Mailikas Mukunda
MAILIKA INFRA PROJECTS PRIVATE LIMITED · Rangareddy · RERA P02400000751
MAILIKAS MUKUNDA is a residential apartment project in PRAGATHI COLONY, Rajendranagar Mandal, Ranga Reddy District, developed by registered promoter MAILIKA INFRA PROJECTS PRIVATE LIMITED. The site extent is 1076.76 m², and the project comprises one residential building with a cellar, stilt for parking and five upper floors, with 20 apartments: 10 2BHK units of 118.22 m² each and 10 3BHK units of 152.12 m² each. It is registered under TG-RERA registration number P02400000751, with a proposed completion date of 14/08/2023.
More from Mailika Infra Projects Pvt Ltd · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | MAILIKAS MUKUNDA RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | The registration certificate identifies MAILIKAS MUKUNDA; the architect’s 2020 certificate describes one building/one wing of Phase 1. |
| TG-RERA registration | P02400000751 RERA record |
| Registration validity | 15/05/2019 to 14/08/2023; the supplied certificate says four years and is not marked extended. Registration validity is distinct from the completion date and the occupancy certificate. Approvals record |
| Registered promoter | MAILIKA INFRA PROJECTS PRIVATE LIMITED RERA record Corporate record |
| RERA status | Project record states “On-Going Project.” The supplied documents also include an architect’s completion certificate and an identified GHMC occupancy certificate; see below for their scope. RERA filing |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | PRAGATHI COLONY RERA record RERA filing |
| Revenue village | Mailardevpally Village, as identified in the building permit, registration certificate and title report. |
| Mandal / district / PIN | Rajendranagar / Ranga Reddy / 500005 RERA record RERA filing |
| Project survey numbers | Sy. Nos. 160, 162, 163/1, 164 and 165/1 RERA record Land records |
| Plot numbers | 355/A and 355/B RERA filing |
| Site extent | Total: 1076.76 m²; area affected in road widening: 176.20 m²; net: 900.56 m². RERA filing |
| Boundaries | East: 40 FEET ROAD; west: PLOT NOS 351 AND 352; north: PLOT NO 354; south: NEIGHBOURS LAND. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order 53279/HO/SZ/Cir-6/2016, approved 04-JUL-2017; file no. 73689/16/04/2016/HO. Approvals record |
| Approved built-up area | 2454.05 m², as recorded in the project filing and also as “Gross F.S.I.” in the permit. These are the labels supplied; no separate gross built-up figure is provided. RERA filing |
| Building arrangement and floors | One residential building/wing; sanctioned construction is a cellar, stilt for parking and five upper floors, with four residential flats on each upper floor. Permit-stated height: 14.95 m. |
| Parking levels | Cellar and stilt approved for parking; permit lists 519.50 m² for each and 1039.00 m² total parking-level area. |
| Unit count | 20 units in the sanctioned permit and 20 in the RERA unit breakdown: 10 2BHK and 10 3BHK. RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configurations and saleable area | 2BHK: 10 units, 118.22 m² each; 3BHK: 10 units, 152.12 m² each. RERA unit table RERA unit details |
| Booked / available | Portal-read figures show 0 booked and 10 available in each configuration (20 available total). The portal data has no as-of date, so these counts are indicative. RERA unit table |
| Construction stage | The 09/09/2020 architect certificate reports 100% completion for listed building tasks and certain development works. A later architect certificate dated 10-07-2024 certifies completion and identifies a GHMC OC. These are document certifications, not independent site observations in this report. |
| Original / revised proposed completion | 14/08/2023 / 14/08/2023 RERA record RERA filing |
| Occupancy certificate | The 10-07-2024 architect certificate identifies GHMC OC I/C11/21464/2019-oc, issued 12/02/2020. The supplied extract identifies the project but does not state a separate phase- or tower-wise OC scope. |
2. The project story
MAILIKAS MUKUNDA is a residential apartment development on plots 355/A and 355/B in Mailardevpally Village, Rajendranagar Mandal, Ranga Reddy District. The RERA record identifies the land as Sy. Nos. 160, 162, 163/1, 164 and 165/1. It is a single-building/one-wing scheme: the GHMC permit provides for a cellar, stilt parking and five residential floors, with four flats per upper floor. RERA record Land records
The registered offering consists of 20 apartments: 10 2BHK and 10 3BHK. The portal-read inventory shows all 20 as available and none booked, but the record does not provide an as-of date for that snapshot. RERA unit table RERA unit details
The project filing lists 14/08/2023 as both the original and revised proposed completion date. Separately, the 2020 architect certificate records 100% completion for the listed building tasks and certain internal and external works; the 2024 architect certificate states completion in all aspects and identifies an OC issued by GHMC in 2020. These are filed certifications. No independent site inspection or current construction-progress measurement is supplied here. RERA record
3. Master plan, architecture & building design
- The approved building permit describes one apartment building, comprising a cellar, a stilt level for parking and five upper residential floors. It specifies four flats on each upper floor, a height of 14.95 m, and a total sanctioned unit count of 20. The permit records a gross F.S.I. of 2454.05 m²; the project filing separately labels 2454.05 m² as approved built-up area. No separate carpet-area or FSI-counted-area schedule is supplied. RERA filing
- The site extent is recorded as 1076.76 m², with 176.20 m² affected by road widening and a net area of 900.56 m². The permit states that the road-affected portion is to be surrendered to GHMC free of cost. RERA filing
- The permit identifies a 45.07 m² tot-lot, rainwater-harvesting percolation pit, transformer space and garbage house. It records cellar and stilt parking areas of 519.50 m² each. The supplied materials do not include readable floor-plan geometry or measurements: four drawing records are listed as scans pending and none has been measured, so details such as flats per floor beyond the permit statement, room arrangements, lifts, stairs, entries, circulation and landscape layout cannot be described from drawings here. Floor plans
4. Homes, configurations & floor plans
The following are the TG-RERA-filed unit counts, booking counts and saleable areas. The supplied floor-plan drawings are scans pending; no software-measured carpet areas or loading values are available. RERA saleable area is the filed saleable-area figure and should not be treated as a carpet-area measurement. RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 118.22 m² | Not measured; drawings pending | Not supplied |
| 3BHK | 10 | 0 | 10 | 152.12 m² | Not measured; drawings pending | Not supplied |
The permit describes four residential flats on each of the five upper floors, but room dimensions, balcony or utility areas, orientation and typical floor arrangements are not established by the available drawing extracts. Floor plans
5. Parking & vehicle circulation
The GHMC permit approves both a cellar and a stilt for parking, each recorded as 519.50 m², for a total parking-level area of 1039.00 m². It requires these areas to be used exclusively for vehicle parking and not converted or misused. The permit does not provide a count of car or two-wheeler spaces, visitor or accessible parking provision, or a unit-by-unit parking allocation.
The supplied record does not establish parking bay dimensions, ramp arrangement, vehicle entries/exits, internal driveways, pedestrian separation, EV charging or whether any space is allocated exclusively to a particular apartment. A drawn or sanctioned parking area alone does not establish an individual buyer’s parking entitlement. Document index
6. Amenities, recreation & open spaces
The permit and RERA-filed amenity record identify the following items. The listed progress percentages are portal-recorded figures; the available evidence does not independently verify current delivery. The 2020 architect certificate reports completion for certain development works, without assigning a separate completion status to each facility in the table below. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Permit-stated tot-lot: 45.07 m² | RERA amenities | Portal lists Green Strip/TOT LOT/Park at 100%; no independent current verification supplied |
| Community buildings | No size or facility details supplied | RERA amenities | Portal: 0%; not established as delivered |
| Recreational open space | Aggregate area not supplied | RERA amenities | Portal: 0%; no independently verified status |
| Swimming pool, gym, clubhouse, children’s play area | Appearing only in third-party vendor amenity information; no size supplied | Promoter website | Vendor-listed; not established as sanctioned or delivered |
The RERA amenity record also lists internal roads and footpaths, street lighting, treatment/disposal of sewage and sullage, solid-waste management, fire protection, and a security camera, but records 0% for those entries. These items are not treated as completed facilities based on the supplied record. RERA amenities
7. Utilities, building services & safety
- The RERA amenity record marks water supply, sewerage (chambers, lines, septic tank and STP), storm-water drains, rainwater harvesting, energy management, and an electrical meter room/substation/receiving station as available at 100%. These are portal-declared progress figures, not independent verification of present operation, capacity or compliance. RERA amenities
- The GHMC permit specifies a rainwater-harvesting percolation pit, transformer space, garbage house and an automatic sprinkler system in the cellar. It also requires fire-safety measures as per the National Building Code before an OC. The permit’s stated requirements do not, by themselves, establish the installed system’s current condition.
- The portal lists “DIESEL GENERATOR 20 KVA,” “SOLAR FENCING” and “SECURITY CAMERA”; each is recorded at 0% progress. The data does not establish generator installation or operating capacity, CCTV coverage, access-control arrangements, waste segregation, lift count or capacity, accessibility provisions, or other life-safety details. RERA amenities
8. Location, access & connectivity
The registered project location is PRAGATHI COLONY, Rajendranagar Mandal, Ranga Reddy District, Telangana, PIN 500005. The permit identifies Mailardevpally Village and lists the east boundary as 40 FEET ROAD. A cadastral parcel-centroid coordinate is supplied as 17.41528, 78.35459. RERA record RERA filing Location record
Supplied measured distances from the parcel centroid include Financial District (Nanakramguda), 1.2 km; IndusInd Bank, 0.4 km; an unnamed bus station, 2.2 km; Manuu Polytechnic Hyderabad, 1.6 km; Sankaraya Eye Hospital, 1.6 km; South India Shopping Mall, 2.6 km; an unnamed park, 1.2 km; Nanakramguda Government Primary School, 0.5 km; and ADP, 0.0 km. These are listed distances; no travel times or route measurements are supplied. Location record
9. Developer & development status
- The registered promoter is MAILIKA INFRA PROJECTS PRIVATE LIMITED, a company, with GSTIN 36AAGCM9423Q1ZR. The RERA-filed address is SAIVIHAR, SHANTHI NAGAR, ROAD NO 1, PRAGATHI COLONY, Rajendranagar, Ranga Reddy, 500005. The supplied record identifies Kishore Kumar Mailika as an authorized signatory. No official project website or contact details are supplied. Corporate record Parties record RERA filing
- The promoter’s Form B declaration, verified at Hyderabad on 12/12/18, declares the title basis, freedom from encumbrances, fund-account arrangements, audit and pending-approval undertakings, and a completion undertaking of 14/08/2023. This is a promoter declaration.
- The project is recorded as one building/one wing of Phase 1, with 20 apartments. The 2020 architect certificate reports 100% completion for listed tasks and certain development works; the 2024 architect certificate states completion in all aspects and identifies a GHMC occupancy certificate. No independent current site assessment is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400000751; issued 15/05/2019; valid to 14/08/2023 |
|---|---|
| Scope and evidence | Form C certificate for MAILIKAS MUKUNDA. |
| Identifier / date | 53279/HO/SZ/Cir-6/2016; approved 04-JUL-2017; file no. 73689/16/04/2016/HO |
|---|---|
| Scope and evidence | Permit for Plot Nos. 355A and 355B, Sy. Nos. 160, 162, 163/1, 164 and 165/1, Mailardevpally Village. |
| Identifier / date | 09/09/2020 |
|---|---|
| Scope and evidence | Describes one building/one wing of Phase 1 and reports 100% completion for listed building tasks and certain internal and external development works. |
| Identifier / date | I/C11/21464/2019-oc; issued 12/02/2020 |
|---|---|
| Scope and evidence | Identified by the architect’s certificate dated 10-07-2024, which states the project is complete in all aspects. The supplied extract does not give a separate tower-wise OC scope. |
| Identifier / date | 15.12.2018 |
|---|---|
| Scope and evidence | Title report concerning Plot Nos. 355/A and 355/B, totaling 1288 Sq. yards in Mailardevpally Village; see the Land & Title section for its detailed treatment. |
| Identifier / date | Form B, verified 12/12/18 |
|---|---|
| Scope and evidence | Promoter-filed declarations and undertakings. |
1. Project at a glance
Project identity
Registered project name: MAILIKAS MUKUNDA
Project type: Residential apartment project
Phase / registered portion: The registration certificate identifies MAILIKAS MUKUNDA; the architect’s 2020 certificate describes one building/one wing of Phase 1.
TG-RERA registration: P02400000751
Registration validity: 15/05/2019 to 14/08/2023; the supplied certificate says four years and is not marked extended. Registration validity is distinct from the completion date and the occupancy certificate.
Registered promoter: MAILIKA INFRA PROJECTS PRIVATE LIMITED
RERA status: Project record states “On-Going Project.” The supplied documents also include an architect’s completion certificate and an identified GHMC occupancy certificate; see below for their scope.
Land and geographic identity
Locality: PRAGATHI COLONY
Revenue village: Mailardevpally Village, as identified in the building permit, registration certificate and title report.
Mandal / district / PIN: Rajendranagar / Ranga Reddy / 500005
Project survey numbers: Sy. Nos. 160, 162, 163/1, 164 and 165/1
Plot numbers: 355/A and 355/B
Site extent: Total: 1076.76 m²; area affected in road widening: 176.20 m²; net: 900.56 m².
Boundaries: East: 40 FEET ROAD; west: PLOT NOS 351 AND 352; north: PLOT NO 354; south: NEIGHBOURS LAND.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 53279/HO/SZ/Cir-6/2016, approved 04-JUL-2017; file no. 73689/16/04/2016/HO.
Approved built-up area: 2454.05 m², as recorded in the project filing and also as “Gross F.S.I.” in the permit. These are the labels supplied; no separate gross built-up figure is provided.
Building arrangement and floors: One residential building/wing; sanctioned construction is a cellar, stilt for parking and five upper floors, with four residential flats on each upper floor. Permit-stated height: 14.95 m.
Parking levels: Cellar and stilt approved for parking; permit lists 519.50 m² for each and 1039.00 m² total parking-level area.
Unit count: 20 units in the sanctioned permit and 20 in the RERA unit breakdown: 10 2BHK and 10 3BHK.
Offering and status
RERA-filed configurations and saleable area: 2BHK: 10 units, 118.22 m² each; 3BHK: 10 units, 152.12 m² each.
Booked / available: Portal-read figures show 0 booked and 10 available in each configuration (20 available total). The portal data has no as-of date, so these counts are indicative.
Construction stage: The 09/09/2020 architect certificate reports 100% completion for listed building tasks and certain development works. A later architect certificate dated 10-07-2024 certifies completion and identifies a GHMC OC. These are document certifications, not independent site observations in this report.
Original / revised proposed completion: 14/08/2023 / 14/08/2023
Occupancy certificate: The 10-07-2024 architect certificate identifies GHMC OC I/C11/21464/2019-oc, issued 12/02/2020. The supplied extract identifies the project but does not state a separate phase- or tower-wise OC scope.
2. The project story
MAILIKAS MUKUNDA is a residential apartment development on plots 355/A and 355/B in Mailardevpally Village, Rajendranagar Mandal, Ranga Reddy District. The RERA record identifies the land as Sy. Nos. 160, 162, 163/1, 164 and 165/1. It is a single-building/one-wing scheme: the GHMC permit provides for a cellar, stilt parking and five residential floors, with four flats per upper floor.
The registered offering consists of 20 apartments: 10 2BHK and 10 3BHK. The portal-read inventory shows all 20 as available and none booked, but the record does not provide an as-of date for that snapshot.
The project filing lists 14/08/2023 as both the original and revised proposed completion date. Separately, the 2020 architect certificate records 100% completion for the listed building tasks and certain internal and external works; the 2024 architect certificate states completion in all aspects and identifies an OC issued by GHMC in 2020. These are filed certifications. No independent site inspection or current construction-progress measurement is supplied here.
3. Master plan, architecture & building design
- The approved building permit describes one apartment building, comprising a cellar, a stilt level for parking and five upper residential floors. It specifies four flats on each upper floor, a height of 14.95 m, and a total sanctioned unit count of 20. The permit records a gross F.S.I. of 2454.05 m²; the project filing separately labels 2454.05 m² as approved built-up area. No separate carpet-area or FSI-counted-area schedule is supplied.
- The site extent is recorded as 1076.76 m², with 176.20 m² affected by road widening and a net area of 900.56 m². The permit states that the road-affected portion is to be surrendered to GHMC free of cost.
- The permit identifies a 45.07 m² tot-lot, rainwater-harvesting percolation pit, transformer space and garbage house. It records cellar and stilt parking areas of 519.50 m² each. The supplied materials do not include readable floor-plan geometry or measurements: four drawing records are listed as scans pending and none has been measured, so details such as flats per floor beyond the permit statement, room arrangements, lifts, stairs, entries, circulation and landscape layout cannot be described from drawings here.
4. Homes, configurations & floor plans
The following are the TG-RERA-filed unit counts, booking counts and saleable areas. The supplied floor-plan drawings are scans pending; no software-measured carpet areas or loading values are available. RERA saleable area is the filed saleable-area figure and should not be treated as a carpet-area measurement.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 118.22 m² | Not measured; drawings pending | Not supplied |
| 3BHK | 10 | 0 | 10 | 152.12 m² | Not measured; drawings pending | Not supplied |
The permit describes four residential flats on each of the five upper floors, but room dimensions, balcony or utility areas, orientation and typical floor arrangements are not established by the available drawing extracts.
5. Parking & vehicle circulation
The GHMC permit approves both a cellar and a stilt for parking, each recorded as 519.50 m², for a total parking-level area of 1039.00 m². It requires these areas to be used exclusively for vehicle parking and not converted or misused. The permit does not provide a count of car or two-wheeler spaces, visitor or accessible parking provision, or a unit-by-unit parking allocation.
The supplied record does not establish parking bay dimensions, ramp arrangement, vehicle entries/exits, internal driveways, pedestrian separation, EV charging or whether any space is allocated exclusively to a particular apartment. A drawn or sanctioned parking area alone does not establish an individual buyer’s parking entitlement.
6. Amenities, recreation & open spaces
The permit and RERA-filed amenity record identify the following items. The listed progress percentages are portal-recorded figures; the available evidence does not independently verify current delivery. The 2020 architect certificate reports completion for certain development works, without assigning a separate completion status to each facility in the table below.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Permit-stated tot-lot: 45.07 m² | Portal lists Green Strip/TOT LOT/Park at 100%; no independent current verification supplied | |
| Community buildings | No size or facility details supplied | Portal: 0%; not established as delivered | |
| Recreational open space | Aggregate area not supplied | Portal: 0%; no independently verified status | |
| Swimming pool, gym, clubhouse, children’s play area | Appearing only in third-party vendor amenity information; no size supplied | Vendor-listed; not established as sanctioned or delivered |
The RERA amenity record also lists internal roads and footpaths, street lighting, treatment/disposal of sewage and sullage, solid-waste management, fire protection, and a security camera, but records 0% for those entries. These items are not treated as completed facilities based on the supplied record.
7. Utilities, building services & safety
- The RERA amenity record marks water supply, sewerage (chambers, lines, septic tank and STP), storm-water drains, rainwater harvesting, energy management, and an electrical meter room/substation/receiving station as available at 100%. These are portal-declared progress figures, not independent verification of present operation, capacity or compliance.
- The GHMC permit specifies a rainwater-harvesting percolation pit, transformer space, garbage house and an automatic sprinkler system in the cellar. It also requires fire-safety measures as per the National Building Code before an OC. The permit’s stated requirements do not, by themselves, establish the installed system’s current condition.
- The portal lists “DIESEL GENERATOR 20 KVA,” “SOLAR FENCING” and “SECURITY CAMERA”; each is recorded at 0% progress. The data does not establish generator installation or operating capacity, CCTV coverage, access-control arrangements, waste segregation, lift count or capacity, accessibility provisions, or other life-safety details.
8. Location, access & connectivity
The registered project location is PRAGATHI COLONY, Rajendranagar Mandal, Ranga Reddy District, Telangana, PIN 500005. The permit identifies Mailardevpally Village and lists the east boundary as 40 FEET ROAD. A cadastral parcel-centroid coordinate is supplied as 17.41528, 78.35459.
Supplied measured distances from the parcel centroid include Financial District (Nanakramguda), 1.2 km; IndusInd Bank, 0.4 km; an unnamed bus station, 2.2 km; Manuu Polytechnic Hyderabad, 1.6 km; Sankaraya Eye Hospital, 1.6 km; South India Shopping Mall, 2.6 km; an unnamed park, 1.2 km; Nanakramguda Government Primary School, 0.5 km; and ADP, 0.0 km. These are listed distances; no travel times or route measurements are supplied.
9. Developer & development status
- The registered promoter is MAILIKA INFRA PROJECTS PRIVATE LIMITED, a company, with GSTIN 36AAGCM9423Q1ZR. The RERA-filed address is SAIVIHAR, SHANTHI NAGAR, ROAD NO 1, PRAGATHI COLONY, Rajendranagar, Ranga Reddy, 500005. The supplied record identifies Kishore Kumar Mailika as an authorized signatory. No official project website or contact details are supplied.
- The promoter’s Form B declaration, verified at Hyderabad on 12/12/18, declares the title basis, freedom from encumbrances, fund-account arrangements, audit and pending-approval undertakings, and a completion undertaking of 14/08/2023. This is a promoter declaration.
- The project is recorded as one building/one wing of Phase 1, with 20 apartments. The 2020 architect certificate reports 100% completion for listed tasks and certain development works; the 2024 architect certificate states completion in all aspects and identifies a GHMC occupancy certificate. No independent current site assessment is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400000751; issued 15/05/2019; valid to 14/08/2023 |
|---|---|
| Scope and evidence | Form C certificate for MAILIKAS MUKUNDA. |
| Identifier / date | 53279/HO/SZ/Cir-6/2016; approved 04-JUL-2017; file no. 73689/16/04/2016/HO |
|---|---|
| Scope and evidence | Permit for Plot Nos. 355A and 355B, Sy. Nos. 160, 162, 163/1, 164 and 165/1, Mailardevpally Village. |
| Identifier / date | 09/09/2020 |
|---|---|
| Scope and evidence | Describes one building/one wing of Phase 1 and reports 100% completion for listed building tasks and certain internal and external development works. |
| Identifier / date | I/C11/21464/2019-oc; issued 12/02/2020 |
|---|---|
| Scope and evidence | Identified by the architect’s certificate dated 10-07-2024, which states the project is complete in all aspects. The supplied extract does not give a separate tower-wise OC scope. |
| Identifier / date | 15.12.2018 |
|---|---|
| Scope and evidence | Title report concerning Plot Nos. 355/A and 355/B, totaling 1288 Sq. yards in Mailardevpally Village; see the Land & Title section for its detailed treatment. |
| Identifier / date | Form B, verified 12/12/18 |
|---|---|
| Scope and evidence | Promoter-filed declarations and undertakings. |
Frequently asked questions
Is MAILIKAS MUKUNDA registered with Telangana RERA?
Yes. MAILIKAS MUKUNDA is registered with the Telangana Real Estate Regulatory Authority as P02400000751; the registration status is On-Going Project.
Who is the developer of MAILIKAS MUKUNDA?
The promoter named in the RERA registration is MAILIKA INFRA PROJECTS PRIVATE LIMITED.
Where is MAILIKAS MUKUNDA located?
MAILIKAS MUKUNDA is in PRAGATHI COLONY, Rajendranagar, Rangareddy, Telangana (500005).
When will MAILIKAS MUKUNDA be completed?
The promoter's proposed date of completion filed with RERA is 14/08/2023. This is the promoter's declaration, not a guarantee.