Suvarchala Nilayam
SRI KANAKADURGA CONSTRUCTIONS · Hanamkonda · RERA P00300004842
SUVARCHALA NILAYAM is a residential apartment project near NIT, Kazipet, Hanamkonda mandal, Warangal Urban district. It is being developed by the registered promoter, SRI KANAKADURGA CONSTRUCTIONS. The project occupies 618.55 sqmts and comprises 1 building with 1 Stilt + 5 upper floors, with 10 3BHK units. It is registered with TG-RERA under P00300004842, and its proposed completion is 01/01/2028.
More from Sri Kanakadurga Constructions · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | SUVARCHALA NILAYAM RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified; the registration and building permit describe one building RERA record |
| TG-RERA registration | P00300004842; registration certificate issued 23/08/2022 and valid from 23/08/2022 to 01/09/2027. This is registration validity, not the completion deadline. RERA record |
| Registered promoter | SRI KANAKADURGA CONSTRUCTIONS; partnership RERA filing Corporate record |
| RERA status | The supplied certificate records registration; no extension is recorded in the certificate. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | RERA filing: NEAR NIT, KAZIPET. RERA record RERA filing |
| Revenue village | Waddepally is stated in the filed title documents and building permit; the RERA land-details field itself says “not disclosed.” Land records |
| Mandal / district / PIN | Hanamkonda / Warangal Urban / 506002 RERA record |
| Survey numbers | Sy.Nos. 532 and 533; subdivision details are not disclosed in the supplied project record. RERA record Land records |
| Plots referenced in the record | 118 & 128 RERA filing |
| Registered site extent | Building permit: 618.55 m2 site area and 618.55 m2 net area; road-affected area recorded as 0 m2. The RERA land-details record also gives total and net area as 618.55 sqmts. RERA filing |
| Boundaries in RERA filing | East: HNO 1-1-48 A OF D RAMARAO; West: HOUSE OF RAMGOPAL RAO 1-1-65; North: 12 M ROAD; South: HOUSE OF OTHERS. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Warangal Municipal Corporation; the RERA filing identifies the authority as DTCP. Approvals record |
| Principal building approval | Building Permit Order / File No. 3006/31380/W51/2021, approved 01 September, 2021. Approvals record |
| Other layout identifiers on the permit | Layout ID LRS/C1/359/2012; Layout LRS No. 358/2012. |
| Approved built-up area | 1,591.35 sqmts in the RERA filing; the permit separately lists residential upper floors as 1,591.35 m2 and stilt as 313.53 m2. RERA filing |
| Building count and sanctioned floors | 1 building; 1 Stilt + 5 upper floors. The permit states a height of 14.99 m. RERA filing |
| Parking levels | Stilt is approved for parking; the permit also states that cellar and stilts approved for parking must be used exclusively for vehicle parking. A cellar is not otherwise identified in the stated floor configuration. |
| Unit counts | 10 units proposed in the RERA unit record; the approved building permit identifies one residential building. RERA unit table RERA filing |
Offering and status
| Item | Project record |
|---|---|
| Configuration | 3BHK, 10 units; RERA-filed saleable area 95.22 sqm per unit. RERA unit table RERA unit details |
| Booked / available | 10 booked / 0 available, as last read from the TG-RERA portal; the portal record supplied here has no as-of date, so counts are indicative. RERA unit table |
| Completion dates | RERA Form B declares completion by 01-09-2027; the project header lists proposed completion as 01/01/2028. RERA record |
| Construction stage | The supplied RERA amenities record marks some items at 100% and others at 0%; it does not provide an overall construction percentage or independently verified site-progress assessment. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents. The building permit says completion notice and an occupancy certificate are required before occupation. Document index |
2. The project story
SUVARCHALA NILAYAM is a single-building residential apartment development registered with TG-RERA under P00300004842. Its filed location is NEAR NIT, KAZIPET., in Hanamkonda, Warangal Urban; the permit and title materials identify Waddepally village and survey numbers 532 and 533. RERA record RERA filing Land records
The building permit allows 1 Stilt + 5 upper floors for a residential building on a stated site area of 618.55 m2. The project’s RERA unit record lists ten 3BHK units. The portal’s booking snapshot shows all ten booked, but it does not state the snapshot date. RERA unit table
The RERA record does not establish an overall construction-completion percentage. Its amenity-progress entries report water supply, sewerage, green strip/tot lot/park, rainwater harvesting and electrical meter room/sub-station/receiving station at 100%, while other listed items are at 0%. These are recorded progress fields, not independent site verification. No occupancy or completion certificate is supplied. RERA amenities Document index
3. Master plan, architecture & building design
The sanctioned record describes one residential building with 1 Stilt + 5 upper floors, a stated height of 14.99 m, and approved built-up area of 1,591.35 sqmts in the RERA filing. The permit lists a further 313.53 m2 for the stilt; these are the record’s separately labelled areas, not a carpet-area or saleable-area measurement. RERA filing
The permit lists setbacks as Front 3, Rear 3.5, Side I 3.5 and Side II 3.5; units for those figures are not specified in the supplied extraction. It records 18M road width and two rainwater harvesting structures.
The supplied material does not establish a floor-by-floor flat arrangement, building footprint, number of flats per floor, lift or stair count, internal circulation, landscaping dimensions, or a residential/common-area breakdown. The approved-plan document is available as a building permit extraction; no separately extracted floor-plan measurements are supplied. Document index
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 10 | 0 | 95.22 sqm | Not measured in supplied drawings data | Not supplied |
The configuration, unit count, booking status and saleable area are from the TG-RERA unit record. The drawing review reports no measured 3BHK flat designs; therefore no drawing-derived carpet area or room dimensions can be stated. RERA unit details Floor plans
Carpet area, saleable area and the share of common areas are distinct measures. The supplied record provides a RERA saleable-area figure, but no measured carpet area or loading figure for these units. RERA unit table Floor plans
5. Parking & vehicle circulation
The building permit states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted floor configuration expressly identifies a stilt but does not separately confirm a cellar.
The RERA-filed permit extraction and amenity record do not give a parking-space count, visitor or accessible parking provision, parking allocation by unit, or details of ramps, internal driveways, pedestrian separation or EV charging. A vendor record mentions open and covered parking, but does not supply counts or establish sanctioned provision or unit allocation. RERA amenities Promoter website
6. Amenities, recreation & open spaces
The following progress figures are entries in the RERA amenities record. They are not independent verification of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Sports/recreation — Green Strip/TOT LOT/Park | Size and quantity not supplied | RERA amenities | RERA record: 100%; not independently verified |
| Water Supply | Source, storage and capacity not supplied | RERA amenities | RERA record: YES; 100%; not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Capacity and treatment/reuse details not supplied | RERA amenities | RERA record: YES; 100%; not independently verified |
| Water Conservation, Rain water Harvesting | Building permit specifies 2 rainwater harvesting structures; design/capacity not supplied | RERA amenities | RERA record: YES; 100%; not independently verified |
| Electrical Meter Room, Sub-Station, Receiving Station | Capacity and equipment details not supplied | RERA amenities | RERA record: YES; 100%; not independently verified |
| Internal Roads & Footpaths | Size/details not supplied | RERA amenities | RERA record: 0% |
| Storm Water Drains | Details not supplied | RERA amenities | RERA record: 0% |
| Street Lighting | Details not supplied | RERA amenities | RERA record: 0% |
| Community Buildings | Facility/size not supplied | RERA amenities | RERA record: 0% |
| Treatment and Disposal of Sewage and Sullage Water | System details not supplied | RERA amenities | RERA record: 0% |
| Solid Waste Management and Disposal | System details not supplied | RERA amenities | RERA record: 0% |
| Energy management | Details not supplied | RERA amenities | RERA record: 0% |
| Fire Protection and Fire Safety Requirements | System details not supplied | RERA amenities | RERA record: 0% |
| Aggregate area of recreational open space | Area not supplied | RERA amenities | RERA record: 0% |
The permit also requires a garbage house within the premises and space for a transformer. These are permit conditions; the supplied record does not independently verify their installation or completion.
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, rainwater harvesting and the electrical meter room/sub-station/receiving station as present and 100% complete. It does not identify water sources, storage or treatment capacity; sewerage-system capacity, reuse or storm-water arrangements; or electrical supply, substation capacity or backup. RERA amenities
The building permit requires two rainwater harvesting structures, transformer space and a garbage house. It also requires the approved parking areas to remain dedicated to vehicle parking, and states that an occupancy certificate is compulsory before occupation. The supplied documents do not establish the installation or completion of these features.
No project-specific evidence is supplied for lift numbers or capacity, fire systems or clearances, emergency access, waste segregation, CCTV, controlled access, accessible ramps or other accessibility features. A vendor specification mentions lifts, water pumps and fire-fighting fittings, but is not a project-specific approval or verification record. Promoter website
8. Location, access & connectivity
The official project record identifies the locality as NEAR NIT, KAZIPET., Hanamkonda, Warangal Urban, PIN 506002. The building permit identifies WADDEPALLY [R V] and gives the permit locality as R.E.C MAIN ROAD_W51. RERA record
The RERA land record gives the northern boundary as 12 M ROAD, and the permit extraction lists road width as 18M. No project-specific public-transport details, route information or measured distances to landmarks are supplied. RERA filing
9. Developer & development status
The registered promoter is SRI KANAKADURGA CONSTRUCTIONS, identified in the RERA filing as a partnership. Its GSTIN is 36AENFS0605L1ZS. The supplied promoter address is H.NO.1-1-846, SIDDARTHA NAGAR, HANAMKONDA, CHAITANYAPURI COLONY, NEAR NIT, KAZIPET., Hanamkonda, Warangal Urban, 506002. Corporate record RERA filing RERA filing
The RERA project record names GUTTA SRILAKSHMI and DONTHI RAM REDDY as landowner/promoter participants, with an AreaShare agreement type. Parties record
Form B declares a completion undertaking of 01-09-2027. The project header separately records proposed completion as 01/01/2028. TG-RERA registration validity ends 01/09/2027; that is a separate date from the project completion deadline. RERA record
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA Registration Certificate, P00300004842 | Form C records registration of SUVARCHALA NILAYAM, valid from 23/08/2022 to 01/09/2027, subject to its stated conditions. |
| Greater Warangal Municipal Corporation Building Permit Order, 3006/31380/W51/2021 | Approved 01 September, 2021 for a residential building at the stated site in survey numbers 532 and 533, Waddepally; the permit records 1 Stilt + 5 upper floors and a site area of 618.55 m2. |
| Layout identifiers recorded on building permit | LRS/C1/359/2012 and 358/2012. |
| Form B declaration | Promoter declaration of land title, no encumbrances, separate-account obligations and completion by 01-09-2027. This is a promoter declaration. |
| Title report and filed title instruments | Title materials include Development Agreement-cum-Irrevocable GPA 30117/2021 and the referenced title-chain documents. |
| Occupancy / completion certificate | None included in the supplied project documents. Document index |
The building permit states that the permission does not confer ownership rights and requires the sanctioned plan to be followed, a commencement notice before construction, a completion notice after completion, and an occupancy certificate before occupation.
1. Project at a glance
Project identity
Registered name: SUVARCHALA NILAYAM
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified; the registration and building permit describe one building
TG-RERA registration: P00300004842; registration certificate issued 23/08/2022 and valid from 23/08/2022 to 01/09/2027. This is registration validity, not the completion deadline.
Registered promoter: SRI KANAKADURGA CONSTRUCTIONS; partnership
RERA status: The supplied certificate records registration; no extension is recorded in the certificate.
Land and geographic identity
Locality: RERA filing: NEAR NIT, KAZIPET.
Revenue village: Waddepally is stated in the filed title documents and building permit; the RERA land-details field itself says “not disclosed.”
Mandal / district / PIN: Hanamkonda / Warangal Urban / 506002
Survey numbers: Sy.Nos. 532 and 533; subdivision details are not disclosed in the supplied project record.
Plots referenced in the record: 118 & 128
Registered site extent: Building permit: 618.55 m2 site area and 618.55 m2 net area; road-affected area recorded as 0 m2. The RERA land-details record also gives total and net area as 618.55 sqmts.
Boundaries in RERA filing: East: HNO 1-1-48 A OF D RAMARAO; West: HOUSE OF RAMGOPAL RAO 1-1-65; North: 12 M ROAD; South: HOUSE OF OTHERS.
Development identity
Sanctioning authority: Greater Warangal Municipal Corporation; the RERA filing identifies the authority as DTCP.
Principal building approval: Building Permit Order / File No. 3006/31380/W51/2021, approved 01 September, 2021.
Other layout identifiers on the permit: Layout ID LRS/C1/359/2012; Layout LRS No. 358/2012.
Approved built-up area: 1,591.35 sqmts in the RERA filing; the permit separately lists residential upper floors as 1,591.35 m2 and stilt as 313.53 m2.
Building count and sanctioned floors: 1 building; 1 Stilt + 5 upper floors. The permit states a height of 14.99 m.
Parking levels: Stilt is approved for parking; the permit also states that cellar and stilts approved for parking must be used exclusively for vehicle parking. A cellar is not otherwise identified in the stated floor configuration.
Unit counts: 10 units proposed in the RERA unit record; the approved building permit identifies one residential building.
Offering and status
Configuration: 3BHK, 10 units; RERA-filed saleable area 95.22 sqm per unit.
Booked / available: 10 booked / 0 available, as last read from the TG-RERA portal; the portal record supplied here has no as-of date, so counts are indicative.
Completion dates: RERA Form B declares completion by 01-09-2027; the project header lists proposed completion as 01/01/2028.
Construction stage: The supplied RERA amenities record marks some items at 100% and others at 0%; it does not provide an overall construction percentage or independently verified site-progress assessment.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents. The building permit says completion notice and an occupancy certificate are required before occupation.
2. The project story
SUVARCHALA NILAYAM is a single-building residential apartment development registered with TG-RERA under P00300004842. Its filed location is NEAR NIT, KAZIPET., in Hanamkonda, Warangal Urban; the permit and title materials identify Waddepally village and survey numbers 532 and 533.
The building permit allows 1 Stilt + 5 upper floors for a residential building on a stated site area of 618.55 m2. The project’s RERA unit record lists ten 3BHK units. The portal’s booking snapshot shows all ten booked, but it does not state the snapshot date.
The RERA record does not establish an overall construction-completion percentage. Its amenity-progress entries report water supply, sewerage, green strip/tot lot/park, rainwater harvesting and electrical meter room/sub-station/receiving station at 100%, while other listed items are at 0%. These are recorded progress fields, not independent site verification. No occupancy or completion certificate is supplied.
3. Master plan, architecture & building design
The sanctioned record describes one residential building with 1 Stilt + 5 upper floors, a stated height of 14.99 m, and approved built-up area of 1,591.35 sqmts in the RERA filing. The permit lists a further 313.53 m2 for the stilt; these are the record’s separately labelled areas, not a carpet-area or saleable-area measurement.
The permit lists setbacks as Front 3, Rear 3.5, Side I 3.5 and Side II 3.5; units for those figures are not specified in the supplied extraction. It records 18M road width and two rainwater harvesting structures.
The supplied material does not establish a floor-by-floor flat arrangement, building footprint, number of flats per floor, lift or stair count, internal circulation, landscaping dimensions, or a residential/common-area breakdown. The approved-plan document is available as a building permit extraction; no separately extracted floor-plan measurements are supplied.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 10 | 0 | 95.22 sqm | Not measured in supplied drawings data | Not supplied |
The configuration, unit count, booking status and saleable area are from the TG-RERA unit record. The drawing review reports no measured 3BHK flat designs; therefore no drawing-derived carpet area or room dimensions can be stated.
Carpet area, saleable area and the share of common areas are distinct measures. The supplied record provides a RERA saleable-area figure, but no measured carpet area or loading figure for these units.
5. Parking & vehicle circulation
The building permit states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted floor configuration expressly identifies a stilt but does not separately confirm a cellar.
The RERA-filed permit extraction and amenity record do not give a parking-space count, visitor or accessible parking provision, parking allocation by unit, or details of ramps, internal driveways, pedestrian separation or EV charging. A vendor record mentions open and covered parking, but does not supply counts or establish sanctioned provision or unit allocation.
6. Amenities, recreation & open spaces
The following progress figures are entries in the RERA amenities record. They are not independent verification of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Sports/recreation — Green Strip/TOT LOT/Park | Size and quantity not supplied | RERA record: 100%; not independently verified | |
| Water Supply | Source, storage and capacity not supplied | RERA record: YES; 100%; not independently verified | |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Capacity and treatment/reuse details not supplied | RERA record: YES; 100%; not independently verified | |
| Water Conservation, Rain water Harvesting | Building permit specifies 2 rainwater harvesting structures; design/capacity not supplied | RERA record: YES; 100%; not independently verified | |
| Electrical Meter Room, Sub-Station, Receiving Station | Capacity and equipment details not supplied | RERA record: YES; 100%; not independently verified | |
| Internal Roads & Footpaths | Size/details not supplied | RERA record: 0% | |
| Storm Water Drains | Details not supplied | RERA record: 0% | |
| Street Lighting | Details not supplied | RERA record: 0% | |
| Community Buildings | Facility/size not supplied | RERA record: 0% | |
| Treatment and Disposal of Sewage and Sullage Water | System details not supplied | RERA record: 0% | |
| Solid Waste Management and Disposal | System details not supplied | RERA record: 0% | |
| Energy management | Details not supplied | RERA record: 0% | |
| Fire Protection and Fire Safety Requirements | System details not supplied | RERA record: 0% | |
| Aggregate area of recreational open space | Area not supplied | RERA record: 0% |
The permit also requires a garbage house within the premises and space for a transformer. These are permit conditions; the supplied record does not independently verify their installation or completion.
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, rainwater harvesting and the electrical meter room/sub-station/receiving station as present and 100% complete. It does not identify water sources, storage or treatment capacity; sewerage-system capacity, reuse or storm-water arrangements; or electrical supply, substation capacity or backup.
The building permit requires two rainwater harvesting structures, transformer space and a garbage house. It also requires the approved parking areas to remain dedicated to vehicle parking, and states that an occupancy certificate is compulsory before occupation. The supplied documents do not establish the installation or completion of these features.
No project-specific evidence is supplied for lift numbers or capacity, fire systems or clearances, emergency access, waste segregation, CCTV, controlled access, accessible ramps or other accessibility features. A vendor specification mentions lifts, water pumps and fire-fighting fittings, but is not a project-specific approval or verification record.
8. Location, access & connectivity
The official project record identifies the locality as NEAR NIT, KAZIPET., Hanamkonda, Warangal Urban, PIN 506002. The building permit identifies WADDEPALLY [R V] and gives the permit locality as R.E.C MAIN ROAD_W51.
The RERA land record gives the northern boundary as 12 M ROAD, and the permit extraction lists road width as 18M. No project-specific public-transport details, route information or measured distances to landmarks are supplied.
9. Developer & development status
The registered promoter is SRI KANAKADURGA CONSTRUCTIONS, identified in the RERA filing as a partnership. Its GSTIN is 36AENFS0605L1ZS. The supplied promoter address is H.NO.1-1-846, SIDDARTHA NAGAR, HANAMKONDA, CHAITANYAPURI COLONY, NEAR NIT, KAZIPET., Hanamkonda, Warangal Urban, 506002.
The RERA project record names GUTTA SRILAKSHMI and DONTHI RAM REDDY as landowner/promoter participants, with an AreaShare agreement type.
Form B declares a completion undertaking of 01-09-2027. The project header separately records proposed completion as 01/01/2028. TG-RERA registration validity ends 01/09/2027; that is a separate date from the project completion deadline.
10. Approvals, official records & documents
TG-RERA Registration Certificate, P00300004842: Form C records registration of SUVARCHALA NILAYAM, valid from 23/08/2022 to 01/09/2027, subject to its stated conditions.
Greater Warangal Municipal Corporation Building Permit Order, 3006/31380/W51/2021: Approved 01 September, 2021 for a residential building at the stated site in survey numbers 532 and 533, Waddepally; the permit records 1 Stilt + 5 upper floors and a site area of 618.55 m2.
Layout identifiers recorded on building permit: LRS/C1/359/2012 and 358/2012.
Form B declaration: Promoter declaration of land title, no encumbrances, separate-account obligations and completion by 01-09-2027. This is a promoter declaration.
Title report and filed title instruments: Title materials include Development Agreement-cum-Irrevocable GPA 30117/2021 and the referenced title-chain documents.
Occupancy / completion certificate: None included in the supplied project documents.
The building permit states that the permission does not confer ownership rights and requires the sanctioned plan to be followed, a commencement notice before construction, a completion notice after completion, and an occupancy certificate before occupation.
Frequently asked questions
Is SUVARCHALA NILAYAM registered with Telangana RERA?
Yes. SUVARCHALA NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P00300004842; the registration status is New Project.
Who is the developer of SUVARCHALA NILAYAM?
The promoter named in the RERA registration is SRI KANAKADURGA CONSTRUCTIONS.
Where is SUVARCHALA NILAYAM located?
SUVARCHALA NILAYAM is in NEAR NIT , KAZIPET ., Hanamkonda, Telangana (506002).
When will SUVARCHALA NILAYAM be completed?
The promoter's proposed date of completion filed with RERA is 01/01/2028. This is the promoter's declaration, not a guarantee.