BABUKHAN TECHPARK TOWER ONE is a commercial project in KOKAPEET, Gandipet mandal, Ranga Reddy district, developed by the registered promoter BABUKHAN HEIGHTS, a partnership. The project record gives a total area of 43,906.69 sq m and a net area of 41,554.71 sq m, with one building comprising 4 cellar + 1 ground + 13 upper floors. TG-RERA lists 13 COMMERCIAL OFFICE units, with a saleable area of 4,001.69 sq m per unit. The TG-RERA registration number is P02400002638, and the project record gives a proposed completion date of 30 April 2027.

01What we found

RegisteredTG-RERA - valid till 30 Dec 2026
37documents on file - each fact links to its page
1court case on this project's land (survey 106, Kokapet)
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldTG-RERA record
Registered project nameBABUKHAN TECHPARK TOWER ONE RERA record
Project typeCommercial RERA record RERA filing
Phase / registered portionOne registered project; the record identifies one proposed building. No separate phase name is disclosed. RERA filing RERA unit table
TG-RERA registrationP02400002638 RERA record
Registration validity3 March 2021–30 December 2026; the certificate says five years and states that registration may be extended by the Authority. This is the registration-validity period, not the project completion deadline. RERA record
Registered promoterBABUKHAN HEIGHTS, a partnership RERA record Corporate record
RERA statusRegistered; the supplied record labels the project “New Project.” RERA record

Land and geographic identity

FieldTG-RERA / land record
LocalityKOKAPEET / Kokapet RERA record RERA filing
Revenue villagekoKapet (also written Kokapet in the filed approval documents) RERA record RERA filing
MandalGandipet in the project record; the approval document also refers to Narsingi Municipality-ORRGC Mandal. RERA record
District / PINRanga Reddy / 500075 RERA record RERA filing
Project survey number(s)Survey No. 106; no project subdivision is specified in the project identity record. RERA record RERA filing
Registered site extent41,554.71 sq m net area and 43,906.69 sq m total area, as entered in the project record. RERA filing
Approval-document extent41,554.65 sq m stated in the HMDA technical approval.
BoundariesEast: proposed 30 meters road; west: Sy. No. 90 and inlet nala and owners’ land; north: 12 meters road; south: Sy. No. 104. RERA filing

Development identity

FieldTG-RERA / approval record
Sanctioning authorityHMDA technical approval, followed by a building permit order from Narsingi Municipality. Approvals record
Principal technical approval027589/ZOA/C1/U6/HMDA/03092019, dated 30 December 2020. Approvals record
Building permitBA.NO: 36/2020-21, file G1/4545/2020-21, dated 08-02-2021. Approvals record
Approved built-up area49,132.77 sq m in the approval record; HMDA’s extracted parameters state 49,132.77, while the RERA project field records 49,132.79 sq m. RERA filing
Building countOne building/unit in the project record; one commercial IT office building in the approval description. RERA filing
Sanctioned floor configuration4 cellar + 1 ground + 13 upper floors.
Height57.23, as stated in the approval parameters; the supplied extract does not specify a unit.
Parking levelsCellars and stilts are approved for parking under the HMDA approval condition; the supplied record does not give a parking-space count.
Unit count13 commercial office units filed with TG-RERA. The approval condition says sanctioned unit numbers must not be increased without prior approval; the supplied extracted plan does not give a separate sanctioned unit count. RERA unit table

Offering and status

FieldTG-RERA record
Filed unit typeCOMMERCIAL OFFICE RERA unit table RERA unit details
Filed saleable area4,001.69 sq m per unit, as recorded for the 13 filed units RERA unit table RERA unit details
Booked / available0 booked and 13 available in the portal-derived record; no as-of date is supplied, so treat these counts as indicative rather than a live inventory confirmation. RERA unit table RERA unit details
Construction stageNot established by the supplied evidence. RERA amenity/infrastructure progress entries are recorded as 0%; this does not independently verify the site’s physical construction status. RERA amenities
Promoter-declared completion30 December 2026 in the Form-B declaration.
Completion date in project record30 April 2027. RERA record RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project evidence. The approval documents state that an occupancy certificate is required before occupation. Document index

2. The project story

  • BABUKHAN TECHPARK TOWER ONE is a TG-RERA-registered commercial project in Kokapet, koKapet revenue village, Gandipet mandal, Ranga Reddy district. The project record identifies Survey No. 106 and one proposed building; the filed approval describes a commercial IT office building. RERA record RERA filing RERA filing
  • The approved building configuration is four cellar levels, a ground floor and thirteen upper floors. TG-RERA lists 13 COMMERCIAL OFFICE units, with zero booked and 13 available in the portal-derived inventory; the inventory has no stated retrieval date. RERA unit details
  • The promoter’s Form-B declaration undertakes completion by 30 December 2026, while the project record gives 30 April 2027 as the proposed completion date. These are reported here as separate record entries; neither establishes actual construction progress. The supplied evidence does not include a site-progress inspection or an occupancy/completion certificate. RERA record RERA filing Document index

3. Master plan, architecture & building design

  • The project record gives a total site area of 43,906.69 sq m and net area of 41,554.71 sq m. The HMDA technical approval describes an extent of 41,554.65 sq m and approves 49,132.77 sq m of built-up area; the project field records approved built-up area as 49,132.79 sq m. These are the areas as stated in their respective records, not measures of saleable or carpet area. RERA filing RERA filing
  • The approval is for one commercial IT office building with four cellar levels, one ground floor and thirteen upper floors, and states a building height of 57.23 (unit not specified in the extract). It also identifies a 10% built-up-area mortgage provision of 4,915.81 sq m and a separate 5% additional built-up-area mortgage of 2,456 sq m in the second floors.
  • The approval extract lists a transformer, garbage house, rainwater-harvesting structure (percolation pit), sewage treatment plant, refuse chute, solar water-heating system, solar lighting system, tot-lot and open space. It does not supply a building footprint, floor-by-floor office arrangement, office dimensions, lift/stair counts, or a quantified common-area schedule.

4. Homes, configurations & floor plans

This is a commercial project; the table below presents the commercial units filed with TG-RERA.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
COMMERCIAL OFFICE130134,001.69 sq m per unitNot measured in the supplied drawingsNot supplied

RERA unit table RERA unit details Floor plans

The filed inventory is indicative because the portal record has no as-of date. Three floor-plan records are noted: two scans are pending measurement and one drawing is recorded as having no flats; no software-measured carpet areas are supplied. The drawing-measurement note distinguishes carpet area from RERA saleable area, which includes a share of common areas, but no project-specific measured carpet or loading figure is available here. RERA unit table Floor plans

5. Parking & vehicle circulation

The HMDA technical approval says the cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not converted or misused. Its extracted building configuration records four cellar levels; the building permit also records four cellars, one ground floor and thirteen upper floors. No number of car or two-wheeler spaces, visitor or accessible bays, ramp arrangement, EV charging provision, or unit-wise parking allocation is supplied. A drawn or sanctioned parking area does not by itself establish exclusive parking rights for a purchaser. Document index

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
TransformerOn-site provision specified; no capacity statedHMDA technical approvalApproval-listed provision; installation status not verified
Garbage houseOn-site provision specifiedHMDA technical approvalApproval-listed provision; completion not verified
Rainwater harvestingPercolation pitHMDA technical approvalApproval-listed provision; completion not verified
Sewage treatment plantSTP; no capacity statedHMDA technical approvalApproval-listed provision; completion not verified
Refuse chuteListed in the approval extractHMDA technical approvalApproval-listed provision; completion not verified
Solar water heatingListed in the approval extractHMDA technical approvalApproval-listed provision; completion not verified
Solar lightingListed in the approval extractHMDA technical approvalApproval-listed provision; completion not verified
Tot-lotListed in the approval extractHMDA technical approvalApproval-listed provision; completion not verified
Open spaceListed in the approval extract; no area statedHMDA technical approvalApproval-listed provision; completion not verified

The TG-RERA amenity record lists 14 project-infrastructure categories, including roads and footpaths, water supply, sewerage, storm-water drains, green strip/tot-lot/park, street lighting, community buildings, waste management, rainwater harvesting, energy management, fire safety, electrical facilities and recreational open space. Each is recorded at 0% progress in that record. The supplied evidence does not establish that any facility is complete or independently verified. RERA amenities

7. Utilities, building services & safety

  • The approval extract lists a transformer, sewage treatment plant, rainwater-harvesting percolation pit, refuse chute, solar water heating and solar lighting. It does not provide capacities, operating details, water source or storage, sewage-reuse arrangements, storm-water system specifications, backup-power provision, or building-service schedules.
  • The approval requires a garbage house and includes fire and structural-safety-related conditions; however, the supplied extracts do not detail fire equipment, escape stairs, lift provision, accessibility measures, CCTV, security arrangements or waste-segregation procedures. The listed facilities and approval conditions are not evidence of installation, commissioning or independent statutory-compliance verification. RERA amenities

8. Location, access & connectivity

The registered location is KOKAPEET, koKapet village, Gandipet mandal, Ranga Reddy district, PIN 500075. The registered site boundaries identify a proposed 30 meters road to the east, a 12 meters road to the north, Survey No. 104 to the south, and Survey No. 90, an inlet nala and owners’ land to the west. RERA record RERA filing RERA filing

The supplied location record gives these mapped distances: Capgemini 0.2 km; Golden Mile Park 0.8 km; ICICI Bank 1.1 km; CBIT bus stop 1.4 km; Mahatma Gandhi Institute of Technology 1.5 km; unnamed school 1.9 km; Continental Hospitals 2.0 km; and Financial District (Nanakramguda) 2.1 km. These are recorded distances from the supplied location data; no travel times or independent route verification are provided. Location record

9. Developer & development status

  • The registered promoter is BABUKHAN HEIGHTS, identified as a partnership. The project record gives its address as BABUKHAN HOUSE, Road No. 10, KOKAPEET, Gandipet, Ranga Reddy, PIN 500075. The TG-RERA certificate lists a promoter-office address as Hyderabad, PIN 500034; no official contact number, email address or website is supplied in the project evidence. Corporate record Parties record
  • The project record names Mustafa Mohd Babukhan as authorized signatory and lists Ghiasuddin Babukhan, Shujathunnisa Begum, Mohsin A K Babukhan, Asra Fatima and Mansoor Babukhan as partners. Parties record
  • The promoter’s Form-B affidavit declares a completion undertaking of 30 December 2026. The project record separately states a proposed completion date of 30 April 2027. No phase-wise completion schedule, verified construction progress, or occupancy/completion certificate is supplied. RERA record RERA filing Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400002638; issued 03/03/2021; stated validity to 30/12/2026
What the supplied record establishesForm C registration for BABUKHAN TECHPARK TOWER ONE and BABUKHAN HEIGHTS.
HMDA technical approval
Identifier / date027589/ZOA/C1/U6/HMDA/03092019; 30/12/2020
What the supplied record establishesTechnical approval for the commercial IT office building on Survey No. 106, including the stated floor configuration and approval conditions.
Narsingi Municipality building permit
Identifier / dateBA.NO: 36/2020-21; file G1/4545/2020-21; 08-02-2021
What the supplied record establishesBuilding permit order for a commercial building on Survey No. 106.
Form-B declaration
Identifier / dateDeclaration dated January 2021
What the supplied record establishesPromoter declaration covering title, encumbrance, project-fund and completion undertakings.
Encumbrance statement filed with RERA
Identifier / dateSearch period 01-10-2007 to 29-12-2020
What the supplied record establishesFiled statement records a mortgage deed, 8654/2020, with BABUKHAN HEIGHTS as executant and HMDA as claimant. This is a historical filed record, not a current encumbrance search.
Title and supporting records
Identifier / dateMultiple filed title documents, including advocate report 151283 and sale-deed/title materials
What the supplied record establishesThe supplied file includes an advocate’s title opinion and title materials for Survey No. 106.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesNo such certificate appears in the evidence provided for this overview. Document index

The HMDA technical approval also refers to structural-drawing clearance CED/2020/HMDA/21 dated 17.06.2020, environmental-clearance reference SEIAA/TS/OL/RRD-315/2019-64, an Energy Conservation Building Code certificate reference 19/TPA-ECBC/GHMC//2017, and registered road-affected-area gift deed 8159/2020. These references are recorded in the approval extract; the underlying certificates or deed are not separately included in the supplied overview documents.

Frequently asked questions

Is BABUKHAN TECHPARK TOWER ONE registered with Telangana RERA?

Yes. BABUKHAN TECHPARK TOWER ONE is registered with the Telangana Real Estate Regulatory Authority as P02400002638; the registration status is New Project.

Who is the developer of BABUKHAN TECHPARK TOWER ONE?

The promoter named in the RERA registration is BABUKHAN HEIGHTS.

Where is BABUKHAN TECHPARK TOWER ONE located?

BABUKHAN TECHPARK TOWER ONE is in KOKAPEET, koKapet, Gandipet, Rangareddy, Telangana (500075).

When will BABUKHAN TECHPARK TOWER ONE be completed?

The promoter's proposed date of completion filed with RERA is 30/04/2027. This is the promoter's declaration, not a guarantee.