NAVYA VINAY ARCADIA- C is a residential apartment project in Bandlaguda, Uppal mandal, Medchal-Malkajgiri district, developed by the registered promoter S S CONSTRUCTIONS. It is on a 445.93 sq.m. site and comprises one residential building with stilt and 5 upper floors, with 10 homes. The homes are filed as 3BHK, with a RERA-filed saleable area of 152.17 sq.m. per configuration. The project is registered under TG-RERA number P02200010938, and the project header records proposed completion as 07/09/2029.
More from S S Constructions · 33 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | NAVYA VINAY ARCADIA- C; the TG-RERA certificate records “NAVYA VINAY ARCADIA- C.” RERA record |
| Project type / phase | Residential apartment project; registered portion/phase is not separately stated. RERA record |
| TG-RERA registration | P02200010938. RERA record |
| Registration validity | 07/05/2026 to 07/05/2029, stated as three years, unless extended by the Authority. This is registration validity, not a possession or completion date. RERA record |
| RERA status | The supplied certificate records registration; the portal record labels the project “New Project.” RERA record |
| Registered promoter | S S CONSTRUCTIONS, stated in the RERA record as a proprietorship. RERA record RERA filing |
| Project status / progress | No construction-progress percentage or independently verified site-progress record is supplied. RERA record RERA amenities |
Land and geographic identity
| Item | Project record |
|---|---|
| Registered locality / revenue village | Bandlaguda; the certificate identifies Bandlaguda, Uppal, Medchal-Malkajgiri. RERA record |
| Mandal / district / PIN | Uppal / Medchal-Malkajgiri / 500068. RERA record |
| Project survey number(s) | 43/A. The building-permit record also writes Sy.No. 43/A. RERA record |
| Site / plot identity | Plot Nos. 220 and 221. RERA record |
| Registered site extent | The project record states 445.93 sq.m.; the building-plan record identifies gross and net plot area as 445.93 sq.m. RERA filing |
| Boundaries | East: Plot Nos. 228 and 229; West: 40 feet wide road; North: Plot No. 222; South: Plot No. 219. RERA filing |
| Registered area affected / net area | RERA filing: affected area 0; net area 445.93 sq.m. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Building permit records identify the Malkajgiri Municipal Corporation; the RERA filing identifies GHMC as the authority. RERA record |
| Principal approval | Approval No. 3705/GHMC/SWBP/LBN2/2026, dated 07/05/2026. Building permit file No. 013784/GHMC/06287/SWBP/LBN2/2026. Approvals record |
| Approved building | One residential building, Stilt + 5 Upper Floors. |
| Approved built-up area | 1239.40 sq.m. excluding parking; 1487.28 sq.m. including parking, as stated in the GHMC plan record. |
| Parking provision in sanction | Stilt parking; the permit records 1.00 car parking space and total parking area 247.88 sq.m. |
| Unit count | 10 dwelling units in the building-permit record and the RERA filing. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK; 10 units. RERA unit table RERA unit details |
| RERA-filed saleable area | 152.17 sq.m. per 3BHK configuration. RERA unit table RERA unit details |
| Portal booking snapshot | 0 booked; 10 available, with no as-of date supplied for these counts; treat as indicative. RERA unit table |
| Completion dates | Form B records an undertaking to complete by 07-0 5 -2029; the project header records proposed completion as 07/09/2029. RERA record |
| Occupancy / completion certificate | No completion or occupancy certificate is recorded in the supplied documents; the building-permit extraction marks completion as not certified. The sanction requires an OC before occupation. |
2. The project story
NAVYA VINAY ARCADIA- C is a residential apartment project registered under TG-RERA number P02200010938 on a 445.93 sq.m. site at Plot Nos. 220 and 221, Survey No. 43/A, Bandlaguda, Uppal. The sanctioned scheme is one building of stilt plus five upper floors, with ten dwelling units; the RERA filing describes the homes as 3BHK. RERA record RERA filing RERA unit table
The supplied record establishes approval and registration, but does not establish the current on-site construction stage. It contains no completion or occupancy certificate. Registration validity runs to 07/05/2029 unless extended; that date is distinct from the completion dates stated in the project records. RERA record
3. Master plan, architecture & building design
The approved building plan describes a single residential building on the 445.93 sq.m. plot, with stilt and five upper floors. It records proposed coverage of 247.88 sq.m. and vacant plot area of 193.74 sq.m.; these are plan-record figures, not measurements of completed works.
The plan separately records total proposed built-up area of 1239.4 sq.m. excluding parking and 1487.28 sq.m. including parking. The building-permit record states a proposed building height of 17.98 m from ground level; another sanctioned parameter records 14.98 m as height, without the same ground-level wording.
The supplied extracts do not establish detailed common-area distribution, floor-by-floor unit arrangements, number of lifts or stairs, or a measured building footprint beyond the proposed coverage figure. The plan identifies a tot-lot requirement, but the municipal permit lists its area as 0 sq.m.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 152.17 sq.m. | 83.6–95.2 sq.m.; median 89.4 sq.m. | 41% |
RERA unit counts and saleable area are filing figures; the booking snapshot has no stated as-of date. Carpet-area figures were software-measured from the approved floor-plan drawings, are not RERA disclosures, and are flagged for review. The drawing measurement covers four flat designs. Saleable area is a distinct filed measure; the supplied drawing-measurement note says it includes the home’s share of common areas and is larger than measured carpet area. RERA unit table RERA unit details Floor plans
The drawing record provides one example flat with bedrooms and a kitchen, including measured bedroom dimensions of 3.99 × 4.0 m, 3.89 × 4.0 m, and 3.89 × 3.0 m, and kitchen dimensions of 3.99 × 5.03 m. These are software measurements from the drawing, not RERA-filed room dimensions. RERA unit details
5. Parking & vehicle circulation
The sanction identifies stilt parking and records 1.00 car parking space and 247.88 sq.m. total parking area. The permit conditions state that the stilt area approved for parking must be used exclusively for vehicle parking and not partitioned or converted to another use.
The supplied record does not establish visitor or accessible parking counts, two-wheeler spaces, parking allocation to individual apartments, a ramp arrangement, or EV charging installation status. The sanction includes a requirement for EV charging infrastructure in parking places; that condition is not evidence that the infrastructure has been installed.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | RERA amenities record says “Green Strip/TOT LOT/Park” available; municipal permit records tot-lot area as 0 sq.m. | RERA amenities | RERA availability entry; progress recorded as 0%; not independently verified complete. |
| Rainwater harvesting | Permit specifies 1 rainwater-harvesting pit and requires a percolation pit. | Sanctioned requirement; RERA progress record is 0%; completion not verified. | |
| Trees | 15 trees recorded in the municipal permit. | Permit record; planting status not verified. | |
| Community buildings | Listed in RERA amenities. | RERA amenities | Progress recorded as 0%; no completion evidence supplied. |
The supplied records do not provide a clubhouse, indoor recreation, sports-facility or facility-capacity schedule. The vendor information lists kids’ play areas/sand pits and a normal park/central green, but these are vendor claims rather than evidence of sanctioned or delivered facilities. Promoter website
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, rainwater harvesting, fire protection and safety requirements, and an electrical meter room/sub-station/receiving station as available, while recording 0% progress against the listed amenities. No commissioning or independent completion evidence is supplied. RERA amenities
The building-plan conditions require a rainwater-harvesting structure, transformer space, a garbage house and fire-fighting installations, and require a Fire NOC before issue of an occupancy certificate. The permit also requires an occupancy certificate before occupation and requires construction-related services, including sanitation, plumbing, fire safety, lifts and electrical installations, to be executed under qualified technical supervision. These are approval conditions, not confirmation of installation or statutory compliance.
The supplied project records do not specify water source or storage capacity, treatment plant capacity, sewage-treatment or reuse arrangements, backup-power capacity, lift count or capacity, CCTV coverage, access-control arrangements, or accessible circulation.
8. Location, access & connectivity
The registered location is Plot Nos. 220 and 221, Bandlaguda, Uppal, Medchal-Malkajgiri, Telangana, PIN 500068. The site boundaries identify a 40 feet wide road to the west; the building-plan record also lists road widths of 12.0 m, 12.00 m, 12 MTRS and 30' WIDE EXISTING ROAD. RERA filing
The supplied location record gives Financial District (Nanakramguda) at 9.7 km. The vendor supplies separate connectivity claims, including Inner Ring Road at approximately 3 km and nearby school, park and clinic distances; these are vendor-provided, not TG-RERA measurements. Location record Promoter website
9. Developer & development status
The registered promoter is S S CONSTRUCTIONS, identified in the RERA filing as a proprietorship. The filing names Yarabarla Madhu as proprietor and authorized signatory. The supplied records identify the promoter’s project address as Navya Towers, Road No.1, Income Tax Colony, Bandlaguda, Uppal, Medchal-Malkajgiri, 500068. RERA filing Parties record RERA record
The project Form B declaration, signed by Yarabarla Madhu on behalf of S S Constructions, states a completion undertaking of 07-0 5 -2029. The project header separately records proposed completion as 07/09/2029. No construction-progress percentage or occupancy certificate is supplied. RERA record
10. Approvals, official records & documents
| Reference / scope | P02200010938; NAVYA VINAY ARCADIA- C; S S CONSTRUCTIONS |
|---|---|
| Available evidence | Form C registration certificate states validity from 07/05/2026 to 07/05/2029. |
| Reference / scope | Approval No. 3705/GHMC/SWBP/LBN2/2026; file No. 013784/GHMC/06287/SWBP/LBN2/2026; dated 07/05/2026 |
|---|---|
| Available evidence | Building-plan and permit records for Survey No. 43/A, Plot Nos. 220 and 221, Bandlaguda. |
| Reference / scope | Project and promoter declaration |
|---|---|
| Available evidence | Yarabarla Madhu’s declaration on behalf of S S Constructions states the project completion undertaking and other promoter declarations. |
| Reference / scope | Not present in supplied records |
|---|---|
| Available evidence | The permit requires an OC before occupation; no issued OC or completion certificate is supplied. |
| Reference / scope | Not established in this Overview evidence |
|---|---|
| Available evidence | No separately supplied evidence establishes completion or commissioning of utilities or amenities. |
The plan record identifies a required Fire NOC before occupancy and other construction and service conditions. Their detailed review is outside this overview.
1. Project at a glance
Project identity
Registered name: NAVYA VINAY ARCADIA- C; the TG-RERA certificate records “NAVYA VINAY ARCADIA- C.”
Project type / phase: Residential apartment project; registered portion/phase is not separately stated.
TG-RERA registration: P02200010938.
Registration validity: 07/05/2026 to 07/05/2029, stated as three years, unless extended by the Authority. This is registration validity, not a possession or completion date.
RERA status: The supplied certificate records registration; the portal record labels the project “New Project.”
Registered promoter: S S CONSTRUCTIONS, stated in the RERA record as a proprietorship.
Project status / progress: No construction-progress percentage or independently verified site-progress record is supplied.
Land and geographic identity
Registered locality / revenue village: Bandlaguda; the certificate identifies Bandlaguda, Uppal, Medchal-Malkajgiri.
Mandal / district / PIN: Uppal / Medchal-Malkajgiri / 500068.
Project survey number(s): 43/A. The building-permit record also writes Sy.No. 43/A.
Site / plot identity: Plot Nos. 220 and 221.
Registered site extent: The project record states 445.93 sq.m.; the building-plan record identifies gross and net plot area as 445.93 sq.m.
Boundaries: East: Plot Nos. 228 and 229; West: 40 feet wide road; North: Plot No. 222; South: Plot No. 219.
Registered area affected / net area: RERA filing: affected area 0; net area 445.93 sq.m.
Development identity
Sanctioning authority: Building permit records identify the Malkajgiri Municipal Corporation; the RERA filing identifies GHMC as the authority.
Principal approval: Approval No. 3705/GHMC/SWBP/LBN2/2026, dated 07/05/2026. Building permit file No. 013784/GHMC/06287/SWBP/LBN2/2026.
Approved building: One residential building, Stilt + 5 Upper Floors.
Approved built-up area: 1239.40 sq.m. excluding parking; 1487.28 sq.m. including parking, as stated in the GHMC plan record.
Parking provision in sanction: Stilt parking; the permit records 1.00 car parking space and total parking area 247.88 sq.m.
Unit count: 10 dwelling units in the building-permit record and the RERA filing.
Offering and status
RERA-filed configuration: 3BHK; 10 units.
RERA-filed saleable area: 152.17 sq.m. per 3BHK configuration.
Portal booking snapshot: 0 booked; 10 available, with no as-of date supplied for these counts; treat as indicative.
Completion dates: Form B records an undertaking to complete by 07-0 5 -2029; the project header records proposed completion as 07/09/2029.
Occupancy / completion certificate: No completion or occupancy certificate is recorded in the supplied documents; the building-permit extraction marks completion as not certified. The sanction requires an OC before occupation.
2. The project story
NAVYA VINAY ARCADIA- C is a residential apartment project registered under TG-RERA number P02200010938 on a 445.93 sq.m. site at Plot Nos. 220 and 221, Survey No. 43/A, Bandlaguda, Uppal. The sanctioned scheme is one building of stilt plus five upper floors, with ten dwelling units; the RERA filing describes the homes as 3BHK.
The supplied record establishes approval and registration, but does not establish the current on-site construction stage. It contains no completion or occupancy certificate. Registration validity runs to 07/05/2029 unless extended; that date is distinct from the completion dates stated in the project records.
3. Master plan, architecture & building design
The approved building plan describes a single residential building on the 445.93 sq.m. plot, with stilt and five upper floors. It records proposed coverage of 247.88 sq.m. and vacant plot area of 193.74 sq.m.; these are plan-record figures, not measurements of completed works.
The plan separately records total proposed built-up area of 1239.4 sq.m. excluding parking and 1487.28 sq.m. including parking. The building-permit record states a proposed building height of 17.98 m from ground level; another sanctioned parameter records 14.98 m as height, without the same ground-level wording.
The supplied extracts do not establish detailed common-area distribution, floor-by-floor unit arrangements, number of lifts or stairs, or a measured building footprint beyond the proposed coverage figure. The plan identifies a tot-lot requirement, but the municipal permit lists its area as 0 sq.m.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 152.17 sq.m. | 83.6–95.2 sq.m.; median 89.4 sq.m. | 41% |
RERA unit counts and saleable area are filing figures; the booking snapshot has no stated as-of date. Carpet-area figures were software-measured from the approved floor-plan drawings, are not RERA disclosures, and are flagged for review. The drawing measurement covers four flat designs. Saleable area is a distinct filed measure; the supplied drawing-measurement note says it includes the home’s share of common areas and is larger than measured carpet area.
The drawing record provides one example flat with bedrooms and a kitchen, including measured bedroom dimensions of 3.99 × 4.0 m, 3.89 × 4.0 m, and 3.89 × 3.0 m, and kitchen dimensions of 3.99 × 5.03 m. These are software measurements from the drawing, not RERA-filed room dimensions.
5. Parking & vehicle circulation
The sanction identifies stilt parking and records 1.00 car parking space and 247.88 sq.m. total parking area. The permit conditions state that the stilt area approved for parking must be used exclusively for vehicle parking and not partitioned or converted to another use.
The supplied record does not establish visitor or accessible parking counts, two-wheeler spaces, parking allocation to individual apartments, a ramp arrangement, or EV charging installation status. The sanction includes a requirement for EV charging infrastructure in parking places; that condition is not evidence that the infrastructure has been installed.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | RERA amenities record says “Green Strip/TOT LOT/Park” available; municipal permit records tot-lot area as 0 sq.m. | RERA availability entry; progress recorded as 0%; not independently verified complete. | |
| Rainwater harvesting | Permit specifies 1 rainwater-harvesting pit and requires a percolation pit. | Sanctioned requirement; RERA progress record is 0%; completion not verified. | |
| Trees | 15 trees recorded in the municipal permit. | Permit record; planting status not verified. | |
| Community buildings | Listed in RERA amenities. | Progress recorded as 0%; no completion evidence supplied. |
The supplied records do not provide a clubhouse, indoor recreation, sports-facility or facility-capacity schedule. The vendor information lists kids’ play areas/sand pits and a normal park/central green, but these are vendor claims rather than evidence of sanctioned or delivered facilities.
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, rainwater harvesting, fire protection and safety requirements, and an electrical meter room/sub-station/receiving station as available, while recording 0% progress against the listed amenities. No commissioning or independent completion evidence is supplied.
The building-plan conditions require a rainwater-harvesting structure, transformer space, a garbage house and fire-fighting installations, and require a Fire NOC before issue of an occupancy certificate. The permit also requires an occupancy certificate before occupation and requires construction-related services, including sanitation, plumbing, fire safety, lifts and electrical installations, to be executed under qualified technical supervision. These are approval conditions, not confirmation of installation or statutory compliance.
The supplied project records do not specify water source or storage capacity, treatment plant capacity, sewage-treatment or reuse arrangements, backup-power capacity, lift count or capacity, CCTV coverage, access-control arrangements, or accessible circulation.
8. Location, access & connectivity
The registered location is Plot Nos. 220 and 221, Bandlaguda, Uppal, Medchal-Malkajgiri, Telangana, PIN 500068. The site boundaries identify a 40 feet wide road to the west; the building-plan record also lists road widths of 12.0 m, 12.00 m, 12 MTRS and 30' WIDE EXISTING ROAD.
The supplied location record gives Financial District (Nanakramguda) at 9.7 km. The vendor supplies separate connectivity claims, including Inner Ring Road at approximately 3 km and nearby school, park and clinic distances; these are vendor-provided, not TG-RERA measurements.
9. Developer & development status
The registered promoter is S S CONSTRUCTIONS, identified in the RERA filing as a proprietorship. The filing names Yarabarla Madhu as proprietor and authorized signatory. The supplied records identify the promoter’s project address as Navya Towers, Road No.1, Income Tax Colony, Bandlaguda, Uppal, Medchal-Malkajgiri, 500068.
The project Form B declaration, signed by Yarabarla Madhu on behalf of S S Constructions, states a completion undertaking of 07-0 5 -2029. The project header separately records proposed completion as 07/09/2029. No construction-progress percentage or occupancy certificate is supplied.
10. Approvals, official records & documents
| Reference / scope | P02200010938; NAVYA VINAY ARCADIA- C; S S CONSTRUCTIONS |
|---|---|
| Available evidence | Form C registration certificate states validity from 07/05/2026 to 07/05/2029. |
| Reference / scope | Approval No. 3705/GHMC/SWBP/LBN2/2026; file No. 013784/GHMC/06287/SWBP/LBN2/2026; dated 07/05/2026 |
|---|---|
| Available evidence | Building-plan and permit records for Survey No. 43/A, Plot Nos. 220 and 221, Bandlaguda. |
| Reference / scope | Project and promoter declaration |
|---|---|
| Available evidence | Yarabarla Madhu’s declaration on behalf of S S Constructions states the project completion undertaking and other promoter declarations. |
| Reference / scope | Not present in supplied records |
|---|---|
| Available evidence | The permit requires an OC before occupation; no issued OC or completion certificate is supplied. |
| Reference / scope | Not established in this Overview evidence |
|---|---|
| Available evidence | No separately supplied evidence establishes completion or commissioning of utilities or amenities. |
The plan record identifies a required Fire NOC before occupancy and other construction and service conditions. Their detailed review is outside this overview.
Frequently asked questions
Is NAVYA VINAY ARCADIA- C registered with Telangana RERA?
Yes. NAVYA VINAY ARCADIA- C is registered with the Telangana Real Estate Regulatory Authority as P02200010938; the registration status is New Project.
Who is the developer of NAVYA VINAY ARCADIA- C?
The promoter named in the RERA registration is S S CONSTRUCTIONS.
Where is NAVYA VINAY ARCADIA- C located?
NAVYA VINAY ARCADIA- C is in Uppal, Bandlaguda, Medchal-Malkajgiri, Telangana (500068).
When will NAVYA VINAY ARCADIA- C be completed?
The promoter's proposed date of completion filed with RERA is 07/09/2029. This is the promoter's declaration, not a guarantee.