Sign in

Anokha S Retreat-2

ANOKHA INFRASTRUCTURE · Rangareddy · RERA P02400010618

ANOKHA S RETREAT-2 is a residential apartment project in Sagar Hills Phase 2, Rajendranagar Mandal, Ranga Reddy District, developed by the registered promoter ANOKHA INFRASTRUCTURE, a partnership. It occupies 444.74 sq. metres and comprises one building with 1 Stilt + 5 upper floors and 10 units, filed as 3BHK. The project is registered under TG-RERA registration P02400010618, and the project identity fields list a proposed completion date of 18/04/2027.

More from Anokha Infrastructure · 2 projects →

01What we found

RegisteredTG-RERA - valid till 18 Dec 2026
20documents on file - each fact links to its page
6court cases on this project's land (survey 273, 274, 275, 281, Rajendra Nagar)
9items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from magicbricks.com

1. Project at a glance

Project identity

ItemProject record
Registered nameANOKHA S RETREAT-2 RERA record
Project typeResidential apartment project RERA record
Phase / registered portionThe project is identified in the building-plan record as Sagar Hills Phase-II; the RERA certificate records the project name and site portion. A separate phase registration description is not provided.
TG-RERA registrationP02400010618 RERA record
Registration validity18/12/2023 to 18/12/2026, stated as three years. This is the registration period, not the building-completion deadline.
Registered promoterANOKHA INFRASTRUCTURE, a partnership. RERA record RERA filing
RERA statusRegistered; the supplied certificate does not record an extension.

Land and geographic identity

ItemProject record
LocalitySagar Hills Phase 2 / Sagar Hills Phase-II RERA record
Revenue villageBudvel Village in the building-plan and title documents; project identity fields also record “Rajendra nagar.”
Mandal / district / PINRajendranagar Mandal; Ranga Reddy District; PIN 500030 RERA record
Survey numbers273, 274, 275 and 281 RERA record Land records
Site descriptionPlot No. 2/P, 3 and 4/P (northern part), Block H, Sagar Hills Phase-II
Registered site extent444.74 sq. metres; the title deed describes 532.00 sq. yards or 444.75 sq. metres.
Plan-record land areaMinimum plot area 444.74 sq. mt.; net plot area 444.74 sq. mt.; road-affected area recorded as 0.0 sq. m.
BoundariesNorth: Plot No. 2 part; South: Plot No. 4 part; East: Plot Nos. 28 part and 29 part; West: 40 feet wide road. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building approval4822/GHMC/CHR/2023-BP, dated 18 December 2023 Approvals record
Approved built-up area1,458.95 sq. m. including parking; 1,229.15 sq. m. residential upper-floor area is separately stated in the permit record.
Building countOne residential apartment building
Sanctioned configuration1 Stilt + 5 upper floors; building height 14.9 m
ParkingStilt area 231.71 sq. m. and total parking area 229.8 sq. m. are stated in the permit record. Cellar and stilt are referred to in plan conditions, but no cellar level is established in the supplied building configuration.
Units10 units appear in both the sanctioned-plan extraction and RERA unit record. RERA unit table

Offering and status

ItemProject record
RERA-filed configuration3BHK; 10 units, 0 booked and 10 available as last read from the TG-RERA portal. The portal record has no as-of date, so counts are indicative. RERA unit table RERA unit details
RERA saleable area141.91 sq. m. for the filed 3BHK configuration RERA unit table RERA unit details
Construction stageNot established by the supplied evidence; no independently verified site-progress report is provided. Document index
Completion datesThe RERA certificate records validity through 18/12/2026; Form B declares completion by 18 December 2026. The project identity fields separately list a proposed completion date of 18/04/2027. RERA record
Occupancy / completion certificateNo occupancy or completion certificate for this building is supplied. The permit requires an occupancy certificate before occupation.

2. The project story

ANOKHA S RETREAT-2 is a small, single-building residential apartment development on the stated Block H site at Sagar Hills Phase-II, Budvel Village, Rajendranagar Mandal, Ranga Reddy District. The site is identified by Survey Nos. 273, 274, 275 and 281, and the plan describes Plot No. 2/P, 3 and 4/P (northern part).

The GHMC building permit is for one residential building with 1 Stilt + 5 upper floors and 10 sanctioned dwelling units. The TG-RERA unit record lists ten 3BHK units; the supplied record shows zero booked and ten available, but provides no count-as-of date. No construction-progress evidence establishes whether work is underway or complete, and no occupancy certificate is supplied. Accordingly, the record supports describing the building as approved and the units as offered in the RERA record, but not assigning a verified construction stage or occupancy status. RERA unit table Document index

3. Master plan, architecture & building design

The filed building plan describes a proposed residential apartment building on a 444.74 sq. m. plot, with a recorded net plot area of 444.74 sq. m. It identifies one building, 1 Stilt + 5 upper floors, and a building height of 14.90 m. The plan extraction records total proposed built-up area of 1,458.95 sq. m. including parking and 1,229.15 sq. m. excluding parking; the permit record separately identifies 1,229.15 sq. m. residential upper-floor area. These are plan/permit figures, not carpet-area or RERA saleable-area measurements.

The plan records 10 dwelling units. It also states that one floor uses TDR, and lists DRC Nos. 00090/TDR/2020 and 02424/TDR/2023. The supplied extracts do not provide a complete drawing-level account of floor-by-floor unit arrangements, lifts, stairs, entrances, internal circulation or landscaping dimensions.

GHMC plan conditions identify a tot-lot, periphery greenery, a transformer space, garbage house, rainwater-harvesting structure, septic tank and sump. The permit also states that the road-affected portion is to be surrendered to GHMC free of cost; the permit’s area schedule records road-affected area as 0.0 sq. m.

4. Homes, configurations & floor plans

The RERA unit record lists ten 3BHK homes, all shown as available in the portal data; that booking snapshot is undated. The filed saleable area is 141.91 sq. m. per unit. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010141.91 sq. m.111.7–114.0 sq. m. (software-measured range; median 112.9 sq. m.)20%

The carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA-filed measurements; the measurement records say they need review. The filed saleable area is a separate figure and should not be read as carpet area: saleable area includes the home’s allocated share of common areas. The supplied record does not provide a measured area for the balcony, and does not establish a RERA-filed carpet-area figure. Floor plans RERA unit details

The drawing measurement for a typical 3BHK plan identifies three bedrooms, living/dining, kitchen, wash area, three toilets and a balcony. This is drawing-based room information, not a separate guarantee of finishes or dimensions. RERA unit details

5. Parking & vehicle circulation

The GHMC permit records a stilt area of 231.71 sq. m. and total parking area of 229.8 sq. m. The plan conditions state that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not partitioned or converted; the supplied building configuration itself describes 1 Stilt + 5 upper floors. No number of parking spaces, parking-space allocation by unit, visitor or accessible parking provision, or two-wheeler count is established in the supplied records. A parking bay shown in a plan would not by itself establish exclusive ownership.

The plan gives road widths of 12.00 MT and 18 mt. in its extracted data, and the site boundary record identifies a 40 feet wide road to the west. The available extracts do not establish the driveway, ramp or vehicle-entry arrangement. RERA filing

6. Amenities, recreation & open spaces

The following are identified in RERA-filed amenity data or the GHMC plan/permit extracts. The amenity record reports 0% progress for every listed item; it does not establish independent completion or on-site verification. RERA amenities

Tot-lot / green strip
Description / sizePlan condition calls for a fenced tot-lot maintained as greenery; no area or capacity supplied.
Declared progress / verified statusAmenity record: 0%; completion not independently verified.
Periphery greenery
Description / sizeTree planting and maintenance of a greenery strip are required by the plan conditions; no dimensions supplied.
Declared progress / verified statusAmenity record: 0%; completion not independently verified.
Internal roads and footpaths
Description / sizeListed in the RERA amenity record; no dimensions supplied.
Evidence sourceRERA amenities
Declared progress / verified status0%; completion not independently verified.
Community buildings
Description / sizeListed in the RERA amenity record; no building details supplied.
Evidence sourceRERA amenities
Declared progress / verified status0%; completion not independently verified.

No clubhouse, indoor recreation facility, sports court or other recreational facility is evidenced in the supplied project records. Utilities and building services are described separately below.

7. Utilities, building services & safety

The GHMC plan extract identifies a sump, septic tank, garbage house, transformer space and rainwater-harvesting structure. The permit record specifies two rainwater-harvesting pits. The RERA amenity record also lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection and safety, and an electrical meter room/sub-station/receiving station. These are listed provisions, not evidence of completed or commissioned services; no capacities or detailed systems are supplied. RERA amenities

The permit requires an occupancy certificate before occupation and an occupancy-stage Fire NOC from the Director (EV&DM). It also requires building services—including sanitation, plumbing, fire safety, lifts and electrical installations—to be executed under qualified technical personnel. The supplied records do not identify lift count or capacity, backup-power capacity, water source or storage capacity, an STP, CCTV provision, access-control arrangements, or accessibility details.

8. Location, access & connectivity

The registered project location is Sagar Hills Phase 2, Rajendra nagar, Ranga Reddy District, Telangana, PIN 500030. The building-plan and title records identify the revenue village as Budvel Village, in Rajendranagar Mandal. RERA record

The plan identifies road widths of 12.00 MT and 18 mt.; the stated western boundary is a 40 feet wide road. The supplied location record lists Rajiv Gandhi International Airport at 9.3 km. No public-transport details or other independently measured distances are supplied. Location record RERA filing

9. Developer & development status

The registered promoter is ANOKHA INFRASTRUCTURE, recorded as a partnership. The project filing identifies GODAMMA AND SONS PRIVATE LIMITED REPRESENTED BY RADHA KISHAN CHILAPPAGARI as authorised signatory and SLEEVA REDDY VATTI as partner. The promoter’s GSTIN is 36ABQFA0695J1ZZ. Parties record Corporate record RERA filing

The registration certificate gives the promoter office as Village Gachi Bowli, Mandal Serilingampally, Ranga Reddy District, PIN 500032. The project record does not provide an official project contact number, email address or promoter website.

The RERA certificate runs from 18/12/2023 to 18/12/2026. Form B, dated 20.02.2026, declares completion by 18 December 2026. The project identity fields also list a proposed completion date of 18/04/2027; the supplied records do not explain that date. No construction-progress report or occupancy/completion certificate for this building is supplied. RERA record

10. Approvals, official records & documents

RecordWhat the supplied project file establishes
TG-RERA registration certificateForm C for ANOKHA S RETREAT-2, registration P02400010618, valid 18/12/2023–18/12/2026; the certificate lists the project’s survey numbers and site portion.
GHMC building permitBuilding Permit Order dated 18 December 2023, approval 4822/GHMC/CHR/2023-BP, for one residential building at Budvel with 1 Stilt + 5 upper floors.
Building-plan drawingProposed residential plan for a stilt-plus-five-upper-floor building, showing 10 units and plan conditions; file no. TS/067298/2023.
Other approval identifiers in the building-permit recordFile no. 012500/GHMC/6157/CHR2/2023-BP; approved layout/LRS/subdivision identifier C/GHMC/056841/2020; DRC Nos. 00090/TDR/2020 and 02424/TDR/2023.
Promoter declarationForm B dated 20.02.2026, signed by the authorised signatory, with declarations about title, encumbrances, project funds, approvals and completion.
Title-related filed documentsSale deed 10882/2023 and advocate title opinion are among the supplied RERA-filed documents.
Occupancy / completion recordNo building-specific occupancy or completion certificate is supplied. The permit requires an occupancy certificate before occupation.

The permit is conditional and states that it does not confer ownership rights; its full conditions are addressed in the approvals review.

Frequently asked questions

Is ANOKHA S RETREAT-2 registered with Telangana RERA?

Yes. ANOKHA S RETREAT-2 is registered with the Telangana Real Estate Regulatory Authority as P02400010618; the registration status is New Project.

Who is the developer of ANOKHA S RETREAT-2?

The promoter named in the RERA registration is ANOKHA INFRASTRUCTURE.

Where is ANOKHA S RETREAT-2 located?

ANOKHA S RETREAT-2 is in SAGAR HILLS PHASE 2, Rajendra nagar, Rajendranagar, Rangareddy, Telangana (500030).

When will ANOKHA S RETREAT-2 be completed?

The promoter's proposed date of completion filed with RERA is 18/04/2027. This is the promoter's declaration, not a guarantee.

More projects in Rajendra Nagar