SRM PRIDE is a residential apartment project in Manchirevula, Gandipet, Ranga Reddy. It is being developed by SRM CONSTRUCTIONS. The project has a site extent of 749.37 m² and one building, Building - A (A1), with 1 Stilt + 5 upper floors and 20 2BHK homes, each with a saleable area of 102.2 m². Its TG-RERA registration is P02400003909, and the proposed completion date recorded in the project header is 30/12/2022.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name and type | SRM PRIDE; residential apartment project. RERA record |
| Registered portion / phase | The records describe one building, “Building - A (A1)”; a separate phase name or phase number is not disclosed. |
| TG-RERA registration | P02400003909, granted 06/01/2022; the certificate states validity through 30/12/2022. Registration validity is separate from the building-permit validity and the completion dates reported below. |
| Registered promoter | SRM CONSTRUCTIONS, identified in the RERA filing as a partnership. RERA filing Corporate record |
| RERA project status | “On-Going Project” in the project record. The registration certificate gives the registration dates above; no extension is recorded in the supplied evidence. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Manchirevula, also described in the building permit as Manchirevula Old village. The project’s registered revenue-village field is Manchirevula. RERA record RERA filing |
| Mandal / district / PIN | Gandipet / Ranga Reddy / 500075. RERA record |
| Project survey numbers | 148, 149, 154 and 155. No project subdivision numbers are disclosed in the supplied RERA identity. RERA record Land records |
| Plot reference | Plot No. 2 in the registration certificate; the building-permit record also refers to a subdivision of Plot 2. |
| Registered site extent | 749.37 m² total area and 749.37 m² net area; the filed area affected by road widening/FTL/Nala widening is 0 m². RERA filing |
| Boundaries in RERA filing | East: ROAD WIDTH 9 FEET; West: S Y 156; North: PLOT NO 2; South: PLOT NO 1 AND PART SP. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Building sanctioning authority | The extracted building permit is issued by NARSINGI MUNICIPALITY. The RERA project filing lists GHMC as Authority Name and records the same principal approval number. RERA filing |
| Principal approval | Building Permit Order 3129/W1/2021/0091, approved 23 September, 2021. The RERA filing records approval date 10/06/2021; the supplied records do not explain the differing dates. RERA filing |
| Approved built-up area | 2,103.31 m² in the RERA project filing. The permit extraction separately lists 1,726.65 m² for five upper floors and 363.26 m² for stilt parking; these are the permit’s stated components, not a substitute for the RERA-filed approved built-up figure. RERA filing |
| Building count and sanctioned form | 1 building in the RERA filing; permit describes Building - A (A1), 1 Stilt + 5 upper floors, height 15.00 m. No basement or podium is identified in the supplied permit extract. RERA filing |
| Parking provision | The permit extract says stilt parking is approved for parking use. It does not state a parking-space count. |
| Unit count | The RERA filing records 1 proposed building unit and 20 homes in its unit inventory. The building permit condition says the number of units sanctioned must not be increased without prior approval; a separate approved apartment-count figure is not stated in the supplied permit extract. RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Configuration and RERA saleable area | 2BHK; 102.2 m² saleable area. RERA unit table |
| Booked / available | 0 booked / 20 available in the RERA portal data as supplied; that record carries no as-of date, so counts are indicative rather than a current availability confirmation. RERA unit table |
| Declared construction progress | The project data records 90% completeness. This is a recorded progress figure, not an independently verified site inspection. RERA record |
| Completion dates | Header fields record proposed and revised completion as 30/12/2022. The filed Form B affidavit separately states 30-08-2023 and revised 30-10-2023. These are promoter declarations in different supplied records; this overview does not determine which date governs. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents; the certificate status and the scope of any phase- or building-wise certification are therefore not established by this evidence. Document index |
The project story
SRM PRIDE is registered as a residential apartment project at Manchirevula, Gandipet Mandal, Ranga Reddy District. The RERA-filed land identity covers Survey Nos. 148, 149, 154 and 155, with a site extent of 749.37 m². The building permit identifies a single residential building, Building - A (A1), with one stilt level and five upper floors. RERA record Land records
The RERA inventory describes twenty 2BHK homes. The project record reports 90% completeness, but the supplied evidence does not establish that figure through an independent site inspection. Nor does it include an occupancy or completion certificate. Accordingly, the declared progress, completion dates, registration validity and certificate status should be read as distinct record items, not as evidence that the building is complete or occupied. RERA unit table RERA record Document index
Master plan, architecture & building design
The permit extract describes one residential building, Building - A (A1), with 1 Stilt + 5 upper floors and a stated height of 15.00 m. It records a site area of 749.37 m², net area of 749.37 m², and road-affected area of 0 m². The RERA filing reports approved built-up area of 2,103.31 m². The permit extract’s 1,726.65 m² for five upper floors and 363.26 m² for stilt parking are separately stated permit figures. RERA filing RERA filing
The supplied permit extract does not provide a complete drawing-based account of building footprint, flats per floor, lifts, stairs, entrances, internal circulation or landscape/open-space dimensions. It names rainwater harvesting, transformer space and a garbage house as permit conditions or site provisions; those entries do not establish that the facilities have been completed.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 102.2 m² | Median 66.8 m²; measured range 61.4–71.8 m² | 35% |
The RERA filing records the unit count and saleable area. Carpet-area measurements come from software analysis of the approved floor-plan drawing geometry, are not RERA-filed, and are marked as needing review. The supplied measurement covers four 2BHK designs. RERA unit table RERA unit details Floor plans
The drawing measurement for one first-floor flat (Flat 02) identifies two bedrooms, two toilets, a living/dining area, kitchen and utility. The utility is excluded from the measured carpet area. Carpet area, balcony or utility space, and saleable area are different measures; the supplied evidence explains that RERA saleable area also includes the home’s share of common areas, and does not establish a separate filed balcony area. RERA unit details Floor plans
Parking & vehicle circulation
The building permit describes the stilt as approved for parking and includes a condition that the stilt and any cellar approved in the plan be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted permit does not specify a cellar level, parking-space count, two-wheeler provision, visitor or accessible spaces, EV charging, ramp arrangement, or unit-wise parking allocation. A count or exclusive unit allocation cannot be established from the supplied evidence.
Amenities, recreation & open spaces
The RERA amenity record marks several facilities as available or included, while the percentage fields shown in the supplied record are 0 for most listed items and 20 for the electrical meter room/substation/receiving-station item. These are recorded portal fields, not independent verification of completion. The building permit also names selected site provisions and conditions. RERA amenities
| Description / size | No size stated; permit requires the tot-lot to be fenced and maintained as greenery before issue of an occupancy certificate. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA record says “YES”; amenity progress field is 0. Completion not independently verified. |
| Description / size | No further description or size stated. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA record says “YES”; progress field is 0. Completion not independently verified. |
| Description / size | Permit specifies a rainwater-harvesting percolation pit and records 4 RWHPs. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA record says “YES”; permit requirement does not establish installation or operation. |
| Description / size | No source, storage or capacity stated. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA record says “YES”; progress field is 0. Completion not independently verified. |
| Description / size | RERA lists sewerage (chambers, lines, septic tank, STP) and treatment/disposal of sewage and sullage water; no capacity or system detail is supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Sewerage record says “YES”; progress fields are 0. Completion not independently verified. |
| Description / size | No capacity or equipment detail stated. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress field is 20; completion not independently verified. |
| Description / size | Internal roads and footpaths, storm-water drains, street lighting, solid-waste management and disposal, energy management, fire protection and safety requirements, and aggregate recreational open space are listed; no size or technical detail is supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress fields are 0; the supplied record does not independently verify completion. |
The supplied RERA amenity data does not document the vendor-listed clubhouse, swimming pool, gym, community hall, children’s play area, visitor parking or other recreational features as sanctioned or completed amenities. RERA amenities Promoter website
Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drainage, treatment and disposal of sewage and sullage water, solid-waste management, energy management, fire protection and fire-safety requirements, and an electrical meter room/substation/receiving-station item. It does not provide system capacities, technical specifications or evidence of completed operation. RERA amenities
The building permit requires a rainwater-harvesting structure, space for a transformer and a garbage house. It also requires submission of a completion notice and obtaining an occupancy certificate before occupation, and specifies that the tot-lot be maintained as greenery before an occupancy certificate is issued. These are permit conditions; the supplied records do not establish compliance or completion. No lift capacity, backup-power arrangement, fire-system details, accessibility arrangements, or water-storage and treatment specifications are stated in the supplied evidence.
Location, access & connectivity
The registered location is Manchirevula, Gandipet Mandal, Ranga Reddy District, PIN 500075. A supplied location record gives a parcel-centroid coordinate of 17.375585259307616, 78.35571032855782. The only measured connectivity distance supplied is 4.6 km to Financial District (Nanakramguda). No approach-road or public-transport measurements are provided in the project evidence. RERA record Location record
Developer & development status
The registered promoter is SRM CONSTRUCTIONS, identified in the RERA filing as a partnership, with GSTIN 36AEKFS0450A1ZF. The supplied RERA record identifies BOBBA ANJANEYULU as partner and authorized signatory. The filed registration certificate gives the promoter office as Rajendra Nagar, Ranga Reddy District, PIN 500091; the project filing separately lists an address at Devi Mid Town Apartments, Suncity, Gandipet, Ranga Reddy District, PIN 500075. Corporate record Parties record RERA filing
The project record reports 90% completeness and the portal inventory lists 20 homes as available, but its booking counts have no as-of date. These are record declarations, not independent confirmation of construction progress or current sales status. The supplied documents do not establish an occupancy or completion certificate for the building. RERA record RERA unit table Document index
Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C registers SRM PRIDE, registration P02400003909, from 06/01/2022 through 30/12/2022. |
| Building permit | Building Permit Order 3129/W1/2021/0091 for a residential building at Manchirevula Old village, issued by Narsingi Municipality; the extract records approval on 23 September, 2021 and validity through 23 September, 2027. |
| Filed site and project information | RERA project fields identify the survey numbers, site area, net area, boundaries, building count, unit inventory, promoter and project completion dates. RERA filing RERA filing RERA unit table |
| Promoter declaration | Form B affidavit-cum-declaration dated 21/10/2021, including promoter statements on title basis, encumbrances, project funds and completion dates. |
| Title-related filing | RERA-filed development agreement/GPA, sale-deed material and advocate’s title search report are listed in the project documents. |
| Occupancy / completion evidence | No occupancy or completion certificate is included in the supplied project documents. Document index |
The supplied records also identify a layout/subdivision reference, HMDAL111154/LRS/SKP/Plg/HMDA/2015-2016, in the building-permit extract. The evidence provided here does not include an approved-layout drawing or a separate occupancy/completion certificate.
Project at a glance
Project identity
Registered name and type: SRM PRIDE; residential apartment project.
Registered portion / phase: The records describe one building, “Building - A (A1)”; a separate phase name or phase number is not disclosed.
TG-RERA registration: P02400003909, granted 06/01/2022; the certificate states validity through 30/12/2022. Registration validity is separate from the building-permit validity and the completion dates reported below.
Registered promoter: SRM CONSTRUCTIONS, identified in the RERA filing as a partnership.
RERA project status: “On-Going Project” in the project record. The registration certificate gives the registration dates above; no extension is recorded in the supplied evidence.
Land and geographic identity
Locality / revenue village: Manchirevula, also described in the building permit as Manchirevula Old village. The project’s registered revenue-village field is Manchirevula.
Mandal / district / PIN: Gandipet / Ranga Reddy / 500075.
Project survey numbers: 148, 149, 154 and 155. No project subdivision numbers are disclosed in the supplied RERA identity.
Plot reference: Plot No. 2 in the registration certificate; the building-permit record also refers to a subdivision of Plot 2.
Registered site extent: 749.37 m² total area and 749.37 m² net area; the filed area affected by road widening/FTL/Nala widening is 0 m².
Boundaries in RERA filing: East: ROAD WIDTH 9 FEET; West: S Y 156; North: PLOT NO 2; South: PLOT NO 1 AND PART SP.
Development identity
Building sanctioning authority: The extracted building permit is issued by NARSINGI MUNICIPALITY. The RERA project filing lists GHMC as Authority Name and records the same principal approval number.
Principal approval: Building Permit Order 3129/W1/2021/0091, approved 23 September, 2021. The RERA filing records approval date 10/06/2021; the supplied records do not explain the differing dates.
Approved built-up area: 2,103.31 m² in the RERA project filing. The permit extraction separately lists 1,726.65 m² for five upper floors and 363.26 m² for stilt parking; these are the permit’s stated components, not a substitute for the RERA-filed approved built-up figure.
Building count and sanctioned form: 1 building in the RERA filing; permit describes Building - A (A1), 1 Stilt + 5 upper floors, height 15.00 m. No basement or podium is identified in the supplied permit extract.
Parking provision: The permit extract says stilt parking is approved for parking use. It does not state a parking-space count.
Unit count: The RERA filing records 1 proposed building unit and 20 homes in its unit inventory. The building permit condition says the number of units sanctioned must not be increased without prior approval; a separate approved apartment-count figure is not stated in the supplied permit extract.
Offering and status
Configuration and RERA saleable area: 2BHK; 102.2 m² saleable area.
Booked / available: 0 booked / 20 available in the RERA portal data as supplied; that record carries no as-of date, so counts are indicative rather than a current availability confirmation.
Declared construction progress: The project data records 90% completeness. This is a recorded progress figure, not an independently verified site inspection.
Completion dates: Header fields record proposed and revised completion as 30/12/2022. The filed Form B affidavit separately states 30-08-2023 and revised 30-10-2023. These are promoter declarations in different supplied records; this overview does not determine which date governs.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents; the certificate status and the scope of any phase- or building-wise certification are therefore not established by this evidence.
The project story
SRM PRIDE is registered as a residential apartment project at Manchirevula, Gandipet Mandal, Ranga Reddy District. The RERA-filed land identity covers Survey Nos. 148, 149, 154 and 155, with a site extent of 749.37 m². The building permit identifies a single residential building, Building - A (A1), with one stilt level and five upper floors.
The RERA inventory describes twenty 2BHK homes. The project record reports 90% completeness, but the supplied evidence does not establish that figure through an independent site inspection. Nor does it include an occupancy or completion certificate. Accordingly, the declared progress, completion dates, registration validity and certificate status should be read as distinct record items, not as evidence that the building is complete or occupied.
Master plan, architecture & building design
The permit extract describes one residential building, Building - A (A1), with 1 Stilt + 5 upper floors and a stated height of 15.00 m. It records a site area of 749.37 m², net area of 749.37 m², and road-affected area of 0 m². The RERA filing reports approved built-up area of 2,103.31 m². The permit extract’s 1,726.65 m² for five upper floors and 363.26 m² for stilt parking are separately stated permit figures.
The supplied permit extract does not provide a complete drawing-based account of building footprint, flats per floor, lifts, stairs, entrances, internal circulation or landscape/open-space dimensions. It names rainwater harvesting, transformer space and a garbage house as permit conditions or site provisions; those entries do not establish that the facilities have been completed.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 102.2 m² | Median 66.8 m²; measured range 61.4–71.8 m² | 35% |
The RERA filing records the unit count and saleable area. Carpet-area measurements come from software analysis of the approved floor-plan drawing geometry, are not RERA-filed, and are marked as needing review. The supplied measurement covers four 2BHK designs.
The drawing measurement for one first-floor flat (Flat 02) identifies two bedrooms, two toilets, a living/dining area, kitchen and utility. The utility is excluded from the measured carpet area. Carpet area, balcony or utility space, and saleable area are different measures; the supplied evidence explains that RERA saleable area also includes the home’s share of common areas, and does not establish a separate filed balcony area.
Parking & vehicle circulation
The building permit describes the stilt as approved for parking and includes a condition that the stilt and any cellar approved in the plan be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted permit does not specify a cellar level, parking-space count, two-wheeler provision, visitor or accessible spaces, EV charging, ramp arrangement, or unit-wise parking allocation. A count or exclusive unit allocation cannot be established from the supplied evidence.
Amenities, recreation & open spaces
The RERA amenity record marks several facilities as available or included, while the percentage fields shown in the supplied record are 0 for most listed items and 20 for the electrical meter room/substation/receiving-station item. These are recorded portal fields, not independent verification of completion. The building permit also names selected site provisions and conditions.
| Description / size | No size stated; permit requires the tot-lot to be fenced and maintained as greenery before issue of an occupancy certificate. |
|---|---|
| Declared progress / verified status | RERA record says “YES”; amenity progress field is 0. Completion not independently verified. |
| Description / size | No further description or size stated. |
|---|---|
| Declared progress / verified status | RERA record says “YES”; progress field is 0. Completion not independently verified. |
| Description / size | Permit specifies a rainwater-harvesting percolation pit and records 4 RWHPs. |
|---|---|
| Declared progress / verified status | RERA record says “YES”; permit requirement does not establish installation or operation. |
| Description / size | No source, storage or capacity stated. |
|---|---|
| Declared progress / verified status | RERA record says “YES”; progress field is 0. Completion not independently verified. |
| Description / size | RERA lists sewerage (chambers, lines, septic tank, STP) and treatment/disposal of sewage and sullage water; no capacity or system detail is supplied. |
|---|---|
| Declared progress / verified status | Sewerage record says “YES”; progress fields are 0. Completion not independently verified. |
| Description / size | No capacity or equipment detail stated. |
|---|---|
| Declared progress / verified status | RERA progress field is 20; completion not independently verified. |
| Description / size | Internal roads and footpaths, storm-water drains, street lighting, solid-waste management and disposal, energy management, fire protection and safety requirements, and aggregate recreational open space are listed; no size or technical detail is supplied. |
|---|---|
| Declared progress / verified status | Progress fields are 0; the supplied record does not independently verify completion. |
The supplied RERA amenity data does not document the vendor-listed clubhouse, swimming pool, gym, community hall, children’s play area, visitor parking or other recreational features as sanctioned or completed amenities.
Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drainage, treatment and disposal of sewage and sullage water, solid-waste management, energy management, fire protection and fire-safety requirements, and an electrical meter room/substation/receiving-station item. It does not provide system capacities, technical specifications or evidence of completed operation.
The building permit requires a rainwater-harvesting structure, space for a transformer and a garbage house. It also requires submission of a completion notice and obtaining an occupancy certificate before occupation, and specifies that the tot-lot be maintained as greenery before an occupancy certificate is issued. These are permit conditions; the supplied records do not establish compliance or completion. No lift capacity, backup-power arrangement, fire-system details, accessibility arrangements, or water-storage and treatment specifications are stated in the supplied evidence.
Location, access & connectivity
The registered location is Manchirevula, Gandipet Mandal, Ranga Reddy District, PIN 500075. A supplied location record gives a parcel-centroid coordinate of 17.375585259307616, 78.35571032855782. The only measured connectivity distance supplied is 4.6 km to Financial District (Nanakramguda). No approach-road or public-transport measurements are provided in the project evidence.
Developer & development status
The registered promoter is SRM CONSTRUCTIONS, identified in the RERA filing as a partnership, with GSTIN 36AEKFS0450A1ZF. The supplied RERA record identifies BOBBA ANJANEYULU as partner and authorized signatory. The filed registration certificate gives the promoter office as Rajendra Nagar, Ranga Reddy District, PIN 500091; the project filing separately lists an address at Devi Mid Town Apartments, Suncity, Gandipet, Ranga Reddy District, PIN 500075.
The project record reports 90% completeness and the portal inventory lists 20 homes as available, but its booking counts have no as-of date. These are record declarations, not independent confirmation of construction progress or current sales status. The supplied documents do not establish an occupancy or completion certificate for the building.
Approvals, official records & documents
TG-RERA registration: Form C registers SRM PRIDE, registration P02400003909, from 06/01/2022 through 30/12/2022.
Building permit: Building Permit Order 3129/W1/2021/0091 for a residential building at Manchirevula Old village, issued by Narsingi Municipality; the extract records approval on 23 September, 2021 and validity through 23 September, 2027.
Filed site and project information: RERA project fields identify the survey numbers, site area, net area, boundaries, building count, unit inventory, promoter and project completion dates.
Promoter declaration: Form B affidavit-cum-declaration dated 21/10/2021, including promoter statements on title basis, encumbrances, project funds and completion dates.
Title-related filing: RERA-filed development agreement/GPA, sale-deed material and advocate’s title search report are listed in the project documents.
Occupancy / completion evidence: No occupancy or completion certificate is included in the supplied project documents.
The supplied records also identify a layout/subdivision reference, HMDAL111154/LRS/SKP/Plg/HMDA/2015-2016, in the building-permit extract. The evidence provided here does not include an approved-layout drawing or a separate occupancy/completion certificate.
Frequently asked questions
Is SRM PRIDE registered with Telangana RERA?
Yes. SRM PRIDE is registered with the Telangana Real Estate Regulatory Authority as P02400003909; the registration status is On-Going Project.
Who is the developer of SRM PRIDE?
The promoter named in the RERA registration is SRM CONSTRUCTIONS.
Where is SRM PRIDE located?
SRM PRIDE is in GANDIPET, Manchirevula, Rangareddy, Telangana (500075).
When will SRM PRIDE be completed?
The promoter's proposed date of completion filed with RERA is 30/12/2022. This is the promoter's declaration, not a guarantee.