BK s JEWEL HOMES

BK INFRA PROJECTS · Medchal-Malkajgiri · RERA P02200004035

BK s JEWEL HOMES is a residential apartment project in DUNDIGAL, Dundigal Muncipality Mandal, Medchal-Malkajgiri. The registered promoter is BK INFRA PROJECTS. The project is on 1656.81 sqmts of land and comprises one residential building with 1 Stilt + 5 Upper Floors and 40 2BHK units. It is registered with TG-RERA under P02200004035, and the stated project completion date is 23/02/2025.

More from Bk Infra Projects · 6 projects →

01What we found

Period endedTG-RERA registration ran to 23 Feb 2025 - check its extension on TG-RERA
12documents on file - each fact links to its page
2court cases on this project's land (survey 538, Dundigal)
7items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Dundigal, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered project nameBK s JEWEL HOMES RERA record
Project type / registered portionResidential apartment project; the record identifies one building. A separately named phase or phase number is not disclosed. RERA record RERA filing Document index
TG-RERA registrationP02200004035; registration certificate states validity from 31/01/2022 to 23/02/2025. The supplied record shows no extension. Registration validity is distinct from the building-permission completion date and from occupancy certification. RERA record Approvals record
Registered promoterBK INFRA PROJECTS; RERA filing identifies the entity type as Partnership. RERA record RERA filing Corporate record
RERA status in supplied recordCertificate records registration for three years; its stated validity ended 23/02/2025, with extended: false in the supplied certificate extraction. Current status should be checked against TG-RERA. Approvals record

Land and geographic identity

FieldProject record
Locality / site descriptionRERA filing: DUNDIGAL; approval documents describe the site as Bowrampet Village. RERA record RERA filing
Revenue villageBowrampet Village in the supplied approval/title documents; project filing also identifies Dundigal. RERA filing
MandalApproval document 195921 states Dundigal Muncipality Mandal; the RERA land record does not disclose a mandal. Land records
District / PINProject filing: Medchal-Malkajgiri, PIN 500043. RERA record RERA filing
Survey number(s) / subdivisionsSurvey No. 538; no subdivision is stated in the supplied project record. RERA record Land records Cadastral map
Plots and site extentPlots E-143, E-144, E-145, E-151, E-152 & E-153; RERA land record gives total and net area as 1656.81 sqmts, affected area 0.0. Approval document 195921 states 1,656.81 Sq. Mt. RERA filing
Boundaries in RERA filingEast: ROAD WIDTH - 12; West: ROAD WIDTH - 9; North: CTS NO; South: PLOT NO E - 150 E - 146. RERA filing

Development identity

FieldProject record
Sanctioning / technical approval authorityHMDA technical approval, with building plans to be sanctioned by the delegated local authority; a separate supplied building-permission document names Dundigal Municipality. Approvals record
Principal approvalHMDA technical approval 036136/MED/R1/U6/HMDA/01062020, dated 23/02/2021. Approvals record
Local building permission recordedGI/DM/3612/8P/2021, file 3613; the extracted date is recorded only as “T 2021”. Approvals record
Building count / useOne residential building in the RERA record; approval describes a residential apartment building. RERA filing
Sanctioned floors1 Stilt + 5 Upper Floors. No basement or podium is stated in the supplied approval extraction.
Approved built-up areaRERA fields state 4104.55 sqmts approved built-up area. The HMDA technical-approval extraction separately lists total built-up area 5121.24 Sq.mts and “Built up Area” 4053.65; the local-permission extraction lists 900.66 and 4053.65 Sqm. These are figures recorded in the respective approval materials; the supplied record does not explain their component definitions. RERA filing
Parking levels / countStilt is part of the recorded floor configuration. RERA unit data marks the 40 units as mortgaged; a sanctioned parking-space count or unit-by-unit allocation is not established in the supplied project records. RERA unit table

Offering and status

FieldProject record
RERA-filed configuration and count2BHK, 40 units; booked 0, available 40 as last read from the TG-RERA portal. The portal record has no as-of date, so counts are indicative. RERA unit details RERA unit table
RERA-filed saleable area23.51 sqm per unit as recorded in the supplied RERA unit data. RERA unit table RERA unit table
Declared completion dateForm B and the registration certificate state 23-02-2025 / 23/02/2025 as the project completion date.
Building-permission completion dateDocument 196419 states construction was to be completed before 29.09.2027. This is a building-permission date, not evidence of completion or occupancy certification.
Construction stage / OC statusNo independently verified construction-stage report or occupancy/completion certificate is supplied. The approval documents require an occupancy certificate before occupation.

2. The project story

The RERA record describes a single-building residential apartment project on Survey No. 538 at plots E-143, E-144, E-145, E-151, E-152 and E-153. The building permissions describe 1 Stilt + 5 Upper Floors and residential use. The RERA filing lists 40 two-bedroom units; its portal-derived booking and availability figures are indicative because the record supplies no reading date. RERA record RERA filing RERA unit details

The project’s Form B declaration gives 23-02-2025 as the promoter’s completion undertaking. The local building-permission extraction separately records a completion-before date of 29.09.2027. Neither date establishes that construction is complete. No site-verified progress evidence or occupancy/completion certificate is included here; the HMDA technical approval states that an occupancy certificate is compulsory before occupation.

3. Master plan, architecture & building design

The supplied approvals describe one residential building with 1 Stilt + 5 Upper Floors. HMDA’s technical approval is for the six named plots in Survey No. 538 and records a site extent of 1,656.81 Sq. Mt. The RERA filing reports approved built-up area of 4104.55 sqmts; the technical-approval extraction also records 5121.24 Sq.mts as total/proposed built-up area and 4053.65 as built-up area. These are retained as the figures stated in their respective records; no supplied drawing or explanation resolves their measurement components. RERA filing

No usable floor-plan measurements are available: the supplied drawing set contains two drawings, neither with flats, and none measured. Accordingly, the record does not establish the building footprint, flats per floor, lift or stair arrangement, entrances, circulation, internal roads, landscaping, open-space area or apartment/common-area distribution. Floor plans RERA amenities

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK4004023.51 sqmNot measuredNot supplied

Unit count, booking figures and saleable area above are from the supplied TG-RERA unit data. Booking/availability is portal-derived, indicative and undated. The floor-plan drawings were not measurable and contain no flats, so no software-measured carpet area or room dimensions can be reported. Carpet area is a different measure from RERA saleable area; no project-specific loading figure is supplied. RERA unit details RERA unit table Floor plans

5. Parking & vehicle circulation

The approval documents identify 1 Stilt + 5 Upper Floors, but the supplied project-specific sanction extraction does not establish the number of parking spaces or their allocation among residents, visitors or individual units. RERA unit data marks the 40 units as mortgaged; that does not establish a parking allocation. The vendor record mentions open and covered parking, including a claim of 39 numbers of covered parking, but this is not substantiated by the supplied RERA approval or allocation records and is not treated here as a sanctioned count. No ramp, driveway, pedestrian-separation, accessible-parking or EV-charging details are supplied. RERA unit table Promoter website

6. Amenities, recreation & open spaces

The RERA amenity record lists facilities and site services, but gives 0% progress for each item; this is not evidence of completion. The approval extraction also lists certain site provisions. No supplied source independently verifies that any facility is complete or operational.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
TransformerSize/capacity not statedHMDA technical-approval extractionListed in approval material; completion not verified.
Garbage HouseSize/capacity not statedHMDA technical-approval extractionListed in approval material; completion not verified.
Rain Water harvesting structuresQuantity/capacity not stated in HMDA extractionHMDA technical-approval extraction; RERA amenity record lists water conservation/rain-water harvesting as “YES”RERA record shows 0% progress; completion not verified. RERA amenities
ETPCapacity not statedHMDA technical-approval extractionApproval material states the applicant shall provide the ETP; completion not verified.
Internal Roads & FootpathsSize/length not statedRERA amenity record0% progress; completion not verified. RERA amenities
Water SupplySource/storage/treatment details not statedRERA amenity recordListed as “YES”; 0% progress; completion not verified. RERA amenities
Sewerage (Chamber, Lines, Septic Tank, STP)Type/capacity not establishedRERA amenity recordListed as “YES”; 0% progress; completion not verified. RERA amenities
Storm Water DrainsDetails not statedRERA amenity record0% progress; completion not verified. RERA amenities
Green Strip/TOT LOT/ParkArea and facilities not statedRERA amenity record0% progress; completion not verified. RERA amenities
Street LightingDetails not statedRERA amenity record0% progress; completion not verified. RERA amenities
Community BuildingsDetails/size not statedRERA amenity record0% progress; completion not verified. RERA amenities
Treatment and disposal of sewage and sullage waterDetails/capacity not statedRERA amenity record0% progress; completion not verified. RERA amenities
Solid waste management and disposalDetails/capacity not statedRERA amenity record0% progress; completion not verified. RERA amenities
Energy managementDetails not statedRERA amenity record0% progress; completion not verified. RERA amenities
Fire protection and fire safety requirementsSystems/details not statedRERA amenity record0% progress; completion not verified. RERA amenities
Electrical meter room, sub-station, receiving stationDetails/capacity not statedRERA amenity record0% progress; completion not verified. RERA amenities
Aggregate recreational open spaceArea not statedRERA amenity record0% progress; completion not verified. RERA amenities

7. Utilities, building services & safety

The RERA amenity record lists water supply, sewerage, storm-water drains, rain-water harvesting/water conservation, energy management, fire protection, electrical meter/sub-station/receiving facilities and solid-waste management. It records water supply, sewerage and rain-water harvesting as “YES,” but gives 0% progress for all listed items; no capacities, technical details or independent completion verification are supplied. RERA amenities

The HMDA technical-approval extraction lists a transformer, garbage house, rain-water harvesting structures and ETP, and states that the ETP is to be provided. The other supplied approval extraction records 11 rain-water harvesting pits (RWHPs). The available material does not establish installation or operational status, water source/storage or treatment capacity, sewerage-treatment capacity, power-backup arrangements, lift details, fire-system specifications, waste-segregation arrangements, CCTV/security provisions or accessibility features. The approval states that an occupancy certificate is compulsory before occupation. RERA amenities

8. Location, access & connectivity

The RERA record identifies the project locality as DUNDIGAL, district Medchal-Malkajgiri, PIN 500043. The supplied approval documents describe the site as Bowrampet Village, Dundigal Municipality. The HMDA technical-approval extraction records an 18 mt. road width; the project filing gives boundary road widths as 12 to the east and 9 to the west, without stating units in those boundary fields. RERA record RERA filing RERA filing

No project-verified public-transport details, named approach route or measured distance to a useful landmark are supplied. The location record contains a distance of 1.2 km to Financial District (Nanakramguda), but the supplied evidence does not establish a route or travel time; it should not be read as a verified travel-time claim. Location record

9. Developer & development status

The registered promoter is BK INFRA PROJECTS, identified in the project filing as a partnership. Its supplied GSTIN is 36AAUFB1258R1ZN. The filing gives the promoter address as DHRUVA DREAMZ APT, ANDHRA BANK LANE, BOWRAMPET, DUNDIGAL, Medchal-Malkajgiri, 500043. It names KADULURI KASHINATH GOUD as authorized signatory and MARUPAKULA BUCHI LINGAM GOUD as partner. Corporate record Parties record RERA filing

The promoter’s Form B declaration states a completion period ending 23-02-2025. The supplied record contains no verified construction-progress report or occupancy/completion certificate; the building-permission extraction separately records completion before 29.09.2027. No official contact email, telephone number or promoter website is supplied. Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200004035, issued 31/01/2022; stated validity through 23/02/2025
What the supplied record establishesForm C registration for BK s JEWEL HOMES, with stated three-year validity and registration conditions. The supplied extraction records no extension.
HMDA technical approval
Identifier / date036136/MED/R1/U6/HMDA/01062020, dated 23/02/2021
What the supplied record establishesTechnical approval for the residential building on Survey No. 538; records 1 Stilt + 5, built-up-area figures and an HMDA mortgage of built-up area. It states that plans are to be sanctioned by the Executive Authority and that an occupancy certificate is required before occupation.
Registered HMDA mortgage
Identifier / date589/2021, dated 4/1/2021
What the supplied record establishesApproval extraction records 10.00% of built-up area, 408.23 Sq.mtrs, on the second floor, mortgaged in favour of the Metropolitan Commissioner, HMDA.
Dundigal Municipality building-permission record
Identifier / dateGI/DM/3612/8P/2021, file 3613; extracted date “T 2021”
What the supplied record establishesRecords a residential building with 1 Stilt + 5 Upper Floors and validity/completion date 29.09.2027.
Promoter declaration, Form B
Identifier / dateCompletion undertaking 23-02-2025
What the supplied record establishesPromoter declaration concerning title, encumbrances, project funds, pending approvals and completion period. It is a promoter declaration, not independent verification.
Layout plan / floor-plan material
Identifier / dateLayout-plan document 195919; floor-plan set records two drawings, none with flats
What the supplied record establishesThe layout-plan document is not extracted; supplied floor-plan data reports no measurable flat drawings. Document index Floor plans

The supplied materials do not include an occupancy certificate, completion certificate, or a project-specific approval record establishing that the building is complete and fit for occupation.

Frequently asked questions

Is BK s JEWEL HOMES registered with Telangana RERA?

Yes. BK s JEWEL HOMES is registered with the Telangana Real Estate Regulatory Authority as P02200004035; the registration status is New Project.

Who is the developer of BK s JEWEL HOMES?

The promoter named in the RERA registration is BK INFRA PROJECTS.

Where is BK s JEWEL HOMES located?

BK s JEWEL HOMES is in DUNDIGAL, Medchal-Malkajgiri, Telangana (500043).

When will BK s JEWEL HOMES be completed?

The promoter's proposed date of completion filed with RERA is 23/02/2025. This is the promoter's declaration, not a guarantee.