ASPEN by TATTVA
TATTVA DEVELOPERS PRIVATE LIMITED · Sangareddy · RERA P01100007700
ASPEN by TATTVA is a plotted development in Patancheru, Patancheru Mandal, Sangareddy District. The registered promoter developing it is TATTVA DEVELOPERS PRIVATE LIMITED. The registered land area is 294773.03 sq mts, with a net area of 222779.45 sq mts; the RERA record identifies the unit type as plots and does not state a plot count or configuration. Its TG-RERA registration number is P01100007700, and its proposed completion date is 28/02/2029.
More from Tattva Developers Pvt Ltd · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | ASPEN by TATTVA RERA record |
| Project type | Plotted development; the RERA record also identifies it as a “New Project.” RERA record RERA filing |
| Phase / registered portion | The registration is for ASPEN by TATTVA. The record does not specify a phase name or define the registered portion by plot numbers. RERA record |
| TG-RERA registration | P01100007700; registration from 01/11/2023 through 31/10/2028. The certificate says registration may be extended by the Authority under the Act and rules; no extension is recorded in the supplied certificate. RERA record |
| Registered promoter | TATTVA DEVELOPERS PRIVATE LIMITED; company. RERA record Corporate record |
| RERA status | Registration certificate supplied; recorded as a new project. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | PATANCHERU / Patancheru RERA record RERA filing |
| Revenue village(s) | Peddakanjarla Village is named in the filed approval and title documents. |
| Mandal | PATANCHERU / Patancheru Mandal RERA record |
| District | Sangareddy RERA record |
| PIN | 502319 RERA record |
| Project survey numbers | 120, 121, 123, 124 and 125; the RERA certificate lists these numbers without subdivisions. The HMDA approval likewise identifies Sy.Nos. 120, 121, 123, 124 and 125. |
| Subdivision references in supplied records | The site-plan drawing names 120P, 121(P) and 123(P). The cadastrally retrieved entries identify 121 and 125/P; these are recorded entries, not a complete parcel-level match to the registered project. Cadastral map |
| Registered land area | RERA land details state total area 294773.03 sq mts and net area 222779.45 sq mts; area affected by road widening/FTL of tanks/nala widening is recorded as 0. RERA filing |
| Boundaries | East: neighbours land; West: neighbours land; North: neighbours land; South: road width – 25. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA), as named in the filed approval. |
| Principal approval | Draft Layout Permit No.35/LO/Plg/HMDA/2023, approved date 01-11-2023; file/proceedings reference Proc.No. 01/Plg/Township/2022. The approval letter also lists Draft Layout Permit No.36/LO/Plg/HMDA/2023 and No.37/LO/Plg/HMDA/2023, each dated 01-11-2023. Approvals record |
| RERA-filed approved built-up area | 185437.24 sqmts. The RERA record also gives mortgage area 27951.78 sqmts. The supplied material does not identify this built-up area by building or facility. RERA filing |
| Buildings / floors / parking levels | Not disclosed in the supplied RERA project fields or extracted drawings in sufficient detail to establish a project-wide building count, floor configuration, or parking levels. A filed HMDA township approval names “Tower 2” among facilities, but this does not establish the building count or floors for ASPEN. |
| Approval’s described land-use components | The HMDA approval describes Housing with other Commercial Buildings under Permit No.35, Open Plots under No.36, and an extent under No.37 whose area is printed without a numerical amount. These are approval-letter descriptions for the wider township approval; the supplied material does not allocate each component to ASPEN’s registered portion. |
Offering and status
| Field | Record |
|---|---|
| RERA-filed unit type | Plots; no RERA unit-count or plot-size schedule is present in the supplied project data. RERA record RERA filing |
| Plot-size information | The promoter’s vendor listing describes “200 - 300 Sq. Yd. Plots” and a “Residential Plot” of 298 sq.yrd.; these are promoter-marketed details, not RERA-filed unit inventory. Promoter website |
| Booked / available counts | Not supplied. RERA record RERA filing |
| Construction / development stage | RERA amenity fields report percentage figures for selected infrastructure items, but these are filed progress figures and are not independent site verification. See section 6. RERA amenities |
| Completion dates | The RERA project fields state proposed completion 28/02/2029; the Form-B declaration states an undertaking to complete by 31/10/2028. These are distinct filed dates; this overview does not reconcile them. RERA record RERA filing |
| Occupancy / completion certificate | No project occupancy or completion certificate is supplied. The registration certificate is valid through 31/10/2028; that registration-validity date is separate from the completion dates above. |
2. The project story
- ASPEN by TATTVA is registered with TG-RERA as a plotted-development project in Patancheru, Sangareddy District. The RERA record identifies the project land by survey numbers 120, 121, 123, 124 and 125. Filed approval material places the township land in Peddakanjarla Village and describes a broader integrated township with housing, other commercial buildings and open plots. The supplied records do not map those wider township components plot-by-plot to ASPEN’s RERA-registered portion. RERA record
- The RERA fields record a total land area of 294773.03 sq mts and net area of 222779.45 sq mts. The promoter’s declaration gives a completion undertaking of 31/10/2028, while the project fields state a proposed completion date of 28/02/2029. No supplied occupancy or completion certificate establishes that any part is complete or certified for occupation. RERA filing RERA record
- A site-plan document is titled “AMALGAMATED SITE PLAN FOR PHASE B1,B2&B3” and is dated 08-07-2022. Its extracted text identifies survey references 120P, 121(P) and 123(P) but does not establish the detailed arrangement, dimensions or allocation of that drawing to ASPEN.
3. Master plan, architecture & building design
- The project is a plotted development, rather than an apartment scheme. The RERA-filed land schedule gives 294773.03 sq mts total area and 222779.45 sq mts net area; these are distinct reported land-area figures and are not built-up, saleable or plot-area measurements. The RERA fields report approved built-up area of 185437.24 sqmts, without a building-by-building or use-by-use breakdown. RERA filing RERA filing
- HMDA’s filed approval letter concerns the 2nd phase of the “Integrated Township” on Sy.Nos. 120, 121, 123, 124 and 125 at Peddakanjarla Village, over Ac. 158.93. It describes housing with other commercial buildings under Draft Layout Permit No.35, open plots under No.36, and a third permit whose area is not numerically stated in the extracted text. The approval letter also lists parks and several community/commercial facilities; it does not provide a complete ASPEN-specific site layout or building schedule in the supplied extraction.
- The supplied site-plan text identifies a drawing for “AMALGAMATED SITE PLAN FOR PHASE B1,B2&B3,” dated 08-07-2022, and survey references 120P, 121(P) and 123(P). The drawing extraction does not establish a sanctioned plot schedule, road-and-park areas, building footprints, floor configuration or the relationship of those phases to ASPEN’s registered portion.
- The HMDA master-plan sheet is image-only and its zoning at the project surveys has not been read from the image or GIS in the supplied evidence. HMDA
4. Homes, configurations & floor plans
- The RERA record identifies the offering as plots, but the supplied material contains no RERA-filed plot count, plot-size bands, booked/available inventory table or measured plot schedule. Accordingly, an inventory table of RERA plot counts and sizes cannot be completed from this evidence. RERA record RERA filing
- The promoter’s vendor listing markets “200 - 300 Sq. Yd. Plots” and a “Residential Plot” of 298 sq.yrd. These are attributed marketing details and are not treated here as RERA-filed inventory. Promoter website
- The only supplied drawing record is a site-plan drawing; no plot measurements or unit-level drawing measurements are available. The floor-plan review records one drawing, with 0 measured, 1 scan pending, and no flats. Carpet-area or loading figures therefore cannot be reported. Floor plans
5. Parking & vehicle circulation
- No ASPEN-specific sanctioned parking count, visitor or accessible parking schedule, parking-level plan, EV-charging detail or plot-level parking allocation is supplied. The RERA project data describes a plotted development and does not provide a parking count in the material available here. RERA record RERA filing
- The HMDA approval refers to roads, including Master Plan Roads and an approach road, and identifies road widths as 18 mts and above. It does not provide an ASPEN-specific internal road plan, vehicle-entry arrangement or plot-by-plot access schedule in the supplied extraction.
6. Amenities, recreation & open spaces
The HMDA approval lists township facilities and infrastructure. These are approval-letter descriptions for the wider township and are not, on the supplied evidence, confirmation that each item is within ASPEN’s registered portion or completed. The RERA amenity fields provide percentage progress figures for certain infrastructure items; these are filed figures, not independently verified site observations. RERA amenities
| Description / size | Listed in the HMDA approval; no size supplied. |
|---|---|
| Declared progress / verified status | No independent completion verification supplied. |
| Description / size | Listed in the HMDA approval; no size supplied. |
|---|---|
| Declared progress / verified status | No independent completion verification supplied. |
| Description / size | RERA amenity field; no further detail supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress percentage not stated. |
| Description / size | RERA amenity field. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Filed as available: YES; progress 0%. |
| Description / size | Promoter-marketed amenity list; no dimensions or capacities supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Marketing listing; no sanctioned or independently verified completion status supplied. |
7. Utilities, building services & safety
The HMDA approval letter specifies infrastructure conditions for the township, including an onsite water supply and drainage system, underground cabling and public utility lines, continuous and quality power supply, a drinking-water source excluding groundwater or a firm commitment from the relevant water authority, storage capacity of at least 1.5 times the determined requirement, a zero-discharge concept for waste, and a minimum of four rain-water-harvesting pits per Acre. These are approval conditions, not evidence of completed facilities at ASPEN. The approval letter also lists an STP and transformer among amenities and utilities.
| Service | Supplied record |
|---|---|
| Water | RERA amenity field: Water Supply, available YES, 20% progress. HMDA approval specifies a drinking-water source excluding groundwater or a firm commitment, with storage capacity at least 1.5 times the determined requirement. No capacity or independent verification is supplied. RERA amenities |
| Sewerage and drainage | RERA fields report Sewerage (Chamber, Lines, Septic Tank, STP), available YES, 20%; Storm Water Drains, available YES, 5%; Treatment and Disposal of Sewage and Sullage Water, available YES, 1%. HMDA approval requires a zero-discharge concept and states that no liquid waste should go out. These progress entries are filed declarations, not independent verification. RERA amenities |
| Electrical | RERA field: Electrical Meter Room, Sub-Station, Receiving Station, available YES, 0%. The HMDA approval lists a transformer and requires continuous and quality power supply. No capacity or completion evidence is supplied. RERA amenities |
| Rain-water harvesting | RERA field: Water Conservation, Rain water Harvesting, available YES, 0%. HMDA approval requires a minimum of four rain-water-harvesting pits per Acre. RERA amenities |
| Waste management | RERA field: Solid Waste Management and Disposal, progress 0%. HMDA approval specifies a zero-discharge concept for solid and liquid waste. RERA amenities |
| Fire and accessibility | RERA Fire Protection and Fire Safety Requirements field shows 0%; no detailed fire-system, access, ramp or accessibility design is supplied. RERA amenities |
8. Location, access & connectivity
- The official project identity places ASPEN by TATTVA in PATANCHERU, Sangareddy District, PIN 502319. Filed HMDA approval material identifies Peddakanjarla Village, Patancheru Mandal, and Sy.Nos. 120, 121, 123, 124 and 125. RERA record
- The RERA record describes the southern boundary as ROAD WIDTH - 25 and gives the other boundaries as neighbours’ land. RERA filing
The supplied location dataset gives the following measured distances to listed nearby places; it does not state travel times:
| Place | Category | Distance |
|---|---|---|
| Financial District (Nanakramguda) | Anchor | 1.2 km |
| IndusInd Bank | Bank | 0.4 km |
| Unnamed bus station | Bus station | 2.2 km |
| Manuu Polytechnic Hyderabad | College | 1.6 km |
| Sankaraya Eye Hospital | Hospital | 1.6 km |
| ADP | IT office | 0.0 km |
| South India Shopping Mall | Mall | 2.6 km |
| Unnamed park | Park | 1.2 km |
| Nanakramguda Govt primary school | School | 0.5 km |
Location record
The promoter’s vendor listing separately gives travel-time claims and additional distances; these are marketing claims, not independently measured connectivity data: “5mins ORR; 10 mins Patancheru; 20 mins BHEL; 20 mins Goudium Internations School; 35 mins Miypur Metro; 40 mins Airport,” and distances to St Marys Group of Institutions College of Engineering Technology (2.5 Km), Oakdale International School (6.2 Km), Aryan School Of Excellence (1.5 Km), Patancheru Railway Station (2.7 Km) and Mahendra Shopping Centre (2.0 Km). Promoter website
9. Developer & development status
- The registered promoter is TATTVA DEVELOPERS PRIVATE LIMITED, a company, identified in the RERA data with GSTIN 36AAHCT6182E1Z6. RERA record Corporate record
- The registration certificate gives the promoter office as “Village: Mandal: District: Hyderabad, Pin: 500033.” The supplied data identifies authorized signatory CHELAPAREDDY RAKESH KUMAR. Parties record
- The promoter’s Form-B declaration states an undertaking to complete the project by 31/10/2028 and declares the land free from encumbrances. These are promoter declarations filed for the project. The RERA project fields separately state proposed completion 28/02/2029. RERA record
- No independent construction inspection, project-wide completion evidence or occupancy/completion certificate is supplied. RERA amenities Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for ASPEN by TATTVA, registration P01100007700, valid 01/11/2023–31/10/2028; certificate issued 23/12/2025. |
| HMDA approval letter | Draft Layout Permit No.35/LO/Plg/HMDA/2023, file/proceedings Proc.No. 01/Plg/Township/2022, dated 01-11-2023; letter describes the 2nd phase of an Integrated Township and lists permits No.36 and No.37. |
| Site-plan drawing | “AMALGAMATED SITE PLAN FOR PHASE B1,B2&B3,” dated 08-07-2022, sheet 08; extracted text lists survey references 120P, 121(P), 123(P). The extraction does not identify a sanctioning authority or supply detailed layout statistics. |
| Form-B declaration | Promoter declaration by authorized signatory Rakesh Kumar Chelapareddy for ASPEN by TATTVA, including completion and fund-management undertakings. |
| HMDA mortgage documents recorded in approval letter | Documents 20576/2023, 20574/2023, 20571/2023, 20573/2023, 20572/2023, 20578/2023, 20575/2023 and 20577/2023, dated 20.10.2023, in favour of MC HMDA. The approval extraction describes reserved plots and facilities associated with those mortgage areas. |
| Environmental-clearance identifiers cited in HMDA approval | EC22B039TG186839 and reference SIA/TG/MIS/433352/2023, dated 27.07.2023. The supplied extraction records these identifiers; it does not provide the underlying clearance document or establish its project-parcel scope. |
| Occupancy / completion certificate | Not supplied in the documents provided for this overview. Document index |
The HMDA approval states that its permission is not proof of land title. The HMDA DPMS approved-layout lookup is reported as unavailable from the public internet in the supplied record; that access limitation does not establish whether a record exists or does not exist. HMDA
1. Project at a glance
Project identity
Registered project name: ASPEN by TATTVA
Project type: Plotted development; the RERA record also identifies it as a “New Project.”
Phase / registered portion: The registration is for ASPEN by TATTVA. The record does not specify a phase name or define the registered portion by plot numbers.
TG-RERA registration: P01100007700; registration from 01/11/2023 through 31/10/2028. The certificate says registration may be extended by the Authority under the Act and rules; no extension is recorded in the supplied certificate.
Registered promoter: TATTVA DEVELOPERS PRIVATE LIMITED; company.
RERA status: Registration certificate supplied; recorded as a new project.
Land and geographic identity
Locality: PATANCHERU / Patancheru
Revenue village(s): Peddakanjarla Village is named in the filed approval and title documents.
Mandal: PATANCHERU / Patancheru Mandal
District: Sangareddy
PIN: 502319
Project survey numbers: 120, 121, 123, 124 and 125; the RERA certificate lists these numbers without subdivisions. The HMDA approval likewise identifies Sy.Nos. 120, 121, 123, 124 and 125.
Subdivision references in supplied records: The site-plan drawing names 120P, 121(P) and 123(P). The cadastrally retrieved entries identify 121 and 125/P; these are recorded entries, not a complete parcel-level match to the registered project.
Registered land area: RERA land details state total area 294773.03 sq mts and net area 222779.45 sq mts; area affected by road widening/FTL of tanks/nala widening is recorded as 0.
Boundaries: East: neighbours land; West: neighbours land; North: neighbours land; South: road width – 25.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA), as named in the filed approval.
Principal approval: Draft Layout Permit No.35/LO/Plg/HMDA/2023, approved date 01-11-2023; file/proceedings reference Proc.No. 01/Plg/Township/2022. The approval letter also lists Draft Layout Permit No.36/LO/Plg/HMDA/2023 and No.37/LO/Plg/HMDA/2023, each dated 01-11-2023.
RERA-filed approved built-up area: 185437.24 sqmts. The RERA record also gives mortgage area 27951.78 sqmts. The supplied material does not identify this built-up area by building or facility.
Buildings / floors / parking levels: Not disclosed in the supplied RERA project fields or extracted drawings in sufficient detail to establish a project-wide building count, floor configuration, or parking levels. A filed HMDA township approval names “Tower 2” among facilities, but this does not establish the building count or floors for ASPEN.
Approval’s described land-use components: The HMDA approval describes Housing with other Commercial Buildings under Permit No.35, Open Plots under No.36, and an extent under No.37 whose area is printed without a numerical amount. These are approval-letter descriptions for the wider township approval; the supplied material does not allocate each component to ASPEN’s registered portion.
Offering and status
RERA-filed unit type: Plots; no RERA unit-count or plot-size schedule is present in the supplied project data.
Plot-size information: The promoter’s vendor listing describes “200 - 300 Sq. Yd. Plots” and a “Residential Plot” of 298 sq.yrd.; these are promoter-marketed details, not RERA-filed unit inventory.
Booked / available counts: Not supplied.
Construction / development stage: RERA amenity fields report percentage figures for selected infrastructure items, but these are filed progress figures and are not independent site verification. See section 6.
Completion dates: The RERA project fields state proposed completion 28/02/2029; the Form-B declaration states an undertaking to complete by 31/10/2028. These are distinct filed dates; this overview does not reconcile them.
Occupancy / completion certificate: No project occupancy or completion certificate is supplied. The registration certificate is valid through 31/10/2028; that registration-validity date is separate from the completion dates above.
2. The project story
- ASPEN by TATTVA is registered with TG-RERA as a plotted-development project in Patancheru, Sangareddy District. The RERA record identifies the project land by survey numbers 120, 121, 123, 124 and 125. Filed approval material places the township land in Peddakanjarla Village and describes a broader integrated township with housing, other commercial buildings and open plots. The supplied records do not map those wider township components plot-by-plot to ASPEN’s RERA-registered portion.
- The RERA fields record a total land area of 294773.03 sq mts and net area of 222779.45 sq mts. The promoter’s declaration gives a completion undertaking of 31/10/2028, while the project fields state a proposed completion date of 28/02/2029. No supplied occupancy or completion certificate establishes that any part is complete or certified for occupation.
- A site-plan document is titled “AMALGAMATED SITE PLAN FOR PHASE B1,B2&B3” and is dated 08-07-2022. Its extracted text identifies survey references 120P, 121(P) and 123(P) but does not establish the detailed arrangement, dimensions or allocation of that drawing to ASPEN.
3. Master plan, architecture & building design
- The project is a plotted development, rather than an apartment scheme. The RERA-filed land schedule gives 294773.03 sq mts total area and 222779.45 sq mts net area; these are distinct reported land-area figures and are not built-up, saleable or plot-area measurements. The RERA fields report approved built-up area of 185437.24 sqmts, without a building-by-building or use-by-use breakdown.
- HMDA’s filed approval letter concerns the 2nd phase of the “Integrated Township” on Sy.Nos. 120, 121, 123, 124 and 125 at Peddakanjarla Village, over Ac. 158.93. It describes housing with other commercial buildings under Draft Layout Permit No.35, open plots under No.36, and a third permit whose area is not numerically stated in the extracted text. The approval letter also lists parks and several community/commercial facilities; it does not provide a complete ASPEN-specific site layout or building schedule in the supplied extraction.
- The supplied site-plan text identifies a drawing for “AMALGAMATED SITE PLAN FOR PHASE B1,B2&B3,” dated 08-07-2022, and survey references 120P, 121(P) and 123(P). The drawing extraction does not establish a sanctioned plot schedule, road-and-park areas, building footprints, floor configuration or the relationship of those phases to ASPEN’s registered portion.
- The HMDA master-plan sheet is image-only and its zoning at the project surveys has not been read from the image or GIS in the supplied evidence.
4. Homes, configurations & floor plans
- The RERA record identifies the offering as plots, but the supplied material contains no RERA-filed plot count, plot-size bands, booked/available inventory table or measured plot schedule. Accordingly, an inventory table of RERA plot counts and sizes cannot be completed from this evidence.
- The promoter’s vendor listing markets “200 - 300 Sq. Yd. Plots” and a “Residential Plot” of 298 sq.yrd. These are attributed marketing details and are not treated here as RERA-filed inventory.
- The only supplied drawing record is a site-plan drawing; no plot measurements or unit-level drawing measurements are available. The floor-plan review records one drawing, with 0 measured, 1 scan pending, and no flats. Carpet-area or loading figures therefore cannot be reported.
5. Parking & vehicle circulation
- No ASPEN-specific sanctioned parking count, visitor or accessible parking schedule, parking-level plan, EV-charging detail or plot-level parking allocation is supplied. The RERA project data describes a plotted development and does not provide a parking count in the material available here.
- The HMDA approval refers to roads, including Master Plan Roads and an approach road, and identifies road widths as 18 mts and above. It does not provide an ASPEN-specific internal road plan, vehicle-entry arrangement or plot-by-plot access schedule in the supplied extraction.
6. Amenities, recreation & open spaces
The HMDA approval lists township facilities and infrastructure. These are approval-letter descriptions for the wider township and are not, on the supplied evidence, confirmation that each item is within ASPEN’s registered portion or completed. The RERA amenity fields provide percentage progress figures for certain infrastructure items; these are filed figures, not independently verified site observations.
| Description / size | Listed in the HMDA approval; no size supplied. |
|---|---|
| Declared progress / verified status | No independent completion verification supplied. |
| Description / size | Listed in the HMDA approval; no size supplied. |
|---|---|
| Declared progress / verified status | No independent completion verification supplied. |
| Description / size | RERA amenity field; no further detail supplied. |
|---|---|
| Declared progress / verified status | Progress percentage not stated. |
| Description / size | RERA amenity field. |
|---|---|
| Declared progress / verified status | Filed as available: YES; progress 0%. |
| Description / size | Promoter-marketed amenity list; no dimensions or capacities supplied. |
|---|---|
| Declared progress / verified status | Marketing listing; no sanctioned or independently verified completion status supplied. |
7. Utilities, building services & safety
The HMDA approval letter specifies infrastructure conditions for the township, including an onsite water supply and drainage system, underground cabling and public utility lines, continuous and quality power supply, a drinking-water source excluding groundwater or a firm commitment from the relevant water authority, storage capacity of at least 1.5 times the determined requirement, a zero-discharge concept for waste, and a minimum of four rain-water-harvesting pits per Acre. These are approval conditions, not evidence of completed facilities at ASPEN. The approval letter also lists an STP and transformer among amenities and utilities.
Water: RERA amenity field: Water Supply, available YES, 20% progress. HMDA approval specifies a drinking-water source excluding groundwater or a firm commitment, with storage capacity at least 1.5 times the determined requirement. No capacity or independent verification is supplied.
Sewerage and drainage: RERA fields report Sewerage (Chamber, Lines, Septic Tank, STP), available YES, 20%; Storm Water Drains, available YES, 5%; Treatment and Disposal of Sewage and Sullage Water, available YES, 1%. HMDA approval requires a zero-discharge concept and states that no liquid waste should go out. These progress entries are filed declarations, not independent verification.
Electrical: RERA field: Electrical Meter Room, Sub-Station, Receiving Station, available YES, 0%. The HMDA approval lists a transformer and requires continuous and quality power supply. No capacity or completion evidence is supplied.
Rain-water harvesting: RERA field: Water Conservation, Rain water Harvesting, available YES, 0%. HMDA approval requires a minimum of four rain-water-harvesting pits per Acre.
Waste management: RERA field: Solid Waste Management and Disposal, progress 0%. HMDA approval specifies a zero-discharge concept for solid and liquid waste.
Fire and accessibility: RERA Fire Protection and Fire Safety Requirements field shows 0%; no detailed fire-system, access, ramp or accessibility design is supplied.
8. Location, access & connectivity
- The official project identity places ASPEN by TATTVA in PATANCHERU, Sangareddy District, PIN 502319. Filed HMDA approval material identifies Peddakanjarla Village, Patancheru Mandal, and Sy.Nos. 120, 121, 123, 124 and 125.
- The RERA record describes the southern boundary as ROAD WIDTH - 25 and gives the other boundaries as neighbours’ land.
The supplied location dataset gives the following measured distances to listed nearby places; it does not state travel times:
| Place | Category | Distance |
|---|---|---|
| Financial District (Nanakramguda) | Anchor | 1.2 km |
| IndusInd Bank | Bank | 0.4 km |
| Unnamed bus station | Bus station | 2.2 km |
| Manuu Polytechnic Hyderabad | College | 1.6 km |
| Sankaraya Eye Hospital | Hospital | 1.6 km |
| ADP | IT office | 0.0 km |
| South India Shopping Mall | Mall | 2.6 km |
| Unnamed park | Park | 1.2 km |
| Nanakramguda Govt primary school | School | 0.5 km |
The promoter’s vendor listing separately gives travel-time claims and additional distances; these are marketing claims, not independently measured connectivity data: “5mins ORR; 10 mins Patancheru; 20 mins BHEL; 20 mins Goudium Internations School; 35 mins Miypur Metro; 40 mins Airport,” and distances to St Marys Group of Institutions College of Engineering Technology (2.5 Km), Oakdale International School (6.2 Km), Aryan School Of Excellence (1.5 Km), Patancheru Railway Station (2.7 Km) and Mahendra Shopping Centre (2.0 Km).
9. Developer & development status
- The registered promoter is TATTVA DEVELOPERS PRIVATE LIMITED, a company, identified in the RERA data with GSTIN 36AAHCT6182E1Z6.
- The registration certificate gives the promoter office as “Village: Mandal: District: Hyderabad, Pin: 500033.” The supplied data identifies authorized signatory CHELAPAREDDY RAKESH KUMAR.
- The promoter’s Form-B declaration states an undertaking to complete the project by 31/10/2028 and declares the land free from encumbrances. These are promoter declarations filed for the project. The RERA project fields separately state proposed completion 28/02/2029.
- No independent construction inspection, project-wide completion evidence or occupancy/completion certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration: Form C for ASPEN by TATTVA, registration P01100007700, valid 01/11/2023–31/10/2028; certificate issued 23/12/2025.
HMDA approval letter: Draft Layout Permit No.35/LO/Plg/HMDA/2023, file/proceedings Proc.No. 01/Plg/Township/2022, dated 01-11-2023; letter describes the 2nd phase of an Integrated Township and lists permits No.36 and No.37.
Site-plan drawing: “AMALGAMATED SITE PLAN FOR PHASE B1,B2&B3,” dated 08-07-2022, sheet 08; extracted text lists survey references 120P, 121(P), 123(P). The extraction does not identify a sanctioning authority or supply detailed layout statistics.
Form-B declaration: Promoter declaration by authorized signatory Rakesh Kumar Chelapareddy for ASPEN by TATTVA, including completion and fund-management undertakings.
HMDA mortgage documents recorded in approval letter: Documents 20576/2023, 20574/2023, 20571/2023, 20573/2023, 20572/2023, 20578/2023, 20575/2023 and 20577/2023, dated 20.10.2023, in favour of MC HMDA. The approval extraction describes reserved plots and facilities associated with those mortgage areas.
Environmental-clearance identifiers cited in HMDA approval: EC22B039TG186839 and reference SIA/TG/MIS/433352/2023, dated 27.07.2023. The supplied extraction records these identifiers; it does not provide the underlying clearance document or establish its project-parcel scope.
Occupancy / completion certificate: Not supplied in the documents provided for this overview.
The HMDA approval states that its permission is not proof of land title. The HMDA DPMS approved-layout lookup is reported as unavailable from the public internet in the supplied record; that access limitation does not establish whether a record exists or does not exist.
Frequently asked questions
Is ASPEN by TATTVA registered with Telangana RERA?
Yes. ASPEN by TATTVA is registered with the Telangana Real Estate Regulatory Authority as P01100007700; the registration status is New Project.
Who is the developer of ASPEN by TATTVA?
The promoter named in the RERA registration is TATTVA DEVELOPERS PRIVATE LIMITED.
Where is ASPEN by TATTVA located?
ASPEN by TATTVA is in PATANCHERU, Sangareddy, Telangana (502319).
When will ASPEN by TATTVA be completed?
The promoter's proposed date of completion filed with RERA is 28/02/2029. This is the promoter's declaration, not a guarantee.
More projects in Patancheru