuga Vizva, Miyapur-Gachibowli Road, Neopolis, Neopolis Layout, Gandipet, Ranga Reddy, PIN 500075.
The RERA record identifies the project as a “New Project” and records three building units. No independent construction-progress or site-inspection evidence is supplied. The building permit sets a construction-completion deadline of 20/08/2031 and requires an Occupancy Certificate before occupation; no Occupancy Certificate is included in the supplied documents.
The promoter’s Form B declaration states that it has legal title to the project land, that the land is free of encumbrances, and that it will complete the project by a date extracted as “0 • 08 • 2031.” This is a promoter declaration, not independent verification of title or completion.
Approvals, official records & documents
| Supplied evidence | Form C, P02400011291, valid 20/08/2026–20/08/2031. |
|---|---|
| Scope / note | Project registration; not an Occupancy Certificate. |
| Supplied evidence | HMDA Permit No. 2439/HMDA/SWBP/2026, approved 20/08/2026; building-permit order issued by Cyberabad Municipal Corporation. |
|---|---|
| Scope / note | Covers the two residential towers and clubhouse on Plot No. 16, Survey Nos. 239 and 240. |
| Supplied evidence | HMDA approval letter forwarding technically approved plans to the Municipal Commissioner, Cyberabad Municipal Corporation, for release of proceedings and plans. |
|---|---|
| Scope / note | Technical-approval record. |
| Supplied evidence | LC1/5550/2021, recorded in the building-permit material. |
|---|---|
| Scope / note | Public HMDA approved-layout lookup is recorded as unavailable in the supplied evidence. |
| Supplied evidence | Registered sale deed material and title reports are listed in the project file. |
|---|---|
| Scope / note | Full title-chain analysis belongs in the Land & Title section. |
| Supplied evidence | Mortgage Deed No. 14131/2026, dated 13/08/2026; the building-permit material records 24,825.80 sq. m mortgaged to the Metropolitan Commissioner, HMDA. |
|---|---|
| Scope / note | Permit records the mortgaged area and restricts its registration until an Occupancy Certificate is produced. |
| Supplied evidence | SIA/TG/INFRA2/572719/2026, dated 18/06/2026 in the permit extraction. |
|---|---|
| Scope / note | The permit references this record; this Overview does not assess environmental-clearance conditions or compliance. |
| Supplied evidence | JNTU/CEH/CIVIL/PC/227/2026, dated 17.08.2026 in the permit extraction. |
|---|---|
| Scope / note | Reference recorded in the building-permit material. |
| Supplied evidence | Contractor’s All Risk Policy No. 20260380268900; Property Watch Register CS No. 14096/2026; bank-guarantee number recorded as ILLEGIBLE. |
|---|---|
| Scope / note | Listed as recorded in the permit extraction. |
No Occupancy Certificate or completion certificate is included in the supplied documents. The building permit requires an Occupancy Certificate before occupation and directs the promoter to approach HMDA for it after construction.
Frequently asked questions
Is GODREJ EPOQUE registered with Telangana RERA?
Yes. GODREJ EPOQUE is registered with the Telangana Real Estate Regulatory Authority as P02400011291; the registration status is New Project.
Who is the developer of GODREJ EPOQUE?
The promoter named in the RERA registration is GODREJ PROPERTIES LIMITED.
Where is GODREJ EPOQUE located?
GODREJ EPOQUE is in NEOPOLIS LAYOUT, koKapet, Gandipet, Rangareddy, Telangana (500075).
When will GODREJ EPOQUE be completed?
The promoter's proposed date of completion filed with RERA is 20/08/2031. This is the promoter's declaration, not a guarantee.