SUVARCHALA NILAYAM is a residential apartment project near NIT, Kazipet, Hanamkonda mandal, Warangal Urban district. It is being developed by the registered promoter, SRI KANAKADURGA CONSTRUCTIONS. The project occupies 618.55 sqmts and comprises 1 building with 1 Stilt + 5 upper floors, with 10 3BHK units. It is registered with TG-RERA under P00300004842, and its proposed completion is 01/01/2028.

More from Sri Kanakadurga Constructions · 4 projects →

01What we found

RegisteredTG-RERA - valid till 1 Sep 2027
18documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameSUVARCHALA NILAYAM RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified; the registration and building permit describe one building RERA record
TG-RERA registrationP00300004842; registration certificate issued 23/08/2022 and valid from 23/08/2022 to 01/09/2027. This is registration validity, not the completion deadline. RERA record
Registered promoterSRI KANAKADURGA CONSTRUCTIONS; partnership RERA filing Corporate record
RERA statusThe supplied certificate records registration; no extension is recorded in the certificate.

Land and geographic identity

ItemProject record
LocalityRERA filing: NEAR NIT, KAZIPET. RERA record RERA filing
Revenue villageWaddepally is stated in the filed title documents and building permit; the RERA land-details field itself says “not disclosed.” Land records
Mandal / district / PINHanamkonda / Warangal Urban / 506002 RERA record
Survey numbersSy.Nos. 532 and 533; subdivision details are not disclosed in the supplied project record. RERA record Land records
Plots referenced in the record118 & 128 RERA filing
Registered site extentBuilding permit: 618.55 m2 site area and 618.55 m2 net area; road-affected area recorded as 0 m2. The RERA land-details record also gives total and net area as 618.55 sqmts. RERA filing
Boundaries in RERA filingEast: HNO 1-1-48 A OF D RAMARAO; West: HOUSE OF RAMGOPAL RAO 1-1-65; North: 12 M ROAD; South: HOUSE OF OTHERS. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Warangal Municipal Corporation; the RERA filing identifies the authority as DTCP. Approvals record
Principal building approvalBuilding Permit Order / File No. 3006/31380/W51/2021, approved 01 September, 2021. Approvals record
Other layout identifiers on the permitLayout ID LRS/C1/359/2012; Layout LRS No. 358/2012.
Approved built-up area1,591.35 sqmts in the RERA filing; the permit separately lists residential upper floors as 1,591.35 m2 and stilt as 313.53 m2. RERA filing
Building count and sanctioned floors1 building; 1 Stilt + 5 upper floors. The permit states a height of 14.99 m. RERA filing
Parking levelsStilt is approved for parking; the permit also states that cellar and stilts approved for parking must be used exclusively for vehicle parking. A cellar is not otherwise identified in the stated floor configuration.
Unit counts10 units proposed in the RERA unit record; the approved building permit identifies one residential building. RERA unit table RERA filing

Offering and status

ItemProject record
Configuration3BHK, 10 units; RERA-filed saleable area 95.22 sqm per unit. RERA unit table RERA unit details
Booked / available10 booked / 0 available, as last read from the TG-RERA portal; the portal record supplied here has no as-of date, so counts are indicative. RERA unit table
Completion datesRERA Form B declares completion by 01-09-2027; the project header lists proposed completion as 01/01/2028. RERA record
Construction stageThe supplied RERA amenities record marks some items at 100% and others at 0%; it does not provide an overall construction percentage or independently verified site-progress assessment. RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The building permit says completion notice and an occupancy certificate are required before occupation. Document index

2. The project story

SUVARCHALA NILAYAM is a single-building residential apartment development registered with TG-RERA under P00300004842. Its filed location is NEAR NIT, KAZIPET., in Hanamkonda, Warangal Urban; the permit and title materials identify Waddepally village and survey numbers 532 and 533. RERA record RERA filing Land records

The building permit allows 1 Stilt + 5 upper floors for a residential building on a stated site area of 618.55 m2. The project’s RERA unit record lists ten 3BHK units. The portal’s booking snapshot shows all ten booked, but it does not state the snapshot date. RERA unit table

The RERA record does not establish an overall construction-completion percentage. Its amenity-progress entries report water supply, sewerage, green strip/tot lot/park, rainwater harvesting and electrical meter room/sub-station/receiving station at 100%, while other listed items are at 0%. These are recorded progress fields, not independent site verification. No occupancy or completion certificate is supplied. RERA amenities Document index

3. Master plan, architecture & building design

The sanctioned record describes one residential building with 1 Stilt + 5 upper floors, a stated height of 14.99 m, and approved built-up area of 1,591.35 sqmts in the RERA filing. The permit lists a further 313.53 m2 for the stilt; these are the record’s separately labelled areas, not a carpet-area or saleable-area measurement. RERA filing

The permit lists setbacks as Front 3, Rear 3.5, Side I 3.5 and Side II 3.5; units for those figures are not specified in the supplied extraction. It records 18M road width and two rainwater harvesting structures.

The supplied material does not establish a floor-by-floor flat arrangement, building footprint, number of flats per floor, lift or stair count, internal circulation, landscaping dimensions, or a residential/common-area breakdown. The approved-plan document is available as a building permit extraction; no separately extracted floor-plan measurements are supplied. Document index

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1010095.22 sqmNot measured in supplied drawings dataNot supplied

The configuration, unit count, booking status and saleable area are from the TG-RERA unit record. The drawing review reports no measured 3BHK flat designs; therefore no drawing-derived carpet area or room dimensions can be stated. RERA unit details Floor plans

Carpet area, saleable area and the share of common areas are distinct measures. The supplied record provides a RERA saleable-area figure, but no measured carpet area or loading figure for these units. RERA unit table Floor plans

5. Parking & vehicle circulation

The building permit states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted floor configuration expressly identifies a stilt but does not separately confirm a cellar.

The RERA-filed permit extraction and amenity record do not give a parking-space count, visitor or accessible parking provision, parking allocation by unit, or details of ramps, internal driveways, pedestrian separation or EV charging. A vendor record mentions open and covered parking, but does not supply counts or establish sanctioned provision or unit allocation. RERA amenities Promoter website

6. Amenities, recreation & open spaces

The following progress figures are entries in the RERA amenities record. They are not independent verification of completion.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Sports/recreation — Green Strip/TOT LOT/ParkSize and quantity not suppliedRERA amenitiesRERA record: 100%; not independently verified
Water SupplySource, storage and capacity not suppliedRERA amenitiesRERA record: YES; 100%; not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)Capacity and treatment/reuse details not suppliedRERA amenitiesRERA record: YES; 100%; not independently verified
Water Conservation, Rain water HarvestingBuilding permit specifies 2 rainwater harvesting structures; design/capacity not suppliedRERA amenitiesRERA record: YES; 100%; not independently verified
Electrical Meter Room, Sub-Station, Receiving StationCapacity and equipment details not suppliedRERA amenitiesRERA record: YES; 100%; not independently verified
Internal Roads & FootpathsSize/details not suppliedRERA amenitiesRERA record: 0%
Storm Water DrainsDetails not suppliedRERA amenitiesRERA record: 0%
Street LightingDetails not suppliedRERA amenitiesRERA record: 0%
Community BuildingsFacility/size not suppliedRERA amenitiesRERA record: 0%
Treatment and Disposal of Sewage and Sullage WaterSystem details not suppliedRERA amenitiesRERA record: 0%
Solid Waste Management and DisposalSystem details not suppliedRERA amenitiesRERA record: 0%
Energy managementDetails not suppliedRERA amenitiesRERA record: 0%
Fire Protection and Fire Safety RequirementsSystem details not suppliedRERA amenitiesRERA record: 0%
Aggregate area of recreational open spaceArea not suppliedRERA amenitiesRERA record: 0%

The permit also requires a garbage house within the premises and space for a transformer. These are permit conditions; the supplied record does not independently verify their installation or completion.

7. Utilities, building services & safety

The RERA amenities record marks water supply, sewerage, rainwater harvesting and the electrical meter room/sub-station/receiving station as present and 100% complete. It does not identify water sources, storage or treatment capacity; sewerage-system capacity, reuse or storm-water arrangements; or electrical supply, substation capacity or backup. RERA amenities

The building permit requires two rainwater harvesting structures, transformer space and a garbage house. It also requires the approved parking areas to remain dedicated to vehicle parking, and states that an occupancy certificate is compulsory before occupation. The supplied documents do not establish the installation or completion of these features.

No project-specific evidence is supplied for lift numbers or capacity, fire systems or clearances, emergency access, waste segregation, CCTV, controlled access, accessible ramps or other accessibility features. A vendor specification mentions lifts, water pumps and fire-fighting fittings, but is not a project-specific approval or verification record. Promoter website

8. Location, access & connectivity

The official project record identifies the locality as NEAR NIT, KAZIPET., Hanamkonda, Warangal Urban, PIN 506002. The building permit identifies WADDEPALLY [R V] and gives the permit locality as R.E.C MAIN ROAD_W51. RERA record

The RERA land record gives the northern boundary as 12 M ROAD, and the permit extraction lists road width as 18M. No project-specific public-transport details, route information or measured distances to landmarks are supplied. RERA filing

9. Developer & development status

The registered promoter is SRI KANAKADURGA CONSTRUCTIONS, identified in the RERA filing as a partnership. Its GSTIN is 36AENFS0605L1ZS. The supplied promoter address is H.NO.1-1-846, SIDDARTHA NAGAR, HANAMKONDA, CHAITANYAPURI COLONY, NEAR NIT, KAZIPET., Hanamkonda, Warangal Urban, 506002. Corporate record RERA filing RERA filing

The RERA project record names GUTTA SRILAKSHMI and DONTHI RAM REDDY as landowner/promoter participants, with an AreaShare agreement type. Parties record

Form B declares a completion undertaking of 01-09-2027. The project header separately records proposed completion as 01/01/2028. TG-RERA registration validity ends 01/09/2027; that is a separate date from the project completion deadline. RERA record

10. Approvals, official records & documents

RecordWhat the supplied document establishes
TG-RERA Registration Certificate, P00300004842Form C records registration of SUVARCHALA NILAYAM, valid from 23/08/2022 to 01/09/2027, subject to its stated conditions.
Greater Warangal Municipal Corporation Building Permit Order, 3006/31380/W51/2021Approved 01 September, 2021 for a residential building at the stated site in survey numbers 532 and 533, Waddepally; the permit records 1 Stilt + 5 upper floors and a site area of 618.55 m2.
Layout identifiers recorded on building permitLRS/C1/359/2012 and 358/2012.
Form B declarationPromoter declaration of land title, no encumbrances, separate-account obligations and completion by 01-09-2027. This is a promoter declaration.
Title report and filed title instrumentsTitle materials include Development Agreement-cum-Irrevocable GPA 30117/2021 and the referenced title-chain documents.
Occupancy / completion certificateNone included in the supplied project documents. Document index

The building permit states that the permission does not confer ownership rights and requires the sanctioned plan to be followed, a commencement notice before construction, a completion notice after completion, and an occupancy certificate before occupation.

Frequently asked questions

Is SUVARCHALA NILAYAM registered with Telangana RERA?

Yes. SUVARCHALA NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P00300004842; the registration status is New Project.

Who is the developer of SUVARCHALA NILAYAM?

The promoter named in the RERA registration is SRI KANAKADURGA CONSTRUCTIONS.

Where is SUVARCHALA NILAYAM located?

SUVARCHALA NILAYAM is in NEAR NIT , KAZIPET ., Hanamkonda, Telangana (506002).

When will SUVARCHALA NILAYAM be completed?

The promoter's proposed date of completion filed with RERA is 01/01/2028. This is the promoter's declaration, not a guarantee.