Sign in

Avasa Nest

YBR INFRA PROJECTS · Rangareddy · RERA P02400006748

AVASA NEST is a plotted development in Ramdaspalli, Ibrahimpatnam Mandal, Ranga Reddy District. It is being developed by registered promoter YBR INFRA PROJECTS, a partnership. The final-layout record gives a total site area of 9105.86 sq.m and identifies 38 plots; no tower, block, floor or home configuration is stated. The project is registered under TG-RERA number P02400006748, and the promoter’s Form B declaration gives 8 June 2026 as the proposed completion date.

More from Ybr Infra Projects · 4 projects →

01What we found

Period endedTG-RERA registration ran to 8 Jun 2026 - check its extension on TG-RERA
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Ramdaspalli, Ibrahimpatnam, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameAVASA NEST RERA record
Project typePlotted development / open-plot layout RERA record RERA filing
Phase or registered portionNo phase number is disclosed; the registration and layout records identify the plotted project on the survey numbers listed below. RERA record
TG-RERA registrationP02400006748; granted 24 August 2023; recorded validity through 8 June 2026. This is registration validity, not a statement of current registration status or project completion. RERA record
Registered promoterYBR INFRA PROJECTS (also styled “Ybr Infra Projects” in the registration certificate); partnership. RERA filing Corporate record
RERA status in supplied recordThe certificate grants registration; it records no extension. The supplied record does not establish the project’s current portal status. Approvals record

Land and geographic identity

FieldRecord
Locality / revenue villageRamdaspalli; the approval documents also spell the village “Ramdaspalle.” RERA record RERA filing
Mandal / district / PINIbrahimpatnam / Ranga Reddy / 501510 RERA record
Project survey numbers and subdivisions41/17A/AA, 41/17EE/AA, 41/17EE/AA/1 RERA record Land records
Site-area figuresTotal site area 9105.86 sq.m; master-plan road-affected area 122.82 sq.m; net site area 8983.04 sq.m. RERA filing
Boundaries filed in the project recordEast: others’ land; west: others’ land; north: others’ land; south: road. RERA filing
Project PIN and locality in registration certificateRamdaspalli, Ibrahimpatnam, Ranga Reddy, 501510

Development identity

FieldRecord
Sanctioning authorityHMDA; the final-layout document identifies delegation to Adibatla Municipality / Municipal Corporation. Approvals record
Final layout approval012546/FLT/HMDA/2801/SMD/2023, dated 26 June 2024 Approvals record
Earlier layout document on file004766/LO/HMDA/0991/SMD/2023, dated 8 June 2023, described in the filed document as a draft layout letter. Approvals record
Approved built-up areaThe final-layout document records total built-up area as 0; this is a plotted layout, not a filed apartment-building scheme. RERA filing
Plots38 plots in the final-layout record. Layout record
Buildings, floors and parking levelsNo building count, floor configuration or parking-level schedule is disclosed in the supplied project record. RERA filing
Layout land-use figuresPlotted area 5968.22 sq.m; roads 2036.31 sq.m; open space 673.87 sq.m; social infrastructure 229.19 sq.m; utilities 75.44 sq.m; amenities area 0. Layout record

Offering and status

FieldRecord
Offering in the registered projectPlots; the final layout identifies 38 plots. Unit-wise plot schedule and registered plot-price/size details are not provided in the RERA information supplied here. RERA filing Layout record
RERA-reported booked / available countsNot disclosed in the supplied extract. RERA filing
Promoter-declared completion date8 June 2026, stated in the Form B declaration; the RERA registration certificate also gives 8 June 2026 as its validity end date. These are separate records and neither establishes current completion by itself.
Completion / OC recordThe final-layout document contains an “Occupancy Certificate Number” field showing 012546/FLT/HMDA/2801/SMD/2023 dated 26 June 2024 and states that the project was completed in all aspects. The supplied information does not establish a separate building-level occupancy certificate; the project is a plotted layout.
Construction or development progressNo independently verified current site-progress assessment is supplied. RERA amenities Document index

2. The project story

AVASA NEST is a plotted residential layout in Ramdaspalli village, Ibrahimpatnam Mandal, Ranga Reddy District. Its registered project land is identified as survey numbers 41/17A/AA, 41/17EE/AA and 41/17EE/AA/1. The final HMDA layout record describes an open-plot development with 38 plots, internal roads, open space, social infrastructure and utility land. RERA record Land records

The final-layout document records the layout permission and states that roads, open spaces, social infrastructure and utilities were handed over to the local body by registered gift deed; it also records a relinquishment deed concerning mortgaged plots. Separately, the RERA-filed Form B is the promoter’s declaration that the project would be completed by 8 June 2026. The supplied material does not include an independent, current on-site progress report.

The layout record does not describe residential buildings, villas, apartment blocks or their construction. A separate RERA-filed completion statement says the project was completed in all aspects, while the approval document identifies the development as a plotted layout; no separate building-level OC evidence is included in the supplied extract.

3. Master plan, architecture & building design

The approved development is an open-plot layout, rather than a building scheme. The final-layout record gives a total site area of 9105.86 sq.m, including 122.82 sq.m affected by a master-plan road, and a net site area of 8983.04 sq.m. It records 38 plots and a total built-up area of 0.

The layout land-use figures recorded in the final-layout document are:

Layout useArea
Plotted area5968.22 sq.m
Layout roads2036.31 sq.m
Open space / park673.87 sq.m
Social infrastructure229.19 sq.m
Utilities75.44 sq.m
Amenities area0

The final-layout document specifies residential use for the plots and describes roads, open spaces, social infrastructure and utilities as layout components. It does not provide a building arrangement, building footprint, floor configuration, tower height, flats per floor, lifts, stairs or phase-wise building plan.

4. Homes, configurations & floor plans

This is a plotted project. The final-layout approval records 38 plots; the supplied RERA extract does not provide a RERA-filed plot-by-plot size schedule or booked/available plot count. RERA filing

The layout drawing has a software-derived plot schedule covering 38 plots, with sizes from 137.64 sq.m (164.6 sq.yd) to 267.07 sq.m (319.4 sq.yd). The median is 144.93 sq.m (173.3 sq.yd). These are drawing-derived measurements, not RERA-filed saleable-area figures. Layout record

The available drawing-derived size bands are:

Plot-size bandNumber of plots
150–200 sq.yd (125–167 sq.m)32
200–250 sq.yd (167–209 sq.m)2
250–300 sq.yd (209–251 sq.m)1
300–400 sq.yd (251–334 sq.m)3

Layout record

The floor-plan records contain two layout sheets and no apartment floor plans. Apartment carpet-area, balcony, utility-area and common-area loading figures therefore do not apply in the supplied evidence. The plotted-area schedule is software-read from the drawing and should be checked against the approved drawing. Floor plans Layout record

5. Parking & vehicle circulation

The supplied project evidence does not state sanctioned car or two-wheeler parking counts, visitor or accessible parking, plot-specific parking allocation, EV charging, or parking structures. No building or parking-level plan is provided.

The draft layout letter specifies road widths of 18 mts and 60 feet, and requires roads to remain open for accessibility to neighbouring sites. The final-layout document also states that roads are to remain open for free public access. These are layout-road provisions; the supplied documents do not establish individual plot parking rights or allocations.

6. Amenities, recreation & open spaces

Landscape / open space

Open space / park
Description / size673.87 sq.m in the final-layout land-use statement
Evidence sourceFinal layout
Declared progress / verified statusThe final-layout record states that open spaces were handed over to the local body by registered gift deed. It does not independently establish current landscaping condition.
Avenue/greenery and park development
Description / sizeThe draft letter requires open space to be developed and mentions park development and plantation/greenery.
Evidence sourceDraft layout letter
Declared progress / verified statusRequirement recorded; current physical condition not independently verified.

Convenience / community

Social infrastructure
Description / size229.19 sq.m
Evidence sourceFinal layout
Declared progress / verified statusThe final-layout record states that social infrastructure was handed over to the local body by registered gift deed; the specific facility or building is not described.
Amenities area
Description / size0 in the final-layout area statement
Evidence sourceFinal layout
Declared progress / verified statusNo separate amenities-area allocation is recorded.
Utilities land
Description / size75.44 sq.m; site utility infrastructure is addressed separately below.
Evidence sourceFinal layout
Declared progress / verified statusArea recorded; present operating status is not independently verified.

No clubhouse or indoor facility is identified in the supplied layout record. The RERA amenities extract marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/park and street lighting as available at 100%; it does not provide independent site verification. RERA amenities

7. Utilities, building services & safety

The final-layout record lists water supply, sewerage and drainage disposal systems, street lighting, rainwater-harvesting structures and other civic amenities as layout provisions. The draft layout letter also lists road formation, storm-water drains, underground drainage lines and a common septic tank / STP among the development works. These documents describe approved or required provisions; the supplied material does not independently verify current operating capacity or completion.

Water
Evidence in the project recordWater supply is listed in the final-layout parameters and RERA amenities extract; the draft letter also mentions an overhead tank. RERA amenities
Status limitationSource, storage capacity and current supply status are not stated.
Sewerage / drainage
Evidence in the project recordSewerage and drainage disposal are listed; the draft letter specifies underground drainage lines and a common septic tank / STP. Storm-water drains are also listed. RERA amenities
Status limitationNo capacity, reuse details or independently verified operating status is supplied.
Rainwater harvesting
Evidence in the project recordListed in the final-layout parameters; the draft letter refers to rainwater-harvesting pits.
Status limitationQuantity and completion status are not established by the supplied material.
Electricity / lighting
Evidence in the project recordThe final-layout record lists street lighting and other civic amenities; the draft letter lists a transformer.
Status limitationSupply capacity, backup and current service status are not disclosed.
Waste management
Evidence in the project recordThe draft letter lists solid-waste and bio-compost provisions.
Status limitationCapacity and implementation status are not independently verified.
Fire and accessibility
Evidence in the project recordNo project-specific fire-system details or accessibility features are established in the supplied material.
Status limitationNot disclosed in the supplied project documents.

8. Location, access & connectivity

The registered project location is Ramdaspalli, Ibrahimpatnam Mandal, Ranga Reddy District, PIN 501510. The project parcel centroid supplied with the location data is 17.23451, 78.63088. RERA record Location record

The final-layout documents identify roads within the layout and require access to neighbouring sites and free public access along the roads. The supplied location data lists the nearest sampled Outer Ring Road interchange at approximately 8.6 km. Location record

No public-transport routes or measured distances to other landmarks are included in the supplied project location data. Location record

9. Developer & development status

The registered promoter is YBR INFRA PROJECTS, identified in the project record as a partnership. The supplied corporate identifier is GSTIN 36AACFY2341N1ZW. The project documents identify Y.BHAKTHAVATHSAL REDDY as the promoter representative / authorised signatory. Corporate record RERA filing

The RERA certificate lists the promoter office as Village: Mallikarjun clny, Mandal: Saroornagar, District: Ranga Reddy, Pin: 500079. The project-record address fields separately list 2nd Floor, Plot No. 42, Sagar Ring Road, Ramdaspalli, Ibrahimpatnam, Ranga Reddy, 501510. Corporate record RERA filing

The supplied RERA record does not state plot-wise bookings, sales availability or an independently verified current development-progress percentage. The promoter’s Form B declaration gives 8 June 2026 as the project completion undertaking; the registration certificate gives the same date as the end of registration validity.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400006748; issued 24 August 2023; validity to 8 June 2026
What the supplied document establishesRegistration of AVASA NEST under section 5, with listed conditions including the separate-account requirement.
Draft layout letter
Identifier / date004766/LO/HMDA/0991/SMD/2023; 8 June 2023
What the supplied document establishesDraft layout letter for the plotted development, including the draft area statement and development conditions.
Final layout permission
Identifier / date012546/FLT/HMDA/2801/SMD/2023; 26 June 2024
What the supplied document establishesFinal HMDA layout permission for the 38-plot layout on the identified survey numbers.
Gift deed referenced in final layout record
Identifier / date7399/2023; 26 May 2023
What the supplied document establishesThe final-layout document records roads, open spaces, social infrastructure and utilities as handed over to the local body by registered gift deed.
Relinquishment deed referenced in final layout record
Identifier / date7783/2024; 19 June 2024
What the supplied document establishesThe final-layout document records a relinquishment deed concerning mortgaged plots.
Form B promoter declaration
Identifier / date29 June 2023
What the supplied document establishesPromoter declaration concerning title, encumbrances, project funding and completion undertaking.
Architect’s completion / final-layout document
Identifier / dateForm–1A / final layout record
What the supplied document establishesThe document states the project was completed in all aspects and includes an “Occupancy Certificate Number” field; the supplied extract does not establish a separate building-level OC.

The supplied record includes an earlier draft layout letter and a final-layout permission, as well as the RERA registration certificate and promoter declaration. Detailed title, encumbrance, approval-condition and legal analysis is addressed in the corresponding report sections.

Frequently asked questions

Is AVASA NEST registered with Telangana RERA?

Yes. AVASA NEST is registered with the Telangana Real Estate Regulatory Authority as P02400006748; the registration status is New Project.

Who is the developer of AVASA NEST?

The promoter named in the RERA registration is YBR INFRA PROJECTS.

Where is AVASA NEST located?

AVASA NEST is in RAMDASPALLI, Ibrahimpatnam, Rangareddy, Telangana (501510).

When will AVASA NEST be completed?

The promoter's proposed date of completion filed with RERA is 08/06/2026. This is the promoter's declaration, not a guarantee.

More projects in Ramdaspalli