Crescent City
SR DEVELOPERS · Medchal-Malkajgiri · RERA P02200001082
CRESCENT CITY is a plotted development located in Yadgarpalle (East), Keesara Mandal, Medchal-Malkajgiri District. The registered promoter is SR DEVELOPERS. The HMDA draft layout letter states a total site area of 89233.21 sq.m and net site area of 89087.12 sq.m; the development is an open-plot layout, and the supplied records do not establish the total plot count or plot-size configurations. Its TG-RERA registration number is P02200001082, and the proposed completion date stated in the registration certificate and Form B declaration is 30 March 2021.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | CRESCENT CITY RERA record |
| Project type | Plotted development / open-plot layout RERA record |
| Phase or registered portion | Not identified as a separate phase in the supplied record; phase scope not disclosed RERA record |
| TG-RERA registration | P02200001082 RERA record |
| Registration validity | 5 August 2019 to 30 March 2021; certificate states validity was not extended RERA record |
| Registered promoter | SR DEVELOPERS (also written in filed records as M/s S.R. Developers) RERA record Corporate record |
| RERA status | Registration certificate on file. Current registration status beyond the stated validity period is not established by the supplied documents. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Keesara; RERA certificate identifies Yadgarpalle (East) RERA record |
| Revenue village | Yadgarpalle (East) RERA record |
| Mandal | Keesara RERA record |
| District | Medchal-Malkajgiri RERA record |
| PIN | 501301 RERA record |
| Project survey numbers | Sy. Nos. 65, 100, 101, 102 and 103, as stated in the HMDA draft layout documents. The RERA land record does not disclose survey numbers. Land records |
| Subdivisions | Not disclosed in the project identity record or the cited HMDA layout documents. Land records |
| Registered site extent | Not separately established in the RERA registration record supplied. The HMDA draft layout letter states total site area 89233.21 sq.m, area affected by master-plan road 146.09 sq.m, and net site area 89087.12 sq.m. RERA filing |
| Boundaries | East: neighbours’ land; West: 40 feet wide road; North: agricultural land in Sy. Nos. 99 and 106; South: agricultural land in Sy. No. 65. RERA filing |
| HMDA land-use areas | Plotted area: 49174.7 sq.m; park: 8250.39 sq.m; social infrastructure: 2254.04 sq.m; road area: 29407.99 sq.m. |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal layout approval | Draft Layout Permit No. 000075/LO/Plg/HMDA/2019, dated 15 April 2019 Approvals record |
| Approved built-up area | Not disclosed; this is a plotted layout, and no building built-up area is supplied. RERA filing |
| Plot count | The RERA-filed HMDA draft layout letter identifies plot-number ranges 243–255, 264–268 and 272–303 as mortgaged plots. The plan extraction also states “Total 50 number of plots” for those mortgage plots; the total project plot count is not established by the supplied records. |
| Buildings, floors and parking levels | Not applicable to the evidenced plotted-layout description; no building or parking-level schedule is supplied. |
| HMDA layout status | Draft layout permission/plan is on file. The draft letter states that final layout release is subject to conditions, including development works and handover of roads and open space. |
Offering and status
| Item | Project record |
|---|---|
| Unit type | Plots; plot count and plot-size range are not established in the supplied RERA records. RERA record |
| Booked / available plots | Not disclosed in the supplied evidence. RERA record |
| Construction stage | RERA-filed amenity/infrastructure progress figures are provided for selected works, but their measurement date and independent site verification are not supplied. RERA amenities |
| Original completion deadline | 30 March 2021, stated in the RERA registration certificate and Form B declaration. |
| Revised completion date | No extension document or revised deadline supplied. |
| Occupancy/completion certificate | No occupancy or completion certificate is supplied. For a plotted layout, the supplied HMDA record instead refers to conditions for final layout release. Document index |
2. The project story
CRESCENT CITY is registered with TG-RERA as a plotted development by SR DEVELOPERS, at Yadgarpalle (East), Keesara Mandal, Medchal-Malkajgiri District. The RERA certificate identifies the project as CRESCENT CITY and gives PIN 501301; the filed HMDA layout documents describe an open-plot residential layout on Sy. Nos. 65, 100, 101, 102 and 103. RERA record
The HMDA draft layout letter records a total site area of 89233.21 sq.m and net site area of 89087.12 sq.m after 146.09 sq.m affected by a master-plan road. Its land-use schedule allocates area to plots, roads, park and social infrastructure. The letter also requires layout roads to be opened for access to neighbouring sites and identifies works and handover steps associated with release of the final layout.
The promoter’s Form B declaration undertook completion by 30 March 2021. The registration certificate gives the same validity end date, and no extension, completion certificate or current independently verified site status is included in the supplied materials. Filed progress percentages for certain infrastructure items are reported in the amenities section below; they are not represented here as an independent inspection. RERA amenities
3. Master plan, architecture & building design
The supplied HMDA documents concern a residential draft plotted layout, not a building or apartment design. They identify Sy. Nos. 65, 100, 101, 102 and 103, with land-use areas reported as follows.
| Layout component | Area stated in HMDA draft layout record |
|---|---|
| Total site area | 89233.21 sq.m |
| Master plan road affected area | 146.09 sq.m |
| Net site area | 89087.12 sq.m |
| Plotted area | 49174.7 sq.m |
| Roads | 29407.99 sq.m |
| Park | 8250.39 sq.m |
| Social infrastructure | 2254.04 sq.m |
The layout plan identifies roads of differing widths, including 9.14 m, 12.20 m, 27.14 m and 30 m, and references existing roads. It also labels utility-related features including a utility area, OHT, septic-tank plan and water harvesting. No building footprints, floor configuration, tower arrangement or building-level approved built-up area are supplied.
The RERA filing describes mortgage area of 7483.59 sq.m. The HMDA draft letter identifies mortgage plots 243–255, 264–268 and 272–303, and states that mortgaged plots cannot be sold under that permission. This is a draft-layout record; it does not establish release of the final layout. RERA filing
4. Homes, configurations & floor plans
The RERA-filed project type is plotted development. The supplied materials do not provide a complete plot inventory, plot-size bands, booking counts, available counts or plot-wise saleable areas. The HMDA draft letter lists mortgage plot-number ranges but that list is not a total project plot count. RERA record
No software-measured plot or unit dimensions are available. The supplied floor-plan review record says two drawings are scans pending measurement, and no carpet-area measurements are reported. Apartment concepts such as carpet area, balcony area and loading therefore do not apply to the available plotted-layout evidence. Floor plans
5. Parking & vehicle circulation
No sanctioned parking count, visitor or accessible parking allocation, parking layout, or plot-specific parking entitlement is established in the supplied RERA or HMDA records. A third-party vendor listing mentions “ample parking space for a bike” and “covered car parking,” but these are not substantiated by the supplied project approval or RERA documents and are not treated as approved or delivered provision. Promoter website
The HMDA draft layout plan identifies internal road widths, including 9.14 m, 12.20 m, 27.14 m and 30 m. The draft letter requires roads to be opened for access to neighbouring sites; it does not establish a final road-handover or completion status.
6. Amenities, recreation & open spaces
HMDA’s draft layout record allocates area to a park and social infrastructure. The RERA-filed amenity progress data reports percentages for selected infrastructure items; the record does not provide an as-of date or independent verification. RERA amenities
| Description / size | Park area: 8250.39 sq.m |
|---|---|
| Evidence source | HMDA draft layout land-use schedule |
| Declared progress / verified status | Area allocation shown in draft layout; completion not verified. |
| Description / size | 2254.04 sq.m |
|---|---|
| Evidence source | HMDA draft layout land-use schedule |
| Declared progress / verified status | Area allocation shown in draft layout; facility type and completion not disclosed. |
| Description / size | No separate size stated |
|---|---|
| Evidence source | RERA-filed amenity record RERA amenities |
| Declared progress / verified status | 65% reported; date and independent verification not supplied. |
| Description / size | No source, capacity or storage size stated |
|---|---|
| Evidence source | RERA-filed amenity record RERA amenities |
| Declared progress / verified status | 0% reported; date and independent verification not supplied. |
| Description / size | No capacity stated |
|---|---|
| Evidence source | RERA-filed amenity record RERA amenities |
| Declared progress / verified status | 55% reported; date and independent verification not supplied. |
| Description / size | No additional size stated |
|---|---|
| Evidence source | RERA-filed amenity record RERA amenities |
| Declared progress / verified status | 0% reported; date and independent verification not supplied. |
| Description / size | No quantity stated |
|---|---|
| Evidence source | RERA-filed amenity record RERA amenities |
| Declared progress / verified status | 0% reported; date and independent verification not supplied. |
| Description / size | No size stated |
|---|---|
| Evidence source | RERA-filed amenity record RERA amenities |
| Declared progress / verified status | 0% reported; date and independent verification not supplied. |
| Description / size | No capacity stated; the layout plan labels water harvesting RERA amenities |
|---|---|
| Evidence source | RERA-filed amenity record and draft layout plan RERA amenities |
| Declared progress / verified status | 0% reported; completion not verified. |
| Description / size | Community buildings; sewage/sullage treatment and disposal; solid-waste management; energy management; fire protection; electrical meter room/sub-station/receiving station; aggregate recreational open space |
|---|---|
| Evidence source | RERA-filed amenity record RERA amenities |
| Declared progress / verified status | 0% reported for each; date and independent verification not supplied. |
A third-party vendor listing advertises a clubhouse, swimming pool, gym, children’s play area and common garden. The supplied project approval and RERA amenity records do not establish these as sanctioned or delivered facilities, so they are not presented as confirmed project amenities. Promoter website RERA amenities
7. Utilities, building services & safety
The HMDA draft layout plan labels a utility area, OHT, septic-tank plan and water harvesting. These drawing labels do not establish installed capacity, commissioning or current operation.
The RERA-filed amenity record reports water supply at 0%, sewerage infrastructure at 55%, storm-water drains at 0%, rainwater harvesting at 0%, and electrical meter room/sub-station/receiving station at 0%. The record supplies no capacities, utility sources, treatment specifications, service-connection details or independent verification date. RERA amenities
Fire protection and fire-safety requirements are listed at 0% in the RERA-filed amenity record. No project-specific fire clearance, fire-system specification, emergency-access details, accessibility provisions, security-system details or waste-management completion evidence is supplied. RERA amenities Document index
8. Location, access & connectivity
The registered location is Yadgarpalle (East), Keesara Mandal, Medchal-Malkajgiri District, PIN 501301. The RERA certificate identifies locality Yadgarpalle (East), while the filed HMDA draft layout records describe the site as Yadagarpalle in the Keesara area. RERA record
The HMDA layout plan shows connections to roads of several stated widths and references existing 40-foot and 60-foot roads, as well as a 100-foot-wide road. The draft letter requires roads to be opened for neighbouring-site access and specifies a master-plan road affected area. These are plan-record details, not confirmation of completed road works.
A location record gives the nearest sampled Outer Ring Road interchange as approximately 8.5 km away. The measurement is a supplied approximate distance; no travel time is provided. Location record
9. Developer & development status
The registered promoter is SR DEVELOPERS, identified in the RERA evidence as a partnership. The supplied partnership document states the firm name was entered in the Register of Firms as No. 1903 of 2018. The project Form B declaration was signed by Gunreddy Rajeshwar Reddy as authorized signatory and is dated 10 July 2019. Corporate record
The RERA registration certificate gives the promoter office as Village: Nagole, Mandal: Uppal, District: Medchal-Malkajgiri, PIN 500068. No official website or project contact details are supplied.
The promoter declared a completion date of 30 March 2021 in Form B, matching the registration certificate’s stated validity end date. No extension order or completion/occupancy certificate is supplied. The RERA-filed progress figures for listed infrastructure items are reported in Section 6; they are not independent confirmation of present site conditions. RERA amenities
10. Approvals, official records & documents
| Identifier / date | P02200001082; issued 5 August 2019; valid to 30 March 2021 |
|---|---|
| What the supplied record establishes | Form C registration certificate for CRESCENT CITY under section 5; the certificate states that it was not extended. |
| Identifier / date | Draft Layout Permit No. 000075/LO/Plg/HMDA/2019; 15 April 2019 |
|---|---|
| What the supplied record establishes | Draft open-plot layout permission for Sy. Nos. 65, 100, 101, 102 and 103; records land-use areas, mortgage plots and conditions for final layout release. |
| Identifier / date | Permit reference printed as 000075/LO/Pig/HM DA /2019; 15 April 2019 |
|---|---|
| What the supplied record establishes | Plan sheet for a proposed residential draft layout, with land-use schedule, road widths, utility labels and mortgage area. |
| Identifier / date | 10 July 2019 |
|---|---|
| What the supplied record establishes | Promoter declaration covering title basis, encumbrance statement, fund-account and audit commitments, pending approvals, and completion undertaking by 30 March 2021. |
| Identifier / date | Dated 27 November 2018 |
|---|---|
| What the supplied record establishes | Advocate’s title opinion concerning lands in Sy. Nos. 65, 100, 101, 102, 103 and 105; the report states the identified title and development-agreement basis. |
| Identifier / date | Encumbrance statements, title instruments, draft sale agreement and supporting title documents Document index |
|---|---|
| What the supplied record establishes | Filed records are available in the evidence pack; they do not include a completion/occupancy certificate or a final-layout release document. |
| Identifier / date | Portal access unavailable in the supplied research record HMDA |
|---|---|
| What the supplied record establishes | The public DPMS lookup could not be accessed; this is not evidence that a record was refused or absent. |
1. Project at a glance
Project identity
Registered name: CRESCENT CITY
Project type: Plotted development / open-plot layout
Phase or registered portion: Not identified as a separate phase in the supplied record; phase scope not disclosed
TG-RERA registration: P02200001082
Registration validity: 5 August 2019 to 30 March 2021; certificate states validity was not extended
Registered promoter: SR DEVELOPERS (also written in filed records as M/s S.R. Developers)
RERA status: Registration certificate on file. Current registration status beyond the stated validity period is not established by the supplied documents.
Land and geographic identity
Locality: Keesara; RERA certificate identifies Yadgarpalle (East)
Revenue village: Yadgarpalle (East)
Mandal: Keesara
District: Medchal-Malkajgiri
PIN: 501301
Project survey numbers: Sy. Nos. 65, 100, 101, 102 and 103, as stated in the HMDA draft layout documents. The RERA land record does not disclose survey numbers.
Subdivisions: Not disclosed in the project identity record or the cited HMDA layout documents.
Registered site extent: Not separately established in the RERA registration record supplied. The HMDA draft layout letter states total site area 89233.21 sq.m, area affected by master-plan road 146.09 sq.m, and net site area 89087.12 sq.m.
Boundaries: East: neighbours’ land; West: 40 feet wide road; North: agricultural land in Sy. Nos. 99 and 106; South: agricultural land in Sy. No. 65.
HMDA land-use areas: Plotted area: 49174.7 sq.m; park: 8250.39 sq.m; social infrastructure: 2254.04 sq.m; road area: 29407.99 sq.m.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: Draft Layout Permit No. 000075/LO/Plg/HMDA/2019, dated 15 April 2019
Approved built-up area: Not disclosed; this is a plotted layout, and no building built-up area is supplied.
Plot count: The RERA-filed HMDA draft layout letter identifies plot-number ranges 243–255, 264–268 and 272–303 as mortgaged plots. The plan extraction also states “Total 50 number of plots” for those mortgage plots; the total project plot count is not established by the supplied records.
Buildings, floors and parking levels: Not applicable to the evidenced plotted-layout description; no building or parking-level schedule is supplied.
HMDA layout status: Draft layout permission/plan is on file. The draft letter states that final layout release is subject to conditions, including development works and handover of roads and open space.
Offering and status
Unit type: Plots; plot count and plot-size range are not established in the supplied RERA records.
Booked / available plots: Not disclosed in the supplied evidence.
Construction stage: RERA-filed amenity/infrastructure progress figures are provided for selected works, but their measurement date and independent site verification are not supplied.
Original completion deadline: 30 March 2021, stated in the RERA registration certificate and Form B declaration.
Revised completion date: No extension document or revised deadline supplied.
Occupancy/completion certificate: No occupancy or completion certificate is supplied. For a plotted layout, the supplied HMDA record instead refers to conditions for final layout release.
2. The project story
CRESCENT CITY is registered with TG-RERA as a plotted development by SR DEVELOPERS, at Yadgarpalle (East), Keesara Mandal, Medchal-Malkajgiri District. The RERA certificate identifies the project as CRESCENT CITY and gives PIN 501301; the filed HMDA layout documents describe an open-plot residential layout on Sy. Nos. 65, 100, 101, 102 and 103.
The HMDA draft layout letter records a total site area of 89233.21 sq.m and net site area of 89087.12 sq.m after 146.09 sq.m affected by a master-plan road. Its land-use schedule allocates area to plots, roads, park and social infrastructure. The letter also requires layout roads to be opened for access to neighbouring sites and identifies works and handover steps associated with release of the final layout.
The promoter’s Form B declaration undertook completion by 30 March 2021. The registration certificate gives the same validity end date, and no extension, completion certificate or current independently verified site status is included in the supplied materials. Filed progress percentages for certain infrastructure items are reported in the amenities section below; they are not represented here as an independent inspection.
3. Master plan, architecture & building design
The supplied HMDA documents concern a residential draft plotted layout, not a building or apartment design. They identify Sy. Nos. 65, 100, 101, 102 and 103, with land-use areas reported as follows.
Total site area: 89233.21 sq.m
Master plan road affected area: 146.09 sq.m
Net site area: 89087.12 sq.m
Plotted area: 49174.7 sq.m
Roads: 29407.99 sq.m
Park: 8250.39 sq.m
Social infrastructure: 2254.04 sq.m
The layout plan identifies roads of differing widths, including 9.14 m, 12.20 m, 27.14 m and 30 m, and references existing roads. It also labels utility-related features including a utility area, OHT, septic-tank plan and water harvesting. No building footprints, floor configuration, tower arrangement or building-level approved built-up area are supplied.
The RERA filing describes mortgage area of 7483.59 sq.m. The HMDA draft letter identifies mortgage plots 243–255, 264–268 and 272–303, and states that mortgaged plots cannot be sold under that permission. This is a draft-layout record; it does not establish release of the final layout.
4. Homes, configurations & floor plans
The RERA-filed project type is plotted development. The supplied materials do not provide a complete plot inventory, plot-size bands, booking counts, available counts or plot-wise saleable areas. The HMDA draft letter lists mortgage plot-number ranges but that list is not a total project plot count.
No software-measured plot or unit dimensions are available. The supplied floor-plan review record says two drawings are scans pending measurement, and no carpet-area measurements are reported. Apartment concepts such as carpet area, balcony area and loading therefore do not apply to the available plotted-layout evidence.
5. Parking & vehicle circulation
No sanctioned parking count, visitor or accessible parking allocation, parking layout, or plot-specific parking entitlement is established in the supplied RERA or HMDA records. A third-party vendor listing mentions “ample parking space for a bike” and “covered car parking,” but these are not substantiated by the supplied project approval or RERA documents and are not treated as approved or delivered provision.
The HMDA draft layout plan identifies internal road widths, including 9.14 m, 12.20 m, 27.14 m and 30 m. The draft letter requires roads to be opened for access to neighbouring sites; it does not establish a final road-handover or completion status.
6. Amenities, recreation & open spaces
HMDA’s draft layout record allocates area to a park and social infrastructure. The RERA-filed amenity progress data reports percentages for selected infrastructure items; the record does not provide an as-of date or independent verification.
| Description / size | Park area: 8250.39 sq.m |
|---|---|
| Evidence source | HMDA draft layout land-use schedule |
| Declared progress / verified status | Area allocation shown in draft layout; completion not verified. |
| Description / size | 2254.04 sq.m |
|---|---|
| Evidence source | HMDA draft layout land-use schedule |
| Declared progress / verified status | Area allocation shown in draft layout; facility type and completion not disclosed. |
| Description / size | No separate size stated |
|---|---|
| Evidence source | RERA-filed amenity record |
| Declared progress / verified status | 65% reported; date and independent verification not supplied. |
| Description / size | No source, capacity or storage size stated |
|---|---|
| Evidence source | RERA-filed amenity record |
| Declared progress / verified status | 0% reported; date and independent verification not supplied. |
| Description / size | No capacity stated |
|---|---|
| Evidence source | RERA-filed amenity record |
| Declared progress / verified status | 55% reported; date and independent verification not supplied. |
| Description / size | No additional size stated |
|---|---|
| Evidence source | RERA-filed amenity record |
| Declared progress / verified status | 0% reported; date and independent verification not supplied. |
| Description / size | No quantity stated |
|---|---|
| Evidence source | RERA-filed amenity record |
| Declared progress / verified status | 0% reported; date and independent verification not supplied. |
| Description / size | No size stated |
|---|---|
| Evidence source | RERA-filed amenity record |
| Declared progress / verified status | 0% reported; date and independent verification not supplied. |
| Description / size | No capacity stated; the layout plan labels water harvesting |
|---|---|
| Evidence source | RERA-filed amenity record and draft layout plan |
| Declared progress / verified status | 0% reported; completion not verified. |
| Description / size | Community buildings; sewage/sullage treatment and disposal; solid-waste management; energy management; fire protection; electrical meter room/sub-station/receiving station; aggregate recreational open space |
|---|---|
| Evidence source | RERA-filed amenity record |
| Declared progress / verified status | 0% reported for each; date and independent verification not supplied. |
A third-party vendor listing advertises a clubhouse, swimming pool, gym, children’s play area and common garden. The supplied project approval and RERA amenity records do not establish these as sanctioned or delivered facilities, so they are not presented as confirmed project amenities.
7. Utilities, building services & safety
The HMDA draft layout plan labels a utility area, OHT, septic-tank plan and water harvesting. These drawing labels do not establish installed capacity, commissioning or current operation.
The RERA-filed amenity record reports water supply at 0%, sewerage infrastructure at 55%, storm-water drains at 0%, rainwater harvesting at 0%, and electrical meter room/sub-station/receiving station at 0%. The record supplies no capacities, utility sources, treatment specifications, service-connection details or independent verification date.
Fire protection and fire-safety requirements are listed at 0% in the RERA-filed amenity record. No project-specific fire clearance, fire-system specification, emergency-access details, accessibility provisions, security-system details or waste-management completion evidence is supplied.
8. Location, access & connectivity
The registered location is Yadgarpalle (East), Keesara Mandal, Medchal-Malkajgiri District, PIN 501301. The RERA certificate identifies locality Yadgarpalle (East), while the filed HMDA draft layout records describe the site as Yadagarpalle in the Keesara area.
The HMDA layout plan shows connections to roads of several stated widths and references existing 40-foot and 60-foot roads, as well as a 100-foot-wide road. The draft letter requires roads to be opened for neighbouring-site access and specifies a master-plan road affected area. These are plan-record details, not confirmation of completed road works.
A location record gives the nearest sampled Outer Ring Road interchange as approximately 8.5 km away. The measurement is a supplied approximate distance; no travel time is provided.
9. Developer & development status
The registered promoter is SR DEVELOPERS, identified in the RERA evidence as a partnership. The supplied partnership document states the firm name was entered in the Register of Firms as No. 1903 of 2018. The project Form B declaration was signed by Gunreddy Rajeshwar Reddy as authorized signatory and is dated 10 July 2019.
The RERA registration certificate gives the promoter office as Village: Nagole, Mandal: Uppal, District: Medchal-Malkajgiri, PIN 500068. No official website or project contact details are supplied.
The promoter declared a completion date of 30 March 2021 in Form B, matching the registration certificate’s stated validity end date. No extension order or completion/occupancy certificate is supplied. The RERA-filed progress figures for listed infrastructure items are reported in Section 6; they are not independent confirmation of present site conditions.
10. Approvals, official records & documents
| Identifier / date | P02200001082; issued 5 August 2019; valid to 30 March 2021 |
|---|---|
| What the supplied record establishes | Form C registration certificate for CRESCENT CITY under section 5; the certificate states that it was not extended. |
| Identifier / date | Draft Layout Permit No. 000075/LO/Plg/HMDA/2019; 15 April 2019 |
|---|---|
| What the supplied record establishes | Draft open-plot layout permission for Sy. Nos. 65, 100, 101, 102 and 103; records land-use areas, mortgage plots and conditions for final layout release. |
| Identifier / date | Permit reference printed as 000075/LO/Pig/HM DA /2019; 15 April 2019 |
|---|---|
| What the supplied record establishes | Plan sheet for a proposed residential draft layout, with land-use schedule, road widths, utility labels and mortgage area. |
| Identifier / date | 10 July 2019 |
|---|---|
| What the supplied record establishes | Promoter declaration covering title basis, encumbrance statement, fund-account and audit commitments, pending approvals, and completion undertaking by 30 March 2021. |
| Identifier / date | Dated 27 November 2018 |
|---|---|
| What the supplied record establishes | Advocate’s title opinion concerning lands in Sy. Nos. 65, 100, 101, 102, 103 and 105; the report states the identified title and development-agreement basis. |
| Identifier / date | Encumbrance statements, title instruments, draft sale agreement and supporting title documents |
|---|---|
| What the supplied record establishes | Filed records are available in the evidence pack; they do not include a completion/occupancy certificate or a final-layout release document. |
| Identifier / date | Portal access unavailable in the supplied research record |
|---|---|
| What the supplied record establishes | The public DPMS lookup could not be accessed; this is not evidence that a record was refused or absent. |
Frequently asked questions
Is CRESCENT CITY registered with Telangana RERA?
Yes. CRESCENT CITY is registered with the Telangana Real Estate Regulatory Authority as P02200001082; the registration status is New Project.
Who is the developer of CRESCENT CITY?
The promoter named in the RERA registration is SR DEVELOPERS.
Where is CRESCENT CITY located?
CRESCENT CITY is in Keesara, Yadgarpalle (East), Medchal-Malkajgiri, Telangana (501301).
When will CRESCENT CITY be completed?
The promoter's proposed date of completion filed with RERA is 30/03/2021. This is the promoter's declaration, not a guarantee.