Advaita Mansion
ADVAITA INFRA · Medchal-Malkajgiri · RERA P02200000969
ADVAITA MANSION is a residential apartment project in Medchal - Malkajgiri, Medchal mandal, Medchal-Malkajgiri district, developed by registered promoter Advaita Infra. The registered site area is 928.72 sq. m, and the project comprises one residential building with 1Stilt + 5 floors and 15 apartments: 10 2BHK and 5 3BHK. Its TG-RERA registration number is P02200000969, and its proposed completion date is 24/12/2019.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | ADVAITA MANSION RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | No separate phase name is disclosed. The registration covers the project identified with survey numbers 148 part, 176 and 179part. |
| TG-RERA registration | P02200000969; issued 02/07/2019, valid through 24/12/2019 according to the certificate. The certificate says registration is not extended. Registration validity is distinct from the project completion deadline and does not establish occupancy status. |
| Registered promoter | Advaita Infra (also shown in project identity data as ADVAITA INFRA). RERA record |
| RERA-recorded status | On-Going Project. RERA record RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / PIN | Medchal - Malkajgiri; 500014 in the RERA project information. RERA record RERA filing |
| Revenue village | The RERA record does not disclose a revenue village. The HMDA technical approval document identifies Dulapalle; the title report identifies Doolapally. The revenue-village identity should therefore be confirmed from the underlying land records. RERA filing |
| Mandal / district | RERA record: Medchal mandal, Medchal-Malkajgiri district. The HMDA technical approval document names Dundigal/Gandimaisamma mandal. RERA record |
| Survey numbers / subdivisions | 148 part, 176, 179part; the HMDA technical approval records 148 PART, 176, 179 PRT. RERA record |
| Registered site extent | RERA land details: 928.72 sq. m total and 928.72 sq. m net area; affected area recorded as 0. RERA filing |
| Other area stated in project documents | HMDA technical approval: 928.74 Sq. Mt. The title report describes 1,111.10 square yards (also stated as 928.87 sq. mtrs.) for the property. |
| Boundaries in RERA record | North and south: 40 Feet wide road; east: Plot no 43 and 50; west: Plot no 40 and 53. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the technical approval directs that building plans be sanctioned by the local Executive Authority in conformity with HMDA’s technical approval. Approvals record |
| Principal approval | Technical approval 005821/MED/R1/U6/HMDA/07122017, dated 24/03/2018. Approvals record |
| Building | One residential building, identified in the approval extraction as A (L SUCHITRA). |
| Floor configuration | 1Stilt + 5 floors, as stated in the technical approval. |
| Approved built-up area | The project fields record 2004.9 sq. m as approved built-up area. The HMDA approval extraction separately lists 2467.47 proposed built-up area and 2004.9 built up area among its sanctioned parameters; the available extract does not explain those area labels further. RERA filing |
| Mortgage area | RERA project fields: 202.34 sq. m. The HMDA approval extraction records 202.33 sq.mts as 10.09% of built-up area in the second floor, under registered mortgage document 2320/2018. RERA filing |
| Units | RERA project information records 1 total building unit and 1 proposed building unit; the unit schedule records 15 apartments: 10 2BHK and 5 3BHK. RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Configurations | 2BHK and 3BHK apartments. RERA unit table |
| RERA-filed saleable area | 2BHK: 74.0 sq. m; 3BHK: 94.0 sq. m. RERA unit table |
| Booked / available | Portal-derived unit data shows 0 booked and 15 available (10 2BHK and 5 3BHK). The record provides no as-of date, so counts are indicative rather than a current inventory confirmation. RERA unit table |
| Construction stage | RERA record labels the project On-Going Project and records 90% completeness. This is a declared record figure, not independent site verification. RERA record RERA filing |
| Completion dates | Original and revised proposed completion dates are both 24/12/2019. RERA record RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied project documents. The HMDA technical approval says occupancy/use is to be allowed only after completion to the technically approved plans and conditions, including a “Fit for Occupancy” certificate. |
2. The project story
- ADVAITA MANSION is recorded with TG-RERA as a residential apartment project on land identified in the registration as survey numbers 148 part, 176 and 179part, in Medchal mandal, Medchal-Malkajgiri district. The RERA record does not specify the revenue village; the filed HMDA technical approval names Dulapalle, while the title report names Doolapally. RERA record RERA filing
- The technical approval describes one 1Stilt + 5-floor residential building. The RERA unit schedule lists 15 apartments—10 2BHK and 5 3BHK—and records all 15 as available in the portal data supplied for this review. No separate phase organization is disclosed. RERA unit table
- The project is marked on-going, with 90% completeness recorded and a proposed completion date of 24/12/2019. These are project-record declarations; the evidence supplied does not independently establish current construction progress or identify an occupancy/completion certificate. RERA record RERA filing
3. Master plan, architecture & building design
- The RERA land record states a total and net site area of 928.72 sq. m, with 0 area affected by road widening/FTL/nala widening. The HMDA technical approval states an extent of 928.74 Sq. Mt. The approval describes one residential building, 1Stilt + 5, and records 2004.9 built up area and 2467.47 proposed built-up area among its parameters. These area figures are presented as recorded; the supplied extract does not define their measurement bases beyond those labels. RERA filing
- The RERA filing lists 2004.9 sq. m as approved built-up area. No floor-plan drawings with measured apartment layouts were available for measurement in the supplied drawing data: the floor-plan record reports two drawings, 0 measured, and 2 no_flats. Accordingly, the evidence does not establish flats per floor, individual apartment layout, footprint, lift count, staircase arrangement, or internal circulation. RERA filing Floor plans
- The HMDA technical approval requires that the stilt/cellar be used exclusively for vehicle parking and not converted, and that no parking or construction be placed in setback areas. It also specifies one entry and one exit, each with a minimum width of 4.5 meters and height clearance of 5 meters. The available material does not provide a site drawing from which to describe landscaping, open-space arrangement, or internal road layout.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 74.0 sq. m | Not measured in supplied drawing data | Not supplied |
| 3BHK | 5 | 0 | 5 | 94.0 sq. m | Not measured in supplied drawing data | Not supplied |
- Unit counts, booked/available figures, and saleable areas above are from the TG-RERA unit record; the booking record has no as-of date. The supplied floor-plan data reports 0 measured drawings, so no software-measured carpet areas or room dimensions can be stated. RERA unit table RERA unit details Floor plans
- The filed saleable area is distinct from carpet area: carpet area is the apartment’s internal usable area, while saleable area may include the apartment’s proportionate share of common areas. The supplied evidence does not provide carpet-area or loading measurements for these configurations. RERA unit table Floor plans
5. Parking & vehicle circulation
- The HMDA technical approval requires the stilt/cellar to be used exclusively for vehicle parking, without partition walls or rolling shutters, and says it must not be converted. It also requires one entry and one exit, each with a minimum 4.5-meter width and 5-meter height clearance.
- The supplied record does not establish the sanctioned number of car or two-wheeler spaces, visitor or accessible parking provision, ramp configuration, or unit-specific parking allocations. A parking bay or general parking requirement does not, by itself, establish exclusive parking rights for a particular apartment.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | RERA amenity record shows “Water Supply” as YES, with 10% progress recorded. | RERA amenities | Portal-declared; not independently verified. |
| Transformer | Provision required within the premises. | Approval condition; completion not established. | |
| Garbage house | Provision required within the premises. | Approval condition; completion not established. | |
| Generator | Required as an alternate source of electric supply. | Approval condition; completion not established. | |
| Rainwater harvesting | HMDA approval requires rainwater-harvesting structures. | Approval condition; completion not established. |
The vendor record also lists landscaped gardens, swimming pool, fitness centre, indoor play area, covered parking, electricity backup, water supply, CCTV, lift and security personnel. These are vendor-listed features, not established here as RERA-filed, sanctioned or delivered facilities. Promoter website
7. Utilities, building services & safety
- The HMDA technical approval requires a water-supply source and sewerage-disposal source to be located at an appropriate distance within the site, preferably 100 feet apart. It specifies water disinfection to maintain 0.3 to 0.4 p.m. residual chlorine in sump/overhead tanks, limits bore depth and size by reference to nearby existing bore-wells, and sets out septic-tank, drainage and overflow conditions. These are approval conditions; the supplied evidence does not confirm their implementation.
- The approval also requires rainwater harvesting, a transformer, a garbage house, a generator, fire-resistant lift swing doors, emergency lighting in corridors/common passages and staircases, manually operated alarm systems, and water-type fire extinguishers at the stated floor-area basis, with DCP extinguishers at generator and transformer areas. Automatic sprinklers are required by that approval where basement area exceeds 200 Sq.Mts. The record does not establish whether a basement exists or whether these systems have been installed or tested.
- The approval assigns construction-stage inspection and compliance oversight to the Executive Authority and states that a “Fit for Occupancy” certificate is required before the building is allowed to be occupied or used. The supplied documents do not establish that such a certificate has been issued. No utility capacities, lift capacities, accessibility arrangements, or independent safety-verification records are supplied.
8. Location, access & connectivity
- The RERA project record identifies the locality as Medchal - Malkajgiri, Medchal mandal, Medchal-Malkajgiri district, PIN 500014. It lists 40-foot-wide roads to the north and south of the site. The revenue village is not disclosed in that record; the HMDA technical approval names Dulapalle, and the title report names Doolapally. RERA record RERA filing RERA filing
- The supplied location data gives a cadastral parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km as an anchor. No approach-road route or public-transport detail is supplied. A vendor listing describes the location as “Malkajgiri, Hyderabad”; that is a vendor-attributed description, not the RERA-recorded locality. Location record Promoter website
9. Developer & development status
- The registered promoter is Advaita Infra, identified in the project record as a Partnership. The listed partners are Aleti karan Reddy, Nalla Lahari, Mamidi Pedda Reddy and Menneni Balakishan Rao; Jakanampally Prashanth is listed as authorized signatory. The supplied data does not provide a verified corporate registration identifier or confirmed registered-office address. RERA record Corporate record Parties record
- A Form B declaration identifies J. PRASHANTH as promoter and states a completion period ending 24-12-2019. The project record also gives 24/12/2019 as both original and revised proposed completion date and records 90% completeness; these are filed/declaratory figures, not independent construction verification. RERA filing
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA registration certificate, P02200000969 | Form C records ADVAITA MANSION registration from 02/07/2019 through 24/12/2019, with a separate-account condition. The certificate records no extension. |
| HMDA technical approval 005821/MED/R1/U6/HMDA/07122017, dated 24/03/2018 | Technical approval for a residential 1Stilt + 5 building; the document directs that building plans be sanctioned by the local Executive Authority in conformity with HMDA’s technical approval. |
| Registered mortgage document 2320/2018, dated 19/02/2018 | The HMDA approval extraction records a mortgage in favour of the Metropolitan Commissioner, HMDA, covering 202.33 sq.mts (10.09% of built-up area) in the second floor. |
| Form B declaration | Promoter declaration identifying J. Prashanth and stating the completion period ending 24-12-2019. |
| Land title search report dated 31-07-2018 | Advocate K. P. Saradhi’s report concerning property at Doolapally, including Plots 41, 42, 51 and 52 in survey numbers 148 part, 176 and 179 part. |
| Encumbrance statement 30260254 | Filed encumbrance statement searched at S.R.O. Medchal for 01-01-1989 to 16-02-2018; its extraction reports one included transaction. |
| Sale agreement form | Partially filled agreement-for-sale form; the supplied extraction does not establish a completed, unit-specific agreement. |
| Occupancy/completion certificate | No such certificate is identified in the supplied project-document set. Document index |
1. Project at a glance
Project identity
Registered name: ADVAITA MANSION
Project type: Residential apartment project
Phase / registered portion: No separate phase name is disclosed. The registration covers the project identified with survey numbers 148 part, 176 and 179part.
TG-RERA registration: P02200000969; issued 02/07/2019, valid through 24/12/2019 according to the certificate. The certificate says registration is not extended. Registration validity is distinct from the project completion deadline and does not establish occupancy status.
Registered promoter: Advaita Infra (also shown in project identity data as ADVAITA INFRA).
RERA-recorded status: On-Going Project.
Land and geographic identity
Locality / PIN: Medchal - Malkajgiri; 500014 in the RERA project information.
Revenue village: The RERA record does not disclose a revenue village. The HMDA technical approval document identifies Dulapalle; the title report identifies Doolapally. The revenue-village identity should therefore be confirmed from the underlying land records.
Mandal / district: RERA record: Medchal mandal, Medchal-Malkajgiri district. The HMDA technical approval document names Dundigal/Gandimaisamma mandal.
Survey numbers / subdivisions: 148 part, 176, 179part; the HMDA technical approval records 148 PART, 176, 179 PRT.
Registered site extent: RERA land details: 928.72 sq. m total and 928.72 sq. m net area; affected area recorded as 0.
Other area stated in project documents: HMDA technical approval: 928.74 Sq. Mt. The title report describes 1,111.10 square yards (also stated as 928.87 sq. mtrs.) for the property.
Boundaries in RERA record: North and south: 40 Feet wide road; east: Plot no 43 and 50; west: Plot no 40 and 53.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the technical approval directs that building plans be sanctioned by the local Executive Authority in conformity with HMDA’s technical approval.
Principal approval: Technical approval 005821/MED/R1/U6/HMDA/07122017, dated 24/03/2018.
Building: One residential building, identified in the approval extraction as A (L SUCHITRA).
Floor configuration: 1Stilt + 5 floors, as stated in the technical approval.
Approved built-up area: The project fields record 2004.9 sq. m as approved built-up area. The HMDA approval extraction separately lists 2467.47 proposed built-up area and 2004.9 built up area among its sanctioned parameters; the available extract does not explain those area labels further.
Mortgage area: RERA project fields: 202.34 sq. m. The HMDA approval extraction records 202.33 sq.mts as 10.09% of built-up area in the second floor, under registered mortgage document 2320/2018.
Units: RERA project information records 1 total building unit and 1 proposed building unit; the unit schedule records 15 apartments: 10 2BHK and 5 3BHK.
Offering and status
Configurations: 2BHK and 3BHK apartments.
RERA-filed saleable area: 2BHK: 74.0 sq. m; 3BHK: 94.0 sq. m.
Booked / available: Portal-derived unit data shows 0 booked and 15 available (10 2BHK and 5 3BHK). The record provides no as-of date, so counts are indicative rather than a current inventory confirmation.
Construction stage: RERA record labels the project On-Going Project and records 90% completeness. This is a declared record figure, not independent site verification.
Completion dates: Original and revised proposed completion dates are both 24/12/2019.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied project documents. The HMDA technical approval says occupancy/use is to be allowed only after completion to the technically approved plans and conditions, including a “Fit for Occupancy” certificate.
2. The project story
- ADVAITA MANSION is recorded with TG-RERA as a residential apartment project on land identified in the registration as survey numbers 148 part, 176 and 179part, in Medchal mandal, Medchal-Malkajgiri district. The RERA record does not specify the revenue village; the filed HMDA technical approval names Dulapalle, while the title report names Doolapally.
- The technical approval describes one 1Stilt + 5-floor residential building. The RERA unit schedule lists 15 apartments—10 2BHK and 5 3BHK—and records all 15 as available in the portal data supplied for this review. No separate phase organization is disclosed.
- The project is marked on-going, with 90% completeness recorded and a proposed completion date of 24/12/2019. These are project-record declarations; the evidence supplied does not independently establish current construction progress or identify an occupancy/completion certificate.
3. Master plan, architecture & building design
- The RERA land record states a total and net site area of 928.72 sq. m, with 0 area affected by road widening/FTL/nala widening. The HMDA technical approval states an extent of 928.74 Sq. Mt. The approval describes one residential building, 1Stilt + 5, and records 2004.9 built up area and 2467.47 proposed built-up area among its parameters. These area figures are presented as recorded; the supplied extract does not define their measurement bases beyond those labels.
- The RERA filing lists 2004.9 sq. m as approved built-up area. No floor-plan drawings with measured apartment layouts were available for measurement in the supplied drawing data: the floor-plan record reports two drawings, 0 measured, and 2 no_flats. Accordingly, the evidence does not establish flats per floor, individual apartment layout, footprint, lift count, staircase arrangement, or internal circulation.
- The HMDA technical approval requires that the stilt/cellar be used exclusively for vehicle parking and not converted, and that no parking or construction be placed in setback areas. It also specifies one entry and one exit, each with a minimum width of 4.5 meters and height clearance of 5 meters. The available material does not provide a site drawing from which to describe landscaping, open-space arrangement, or internal road layout.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 74.0 sq. m | Not measured in supplied drawing data | Not supplied |
| 3BHK | 5 | 0 | 5 | 94.0 sq. m | Not measured in supplied drawing data | Not supplied |
- Unit counts, booked/available figures, and saleable areas above are from the TG-RERA unit record; the booking record has no as-of date. The supplied floor-plan data reports 0 measured drawings, so no software-measured carpet areas or room dimensions can be stated.
- The filed saleable area is distinct from carpet area: carpet area is the apartment’s internal usable area, while saleable area may include the apartment’s proportionate share of common areas. The supplied evidence does not provide carpet-area or loading measurements for these configurations.
5. Parking & vehicle circulation
- The HMDA technical approval requires the stilt/cellar to be used exclusively for vehicle parking, without partition walls or rolling shutters, and says it must not be converted. It also requires one entry and one exit, each with a minimum 4.5-meter width and 5-meter height clearance.
- The supplied record does not establish the sanctioned number of car or two-wheeler spaces, visitor or accessible parking provision, ramp configuration, or unit-specific parking allocations. A parking bay or general parking requirement does not, by itself, establish exclusive parking rights for a particular apartment.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | RERA amenity record shows “Water Supply” as YES, with 10% progress recorded. | Portal-declared; not independently verified. | |
| Transformer | Provision required within the premises. | Approval condition; completion not established. | |
| Garbage house | Provision required within the premises. | Approval condition; completion not established. | |
| Generator | Required as an alternate source of electric supply. | Approval condition; completion not established. | |
| Rainwater harvesting | HMDA approval requires rainwater-harvesting structures. | Approval condition; completion not established. |
The vendor record also lists landscaped gardens, swimming pool, fitness centre, indoor play area, covered parking, electricity backup, water supply, CCTV, lift and security personnel. These are vendor-listed features, not established here as RERA-filed, sanctioned or delivered facilities.
7. Utilities, building services & safety
- The HMDA technical approval requires a water-supply source and sewerage-disposal source to be located at an appropriate distance within the site, preferably 100 feet apart. It specifies water disinfection to maintain 0.3 to 0.4 p.m. residual chlorine in sump/overhead tanks, limits bore depth and size by reference to nearby existing bore-wells, and sets out septic-tank, drainage and overflow conditions. These are approval conditions; the supplied evidence does not confirm their implementation.
- The approval also requires rainwater harvesting, a transformer, a garbage house, a generator, fire-resistant lift swing doors, emergency lighting in corridors/common passages and staircases, manually operated alarm systems, and water-type fire extinguishers at the stated floor-area basis, with DCP extinguishers at generator and transformer areas. Automatic sprinklers are required by that approval where basement area exceeds 200 Sq.Mts. The record does not establish whether a basement exists or whether these systems have been installed or tested.
- The approval assigns construction-stage inspection and compliance oversight to the Executive Authority and states that a “Fit for Occupancy” certificate is required before the building is allowed to be occupied or used. The supplied documents do not establish that such a certificate has been issued. No utility capacities, lift capacities, accessibility arrangements, or independent safety-verification records are supplied.
8. Location, access & connectivity
- The RERA project record identifies the locality as Medchal - Malkajgiri, Medchal mandal, Medchal-Malkajgiri district, PIN 500014. It lists 40-foot-wide roads to the north and south of the site. The revenue village is not disclosed in that record; the HMDA technical approval names Dulapalle, and the title report names Doolapally.
- The supplied location data gives a cadastral parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km as an anchor. No approach-road route or public-transport detail is supplied. A vendor listing describes the location as “Malkajgiri, Hyderabad”; that is a vendor-attributed description, not the RERA-recorded locality.
9. Developer & development status
- The registered promoter is Advaita Infra, identified in the project record as a Partnership. The listed partners are Aleti karan Reddy, Nalla Lahari, Mamidi Pedda Reddy and Menneni Balakishan Rao; Jakanampally Prashanth is listed as authorized signatory. The supplied data does not provide a verified corporate registration identifier or confirmed registered-office address.
- A Form B declaration identifies J. PRASHANTH as promoter and states a completion period ending 24-12-2019. The project record also gives 24/12/2019 as both original and revised proposed completion date and records 90% completeness; these are filed/declaratory figures, not independent construction verification.
10. Approvals, official records & documents
TG-RERA registration certificate, P02200000969: Form C records ADVAITA MANSION registration from 02/07/2019 through 24/12/2019, with a separate-account condition. The certificate records no extension.
HMDA technical approval 005821/MED/R1/U6/HMDA/07122017, dated 24/03/2018: Technical approval for a residential 1Stilt + 5 building; the document directs that building plans be sanctioned by the local Executive Authority in conformity with HMDA’s technical approval.
Registered mortgage document 2320/2018, dated 19/02/2018: The HMDA approval extraction records a mortgage in favour of the Metropolitan Commissioner, HMDA, covering 202.33 sq.mts (10.09% of built-up area) in the second floor.
Form B declaration: Promoter declaration identifying J. Prashanth and stating the completion period ending 24-12-2019.
Land title search report dated 31-07-2018: Advocate K. P. Saradhi’s report concerning property at Doolapally, including Plots 41, 42, 51 and 52 in survey numbers 148 part, 176 and 179 part.
Encumbrance statement 30260254: Filed encumbrance statement searched at S.R.O. Medchal for 01-01-1989 to 16-02-2018; its extraction reports one included transaction.
Sale agreement form: Partially filled agreement-for-sale form; the supplied extraction does not establish a completed, unit-specific agreement.
Occupancy/completion certificate: No such certificate is identified in the supplied project-document set.
Frequently asked questions
Is ADVAITA MANSION registered with Telangana RERA?
Yes. ADVAITA MANSION is registered with the Telangana Real Estate Regulatory Authority as P02200000969; the registration status is On-Going Project.
Who is the developer of ADVAITA MANSION?
The promoter named in the RERA registration is ADVAITA INFRA.
Where is ADVAITA MANSION located?
ADVAITA MANSION is in Medchal - Malkajgiri, Medchal, Medchal-Malkajgiri, Telangana (500014).
When will ADVAITA MANSION be completed?
The promoter's proposed date of completion filed with RERA is 24/12/2019. This is the promoter's declaration, not a guarantee.