THE RETREAT is a residential apartment project in NARSINGI, Rajendranagar mandal, Ranga Reddy district, developed by registered promoter Putty Developers. The project is on 747.99 sq. m of land and comprises one building with 1 Stilt + 5 Upper floors and 15 3BHK apartments, each with a RERA-filed saleable area of 146.15 sq. m (1,573 sq. ft). It is registered under TG-RERA number P02400003986, with proposed and revised proposed completion of 31/01/2023.

More from Putty Developers · 4 projects →

01What we found

Period endedTG-RERA registration ran to 31 Jan 2023 - check its extension on TG-RERA
12documents on file - each fact links to its page
1court case on this project's land (survey 90, Rajendra Nagar)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.in
Rajendra Nagar, Rajendranagar, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameTHE RETREAT RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified; TG-RERA registration is for the project on Survey No. 90
TG-RERA registrationP02400003986
Registration validity22/01/2022 to 31/01/2023; the filed certificate states one year and says extension would be in accordance with the Act and Rules
Registered promoterPutty Developers
RERA-recorded statusOn-Going Project RERA filing

Land and geographic identity

FieldRecord
LocalityNARSINGI RERA filing
Revenue villageManchirevula Village is named in the project’s HMDA technical approval and title documents; the RERA fields also record “Rajendra nagar” as village and “NARSINGI” as locality. RERA filing
MandalRajendranagar RERA record
District / PINRanga Reddy / 500089 RERA record
Project survey numberSy.No. 90
PlotL-11
Registered site extentRERA land record: 747.99 sq. m; the HMDA approval also records 747.99 sq. m. The title documents describe 900 sq. yards, equivalent to 752.4 sq. m. Land records
Net / total areaRERA land record: total 747.99 sq. m and net 747.99 sq. m; affected area recorded as 0. Land records
Boundaries in RERA land recordEast: PLOT NO L 7; West: ROAD WIDTH 12; North: PLOT NO L 9 L 10; South: PLOT NO 12. Land records

Development identity

FieldRecord
Principal sanctioning authorityHyderabad Metropolitan Development Authority (HMDA), technical approval 032209/SKP/R1/U6/HMDA/24122019, dated 18/06/2020; the approval directs that building plans be sanctioned by the Executive Authority in conformity with HMDA’s technical approval. Approvals record
Local building permit on fileNarsingi Municipality Building Permit Order BA.NO: 08/2020-21, proceedings/file G1/2509/2020, dated 08.09:2020. Approvals record
Approved built-up areaThe RERA fields record 1849.27 sq. m. The filed HMDA and municipal approval extractions separately record “Built up Area 1838.9” and “Built up area 1838.9 sq Mts.” RERA filing
Building countRERA record: 1 proposed building unit; building-permit material describes one building. RERA filing
Sanctioned configuration1 Stilt + 5 Upper floors in the HMDA and municipal approval records.
Parking levelsStilt is shown in the sanctioned configuration; the supplied approval extraction does not state a parking-space count.
Approved vs RERA-declared homesApproved plan record: 1 building unit; RERA unit record: 15 3BHK apartments. RERA filing RERA unit table

Offering and status

FieldRecord
RERA-filed configuration3BHK; 15 units RERA unit table
RERA-filed saleable area146.15 sq. m per unit (1,573 sq. ft as recorded) RERA unit table
Booking / availability0 booked; 15 available, as last read from the TG-RERA portal. The portal record supplies no as-of date, so counts are indicative. RERA unit table
Construction stageRERA record gives 90% completeness; this is a reported record value, not an independently verified site measurement. RERA record
Completion datesProposed and revised proposed completion: 31/01/2023. RERA record RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project evidence; certificate status is therefore not established by the reviewed records. Document index

Registration validity, the stated completion deadline and the status of an occupancy/completion certificate are separate matters; the table does not treat one as evidence of another.

2. The project story

THE RETREAT is registered with TG-RERA as a residential apartment project on Survey No. 90, Plot L-11, at the Manchirevula / NARSINGI location recorded in the project materials. The RERA filing describes one building and 15 three-bedroom apartments. RERA record RERA unit table

The filed building-permit material describes a single 1 Stilt + 5 Upper floors building. The RERA record reports 90% completeness, but the supplied evidence does not include an independent site-progress inspection or a completion/occupancy certificate. The promoter’s Form B affidavit undertook to complete by 31-12-2022; the project record separately states proposed and revised completion as 31/01/2023. RERA record

3. Master plan, architecture & building design

The RERA record identifies a 747.99 sq. m site and reports approved built-up area of 1849.27 sq. m. The HMDA technical approval extraction records a residential building of one stilt and five upper floors and “Built up Area 1838.9”; the municipal permit extraction likewise records 1838.9 sq. m. These are the figures as stated in their respective records; no supplied drawing set enables a further area classification or independent measurement. Land records RERA filing

The municipal permit identifies a building height of 14.95 and a stilt area of 318.88 sq. m. It records residential area of 1,667.85 sq. m and one stilt plus five upper floors. The HMDA technical approval also specifies one entry and one exit, each with minimum width of 4.5 meters and height clearance of 5 meters.

The supplied floor-plan material has three drawings listed: one scan is pending review and two are marked as having no flats; none has a software-measured plan. Accordingly, the evidence does not establish flats per floor, room arrangements, lift and stair locations, or detailed circulation and common-area layouts. Floor plans

The HMDA master-plan sheet for the area is available as an image, but the evidence does not identify the exact land-use zone at the project survey. The HMDA approved-layout lookup is unavailable through the public portal route described in the record, and no layout approval number is disclosed in the RERA land fields. HMDA

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK15015146.15 sq. m (1,573 sq. ft)Not measured in supplied drawingsNot supplied

RERA unit table RERA unit details Floor plans

The area shown is the RERA-filed saleable area; the evidence does not provide a RERA-filed carpet area or loading figure. No drawing-based carpet or room measurements are available in the supplied record. The portal booking and availability figures have no stated as-of date and should be treated as indicative. RERA unit table Floor plans

5. Parking & vehicle circulation

The building permit identifies a stilt level, but the supplied records do not establish the sanctioned number of car or two-wheeler spaces, visitor or accessible spaces, parking allocation to individual apartments, or any mechanical or surface parking provision. The approval condition describes the stilt as part of the building configuration; no exclusive unit ownership or allocation is evidenced. RERA unit table

The HMDA technical approval specifies one entry and one exit, each with a minimum width of 4.5 meters and height clearance of 5 meters. The supplied material does not describe a ramp, internal driveway arrangement, pedestrian separation or EV charging.

6. Amenities, recreation & open spaces

The TG-RERA amenity record includes availability and progress fields, but no independent verification of completion is supplied. The permit documents also state specific site provisions and conditions.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green Strip / TOT LOT / ParkNo size suppliedTG-RERA amenity record RERA amenitiesAvailable: YES; progress recorded as 10%; completion not independently verified
Water conservation / rainwater harvestingNo capacity suppliedTG-RERA amenity record; HMDA and municipal permit conditions RERA amenitiesAvailable: YES; progress recorded as 50%; permits require rainwater-harvesting provision; completion not independently verified
Community buildingsNo size or capacity suppliedTG-RERA amenity record RERA amenitiesProgress recorded as 0%; no completion verification
Recreational open spaceNo area suppliedTG-RERA amenity record RERA amenitiesProgress recorded as 0%; no completion verification
Tot-lotMunicipal permit lists “Tot-lot (m2) 0”Municipal permit extractionNo delivered status established
Indoor / clubhouse or sports facilitiesNo project-filed facility detail supplied—Not established in the supplied project records

7. Utilities, building services & safety

The RERA amenity record marks water supply, sewerage, rainwater harvesting and electrical meter room/sub-station/receiving station as available, with progress values of 0%, 0%, 50% and 20%, respectively. These are portal-recorded values; no independent completion verification or capacity details are supplied. RERA amenities

  • Water and sewerage: HMDA’s technical approval requires a septic tank and says effluent or drainage must not overflow onto a road or public place. The municipal permit lists an ETP; the supplied records do not give system capacities, treatment performance or reuse arrangements.
  • Storm water and harvesting: The TG-RERA amenity record lists storm-water drains and rainwater harvesting. The HMDA approval requires rainwater-harvesting structures, and the municipal permit specifies rainwater-harvesting structures/percolation pits. RERA amenities
  • Electrical and waste provisions: The HMDA approval lists transformer and garbage-house provisions; the municipal permit requires transformer space and lists a garbage house. The RERA amenity record shows electrical meter room/sub-station/receiving station available at 20% progress and solid-waste management at 0%. Generator or backup capacity is not established by the project-filed evidence supplied here. RERA amenities
  • Fire and access: The municipal permit assigns structural and fire-safety requirements to the owner, builder/developer, architect and structural engineer. The RERA amenity record lists fire protection and fire-safety requirements at 0% progress. The supplied documents do not establish installed systems, fire clearance or independent compliance verification. RERA amenities
  • Lifts, security and accessibility: The supplied project records do not establish lift numbers or capacities, CCTV, access-control arrangements, ramps or accessible circulation. Document index RERA amenities

8. Location, access & connectivity

The official project record places THE RETREAT in the NARSINGI locality, Rajendranagar mandal, Ranga Reddy district, PIN 500089; project title and approval materials identify Plot L-11 in Sy.No. 90, Manchirevula Village. RERA record

The supplied location data gives the Financial District (Nanakramguda) at 3.4 km. No other measured distances, public-transport details or project approach-road description are supplied. The municipal permit material refers to 40-foot / 12.0-metre-wide roads; the HMDA approval specifies a 4.5-metre minimum width for the building’s entry and exit. Location record

9. Developer & development status

The registered promoter is Putty Developers, recorded as a partnership. The supplied corporate identifier is GSTIN 36ABAFP6590K1ZS. The listed partners are Rama Krishna Rao Putty and Dokku Siva Kumari; Rama Krishna Rao Putty is identified as authorized signatory in the RERA-filed authorization document. Corporate record Parties record

The promoter’s Form B affidavit, dated 10 December 2021, declares legal title, says the land is free from encumbrances, and undertakes completion by 31-12-2022. These are promoter declarations in that filing. The project record reports 90% completeness and states a proposed and revised completion date of 31/01/2023; the supplied evidence does not provide independently verified construction progress or an occupancy/completion certificate. RERA record

The RERA registration certificate gives the promoter’s office as Village Kannamet, Mandal Serilingampally, Ranga Reddy district, PIN 500084. No official promoter website or contact details are supplied.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400003986; issued 22/01/2022; validity to 31/01/2023
Scope and noteForm C certificate for THE RETREAT, promoter Putty Developers, Survey No. 90.
HMDA technical approval
Identifier / date032209/SKP/R1/U6/HMDA/24122019; 18/06/2020
Scope and noteTechnical approval for residential building on Plot L-11, Sy.No. 90, Manchirevula Village; directs local Executive Authority sanction in conformity with the technically approved plans.
Narsingi Municipality building permit
Identifier / dateBA.NO: 08/2020-21; proceedings/file G1/2509/2020; 08.09:2020
Scope and noteBuilding Permit Order for applicant Meka Bharathi; records 1 stilt + 5 upper floors and conditions including completion notice and occupancy certificate before occupation.
Promoter Form B declaration
Identifier / date10 December 2021
Scope and notePromoter declaration by Putty Rama Krishna Rao, including title, encumbrance and completion undertakings.
Title and development agreement material
Identifier / dateDevelopment Agreement-Cum-GPA Doc. No. 13567/2021; 08-10-2021
Scope and noteSupplied title material concerns Plot L-11, Sy.No. 90, Manchirevula Village and records development rights; see Land & Title for the deed register and title analysis.
Layout approval
Identifier / dateNot disclosed in the RERA land fields
Scope and noteHMDA public layout lookup is recorded as unavailable; this is a portal-access limitation, not evidence of approval or refusal. HMDA
Occupancy / completion certificate
Identifier / dateNot located in supplied project documents
Scope and noteThe supplied municipal permit requires a completion notice to obtain an occupancy certificate; certificate status is not established by the reviewed material. Document index

The supplied project documents include three commencement/building-permit-related records, but the project-specific approval evidence summarized above is the HMDA and Narsingi Municipality material for Sy.No. 90, Plot L-11. Document index

Frequently asked questions

Is THE RETREAT registered with Telangana RERA?

Yes. THE RETREAT is registered with the Telangana Real Estate Regulatory Authority as P02400003986; the registration status is On-Going Project.

Who is the developer of THE RETREAT?

The promoter named in the RERA registration is Putty Developers.

Where is THE RETREAT located?

THE RETREAT is in NARSINGI, Rajendra nagar, Rajendranagar, Rangareddy, Telangana (500089).