Avasa Hills
YBR INFRA DEVELOPERS · Rangareddy · RERA P02400001224
AVASA HILLS is a plotted development in Ramdaspalli, Ibrahimpatnam mandal, Ranga Reddy district, developed by registered promoter YBR INFRA DEVELOPERS. The recorded total site area is 167267.89 sq.m, and the layout is for residential open plots; the supplied record does not state a total plot count or plot-size configurations. It is registered with TG-RERA under P02400001224, and the proposed completion date is 01/11/2021.
More from Ybr Infra Developers · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | RERA-filed / recorded information |
|---|---|
| Registered project name | AVASA HILLS RERA record |
| Project type | Plotted development / open-plot residential layout RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; registration is for AVASA HILLS |
| TG-RERA registration | P02400001224 |
| Registration validity | From 05/10/2019 to 01/11/2021; certificate states two years, unless extended by the Authority. Extension is recorded as not granted in the supplied certificate data. This is the registration period, not the completion deadline. |
| Registered promoter | YBR INFRA DEVELOPERS |
| RERA status | The supplied registration certificate records the registration period above. A current portal status beyond that period is not established by the supplied record. |
Land and geographic identity
| Item | RERA-filed / recorded information |
|---|---|
| Locality / revenue village | Ramdaspalli; the final layout letter spells it “Ramdaspalle.” RERA record |
| Mandal | Ibrahimpatnam RERA record |
| District | Ranga Reddy RERA record |
| PIN | 501510 RERA record |
| Project survey numbers | 41/3, 41/4, 41/5 and 41/6 |
| Subdivisions | Subdivision-level holdings for the project are not specified in the registration certificate. The title material lists subsidiary survey references, including 41/6/A2; 41/4/A; 41/5/A; 41/6/A; 41/4/E; 41/5/E; 41/6/E; 41/5/AA; 41/4/AA; 41/5/AA; 41/6/AA; the full deed register and parcel scope are addressed in Land & Title. |
| Total site area | 167267.89 sq.m RERA filing |
| Area affected by master-plan road | 9257.81 sq.m RERA filing |
| Net site area | 158010.08 sq.m RERA filing |
| Boundaries filed on RERA record | North and south: 30 WIDE EXISTING ROAD; east and west: LAND OF GURAVAIAH CHOWDARY RERA filing |
Development identity
| Item | RERA-filed / recorded information |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal layout approval | Final Layout Letter / Layout Permit 000228/LO/Plg/HMDA/2018, dated 20 January, 2021 in the supplied extraction |
| Approved built-up area | 106246.21 sq.m is recorded as “Approved Built up Area” in the RERA fields. The supplied layout documents concern a plotted layout; no separate building plans or building configuration are identified. RERA filing |
| Plot / land-use figures in draft layout letter | Plotted area 106246.21 sq.m; park 12488.7 sq.m; social infrastructure 3977.25 sq.m; layout roads 35298.16 sq.m; amenities area 0. |
| Building count, floors and building parking levels | Not disclosed in the supplied project record; this is a plotted layout, not a documented multi-storey building scheme. Document index |
| Plots | Draft layout letter identifies plot-number ranges 238 TO 262, 264 TO 269 & 471 TO 557. The supplied record does not establish a single total plot count or plot-size schedule. |
| Mortgage area | 21487.19 sq.m is recorded in the RERA land fields; the draft layout letter identifies mortgage documents 22683 and 22684 dated 16/10/2018 and lists plots subject to mortgage. RERA filing |
Offering and status
| Item | RERA-filed / recorded information |
|---|---|
| Offering | Residential open plots; plot types, sizes, and current inventory by plot are not available in the supplied data. |
| Booked / available | Not established by the supplied record. |
| Construction stage | HMDA’s Architect’s Certificate (Form–1A) states that the project was completed in all aspects. The certificate records an HMDA Occupancy Certificate; this is not an independent current-site inspection. |
| Completion date | The RERA certificate and promoter’s Form B state 01/11/2021 as the project end date. The Form B is the promoter’s completion undertaking. |
| Occupancy certificate | Form–1A records Occupancy Certificate No. 037930/LT/SMD/FLT/U6/HMDA/06082020, issued by HMDA on 20-01-2021. The supplied extraction describes it as covering AVASA HILLS; no plot-by-plot or separate phase scope is stated. |
2. The project story
AVASA HILLS is registered as a residential plotted development in Ramdaspalli village, Ibrahimpatnam mandal, Ranga Reddy district. Its registered land identity comprises survey numbers 41/3, 41/4, 41/5 and 41/6, with a recorded net site area of 158010.08 sq.m. The HMDA final-layout record describes open plots and identifies roads, open spaces and social-infrastructure land within the layout. RERA record
The project record includes plot-number ranges in the draft layout letter, but does not provide a reliable current plot inventory, plot-size schedule or booked/available counts. A partially completed sample allotment letter is on file; its plot and buyer particulars are not filled in in the supplied extraction.
The promoter’s Form B undertook completion by 1st November 2021. Separately, the architect’s Form–1A states that the project was completed in all aspects and records an HMDA Occupancy Certificate issued on 20-01-2021. These are filed declarations and certificate records; no independent site inspection or current physical-progress verification is supplied.
3. Master plan, architecture & building design
This is documented as a plotted layout, not a building or apartment scheme. The layout record gives a total site area of 167267.89 sq.m, of which 9257.81 sq.m is identified as affected by a master-plan road, leaving a stated net site area of 158010.08 sq.m. The draft layout letter separately allocates 106246.21 sq.m to plotted area, 12488.7 sq.m to park, 3977.25 sq.m to social infrastructure and 35298.16 sq.m to layout roads; amenities area is recorded as 0. RERA filing
HMDA’s final-layout letter records approval for an open-plot residential layout across survey numbers 41/3, 41/4, 41/5 and 41/6. It also records that roads, open spaces and social-infrastructure areas were taken over by the Local Authority by registered gift deed 11000/2020, dated 13-08-2020, and that a relinquishment deed concerning mortgaged plots was executed as 12576/2020, dated 29-12-2020.
The supplied record does not establish plot dimensions, plot-size bands, a complete plot schedule, building footprints, dwelling-house designs, or a phase-wise layout organization. The final-layout conditions describe residential dwelling-house use for building sites and refer to individual building permission under the applicable building rules; individual building plans are not included in the supplied evidence. Document index
4. Homes, configurations & floor plans
This project offers plots rather than apartment configurations. No RERA-normalised plot inventory, plot-size schedule, booked/available counts or RERA saleable-area figures are supplied. The plotted area recorded in the layout material is 106246.21 sq.m; it is a land-use figure and should not be read as a plot-by-plot saleable-area schedule.
The two supplied drawing records are pending scan measurement; 0 have been measured and 2 scans are pending. No software-measured carpet areas or room dimensions are available. Floor plans
A partially completed allotment-letter document refers to open plots in AVASA HILLS but leaves the buyer and plot particulars, price and payment amounts blank in the supplied extraction.
5. Parking & vehicle circulation
No resident, visitor, accessible, two-wheeler or other parking-space counts, parking levels, ramps, or plot-specific parking allocations are established in the supplied record. The project is a plotted layout, and no exclusive parking entitlement for a particular plot is documented here. Document index
The draft layout letter identifies layout roads and requires roads to be opened for access to neighbouring sites; the final-layout letter states that roads are to remain open for free access to the general public. The supplied extracts do not describe road widths beyond the identified 30 mtrs proposed master-plan road, or provide a detailed internal vehicle-circulation drawing.
6. Amenities, recreation & open spaces
The following are recorded in HMDA layout documents or the RERA project-progress fields. The supplied evidence does not independently verify present condition or completion of these facilities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 12488.7 sq.m in the draft layout land-use schedule | Layout allocation recorded; present condition not independently verified | |
| Social infrastructure | 3977.25 sq.m | Land-use allocation recorded; the final-layout letter says social-infrastructure area was taken over by the Local Authority | |
| Internal roads | 35298.16 sq.m in the draft layout schedule | Layout allocation recorded; current condition not independently verified | |
| Avenue plantation and park development | No size or quantity supplied | Listed as layout provisions; delivery status not independently verified | |
| Rainwater harvesting pits / structure | No size or capacity supplied | Listed in layout documents; delivery status not independently verified |
A separate RERA amenities record marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/tot lot/park, street lighting, rainwater harvesting, and electrical meter room/sub-station/receiving station as YES, 100%. Community buildings, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection, and aggregate recreational open space are listed at 0% in that record. These percentages are filed progress data, not independent verification. RERA amenities
7. Utilities, building services & safety
HMDA’s final-layout letter lists water supply, sewerage, drainage disposal systems, street lighting and a rainwater-harvesting structure as civic amenities in the layout, and assigns their proper and effective maintenance to the local body. It does not provide capacities, engineering drawings or independent commissioning evidence.
The draft layout letter also lists a common septic tank / STP, overhead tank, transformer, avenue plantation, park development and rainwater-harvesting pits. The supplied documents do not establish their capacities, installation status or current operating condition.
The RERA amenities record marks water supply, sewerage, storm-water drains, street lighting, rainwater harvesting and an electrical meter room/sub-station/receiving station as YES, 100%. The same record lists fire-protection and fire-safety requirements, energy management, and solid-waste management and disposal at 0%. No fire-system specifications, emergency-access details, security systems, accessibility provisions or independent safety clearances are supplied. RERA amenities
8. Location, access & connectivity
The registered location is Ramdaspalli village, Ibrahimpatnam mandal, Ranga Reddy district, Telangana, PIN 501510. The project boundaries recorded in the RERA fields are roads to the north and south (“30 WIDE EXISTING ROAD”) and land of Guravaiah Chowdary to the east and west. RERA record RERA filing
The supplied location data records the following measured distances: Outer Ring Road (nearest sampled interchange, approx), 11.8 km; TGSRTC Bus Station, Ibrahimpatnam, 0.5 km; and Community Health Centre, Ibrahimpatnam, 0.3 km. An additional connectivity reference in the vendor data identifies AVN Institute of Engineering Technology at 1.2 Km; this is a vendor-supplied reference, not a RERA-filed distance. Location record Promoter website
9. Developer & development status
The registered promoter is YBR INFRA DEVELOPERS, identified in the RERA fields as a partnership. The supplied corporate data identifies SRUNGAVARAPU SRIRANGA as a partner and Y BHAKTHAVATHSAL REDDY as an authorized signatory. The registration certificate’s promoter-office field is incomplete; a separate project/promoter address is listed as LR PLAZA, HYDERGUDA, RAMDASPALLY, IBRAHIMPATNAM, Ibrahimpatnam, Ranga Reddy, 501510. RERA filing Corporate record Parties record
The promoter’s Form B, dated 31st day of January 2019, declares completion by 1st November 2021 and sets out undertakings concerning project funds, accounts, approvals and treatment of allottees. The architect’s Form–1A states completion in all aspects and records the HMDA Occupancy Certificate dated 20-01-2021. These documents describe filed declarations and certificate evidence; no independent current-site inspection is supplied.
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | FORM “C” registration certificate for AVASA HILLS, P02400001224; valid from 05/10/2019 to 01/11/2021 as stated in the certificate. |
| HMDA draft layout | Draft layout letter under Layout Permit 000228/LO/Plg/HMDA/2018, dated 01 November, 2018, covering survey numbers 41/3, 41/4, 41/5 and 41/6. |
| HMDA final layout | Final Layout Letter for the residential open-plot layout, dated 20 January, 2021 in the supplied extraction; records approval number 000228/LO/Plg/HMDA/2018. |
| HMDA Occupancy Certificate | Architect’s Form–1A records certificate 037930/LT/SMD/FLT/U6/HMDA/06082020, issued 20-01-2021. |
| Promoter declaration | Form B affidavit-cum-declaration for AVASA HILLS, dated 31st day of January 2019, including the promoter’s completion undertaking and project-account declarations. |
| Layout land-transfer records cited in final layout letter | Gift deed 11000/2020, dated 13-08-2020; relinquishment deed 12576/2020, dated 29-12-2020. |
| RERA-filed sample transaction documents | Partially completed allotment letter and agreement-for-sale documents are listed; supplied extracts leave material buyer, plot and transaction particulars blank. |
1. Project at a glance
Project identity
Registered project name: AVASA HILLS
Project type: Plotted development / open-plot residential layout
Phase / registered portion: Phase not separately identified in the supplied record; registration is for AVASA HILLS
TG-RERA registration: P02400001224
Registration validity: From 05/10/2019 to 01/11/2021; certificate states two years, unless extended by the Authority. Extension is recorded as not granted in the supplied certificate data. This is the registration period, not the completion deadline.
Registered promoter: YBR INFRA DEVELOPERS
RERA status: The supplied registration certificate records the registration period above. A current portal status beyond that period is not established by the supplied record.
Land and geographic identity
Locality / revenue village: Ramdaspalli; the final layout letter spells it “Ramdaspalle.”
Mandal: Ibrahimpatnam
District: Ranga Reddy
PIN: 501510
Project survey numbers: 41/3, 41/4, 41/5 and 41/6
Subdivisions: Subdivision-level holdings for the project are not specified in the registration certificate. The title material lists subsidiary survey references, including 41/6/A2; 41/4/A; 41/5/A; 41/6/A; 41/4/E; 41/5/E; 41/6/E; 41/5/AA; 41/4/AA; 41/5/AA; 41/6/AA; the full deed register and parcel scope are addressed in Land & Title.
Total site area: 167267.89 sq.m
Area affected by master-plan road: 9257.81 sq.m
Net site area: 158010.08 sq.m
Boundaries filed on RERA record: North and south: 30 WIDE EXISTING ROAD; east and west: LAND OF GURAVAIAH CHOWDARY
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: Final Layout Letter / Layout Permit 000228/LO/Plg/HMDA/2018, dated 20 January, 2021 in the supplied extraction
Approved built-up area: 106246.21 sq.m is recorded as “Approved Built up Area” in the RERA fields. The supplied layout documents concern a plotted layout; no separate building plans or building configuration are identified.
Plot / land-use figures in draft layout letter: Plotted area 106246.21 sq.m; park 12488.7 sq.m; social infrastructure 3977.25 sq.m; layout roads 35298.16 sq.m; amenities area 0.
Building count, floors and building parking levels: Not disclosed in the supplied project record; this is a plotted layout, not a documented multi-storey building scheme.
Plots: Draft layout letter identifies plot-number ranges 238 TO 262, 264 TO 269 & 471 TO 557. The supplied record does not establish a single total plot count or plot-size schedule.
Mortgage area: 21487.19 sq.m is recorded in the RERA land fields; the draft layout letter identifies mortgage documents 22683 and 22684 dated 16/10/2018 and lists plots subject to mortgage.
Offering and status
Offering: Residential open plots; plot types, sizes, and current inventory by plot are not available in the supplied data.
Booked / available: Not established by the supplied record.
Construction stage: HMDA’s Architect’s Certificate (Form–1A) states that the project was completed in all aspects. The certificate records an HMDA Occupancy Certificate; this is not an independent current-site inspection.
Completion date: The RERA certificate and promoter’s Form B state 01/11/2021 as the project end date. The Form B is the promoter’s completion undertaking.
Occupancy certificate: Form–1A records Occupancy Certificate No. 037930/LT/SMD/FLT/U6/HMDA/06082020, issued by HMDA on 20-01-2021. The supplied extraction describes it as covering AVASA HILLS; no plot-by-plot or separate phase scope is stated.
2. The project story
AVASA HILLS is registered as a residential plotted development in Ramdaspalli village, Ibrahimpatnam mandal, Ranga Reddy district. Its registered land identity comprises survey numbers 41/3, 41/4, 41/5 and 41/6, with a recorded net site area of 158010.08 sq.m. The HMDA final-layout record describes open plots and identifies roads, open spaces and social-infrastructure land within the layout.
The project record includes plot-number ranges in the draft layout letter, but does not provide a reliable current plot inventory, plot-size schedule or booked/available counts. A partially completed sample allotment letter is on file; its plot and buyer particulars are not filled in in the supplied extraction.
The promoter’s Form B undertook completion by 1st November 2021. Separately, the architect’s Form–1A states that the project was completed in all aspects and records an HMDA Occupancy Certificate issued on 20-01-2021. These are filed declarations and certificate records; no independent site inspection or current physical-progress verification is supplied.
3. Master plan, architecture & building design
This is documented as a plotted layout, not a building or apartment scheme. The layout record gives a total site area of 167267.89 sq.m, of which 9257.81 sq.m is identified as affected by a master-plan road, leaving a stated net site area of 158010.08 sq.m. The draft layout letter separately allocates 106246.21 sq.m to plotted area, 12488.7 sq.m to park, 3977.25 sq.m to social infrastructure and 35298.16 sq.m to layout roads; amenities area is recorded as 0.
HMDA’s final-layout letter records approval for an open-plot residential layout across survey numbers 41/3, 41/4, 41/5 and 41/6. It also records that roads, open spaces and social-infrastructure areas were taken over by the Local Authority by registered gift deed 11000/2020, dated 13-08-2020, and that a relinquishment deed concerning mortgaged plots was executed as 12576/2020, dated 29-12-2020.
The supplied record does not establish plot dimensions, plot-size bands, a complete plot schedule, building footprints, dwelling-house designs, or a phase-wise layout organization. The final-layout conditions describe residential dwelling-house use for building sites and refer to individual building permission under the applicable building rules; individual building plans are not included in the supplied evidence.
4. Homes, configurations & floor plans
This project offers plots rather than apartment configurations. No RERA-normalised plot inventory, plot-size schedule, booked/available counts or RERA saleable-area figures are supplied. The plotted area recorded in the layout material is 106246.21 sq.m; it is a land-use figure and should not be read as a plot-by-plot saleable-area schedule.
The two supplied drawing records are pending scan measurement; 0 have been measured and 2 scans are pending. No software-measured carpet areas or room dimensions are available.
A partially completed allotment-letter document refers to open plots in AVASA HILLS but leaves the buyer and plot particulars, price and payment amounts blank in the supplied extraction.
5. Parking & vehicle circulation
No resident, visitor, accessible, two-wheeler or other parking-space counts, parking levels, ramps, or plot-specific parking allocations are established in the supplied record. The project is a plotted layout, and no exclusive parking entitlement for a particular plot is documented here.
The draft layout letter identifies layout roads and requires roads to be opened for access to neighbouring sites; the final-layout letter states that roads are to remain open for free access to the general public. The supplied extracts do not describe road widths beyond the identified 30 mtrs proposed master-plan road, or provide a detailed internal vehicle-circulation drawing.
6. Amenities, recreation & open spaces
The following are recorded in HMDA layout documents or the RERA project-progress fields. The supplied evidence does not independently verify present condition or completion of these facilities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 12488.7 sq.m in the draft layout land-use schedule | Layout allocation recorded; present condition not independently verified | |
| Social infrastructure | 3977.25 sq.m | Land-use allocation recorded; the final-layout letter says social-infrastructure area was taken over by the Local Authority | |
| Internal roads | 35298.16 sq.m in the draft layout schedule | Layout allocation recorded; current condition not independently verified | |
| Avenue plantation and park development | No size or quantity supplied | Listed as layout provisions; delivery status not independently verified | |
| Rainwater harvesting pits / structure | No size or capacity supplied | Listed in layout documents; delivery status not independently verified |
A separate RERA amenities record marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/tot lot/park, street lighting, rainwater harvesting, and electrical meter room/sub-station/receiving station as YES, 100%. Community buildings, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection, and aggregate recreational open space are listed at 0% in that record. These percentages are filed progress data, not independent verification.
7. Utilities, building services & safety
HMDA’s final-layout letter lists water supply, sewerage, drainage disposal systems, street lighting and a rainwater-harvesting structure as civic amenities in the layout, and assigns their proper and effective maintenance to the local body. It does not provide capacities, engineering drawings or independent commissioning evidence.
The draft layout letter also lists a common septic tank / STP, overhead tank, transformer, avenue plantation, park development and rainwater-harvesting pits. The supplied documents do not establish their capacities, installation status or current operating condition.
The RERA amenities record marks water supply, sewerage, storm-water drains, street lighting, rainwater harvesting and an electrical meter room/sub-station/receiving station as YES, 100%. The same record lists fire-protection and fire-safety requirements, energy management, and solid-waste management and disposal at 0%. No fire-system specifications, emergency-access details, security systems, accessibility provisions or independent safety clearances are supplied.
8. Location, access & connectivity
The registered location is Ramdaspalli village, Ibrahimpatnam mandal, Ranga Reddy district, Telangana, PIN 501510. The project boundaries recorded in the RERA fields are roads to the north and south (“30 WIDE EXISTING ROAD”) and land of Guravaiah Chowdary to the east and west.
The supplied location data records the following measured distances: Outer Ring Road (nearest sampled interchange, approx), 11.8 km; TGSRTC Bus Station, Ibrahimpatnam, 0.5 km; and Community Health Centre, Ibrahimpatnam, 0.3 km. An additional connectivity reference in the vendor data identifies AVN Institute of Engineering Technology at 1.2 Km; this is a vendor-supplied reference, not a RERA-filed distance.
9. Developer & development status
The registered promoter is YBR INFRA DEVELOPERS, identified in the RERA fields as a partnership. The supplied corporate data identifies SRUNGAVARAPU SRIRANGA as a partner and Y BHAKTHAVATHSAL REDDY as an authorized signatory. The registration certificate’s promoter-office field is incomplete; a separate project/promoter address is listed as LR PLAZA, HYDERGUDA, RAMDASPALLY, IBRAHIMPATNAM, Ibrahimpatnam, Ranga Reddy, 501510.
The promoter’s Form B, dated 31st day of January 2019, declares completion by 1st November 2021 and sets out undertakings concerning project funds, accounts, approvals and treatment of allottees. The architect’s Form–1A states completion in all aspects and records the HMDA Occupancy Certificate dated 20-01-2021. These documents describe filed declarations and certificate evidence; no independent current-site inspection is supplied.
10. Approvals, official records & documents
TG-RERA registration: FORM “C” registration certificate for AVASA HILLS, P02400001224; valid from 05/10/2019 to 01/11/2021 as stated in the certificate.
HMDA draft layout: Draft layout letter under Layout Permit 000228/LO/Plg/HMDA/2018, dated 01 November, 2018, covering survey numbers 41/3, 41/4, 41/5 and 41/6.
HMDA final layout: Final Layout Letter for the residential open-plot layout, dated 20 January, 2021 in the supplied extraction; records approval number 000228/LO/Plg/HMDA/2018.
HMDA Occupancy Certificate: Architect’s Form–1A records certificate 037930/LT/SMD/FLT/U6/HMDA/06082020, issued 20-01-2021.
Promoter declaration: Form B affidavit-cum-declaration for AVASA HILLS, dated 31st day of January 2019, including the promoter’s completion undertaking and project-account declarations.
Layout land-transfer records cited in final layout letter: Gift deed 11000/2020, dated 13-08-2020; relinquishment deed 12576/2020, dated 29-12-2020.
RERA-filed sample transaction documents: Partially completed allotment letter and agreement-for-sale documents are listed; supplied extracts leave material buyer, plot and transaction particulars blank.
Frequently asked questions
Is AVASA HILLS registered with Telangana RERA?
Yes. AVASA HILLS is registered with the Telangana Real Estate Regulatory Authority as P02400001224; the registration status is New Project.
Who is the developer of AVASA HILLS?
The promoter named in the RERA registration is YBR INFRA DEVELOPERS.
Where is AVASA HILLS located?
AVASA HILLS is in IBRAHIMPATNAM, Ramdaspalli, Rangareddy, Telangana (501510).
When will AVASA HILLS be completed?
The promoter's proposed date of completion filed with RERA is 01/11/2021. This is the promoter's declaration, not a guarantee.