BREEZY HEIGHTS is a residential apartment project in SHANKARPALLY, Shankarpalle mandal, Ranga Reddy district, developed by registered promoter BUILD SMILES INFRA PRIVATE LIMITED. It has a registered site extent of 2,014.14 sq. m and one building with 1 Stilt + 5 upper floors, comprising 40 homes: 30 2BHK units of 116.12 sq. m saleable area each and 10 3BHK units of 143.99 sq. m saleable area each. Its TG-RERA registration number is P02400005908, and its declared completion date is 26 November 2025.

More from Build Smiles Infra Pvt Ltd · 2 projects →

01What we found

Period endedTG-RERA registration ran to 26 Nov 2025 - check its extension on TG-RERA
11documents on file - each fact links to its page
2court cases on this project's land (survey 230, Shankarpally)
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project photo

1. Project at a glance

Project identity

FieldProject record
Registered project nameBREEZY HEIGHTS RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo phase designation disclosed; the registration record identifies one building RERA record RERA filing
TG-RERA registration numberP02400005908
Registration validity28/03/2023 to 26/11/2025; the certificate states two years and is not marked extended in the supplied record
Registered promoterBUILD SMILES INFRA PRIVATE LIMITED RERA record
RERA status in supplied recordNew Project; the registration end date has passed. No extension or current registration-status confirmation is supplied. RERA filing

Land and geographic identity

FieldProject record
LocalitySHANKARPALLY RERA record RERA filing
Revenue villageShankarpally RERA record RERA filing
MandalShankarpalle in the project identity record; the building-permit extraction states Shankarpally RERA record RERA filing
District / PINRanga Reddy / 501203 RERA record
Project survey numbers and subdivisionsSurvey Nos. 230/7/1 and 230/7/2 RERA record
Registered site extent2,014.14 sq. m RERA filing
Total / net land areaTotal area 2014.14 sq. m; net area 2014.14 sq. m; recorded affected area 0 sq. m RERA filing
Boundaries as filedEast: OPEN LAND; West: 40 FEET WIDE ROAD; North: OPEN LAND; South: OPEN LAND RERA filing

Development identity

FieldProject record
Sanctioning authorityHMDA building permission, delegated to Shankarpally Municipality / Municipal Corporation Approvals record
Principal approvalBuilding Permit Order No. 003585/BP/HMDA/0645/SKP/2022, approved 26 November 2022; proceedings No. 001854/BP/HMDA/SKP/2022 Approvals record
Approved built-up areaThe permit extraction records “Total Built up Area 4,892.94 Sq.mts” and “Proposed Built-up Area 3,971.25”; these are separately labelled in the permit record.
Building countOne building in the RERA land details; the permit names building A (KASTURI ANJAIAH) RERA filing
Sanctioned floor configuration1 Stilt + 5 upper floors; the permit separately records building height as 15, with no unit supplied for that figure
Parking levelStilt is designated exclusively for vehicle parking by the permit; no parking-space count is provided
Unit countsOne building and one proposed building unit are recorded in the RERA land details; the apartment inventory lists 40 homes (30 2BHK and 10 3BHK). RERA filing RERA unit table
Layout approvalNo LP number is present in the RERA record; the HMDA approved-layout lookup is reported unavailable from the public internet. HMDA

Offering and status

FieldProject record
RERA-filed configurations2BHK: 30 units, saleable area 116.12 sq. m each; 3BHK: 10 units, saleable area 143.99 sq. m each RERA unit table RERA filing
Booking / availabilityPortal counts show 0 booked and 30 available 2BHK units, and 0 booked and 10 available 3BHK units. The portal extract supplies no as-of date; treat these counts as indicative. RERA unit table
Declared completion date26 November 2025, also stated in the promoter’s Form B completion undertaking RERA record
Construction stageNo site-verified construction-progress figure or construction-stage description is supplied. The RERA amenities record shows 0% against its listed items, but that is not an independently verified site-progress assessment. RERA amenities
Occupancy / completion certificateThe permit requires an occupancy certificate before occupation; the permit extraction records completion certified as false. No occupancy or completion certificate is supplied.

2. The project story

BREEZY HEIGHTS is registered as a residential apartment project in Shankarpally village, Ranga Reddy district, on Survey Nos. 230/7/1 and 230/7/2. The RERA record describes a single building with 40 apartments: 30 2BHK and 10 3BHK homes. The building permit authorizes one residential building, identified as A (KASTURI ANJAIAH), with a stilt level and five upper floors. RERA record RERA filing RERA unit table

The promoter’s Form B undertaking set 26 November 2025 as the completion date. The supplied record does not establish construction progress on site, completion, or an issued occupancy certificate. The building permit states that an occupancy certificate is required before occupation. Registration validity, the promoter’s completion undertaking, and the absence of an occupancy certificate are separate matters; the supplied material does not confirm an extension or current RERA registration status.

3. Master plan, architecture & building design

The project site is recorded as 2014.14 sq. m, with net area also 2014.14 sq. m and affected area recorded as 0 sq. m. The building-permit extraction gives two distinct built-up figures: total built-up area of 4,892.94 sq. m and proposed built-up area of 3,971.25 sq. m. The supplied record does not define those figures further, so they should not be treated as interchangeable. RERA filing

The sanctioned building is a single residential block with 1 Stilt + 5 upper floors. The permit records height as 15 without specifying a unit in the supplied extraction. It also requires construction in accordance with the technically approved building plans and does not permit parking or construction in setback areas.

No extracted drawing information is supplied for the building footprint, number of apartments per floor, lift or stair arrangement, entrances, exits, internal circulation, landscaping, open-space dimensions, or residential/common-area distribution. The listed layout-plan filing is not extracted, and no LP number is disclosed in the RERA record. HMDA

4. Homes, configurations & floor plans

The RERA-filed unit types, counts and saleable areas are shown below. Drawing-based carpet measurements are software-measured from the submitted floor-plan record, not RERA disclosures; the measurement source itself says the drawing geometry needs review. Carpet area and saleable area are different measures: the supplied notes describe saleable area as including a home’s share of common areas. RERA unit table Floor plans RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK30030116.12 sq. mSoftware-measured range 64.2–84.0 sq. m; median 69.4 sq. m40%
3BHK10010143.99 sq. mSoftware-measured range 88.8–89.0 sq. m; median 88.9 sq. m38%

The drawing extraction includes a typical 2, 3, 4 and 5 floor-plan panel for a measured 2BHK design, and a first-floor plan panel for a measured 3BHK design. In the sampled 2BHK plan, the listed spaces include living/dining, kitchen, two bedrooms, toilets, a utility and a balcony. The sampled 3BHK plan lists living, dining, kitchen, bedrooms, toilets and a utility. These are drawing-derived descriptions, not a guarantee that every unit has the same arrangement. RERA unit details

The drawing-measurement dataset also identifies 1BHK designs, but does not match that configuration to the RERA-filed inventory. Accordingly, no 1BHK count or RERA-filed 1BHK offering is established here. Floor plans RERA unit details

5. Parking & vehicle circulation

The building permit designates the stilt exclusively for vehicle parking, without partition walls or rolling shutters. It also states that no parking or construction is to be placed in setback areas. The RERA and permit material supplied here does not establish the number of car or two-wheeler spaces, visitor or accessible spaces, parking allocation to individual units, or whether any parking arrangement is exclusive.

The permit records a minimum approach-road width of 4.5 m and requires the approach road indicated in the plan to be developed and maintained as a black-topped road before occupancy-certificate release. No extracted drawing information establishes ramps, separate pedestrian routes, parking entry/exit arrangements, or EV charging.

6. Amenities, recreation & open spaces

The RERA amenities record lists the following items. Its progress field is 0% for each listed item; this is the recorded declaration, not independent verification of site condition. The permit separately requires rainwater-harvesting structures, CCTV cameras and an STP. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water SupplyListed; no source, storage or capacity specifiedRERA amenitiesRERA record: 0%; not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)Listed; no capacity specifiedRERA amenitiesRERA record: 0%; permit also requires STP
Storm Water DrainsListed; no further detailsRERA amenitiesRERA record: 0%; not independently verified
Green Strip/TOT LOT/ParkListed; no area or design detailsRERA amenitiesRERA record: 0%; not independently verified
Street LightingListed; no further detailsRERA amenitiesRERA record: 0%; not independently verified
Community BuildingsListed; no size or facility detailsRERA amenitiesRERA record: 0%; not independently verified
Treatment and Disposal of Sewage and Sullage WaterListed; no treatment details or capacityRERA amenitiesRERA record: 0%; not independently verified
Solid Waste Management and DisposalListed; no system detailsRERA amenitiesRERA record: 0%; not independently verified
Water Conservation, Rain water HarvestingListed; no capacity detailsRERA amenitiesRERA record: 0%; permit requires rainwater-harvesting structures
Energy managementListed; no system detailsRERA amenitiesRERA record: 0%; not independently verified
Fire Protection and Fire Safety RequirementsListed; no equipment or system detailsRERA amenitiesRERA record: 0%; not independently verified
Electrical Meter Room, Sub-Station, Receiving StationListedRERA amenitiesRERA record: 0%; not independently verified
Aggregate area of recreational Open SpaceListed; area not suppliedRERA amenitiesRERA record: 0%; not independently verified
Internal Roads & FootpathsListed; no dimensions or surfacing detailsRERA amenitiesRERA record: 0%; not independently verified

No project-filed evidence supplied here establishes a clubhouse, gymnasium, children’s playground, garden, or other specific recreation facility as approved or delivered.

7. Utilities, building services & safety

The RERA amenities record lists water supply, sewerage, storm-water drains, sewage and sullage treatment, solid-waste management, rainwater harvesting, energy management, fire-safety requirements, and an electrical meter room/sub-station/receiving station. It does not provide system capacities, technical specifications, or verified completion status. RERA amenities

The building permit requires an STP, rainwater-harvesting structures and CCTV cameras. It also requires an occupancy certificate before occupation, a completion notice after building completion, and a compliance report to HMDA at the specified roof-stage milestones. These are permit conditions; the supplied record does not establish that the systems are installed or that the required certificates have been issued.

No supplied project record establishes water source or storage capacity, STP capacity or reuse arrangements, electrical-backup capacity, lift numbers or capacities, fire-system specifications, waste-segregation arrangements, accessibility provisions, or completed safety works. RERA amenities

8. Location, access & connectivity

The registered project location is Shankarpally village, Shankarpalle mandal, Ranga Reddy district, PIN 501203; the RERA record gives locality as SHANKARPALLY. The site boundaries identify a 40 FEET WIDE ROAD on the west and OPEN LAND on the other three sides. RERA record RERA filing RERA filing

A location record gives the nearest sampled Outer Ring Road interchange at approximately 15.5 km. The building permit specifies a minimum approach-road width of 4.5 m and requires the road shown in the plan to be developed and maintained as black-topped before occupancy-certificate release. No public-transport route or measured distance to other landmarks is supplied. Location record

9. Developer & development status

The registered promoter is BUILD SMILES INFRA PRIVATE LIMITED, a company. Its supplied corporate identifier is GSTIN 36AAKCB1200E2ZO. The project record gives the promoter address as FLOATILLA APARTMENTS, ALKAPOOR TOWNSHIP, SHANKARPALLY, SHANKARPALLY, Shankarpalle, Ranga Reddy, 501203. The registration certificate separately records a promoter office at Neknapur, Gandipet, Ranga Reddy, PIN 500089. Corporate record RERA record

The RERA record identifies JITENDER MERUGU as authorized signatory and GOURI SRUJANA MATTA as a director. The promoter’s Form B, signed by Jitender Merugu, declares completion by 26 November 2025. The supplied materials contain no site-verified construction-progress figure and do not establish that this deadline was met. Parties record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C registration certificate for BREEZY HEIGHTS, P02400005908; issued 28/03/2023 and valid through 26/11/2025, unless extended by the Authority under the Act and rules. No extension record is supplied here.
Building permissionHMDA building permit No. 003585/BP/HMDA/0645/SKP/2022, approved 26 November 2022; proceedings No. 001854/BP/HMDA/SKP/2022. The order permits a residential building at Survey Nos. 230/7/1 and 230/7/2. Approvals record
Commencement / building-permit orderThe filed permit document is indexed as “Commencement Certificates for each building in each phase”; its extracted content is a building permit order. No separate commencement notice is supplied. Document index
Layout planA layout-plan filing is listed, but its content is not extracted. No LP number is recorded in the RERA record; the HMDA public approved-layout lookup is reported unavailable. HMDA
Occupancy / completion certificateThe permit requires an occupancy certificate before occupation; the permit extraction marks completion certified as false. No occupancy or completion certificate is supplied.
Promoter declarationForm B affidavit-cum-declaration dated 09 January 2023, signed by Jitender Merugu for BUILD SMILES INFRA PVT. LTD.; includes the promoter’s completion undertaking and stated land/encumbrance declarations.
Other project-filed materialEncumbrance statement, legal-title-report files, and an agreement-for-sale form are listed in the RERA documents; the supplied material does not establish a completed unit sale from the blank agreement form. Document index

Frequently asked questions

Is BREEZY HEIGHTS registered with Telangana RERA?

Yes. BREEZY HEIGHTS is registered with the Telangana Real Estate Regulatory Authority as P02400005908; the registration status is New Project.

Who is the developer of BREEZY HEIGHTS?

The promoter named in the RERA registration is BUILD SMILES INFRA PRIVATE LIMITED.

Where is BREEZY HEIGHTS located?

BREEZY HEIGHTS is in SHANKARPALLY, Shankarpalle, Rangareddy, Telangana (501203).

When will BREEZY HEIGHTS be completed?

The promoter's proposed date of completion filed with RERA is 26/11/2025. This is the promoter's declaration, not a guarantee.

More projects in Shankarpally