Auroland
AURO REALTY PRIVATE LIMITED · Sangareddy · RERA P01100007349
AUROLAND is a plotted development in PATANCHERU locality, Patancheru mandal, Sangareddy district, developed by registered promoter AURO REALTY PRIVATE LIMITED. The registered site extent is 130210.83 sq. m, and the supplied RERA data does not state a number of towers, blocks, floors or homes; promoter-marketed plot configurations are 200 Sq. Yards, 300 Sq. Yards, and large/corner plots “Up to 390+ Sq. Yds.” It is registered under TG-RERA number P01100007349, with proposed completion recorded as 28/02/2029.
More from Auro Realty Pvt Ltd · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | AUROLAND RERA record |
| Project type | Plotted development in TG-RERA; HMDA approval describes the second phase of an “Integrated Township,” including housing, commercial buildings and open plots. RERA record |
| Phase / registered portion | New Project; the registration record does not identify a phase number. The HMDA approval document describes the second phase of the Integrated Township. RERA record |
| TG-RERA registration | P01100007349 |
| Registration validity | 08/12/2023–30/10/2028, unless extended by the Authority. This is the registration period, not a construction or possession date. |
| Registered promoter | AURO REALTY PRIVATE LIMITED, company. RERA record Corporate record |
| RERA status | Registered; the certificate is Form C, granted under section 5. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Locality: PATANCHERU. Revenue village: Peddakanjerla (also rendered “Pedakanjarla” in filed documents). RERA record |
| Mandal / district / PIN | PATANCHERU mandal; Sangareddy district; PIN 509310. RERA record |
| Project survey numbers | 120, 121, 123, 124 and 125. RERA record |
| Subdivisions | The RERA registration and HMDA approval list the parent survey numbers above; project subdivisions are not disclosed in those records. |
| Registered site extent | 130210.83 sq. m total area; 130210.83 sq. m net area; affected area recorded as 0 sq. m. RERA filing |
| HMDA approval extent | The HMDA approval document states Ac. 158.93 for its second-phase township approval. |
| Boundaries in RERA filing | East: NEIGHBOURHOOD; west: ROAD WIDTH - 20; north: NEIGHBOURHOOD; south: NEIGHBOURHOOD. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA). Approvals record |
| Principal approval | Draft Layout Permit No.35/LO/Plg/HMDA/2023, dated 01-11-2023; file/proceedings Proc.No. 01/Plg/Township/2022. Approvals record |
| Other draft layout permit numbers in the filed approval | No.36/LO/Plg/HMDA/2023 and No.37/LO/Plg/HMDA/2023, dated 01-11-2023. |
| Approved built-up area | 79681.46 sq. m recorded in the RERA project information. RERA filing |
| Building count / floor configuration | Not disclosed in the supplied project-specific RERA data. The HMDA approval refers to housing, commercial buildings, an office block and Tower 2, but the supplied extract does not establish a complete building count or floor schedule. |
| Parking levels / approved parking count | Not disclosed in the supplied records. |
| Unit / plot count | RERA unit-count data is not supplied. The promoter website record describes 422 plots; this is promoter-marketed information, not a count established by the supplied RERA unit register. Promoter website |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed offering | Plotted development; the supplied RERA data does not include a plot inventory or plot-size schedule. RERA record RERA filing |
| Promoter-marketed plot types | 200 Sq. Yards, 300 Sq. Yards, and large/corner plots “Up to 390+ Sq. Yds.”; orientations are described as east- and west-facing. Promoter website |
| Booked / available | Not disclosed in the supplied RERA unit records. |
| Construction stage | The promoter website record describes the project as Under Construction. No independently verified site-progress record is supplied. Promoter website |
| Completion dates | Form B promoter declaration: 30-October-2028. The RERA header separately records proposed completion as 28/02/2029. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The available approval is a draft layout permit, not an occupancy certificate. Document index |
2. The project story
AUROLAND is registered as a plotted development in the Patancheru locality, on land identified in the RERA record as survey numbers 120, 121, 123, 124 and 125 in Peddakanjerla village, Patancheru mandal, Sangareddy district. The registered site extent is 130210.83 sq. m. RERA record RERA filing
The HMDA document describes its approval as the second phase of an Integrated Township and records housing with commercial buildings and open plots. Its listed facilities and development works include school buildings, a sports-centre complex, shopping and market complexes, a convention centre, parks and site infrastructure. This is the scope described in the filed approval document; it does not establish the present construction status of each component.
The RERA record identifies the project as a new project. The promoter’s website information describes it as under construction, but the supplied evidence contains no independent site inspection or progress certification. No occupancy or completion certificate is included. RERA record Promoter website Document index
3. Master plan, architecture & building design
The HMDA approval is for the second phase of an Integrated Township over Ac. 158.93, covering survey numbers 120, 121, 123, 124 and 125 in Peddakanjerla village. It records draft layout permits for housing, commercial buildings and open plots, and specifies 18 mts road widths in the approval extract.
The RERA filing records 79681.46 sq. m as approved built-up area. The supplied data does not provide a plot layout drawing or schedule from which plot count, plot-by-plot dimensions, road hierarchy, park areas, land-use allocation or open-space area can be confirmed. It also does not provide a complete building schedule, floor configuration or building-footprint figures. RERA filing
HMDA’s approval extract lists primary and secondary school buildings, a sports-centre complex, shopping and market complexes, and a convention centre. It also identifies reserved mortgage areas associated with plots and facilities, including HMDA mortgage deed numbers 20576/2023, 20574/2023, 20571/2023, 20573/2023, 20572/2023, 20578/2023, 20575/2023 and 20577/2023. Their specific scopes are listed in the approval record; this overview does not determine plot availability or allocation.
The supplied floor-plan records contain two drawings, but both are scans pending measurement; no software-measured carpet area or room dimensions are available. Floor plans
4. Homes, configurations & floor plans
This is a plotted-development registration. No RERA unit-type register, plot inventory, booking schedule or RERA-filed saleable-area schedule is supplied, so a RERA configuration table cannot be completed from the available records. RERA record [units not supplied]
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
Promoter-marketed configurations include 200 Sq. Yards and 300 Sq. Yards plots, and large/corner plots described as Up to 390+ Sq. Yds. The website record also describes 200- and 300-square-yard plots as 1,800 sq. ft. and 2,700 sq. ft. respectively; these are vendor-provided figures, not a supplied RERA plot schedule. Promoter website
The two drawing files are scans pending measurement. Accordingly, no drawing-based room, plot-boundary or carpet-area measurement is available. Floor plans
5. Parking & vehicle circulation
The supplied records do not establish a sanctioned parking count, visitor or accessible parking provision, parking levels, vehicle ramps, parking allocation to individual plots, or EV-charging facilities. The HMDA approval extract specifies 18 mts road widths, but does not provide a complete internal circulation or parking schedule in the supplied material. Document index
6. Amenities, recreation & open spaces
The RERA amenity record lists 14 infrastructure and facility categories. It marks several categories as available in the filing, but records 0 progress for the listed items; these figures are filing data, not independent confirmation of delivery. RERA amenities
| Description / size | Listed in HMDA approval; 198 Sq. mts appears in the approval’s mortgage-area description. |
|---|---|
| Evidence source | HMDA-approved township works |
| Declared progress / verified status | No construction progress or independent completion verification supplied. |
| Description / size | Listed in HMDA approval; 378 Sq. mts appears in the approval’s mortgage-area description. |
|---|---|
| Evidence source | HMDA-approved township works |
| Declared progress / verified status | No construction progress or independent completion verification supplied. |
| Description / size | Listed in HMDA approval; 87 Sq. mts appears in the approval’s mortgage-area description. |
|---|---|
| Evidence source | HMDA-approved township works |
| Declared progress / verified status | No construction progress or independent completion verification supplied. |
| Description / size | Listed in HMDA approval; 420 Sq. mts appears in the approval’s mortgage-area description. |
|---|---|
| Evidence source | HMDA-approved township works |
| Declared progress / verified status | No construction progress or independent completion verification supplied. |
| Description / size | Listed in HMDA approval; 258 Sq. mts appears in the approval’s mortgage-area description. |
|---|---|
| Evidence source | HMDA-approved township works |
| Declared progress / verified status | No construction progress or independent completion verification supplied. |
| Description / size | Listed in HMDA approval; 338 Sq. mts appears in the approval’s mortgage-area description. |
|---|---|
| Evidence source | HMDA-approved township works |
| Declared progress / verified status | No construction progress or independent completion verification supplied. |
| Description / size | Park development is listed in the HMDA approval; the RERA amenity list includes green strip, tot lot or park. No area is supplied. RERA amenities |
|---|---|
| Evidence source | HMDA approval and RERA amenity filing |
| Declared progress / verified status | RERA progress recorded as 0; no independent completion verification supplied. |
| Description / size | Described by the promoter’s website record; no area or capacity supplied. Promoter website |
|---|---|
| Evidence source | Promoter-marketed |
| Declared progress / verified status | Not independently verified; no progress figure supplied. |
7. Utilities, building services & safety
The HMDA approval requires on-site roads, street lighting, water supply and drainage to be provided and maintained by the applicant until an urban local body is constituted for the area. It also requires a drinking-water source other than groundwater, or a firm commitment from Hyderabad Metro Water Supply & Sewerage Board or another concerned authority; continuous, quality power supply; and a “Zero (‘0’) discharge” approach for solid and liquid waste management. These are approval conditions, not evidence that the systems are complete or operating.
| Evidence in supplied records | RERA amenity filing lists water supply. HMDA requires a non-groundwater drinking-water source or firm supply commitment and records water-supply conditions. An overhead tank is listed among approved township facilities. RERA amenities |
|---|---|
| Status supported by the evidence | Filed / approval condition; source, storage capacity and completed supply are not verified. |
| Evidence in supplied records | RERA amenity filing lists sewerage, storm-water drains and sewage/sullage treatment. HMDA lists a common septic tank / STP and drainage works. RERA amenities |
|---|---|
| Status supported by the evidence | Listed in filing and approval; capacity, commissioning and operating status are not supplied. |
| Evidence in supplied records | RERA filing lists water conservation/rainwater harvesting. HMDA requires a minimum of four rainwater-harvesting pits per acre. RERA amenities |
|---|---|
| Status supported by the evidence | Filed / approval condition; installation and completion are not verified. |
| Evidence in supplied records | RERA filing lists an electrical meter room, sub-station or receiving station. HMDA requires continuous, quality power supply and lists a transformer. RERA amenities |
|---|---|
| Status supported by the evidence | Filed / approval condition; capacity and completed supply are not verified. |
| Evidence in supplied records | RERA filing lists internal roads, footpaths and street lighting; HMDA specifies 18 mts road widths and requires roads and street lights. RERA amenities |
|---|---|
| Status supported by the evidence | Filed / approval condition; completion is not independently verified. |
| Evidence in supplied records | RERA amenity filing includes solid-waste management and disposal; HMDA specifies a zero-discharge concept for waste management. RERA amenities |
|---|---|
| Status supported by the evidence | Listed, but system details and operating status are not supplied. |
| Evidence in supplied records | A fire-protection and fire-safety category appears in the RERA amenity filing. No system design, clearance or completion evidence is supplied. RERA amenities |
|---|---|
| Status supported by the evidence | Not independently verified. |
| Evidence in supplied records | No project-specific lift, accessible-circulation or security-system details are supplied in the RERA or HMDA records provided. |
|---|---|
| Status supported by the evidence | Not disclosed in the supplied project documents. |
8. Location, access & connectivity
The registered locality is PATANCHERU; the HMDA approval identifies Peddakanjerla Village, Patancheru Mandal, Sangareddy District. The RERA certificate lists PIN 509310. RERA record
The cadastral parcel centroid is recorded at 17.544640733040016, 78.25728693095908. A location analysis gives the nearest sampled Outer Ring Road interchange as approximately 1.7 km away. This is a supplied mapped-distance estimate, not a travel-time claim. Cadastral map Location record
No verified public-transport information or measured distances to other landmarks are supplied. Location record
9. Developer & development status
The registered legal promoter is AURO REALTY PRIVATE LIMITED, a company. Its supplied corporate identifier is GSTIN 36AAICM3245N1Z3. Corporate record RERA record
The RERA certificate lists the promoter office as Village: Miyapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500050. The RERA project information separately records the promoter address as 1-121/1 SY NO. 66 PART, 67 PART, Serlingampally, PeddaKanjarla, Patancheru, Sangareddy, PIN 509310. RERA filing
The promoter’s Form B declaration, dated 21 November 2023, undertakes completion by 30-October-2028 and makes declarations concerning title, encumbrances, project funds, accounts and pending approvals. The RERA header records proposed completion as 28/02/2029. RERA record No independent site-progress certificate or occupancy/completion certificate is supplied. Document index
The HMDA approval document names Aurobindo Tattva Township Developers LLP as applicant and also refers to Tattva Developers Pvt Ltd and Auro Realty Pvt as developers. This overview identifies Auro Realty Private Limited as the TG-RERA registered promoter; the supplied records do not establish further corporate roles beyond those recorded in the approval document.
10. Approvals, official records & documents
| Supplied evidence | Form C, registration P01100007349, issued 08/12/2023, valid to 30/10/2028. |
|---|---|
| Scope / note | AUROLAND; registered promoter: Auro Realty Private Limited. |
| Supplied evidence | Draft Layout Permit No.35/LO/Plg/HMDA/2023, 01-11-2023; file/proceedings Proc.No. 01/Plg/Township/2022. |
|---|---|
| Scope / note | Approval extract describes the second phase of the Integrated Township. It also references draft permits No.36/LO/Plg/HMDA/2023 and No.37/LO/Plg/HMDA/2023. |
| Supplied evidence | 33044/2022, 33046/2022, 33045/2022, 33047/2022, 33048/2022, 33049/2022 (dated 24.09.2022); and 20576/2023, 20574/2023, 20571/2023, 20573/2023, 20572/2023, 20578/2023, 20575/2023, 20577/2023 (dated 20.10.2023). Approvals record |
|---|---|
| Scope / note | Referenced in the HMDA approval; specific reserved areas and facilities are described in that document. |
| Supplied evidence | 1685 (04.10.2023), 6302630729 (05.10.2023), and 1684 (04.10.2023). Approvals record |
|---|---|
| Scope / note | Listed in the approval record. |
| Supplied evidence | EC22B039TG186839 and SIA/TG/MIS/433352/2023, dated 27.07.2023. |
|---|---|
| Scope / note | References appearing in the HMDA approval extract; no separate project-specific clearance document is supplied here. |
| Supplied evidence | Form B affidavit dated 21 November 2023. |
|---|---|
| Scope / note | Includes the promoter’s completion undertaking and other declarations. |
| Supplied evidence | None supplied. Document index |
|---|---|
| Scope / note | No occupancy or completion certificate is established by the supplied documents. |
The supplied HMDA document expressly says the permission is not proof of title.
1. Project at a glance
Project identity
Registered project name: AUROLAND
Project type: Plotted development in TG-RERA; HMDA approval describes the second phase of an “Integrated Township,” including housing, commercial buildings and open plots.
Phase / registered portion: New Project; the registration record does not identify a phase number. The HMDA approval document describes the second phase of the Integrated Township.
TG-RERA registration: P01100007349
Registration validity: 08/12/2023–30/10/2028, unless extended by the Authority. This is the registration period, not a construction or possession date.
Registered promoter: AURO REALTY PRIVATE LIMITED, company.
RERA status: Registered; the certificate is Form C, granted under section 5.
Land and geographic identity
Locality / revenue village: Locality: PATANCHERU. Revenue village: Peddakanjerla (also rendered “Pedakanjarla” in filed documents).
Mandal / district / PIN: PATANCHERU mandal; Sangareddy district; PIN 509310.
Project survey numbers: 120, 121, 123, 124 and 125.
Subdivisions: The RERA registration and HMDA approval list the parent survey numbers above; project subdivisions are not disclosed in those records.
Registered site extent: 130210.83 sq. m total area; 130210.83 sq. m net area; affected area recorded as 0 sq. m.
HMDA approval extent: The HMDA approval document states Ac. 158.93 for its second-phase township approval.
Boundaries in RERA filing: East: NEIGHBOURHOOD; west: ROAD WIDTH - 20; north: NEIGHBOURHOOD; south: NEIGHBOURHOOD.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA).
Principal approval: Draft Layout Permit No.35/LO/Plg/HMDA/2023, dated 01-11-2023; file/proceedings Proc.No. 01/Plg/Township/2022.
Other draft layout permit numbers in the filed approval: No.36/LO/Plg/HMDA/2023 and No.37/LO/Plg/HMDA/2023, dated 01-11-2023.
Approved built-up area: 79681.46 sq. m recorded in the RERA project information.
Building count / floor configuration: Not disclosed in the supplied project-specific RERA data. The HMDA approval refers to housing, commercial buildings, an office block and Tower 2, but the supplied extract does not establish a complete building count or floor schedule.
Parking levels / approved parking count: Not disclosed in the supplied records.
Unit / plot count: RERA unit-count data is not supplied. The promoter website record describes 422 plots; this is promoter-marketed information, not a count established by the supplied RERA unit register.
Offering and status
RERA-filed offering: Plotted development; the supplied RERA data does not include a plot inventory or plot-size schedule.
Promoter-marketed plot types: 200 Sq. Yards, 300 Sq. Yards, and large/corner plots “Up to 390+ Sq. Yds.”; orientations are described as east- and west-facing.
Booked / available: Not disclosed in the supplied RERA unit records.
Construction stage: The promoter website record describes the project as Under Construction. No independently verified site-progress record is supplied.
Completion dates: Form B promoter declaration: 30-October-2028. The RERA header separately records proposed completion as 28/02/2029.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The available approval is a draft layout permit, not an occupancy certificate.
2. The project story
AUROLAND is registered as a plotted development in the Patancheru locality, on land identified in the RERA record as survey numbers 120, 121, 123, 124 and 125 in Peddakanjerla village, Patancheru mandal, Sangareddy district. The registered site extent is 130210.83 sq. m.
The HMDA document describes its approval as the second phase of an Integrated Township and records housing with commercial buildings and open plots. Its listed facilities and development works include school buildings, a sports-centre complex, shopping and market complexes, a convention centre, parks and site infrastructure. This is the scope described in the filed approval document; it does not establish the present construction status of each component.
The RERA record identifies the project as a new project. The promoter’s website information describes it as under construction, but the supplied evidence contains no independent site inspection or progress certification. No occupancy or completion certificate is included.
3. Master plan, architecture & building design
The HMDA approval is for the second phase of an Integrated Township over Ac. 158.93, covering survey numbers 120, 121, 123, 124 and 125 in Peddakanjerla village. It records draft layout permits for housing, commercial buildings and open plots, and specifies 18 mts road widths in the approval extract.
The RERA filing records 79681.46 sq. m as approved built-up area. The supplied data does not provide a plot layout drawing or schedule from which plot count, plot-by-plot dimensions, road hierarchy, park areas, land-use allocation or open-space area can be confirmed. It also does not provide a complete building schedule, floor configuration or building-footprint figures.
HMDA’s approval extract lists primary and secondary school buildings, a sports-centre complex, shopping and market complexes, and a convention centre. It also identifies reserved mortgage areas associated with plots and facilities, including HMDA mortgage deed numbers 20576/2023, 20574/2023, 20571/2023, 20573/2023, 20572/2023, 20578/2023, 20575/2023 and 20577/2023. Their specific scopes are listed in the approval record; this overview does not determine plot availability or allocation.
The supplied floor-plan records contain two drawings, but both are scans pending measurement; no software-measured carpet area or room dimensions are available.
4. Homes, configurations & floor plans
This is a plotted-development registration. No RERA unit-type register, plot inventory, booking schedule or RERA-filed saleable-area schedule is supplied, so a RERA configuration table cannot be completed from the available records. [units not supplied]
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
Promoter-marketed configurations include 200 Sq. Yards and 300 Sq. Yards plots, and large/corner plots described as Up to 390+ Sq. Yds. The website record also describes 200- and 300-square-yard plots as 1,800 sq. ft. and 2,700 sq. ft. respectively; these are vendor-provided figures, not a supplied RERA plot schedule.
The two drawing files are scans pending measurement. Accordingly, no drawing-based room, plot-boundary or carpet-area measurement is available.
5. Parking & vehicle circulation
The supplied records do not establish a sanctioned parking count, visitor or accessible parking provision, parking levels, vehicle ramps, parking allocation to individual plots, or EV-charging facilities. The HMDA approval extract specifies 18 mts road widths, but does not provide a complete internal circulation or parking schedule in the supplied material.
6. Amenities, recreation & open spaces
The RERA amenity record lists 14 infrastructure and facility categories. It marks several categories as available in the filing, but records 0 progress for the listed items; these figures are filing data, not independent confirmation of delivery.
| Description / size | Listed in HMDA approval; 198 Sq. mts appears in the approval’s mortgage-area description. |
|---|---|
| Evidence source | HMDA-approved township works |
| Declared progress / verified status | No construction progress or independent completion verification supplied. |
| Description / size | Listed in HMDA approval; 378 Sq. mts appears in the approval’s mortgage-area description. |
|---|---|
| Evidence source | HMDA-approved township works |
| Declared progress / verified status | No construction progress or independent completion verification supplied. |
| Description / size | Listed in HMDA approval; 87 Sq. mts appears in the approval’s mortgage-area description. |
|---|---|
| Evidence source | HMDA-approved township works |
| Declared progress / verified status | No construction progress or independent completion verification supplied. |
| Description / size | Listed in HMDA approval; 420 Sq. mts appears in the approval’s mortgage-area description. |
|---|---|
| Evidence source | HMDA-approved township works |
| Declared progress / verified status | No construction progress or independent completion verification supplied. |
| Description / size | Listed in HMDA approval; 258 Sq. mts appears in the approval’s mortgage-area description. |
|---|---|
| Evidence source | HMDA-approved township works |
| Declared progress / verified status | No construction progress or independent completion verification supplied. |
| Description / size | Listed in HMDA approval; 338 Sq. mts appears in the approval’s mortgage-area description. |
|---|---|
| Evidence source | HMDA-approved township works |
| Declared progress / verified status | No construction progress or independent completion verification supplied. |
| Description / size | Park development is listed in the HMDA approval; the RERA amenity list includes green strip, tot lot or park. No area is supplied. |
|---|---|
| Evidence source | HMDA approval and RERA amenity filing |
| Declared progress / verified status | RERA progress recorded as 0; no independent completion verification supplied. |
| Description / size | Described by the promoter’s website record; no area or capacity supplied. |
|---|---|
| Evidence source | Promoter-marketed |
| Declared progress / verified status | Not independently verified; no progress figure supplied. |
7. Utilities, building services & safety
The HMDA approval requires on-site roads, street lighting, water supply and drainage to be provided and maintained by the applicant until an urban local body is constituted for the area. It also requires a drinking-water source other than groundwater, or a firm commitment from Hyderabad Metro Water Supply & Sewerage Board or another concerned authority; continuous, quality power supply; and a “Zero (‘0’) discharge” approach for solid and liquid waste management. These are approval conditions, not evidence that the systems are complete or operating.
| Evidence in supplied records | RERA amenity filing lists water supply. HMDA requires a non-groundwater drinking-water source or firm supply commitment and records water-supply conditions. An overhead tank is listed among approved township facilities. |
|---|---|
| Status supported by the evidence | Filed / approval condition; source, storage capacity and completed supply are not verified. |
| Evidence in supplied records | RERA amenity filing lists sewerage, storm-water drains and sewage/sullage treatment. HMDA lists a common septic tank / STP and drainage works. |
|---|---|
| Status supported by the evidence | Listed in filing and approval; capacity, commissioning and operating status are not supplied. |
| Evidence in supplied records | RERA filing lists water conservation/rainwater harvesting. HMDA requires a minimum of four rainwater-harvesting pits per acre. |
|---|---|
| Status supported by the evidence | Filed / approval condition; installation and completion are not verified. |
| Evidence in supplied records | RERA filing lists an electrical meter room, sub-station or receiving station. HMDA requires continuous, quality power supply and lists a transformer. |
|---|---|
| Status supported by the evidence | Filed / approval condition; capacity and completed supply are not verified. |
| Evidence in supplied records | RERA filing lists internal roads, footpaths and street lighting; HMDA specifies 18 mts road widths and requires roads and street lights. |
|---|---|
| Status supported by the evidence | Filed / approval condition; completion is not independently verified. |
| Evidence in supplied records | RERA amenity filing includes solid-waste management and disposal; HMDA specifies a zero-discharge concept for waste management. |
|---|---|
| Status supported by the evidence | Listed, but system details and operating status are not supplied. |
| Evidence in supplied records | A fire-protection and fire-safety category appears in the RERA amenity filing. No system design, clearance or completion evidence is supplied. |
|---|---|
| Status supported by the evidence | Not independently verified. |
| Evidence in supplied records | No project-specific lift, accessible-circulation or security-system details are supplied in the RERA or HMDA records provided. |
|---|---|
| Status supported by the evidence | Not disclosed in the supplied project documents. |
8. Location, access & connectivity
The registered locality is PATANCHERU; the HMDA approval identifies Peddakanjerla Village, Patancheru Mandal, Sangareddy District. The RERA certificate lists PIN 509310.
The cadastral parcel centroid is recorded at 17.544640733040016, 78.25728693095908. A location analysis gives the nearest sampled Outer Ring Road interchange as approximately 1.7 km away. This is a supplied mapped-distance estimate, not a travel-time claim.
No verified public-transport information or measured distances to other landmarks are supplied.
9. Developer & development status
The registered legal promoter is AURO REALTY PRIVATE LIMITED, a company. Its supplied corporate identifier is GSTIN 36AAICM3245N1Z3.
The RERA certificate lists the promoter office as Village: Miyapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500050. The RERA project information separately records the promoter address as 1-121/1 SY NO. 66 PART, 67 PART, Serlingampally, PeddaKanjarla, Patancheru, Sangareddy, PIN 509310.
The promoter’s Form B declaration, dated 21 November 2023, undertakes completion by 30-October-2028 and makes declarations concerning title, encumbrances, project funds, accounts and pending approvals. The RERA header records proposed completion as 28/02/2029. No independent site-progress certificate or occupancy/completion certificate is supplied.
The HMDA approval document names Aurobindo Tattva Township Developers LLP as applicant and also refers to Tattva Developers Pvt Ltd and Auro Realty Pvt as developers. This overview identifies Auro Realty Private Limited as the TG-RERA registered promoter; the supplied records do not establish further corporate roles beyond those recorded in the approval document.
10. Approvals, official records & documents
| Supplied evidence | Form C, registration P01100007349, issued 08/12/2023, valid to 30/10/2028. |
|---|---|
| Scope / note | AUROLAND; registered promoter: Auro Realty Private Limited. |
| Supplied evidence | Draft Layout Permit No.35/LO/Plg/HMDA/2023, 01-11-2023; file/proceedings Proc.No. 01/Plg/Township/2022. |
|---|---|
| Scope / note | Approval extract describes the second phase of the Integrated Township. It also references draft permits No.36/LO/Plg/HMDA/2023 and No.37/LO/Plg/HMDA/2023. |
| Supplied evidence | 33044/2022, 33046/2022, 33045/2022, 33047/2022, 33048/2022, 33049/2022 (dated 24.09.2022); and 20576/2023, 20574/2023, 20571/2023, 20573/2023, 20572/2023, 20578/2023, 20575/2023, 20577/2023 (dated 20.10.2023). |
|---|---|
| Scope / note | Referenced in the HMDA approval; specific reserved areas and facilities are described in that document. |
| Supplied evidence | 1685 (04.10.2023), 6302630729 (05.10.2023), and 1684 (04.10.2023). |
|---|---|
| Scope / note | Listed in the approval record. |
| Supplied evidence | EC22B039TG186839 and SIA/TG/MIS/433352/2023, dated 27.07.2023. |
|---|---|
| Scope / note | References appearing in the HMDA approval extract; no separate project-specific clearance document is supplied here. |
| Supplied evidence | Form B affidavit dated 21 November 2023. |
|---|---|
| Scope / note | Includes the promoter’s completion undertaking and other declarations. |
| Supplied evidence | None supplied. |
|---|---|
| Scope / note | No occupancy or completion certificate is established by the supplied documents. |
The supplied HMDA document expressly says the permission is not proof of title.
Frequently asked questions
Is AUROLAND registered with Telangana RERA?
Yes. AUROLAND is registered with the Telangana Real Estate Regulatory Authority as P01100007349; the registration status is New Project.
Who is the developer of AUROLAND?
The promoter named in the RERA registration is AURO REALTY PRIVATE LIMITED.
Where is AUROLAND located?
AUROLAND is in PATANCHERU, Sangareddy, Telangana (509310).
When will AUROLAND be completed?
The promoter's proposed date of completion filed with RERA is 28/02/2029. This is the promoter's declaration, not a guarantee.