Akshaya Residency
AKSHAYA DEVELOPERS · Karimnagar · RERA P02700002258
AKSHAYA RESIDENCY is a residential apartment project in WARD 39, Karimnagar, Karimnagar district. It is being developed by the registered promoter AKSHAYA DEVELOPERS, recorded as a partnership. The project occupies 401.6 sq m and comprises one residential building with 1 Stilt + 4 upper floors and 4 3BHK units. Its TG-RERA registration number is P02700002258, issued 30/10/2020, and the proposed completion date in the project fields is 30/11/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | AKSHAYA RESIDENCY RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | No separate phase is identified in the supplied record; the registration is for AKSHAYA RESIDENCY. RERA record |
| TG-RERA registration | P02700002258; issued 30/10/2020. RERA record |
| Registration validity | Certificate states validity from 30/10/2020 to 04/07/2026; extension is not recorded in the supplied certificate. This is the registration period, not the construction completion date. RERA record |
| Registered promoter | AKSHAYA DEVELOPERS; recorded as a partnership. RERA record RERA filing Corporate record |
| RERA status | The supplied registration certificate grants registration under section 5. The portal record labels the project “New Project”; no current construction-status verification is supplied. RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / address identifiers | WARD 39; Mukarampura is named in the building-permit extraction. House identifier recorded in that order: 12-7-817/1 & 2-7-846. RERA record RERA filing |
| Revenue village | Not disclosed in the supplied RERA land record. “WARD 39” is recorded as village/locality in the filing, but a revenue village is not established. Land records RERA filing |
| Mandal | Not disclosed. Land records |
| District / PIN | Karimnagar / 505001. RERA record |
| Survey numbers and subdivisions | 2-7-817/1& 2-7-846, as recorded in the project filing and registration certificate. RERA record RERA filing |
| Site area | Total area: 401.6 sq m; net area: 401.60 sq m in the RERA filing. The building-permit extraction also records extent 401.6 m2 and a sanctioned net area of 371.14 m2. RERA filing |
| Area affected by road widening / FTL / nala widening | 0 sq m in the RERA land fields. Separately, the building-permit extraction records a road-affected area of 30.46 m2 and a condition concerning surrender of the affected portion. RERA filing |
| Boundaries in RERA filing | East: OTHER LAND; West: OTHER LAND; North: OTHER LAND; South: ROAD WIDTH 9. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Karimnagar Municipal Corporation, as stated in the building permit. |
| Principal building approval | Building Permit Order / approval no. 3011/W39/2020/5857, approved 29 July, 2020. The project filing identifies the same number as its plan approval. Approvals record |
| Approved built-up area | 1081.38 sq m in the RERA project fields. The permit extraction separately lists upper floors area 865.08 m2 and stilt area 199.67 m2. RERA filing |
| Building count and floors | One residential building; sanctioned as 1 Stilt + 4 upper floors. The permit extraction records height 11.54 m. RERA filing |
| Parking levels / provision | Stilt is included in the sanctioned configuration. The permit states that the cellar and stilts approved for parking are to be used exclusively for vehicle parking; the supplied record does not establish a parking-space count or whether a cellar is provided in this building. |
| Unit count | Approved plan: 1 building unit; RERA filing: 1 proposed building unit and 4 total units. RERA filing RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configuration | 3BHK; 4 units. RERA unit table RERA unit details |
| RERA-filed saleable area | 216.27 sq m per unit. RERA unit table RERA unit details |
| Booked / available | 0 booked and 4 available in the portal-derived record; no as-of date is supplied, so these counts are indicative. RERA unit table |
| RERA completion undertaking | 04/7/2026 in the Form B declaration. |
| Proposed completion date in project fields | 30/11/2026. RERA filing |
| Construction stage | Not established by the supplied evidence. The portal amenity-progress entries are recorded as 0%; these are not independent site observations. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied documents. The building permit requires a completion notice and occupancy certificate before occupation. Document index |
2. The project story
AKSHAYA RESIDENCY is registered as a residential apartment project in WARD 39, Karimnagar district, on the land recorded under survey numbers 2-7-817/1& 2-7-846. The supplied RERA land record describes a site of 401.6 sq m and one proposed building; the Karimnagar Municipal Corporation building permit specifies one building with 1 stilt and 4 upper floors. RERA record Land records RERA filing
The RERA unit record lists four 3BHK apartments, each with a filed saleable area of 216.27 sq m. It records all four as available, but provides no as-of date for that inventory snapshot. The evidence supplied does not establish the present construction stage, actual site completion, or whether any unit has since been booked. RERA unit table RERA unit details
The promoter’s Form B declaration undertakes completion by 04/7/2026; the project-information fields separately give a proposed completion date of 30/11/2026. The supplied record does not establish completion or occupancy certification for the building. The permit requires an occupancy certificate before occupation. RERA filing
3. Master plan, architecture & building design
The supplied RERA filing records a 401.6 sq m total site area, 401.60 sq m net area, one building unit, and approved built-up area of 1081.38 sq m. The building-permit extraction describes a residential building as “1 Stilt + 4 upper floors,” with a height of 11.54 m, upper-floors area of 865.08 m2, and stilt area of 199.67 m2. These are separately recorded figures and should not be treated as interchangeable area measures. RERA filing RERA filing
The permit lists setbacks as Front 3.01, Rear 2.01, Side I 2.01 and Side II 2.01; units are not stated in the supplied extraction. It also refers to a tot-lot, transformer space, garbage house and rainwater-harvesting percolation pit. The supplied material does not include readable floor drawings establishing flat layout, number of flats per floor, lifts, stairs, entrances, circulation, or the extent and arrangement of open areas.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 4 | 0 | 4 | 216.27 sq m | Not measured from the supplied drawings | Not supplied |
The configuration, unit count, booking status, availability and saleable area above are from the RERA-derived record. The inventory has no stated as-of date. RERA unit table RERA unit details
Two floor-plan drawings are recorded, but both are scans pending measurement. Accordingly, no drawing-based carpet area or room dimensions are established here. RERA saleable area is not a carpet-area measurement; the supplied material does not provide a verified breakdown of carpet, balcony or utility areas, or common-area loading. Floor plans RERA unit details
5. Parking & vehicle circulation
The building permit states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not divided by partition walls or rolling shutters. The sanctioned building configuration includes a stilt, but the supplied record does not provide the number of parking spaces, the presence or extent of a cellar, vehicle circulation details, or visitor and accessible-parking allocations.
The project-level filing records a mortgage area of 109.65 sq m; this is not a parking-space count or an allocation to any apartment. No unit-specific parking allocation is established by the supplied documents. RERA filing Land records
6. Amenities, recreation & open spaces
The RERA amenity record lists the following project facilities and infrastructure. Every listed progress value is 0%; no independently verified completion status is supplied. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | Listed; no size or facility detail supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Green Strip/TOT LOT/Park | Listed; the permit also refers to a tot-lot | RERA amenity record; building permit RERA amenities | 0%; not independently verified |
| Aggregate area of recreational open space | Listed; area not supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Internal roads & footpaths | Listed; dimensions and layout not supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Water supply | Listed as “YES”; source and capacity not supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Sewerage | Chambers, lines, septic tank and STP listed as a category; specific installed system not established | RERA amenity record RERA amenities | 0%; not independently verified |
| Storm-water drains | Listed; details not supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Street lighting | Listed as “YES”; extent not supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Treatment and disposal of sewage and sullage water | Listed; system details not supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Solid-waste management and disposal | Listed; arrangements not supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Water conservation / rainwater harvesting | Listed as “YES”; permit specifies a rainwater-harvesting percolation pit | RERA amenity record; building permit RERA amenities | 0%; not independently verified |
| Energy management | Listed; details not supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Fire protection and fire-safety requirements | Listed; system details not supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Electrical meter room / sub-station / receiving station | Listed as “YES”; permit also requires transformer space | RERA amenity record; building permit RERA amenities | 0%; not independently verified |
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drainage, sewage and sullage treatment/disposal, solid-waste management, water conservation and rainwater harvesting, energy management, fire safety, and electrical meter-room/sub-station/receiving-station provision. It marks water supply, street lighting, water conservation/rainwater harvesting and electrical meter-room/sub-station/receiving-station as “YES,” but lists 0% progress for all 14 amenity categories. These entries do not establish installed capacity or completed services. RERA amenities
The building permit requires a rainwater-harvesting percolation pit, transformer space and garbage house. It also requires a completion notice and occupancy certificate before occupation, and says public amenities such as water and electricity connections will be provided only on production of the occupancy certificate. The supplied record does not give water source or storage capacity, STP or reuse capacity, backup power, lift details, fire-system specifications, or accessibility provisions.
8. Location, access & connectivity
The registered project location is WARD 39, Karimnagar, Telangana, PIN 505001; the building-permit extraction names Mukarampura. A revenue village and mandal are not disclosed in the supplied RERA land record. The filing gives the south boundary as “ROAD WIDTH 9.” The building-permit extraction separately refers to an 18M road width and an affected road portion; no approach-road or internal circulation plan is supplied here. RERA record RERA filing Land records
No verified public-transport details or measured distances to local landmarks are supplied for this registered location. The location data includes a cadastral parcel-centroid coordinate (17.41528, 78.35459) and a listed distance of 1.2 km to Financial District (Nanakramguda); the supplied data does not establish that this coordinate or distance is a verified project-access measurement. Location record
9. Developer & development status
The registered promoter is AKSHAYA DEVELOPERS, recorded as a partnership. The RERA filing names PRAVEENA NEELAM as a partner and SHAMANTHULA KOTESHWARA RAO as authorized signatory. A partner resolution dated 04 June 2020 authorizes the partnership to apply for registration of AKSHAYA RESIDENCY and authorizes KOTESHWARA RAO SHAMANTHULA to sign and execute registration documents. Corporate record Parties record
The promoter address recorded in the project data is SHEELA APARTMENTS, SHARADHA NAGAR, MUKARAMPURA, WARD 39, Karimnagar, 505001. The supplied evidence does not include an official website or project-specific contact details. Parties record
No independently verified construction progress is supplied. The Form B filing records the promoter’s completion undertaking of 04/7/2026, while the project-information fields state 30/11/2026 as the proposed completion date. The registration certificate gives validity through 04/07/2026; registration validity, completion timing and occupancy certification are separate matters. RERA filing
10. Approvals, official records & documents
| Supplied evidence | Form C, registration no. P02700002258; issued 30/10/2020, valid through 04/07/2026 |
|---|---|
| Scope / note | AKSHAYA RESIDENCY; certificate states registration under section 5 |
| Supplied evidence | Karimnagar Municipal Corporation Building Permit Order, approval no. 3011/W39/2020/5857; approved 29 July, 2020 |
|---|---|
| Scope / note | One building, 1 Stilt + 4 upper floors; permit extraction states validity up to 29 January, 2022 |
| Supplied evidence | Promoter declaration, including completion undertaking and title/encumbrance statements |
|---|---|
| Scope / note | Promoter-declared information; not a site-completion certificate |
| Supplied evidence | Resolution dated 04 June 2020 authorizing the RERA application and signatory |
|---|---|
| Scope / note | Corporate authorization; does not establish land ownership |
| Supplied evidence | Two drawings recorded; both scans pending measurement Floor plans |
|---|---|
| Scope / note | No drawing-based measurements or room details established |
| Supplied evidence | None included in the supplied documents Document index |
|---|---|
| Scope / note | The building permit requires an occupancy certificate before occupation |
The supplied evidence does not establish a revenue village or mandal for the project land. It also does not include an occupancy/completion certificate, readable measured floor plans, or independently verified construction progress. Land records Document index Floor plans
1. Project at a glance
Project identity
Registered name: AKSHAYA RESIDENCY
Project type: Residential apartment project
Phase / registered portion: No separate phase is identified in the supplied record; the registration is for AKSHAYA RESIDENCY.
TG-RERA registration: P02700002258; issued 30/10/2020.
Registration validity: Certificate states validity from 30/10/2020 to 04/07/2026; extension is not recorded in the supplied certificate. This is the registration period, not the construction completion date.
Registered promoter: AKSHAYA DEVELOPERS; recorded as a partnership.
RERA status: The supplied registration certificate grants registration under section 5. The portal record labels the project “New Project”; no current construction-status verification is supplied.
Land and geographic identity
Locality / address identifiers: WARD 39; Mukarampura is named in the building-permit extraction. House identifier recorded in that order: 12-7-817/1 & 2-7-846.
Revenue village: Not disclosed in the supplied RERA land record. “WARD 39” is recorded as village/locality in the filing, but a revenue village is not established.
Mandal: Not disclosed.
District / PIN: Karimnagar / 505001.
Survey numbers and subdivisions: 2-7-817/1& 2-7-846, as recorded in the project filing and registration certificate.
Site area: Total area: 401.6 sq m; net area: 401.60 sq m in the RERA filing. The building-permit extraction also records extent 401.6 m2 and a sanctioned net area of 371.14 m2.
Area affected by road widening / FTL / nala widening: 0 sq m in the RERA land fields. Separately, the building-permit extraction records a road-affected area of 30.46 m2 and a condition concerning surrender of the affected portion.
Boundaries in RERA filing: East: OTHER LAND; West: OTHER LAND; North: OTHER LAND; South: ROAD WIDTH 9.
Development identity
Sanctioning authority: Karimnagar Municipal Corporation, as stated in the building permit.
Principal building approval: Building Permit Order / approval no. 3011/W39/2020/5857, approved 29 July, 2020. The project filing identifies the same number as its plan approval.
Approved built-up area: 1081.38 sq m in the RERA project fields. The permit extraction separately lists upper floors area 865.08 m2 and stilt area 199.67 m2.
Building count and floors: One residential building; sanctioned as 1 Stilt + 4 upper floors. The permit extraction records height 11.54 m.
Parking levels / provision: Stilt is included in the sanctioned configuration. The permit states that the cellar and stilts approved for parking are to be used exclusively for vehicle parking; the supplied record does not establish a parking-space count or whether a cellar is provided in this building.
Unit count: Approved plan: 1 building unit; RERA filing: 1 proposed building unit and 4 total units.
Offering and status
RERA-filed configuration: 3BHK; 4 units.
RERA-filed saleable area: 216.27 sq m per unit.
Booked / available: 0 booked and 4 available in the portal-derived record; no as-of date is supplied, so these counts are indicative.
RERA completion undertaking: 04/7/2026 in the Form B declaration.
Proposed completion date in project fields: 30/11/2026.
Construction stage: Not established by the supplied evidence. The portal amenity-progress entries are recorded as 0%; these are not independent site observations.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied documents. The building permit requires a completion notice and occupancy certificate before occupation.
2. The project story
AKSHAYA RESIDENCY is registered as a residential apartment project in WARD 39, Karimnagar district, on the land recorded under survey numbers 2-7-817/1& 2-7-846. The supplied RERA land record describes a site of 401.6 sq m and one proposed building; the Karimnagar Municipal Corporation building permit specifies one building with 1 stilt and 4 upper floors.
The RERA unit record lists four 3BHK apartments, each with a filed saleable area of 216.27 sq m. It records all four as available, but provides no as-of date for that inventory snapshot. The evidence supplied does not establish the present construction stage, actual site completion, or whether any unit has since been booked.
The promoter’s Form B declaration undertakes completion by 04/7/2026; the project-information fields separately give a proposed completion date of 30/11/2026. The supplied record does not establish completion or occupancy certification for the building. The permit requires an occupancy certificate before occupation.
3. Master plan, architecture & building design
The supplied RERA filing records a 401.6 sq m total site area, 401.60 sq m net area, one building unit, and approved built-up area of 1081.38 sq m. The building-permit extraction describes a residential building as “1 Stilt + 4 upper floors,” with a height of 11.54 m, upper-floors area of 865.08 m2, and stilt area of 199.67 m2. These are separately recorded figures and should not be treated as interchangeable area measures.
The permit lists setbacks as Front 3.01, Rear 2.01, Side I 2.01 and Side II 2.01; units are not stated in the supplied extraction. It also refers to a tot-lot, transformer space, garbage house and rainwater-harvesting percolation pit. The supplied material does not include readable floor drawings establishing flat layout, number of flats per floor, lifts, stairs, entrances, circulation, or the extent and arrangement of open areas.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 4 | 0 | 4 | 216.27 sq m | Not measured from the supplied drawings | Not supplied |
The configuration, unit count, booking status, availability and saleable area above are from the RERA-derived record. The inventory has no stated as-of date.
Two floor-plan drawings are recorded, but both are scans pending measurement. Accordingly, no drawing-based carpet area or room dimensions are established here. RERA saleable area is not a carpet-area measurement; the supplied material does not provide a verified breakdown of carpet, balcony or utility areas, or common-area loading.
5. Parking & vehicle circulation
The building permit states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not divided by partition walls or rolling shutters. The sanctioned building configuration includes a stilt, but the supplied record does not provide the number of parking spaces, the presence or extent of a cellar, vehicle circulation details, or visitor and accessible-parking allocations.
The project-level filing records a mortgage area of 109.65 sq m; this is not a parking-space count or an allocation to any apartment. No unit-specific parking allocation is established by the supplied documents.
6. Amenities, recreation & open spaces
The RERA amenity record lists the following project facilities and infrastructure. Every listed progress value is 0%; no independently verified completion status is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | Listed; no size or facility detail supplied | RERA amenity record | 0%; not independently verified |
| Green Strip/TOT LOT/Park | Listed; the permit also refers to a tot-lot | RERA amenity record; building permit | 0%; not independently verified |
| Aggregate area of recreational open space | Listed; area not supplied | RERA amenity record | 0%; not independently verified |
| Internal roads & footpaths | Listed; dimensions and layout not supplied | RERA amenity record | 0%; not independently verified |
| Water supply | Listed as “YES”; source and capacity not supplied | RERA amenity record | 0%; not independently verified |
| Sewerage | Chambers, lines, septic tank and STP listed as a category; specific installed system not established | RERA amenity record | 0%; not independently verified |
| Storm-water drains | Listed; details not supplied | RERA amenity record | 0%; not independently verified |
| Street lighting | Listed as “YES”; extent not supplied | RERA amenity record | 0%; not independently verified |
| Treatment and disposal of sewage and sullage water | Listed; system details not supplied | RERA amenity record | 0%; not independently verified |
| Solid-waste management and disposal | Listed; arrangements not supplied | RERA amenity record | 0%; not independently verified |
| Water conservation / rainwater harvesting | Listed as “YES”; permit specifies a rainwater-harvesting percolation pit | RERA amenity record; building permit | 0%; not independently verified |
| Energy management | Listed; details not supplied | RERA amenity record | 0%; not independently verified |
| Fire protection and fire-safety requirements | Listed; system details not supplied | RERA amenity record | 0%; not independently verified |
| Electrical meter room / sub-station / receiving station | Listed as “YES”; permit also requires transformer space | RERA amenity record; building permit | 0%; not independently verified |
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drainage, sewage and sullage treatment/disposal, solid-waste management, water conservation and rainwater harvesting, energy management, fire safety, and electrical meter-room/sub-station/receiving-station provision. It marks water supply, street lighting, water conservation/rainwater harvesting and electrical meter-room/sub-station/receiving-station as “YES,” but lists 0% progress for all 14 amenity categories. These entries do not establish installed capacity or completed services.
The building permit requires a rainwater-harvesting percolation pit, transformer space and garbage house. It also requires a completion notice and occupancy certificate before occupation, and says public amenities such as water and electricity connections will be provided only on production of the occupancy certificate. The supplied record does not give water source or storage capacity, STP or reuse capacity, backup power, lift details, fire-system specifications, or accessibility provisions.
8. Location, access & connectivity
The registered project location is WARD 39, Karimnagar, Telangana, PIN 505001; the building-permit extraction names Mukarampura. A revenue village and mandal are not disclosed in the supplied RERA land record. The filing gives the south boundary as “ROAD WIDTH 9.” The building-permit extraction separately refers to an 18M road width and an affected road portion; no approach-road or internal circulation plan is supplied here.
No verified public-transport details or measured distances to local landmarks are supplied for this registered location. The location data includes a cadastral parcel-centroid coordinate (17.41528, 78.35459) and a listed distance of 1.2 km to Financial District (Nanakramguda); the supplied data does not establish that this coordinate or distance is a verified project-access measurement.
9. Developer & development status
The registered promoter is AKSHAYA DEVELOPERS, recorded as a partnership. The RERA filing names PRAVEENA NEELAM as a partner and SHAMANTHULA KOTESHWARA RAO as authorized signatory. A partner resolution dated 04 June 2020 authorizes the partnership to apply for registration of AKSHAYA RESIDENCY and authorizes KOTESHWARA RAO SHAMANTHULA to sign and execute registration documents.
The promoter address recorded in the project data is SHEELA APARTMENTS, SHARADHA NAGAR, MUKARAMPURA, WARD 39, Karimnagar, 505001. The supplied evidence does not include an official website or project-specific contact details.
No independently verified construction progress is supplied. The Form B filing records the promoter’s completion undertaking of 04/7/2026, while the project-information fields state 30/11/2026 as the proposed completion date. The registration certificate gives validity through 04/07/2026; registration validity, completion timing and occupancy certification are separate matters.
10. Approvals, official records & documents
| Supplied evidence | Form C, registration no. P02700002258; issued 30/10/2020, valid through 04/07/2026 |
|---|---|
| Scope / note | AKSHAYA RESIDENCY; certificate states registration under section 5 |
| Supplied evidence | Karimnagar Municipal Corporation Building Permit Order, approval no. 3011/W39/2020/5857; approved 29 July, 2020 |
|---|---|
| Scope / note | One building, 1 Stilt + 4 upper floors; permit extraction states validity up to 29 January, 2022 |
| Supplied evidence | Promoter declaration, including completion undertaking and title/encumbrance statements |
|---|---|
| Scope / note | Promoter-declared information; not a site-completion certificate |
| Supplied evidence | Resolution dated 04 June 2020 authorizing the RERA application and signatory |
|---|---|
| Scope / note | Corporate authorization; does not establish land ownership |
| Supplied evidence | Two drawings recorded; both scans pending measurement |
|---|---|
| Scope / note | No drawing-based measurements or room details established |
| Supplied evidence | None included in the supplied documents |
|---|---|
| Scope / note | The building permit requires an occupancy certificate before occupation |
The supplied evidence does not establish a revenue village or mandal for the project land. It also does not include an occupancy/completion certificate, readable measured floor plans, or independently verified construction progress.
Frequently asked questions
Is AKSHAYA RESIDENCY registered with Telangana RERA?
Yes. AKSHAYA RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02700002258; the registration status is New Project.
Who is the developer of AKSHAYA RESIDENCY?
The promoter named in the RERA registration is AKSHAYA DEVELOPERS.
Where is AKSHAYA RESIDENCY located?
AKSHAYA RESIDENCY is in WARD 39, Karimnagar, Telangana (505001).
When will AKSHAYA RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.
More projects in Karimnagar