Crystal Avenue
CRYSTAL AVENUE · Rangareddy · RERA P02400000631
CRYSTAL AVENUE is a plotted development / residential open layout in Saheb Nagar, Hayathnagar, Ranga Reddy District. The registered promoter is Crystal Avenue. The registered site extent is 40976.60 Sq. mtrs/49.007.61 Sq. yds/Ac. 10 Acres 5.0 Gts., and the final-layout proceedings describe 154 open plots; no tower or floor configuration is disclosed. It is registered with TG-RERA under P02400000631, issued 18/04/2019, with a RERA-filed proposed completion date of 30/06/2020.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | CRYSTAL AVENUE RERA record |
| Project type | Plotted development / residential open layout RERA record RERA filing |
| Phase or registered portion | The RERA certificate identifies CRYSTAL AVENUE; a separate phase name or phase-specific registration is not disclosed. |
| TG-RERA registration | P02400000631, issued 18/04/2019; stated validity 18/04/2019–30/06/2020. The registration record captured on 10/09/2026 lists the same dates. Approvals record |
| Registered promoter | Crystal Avenue; the RERA Form-B declaration identifies Marupuru Damodar Reddy as promoter. |
| RERA status | Registration was granted under section 5. The supplied certificate records expiry on 30/06/2020 and says registration was not extended; it does not establish current registration validity. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Saheb Nagar; the project documents also describe the village as Saheb Nagar Kalan, Sahebnagar Kalan, or Saheb Nagar old Village. RERA record |
| Revenue village | Saheb Nagar / Saheb Nagar Kalan (also recorded as Saheb Nagar old Village in the final-layout records). RERA record |
| Mandal / district / PIN | Hayathnagar / Ranga Reddy / 500070. RERA record |
| Survey numbers and subdivisions | Sy. No. 144 in the RERA project identity; the layout and completion documents specify Sy. No. 144/A. RERA record |
| Registered site extent | GHMC tentative-layout record: 40976.60 Sq. mtrs/49.007.61 Sq. yds/Ac. 10 Acres 5.0 Gts. |
| Final-layout extent | 37785.86 Sq. mtrs in GHMC final-layout proceedings. The RERA land record separately lists total area 40976.60 sqmts, affected area 3190.86 sqmts, and net area 37785.74 sqmts. Land records |
| Boundaries in RERA land record | North: ROAD; South: ROAD; East: ROAD; West: NEIGHBOR FLAT. Land records |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). |
| Principal tentative-layout approval | GHMC Proc. No. 113232/24/01/2017/H0 179, dated 21.02.2018; file no. 113282/24/01/2017/HO. The record describes a 135-plot tentative layout. |
| Final-layout proceedings | GHMC Proc. No. 1/C3/01943/2021-FLT, dated 18.03.2021; the final-layout record describes 154 open plots. |
| Approved built-up area | 22317.60 sqmts is entered as approved built-up area in the RERA project fields; it is not described in the supplied records as a building floor-area schedule. RERA filing |
| Plot count | Final GHMC layout proceedings: 154-open plots. The supplied tentative approval records 135 plots. |
| Building / floor configuration | Not disclosed as a building layout. This is a plotted layout, and no sanctioned floor or tower schedule is supplied. |
| Parking | No sanctioned parking count, parking-level plan, or plot-wise parking allocation is supplied. |
Offering and status
| Item | Record |
|---|---|
| Offering | Residential plots in an open layout; plot-size bands, plot-by-plot areas, and booked/available counts are not disclosed in the supplied data. |
| RERA-filed proposed completion date | 30/06/2020. RERA record |
| Layout completion evidence | GHMC final-layout proceedings are dated 18.03.2021; a Form–1A architect’s certificate dated 26-10-2025 certifies completion of the open-layout project. |
| Completion / occupancy certificate status | The file includes GHMC final-layout proceedings, not a building occupancy certificate. The supplied records do not establish an OC applicable to a building or tower. |
| Construction stage | No current site inspection or independently verified construction-progress report is supplied. The architect’s Form–1A certificate reports completion of the open layout. |
The project story
- CRYSTAL AVENUE is registered with TG-RERA as a plotted-development project in the Saheb Nagar area of Hayathnagar Mandal, Ranga Reddy District. The RERA identity cites Sy. No. 144; the GHMC layout and completion records specify Sy. No. 144/A and describe a residential open layout. RERA record
- The supplied record describes the layout at different approval stages: GHMC’s 21.02.2018 tentative-layout proceedings refer to 135 plots, while the final-layout proceedings dated 18.03.2021 refer to 154 open plots. The latter record says roads, park/open area, utility area and social-infrastructure land were handed over to GHMC. An architect’s Form–1A certificate dated 26-10-2025 certifies completion of the residential open layout. These are documentary records; no independent site inspection is supplied.
- The project’s RERA certificate states registration through 30/06/2020, and the promoter’s Form-B declares that date as the completion undertaking. Registration validity, the declared completion deadline and the later layout-completion evidence are distinct records; the supplied documents do not establish an applicable building OC.
Master plan, architecture & building design
- This is documented as a plotted layout, not a multi-storey residential-building scheme. The GHMC tentative approval describes a 135-plot layout in Sy. No. 144/A; the final-layout proceedings describe 154 open plots over 37785.86 Sq. mtrs. The RERA land record lists total area 40976.60 sqmts, affected area 3190.86 sqmts, and net area 37785.74 sqmts. Land records
- The final-layout proceedings list 10870.36 Sq.mts for roads, 2859.21 Sq.mts for open area (park), 194.89 Sq.mts for utility area, and 971:14 Sq.mts for social infrastructure; they state a total area of 14895.60 Sq.mts handed over to GHMC. The record also lists 3190.86 Sq.mts as road-widening area.
- The RERA fields list 22317.60 sqmts as approved built-up area, but the supplied documents do not provide a building schedule, floor configuration, plot-size schedule, or drawing-derived layout measurements. The supplied floor-plan data records two drawings, both scans pending, with no measured plans available. RERA filing Floor plans
Homes, configurations & floor plans
The RERA and GHMC records describe a plotted residential layout, not an apartment configuration schedule. The final GHMC proceedings record 154-open plots, but plot-wise sizes, unit inventory, booked counts and available counts are not supplied. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 154 open plots in final-layout proceedings | Not disclosed | Not disclosed | Not disclosed | Not supplied | Not supplied |
The supplied floor-plan extraction records two drawings, with 0 measured and 2 scans pending; therefore no software-measured plot or home areas can be reported. Floor plans
Parking & vehicle circulation
The supplied records do not establish a sanctioned parking count, visitor or accessible parking, parking layout, parking allocation to individual plots, or EV-charging provision. The GHMC records refer to layout roads and road handover, but do not provide road-width details beyond the tentative-approval conditions identifying proposed 30.0 M, 12.0 M & 9.0 M roads for the affected-land surrender.
Amenities, recreation & open spaces
The final-layout proceedings record land for a park/open area, utility area and social infrastructure, and state these areas were handed over to GHMC. The RERA amenities schedule marks a number of infrastructure and open-space items as available, but shows 0 progress for each listed item; this is a filed schedule, not independent verification of delivery. RERA amenities
| Facility | Open area (park) |
|---|---|
| Description / size | 2859.21 Sq.mts |
| Declared progress / verified status | GHMC proceedings record handover to GHMC; no independent site verification supplied. |
| Facility | Green Strip/TOT LOT/Park; aggregate recreational open space |
|---|---|
| Description / size | Size not disclosed |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA schedule marks Green Strip/TOT LOT/Park “YES” and progress 0; aggregate recreational open-space progress is 0. |
| Facility | Social infrastructure |
|---|---|
| Description / size | 971:14 Sq.mts |
| Declared progress / verified status | GHMC proceedings record handover to GHMC; no facility specification or independent site verification supplied. |
| Facility | Community buildings |
|---|---|
| Description / size | Size and quantity not disclosed |
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress 0; no completed status established. |
Promoter-marketed amenity descriptions, including a gym, supermarket, tennis court, indoor games and swimming pool, are not treated here as RERA-filed or delivered facilities. Promoter website
Utilities, building services & safety
The GHMC tentative-layout conditions call for underground drainage, street lighting, avenue plantation, a septic tank, and development of abutting roads before final-layout release. The RERA amenities schedule lists water supply, sewerage (including chamber, lines, septic tank and STP), storm-water drains, treatment and disposal of sewage and sullage water, rainwater harvesting, and an electrical meter room/sub-station/receiving station; each is shown with 0 progress. These entries do not establish installed capacity or independently verified completion. RERA amenities
| Evidence in supplied record | Listed in the RERA amenities schedule; source, storage and treatment details are not supplied. RERA amenities |
|---|---|
| Status / limits | “YES” is recorded; progress 0. |
| Evidence in supplied record | Tentative GHMC conditions call for underground drainage and a septic tank; RERA schedule lists sewerage, storm-water drains and sewage/sullage treatment and disposal. RERA amenities |
|---|---|
| Status / limits | RERA schedule progress 0; no capacity or commissioning evidence supplied. |
| Evidence in supplied record | Tentative GHMC conditions call for street lighting; RERA schedule lists street lighting and an electrical meter room/sub-station/receiving station. RERA amenities |
|---|---|
| Status / limits | RERA schedule progress 0; capacity and energisation are not established. |
| Evidence in supplied record | Rainwater harvesting is listed in the RERA schedule. RERA amenities |
|---|---|
| Status / limits | Progress 0; design and completion evidence not supplied. |
| Evidence in supplied record | Solid-waste management and disposal are listed in the RERA schedule. RERA amenities |
|---|---|
| Status / limits | Progress 0; no operational details supplied. |
| Evidence in supplied record | Fire-protection and fire-safety requirements appear in the RERA schedule; accessibility details are not supplied. RERA amenities |
|---|---|
| Status / limits | Progress 0; no compliance clearance or installed-system evidence supplied. |
Location, access & connectivity
- The RERA identity places the project in Saheb Nagar, Hayathnagar Mandal, Ranga Reddy District, PIN 500070. The GHMC layout records identify Saheb Nagar Kalan and Sy. No. 144/A. The supplied cadastral coordinate is a parcel-centroid location, 17.41528, 78.35459. RERA record Location record
- No project-specific approach-road or public-transport schedule is supplied. The location data identifies Financial District (Nanakramguda) at 1.2 km as a connectivity point. Location record
Developer & development status
- The registered promoter is Crystal Avenue, recorded as a proprietorship in the project fields; the Form-B declaration identifies Marupuru Damodar Reddy as promoter. The supplied RERA certificate lists a promoter-office address in Kukatpally, Medchal-Malkajgiri District, PIN 500072. The project record separately lists the address at Orchids, Bank Colony Road, Saheb Nagar, Hayathnagar, Ranga Reddy District, PIN 500070. RERA filing Parties record
- The RERA-filed completion undertaking is 30.06"2020 as transcribed in Form-B; the registration certificate gives the end date as 30/06/2020. GHMC’s final-layout proceedings are dated 18.03.2021, and the architect’s Form–1A certificate dated 26-10-2025 certifies completion of the open layout. No independent site inspection, current plot-inventory statement, or building OC is supplied.
Approvals, official records & documents
| Issuer / date | TG-RERA; issued 18/04/2019 |
|---|---|
| What the supplied record identifies | Registration for CRYSTAL AVENUE, recorded through 30/06/2020. |
| Issuer / date | GHMC; 21.02.2018 |
|---|---|
| What the supplied record identifies | Tentative approval for a 135-plot layout in Sy. No. 144/A, with conditions and affected-land surrender requirements. |
| Issuer / date | GHMC; 18.03.2021 |
|---|---|
| What the supplied record identifies | Final layout with 154 open plots; records land handed over for roads, park/open area, utility area and social infrastructure. |
| Issuer / date | Architect; 26-10-2025 |
|---|---|
| What the supplied record identifies | Certifies completion of the CRYSTAL AVENUE residential open-layout project and cites a final-layout certificate. |
| Issuer / date | Promoter; completion undertaking stated as 30.06"2020 |
|---|---|
| What the supplied record identifies | Promoter declaration concerning title basis, encumbrances, completion undertaking and project-account handling. |
| Issuer / date | Document listed in RERA file |
|---|---|
| What the supplied record identifies | Registration Certificate is identified; further details are not supplied. |
The supplied final-layout record is a GHMC layout document; it is not a building occupancy certificate. The public HMDA DPMS approved-layout lookup is recorded as unavailable in the supplied evidence, so no additional portal result is reported. HMDA
Project at a glance
Project identity
Registered project name: CRYSTAL AVENUE
Project type: Plotted development / residential open layout
Phase or registered portion: The RERA certificate identifies CRYSTAL AVENUE; a separate phase name or phase-specific registration is not disclosed.
TG-RERA registration: P02400000631, issued 18/04/2019; stated validity 18/04/2019–30/06/2020. The registration record captured on 10/09/2026 lists the same dates.
Registered promoter: Crystal Avenue; the RERA Form-B declaration identifies Marupuru Damodar Reddy as promoter.
RERA status: Registration was granted under section 5. The supplied certificate records expiry on 30/06/2020 and says registration was not extended; it does not establish current registration validity.
Land and geographic identity
Locality: Saheb Nagar; the project documents also describe the village as Saheb Nagar Kalan, Sahebnagar Kalan, or Saheb Nagar old Village.
Revenue village: Saheb Nagar / Saheb Nagar Kalan (also recorded as Saheb Nagar old Village in the final-layout records).
Mandal / district / PIN: Hayathnagar / Ranga Reddy / 500070.
Survey numbers and subdivisions: Sy. No. 144 in the RERA project identity; the layout and completion documents specify Sy. No. 144/A.
Registered site extent: GHMC tentative-layout record: 40976.60 Sq. mtrs/49.007.61 Sq. yds/Ac. 10 Acres 5.0 Gts.
Final-layout extent: 37785.86 Sq. mtrs in GHMC final-layout proceedings. The RERA land record separately lists total area 40976.60 sqmts, affected area 3190.86 sqmts, and net area 37785.74 sqmts.
Boundaries in RERA land record: North: ROAD; South: ROAD; East: ROAD; West: NEIGHBOR FLAT.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal tentative-layout approval: GHMC Proc. No. 113232/24/01/2017/H0 179, dated 21.02.2018; file no. 113282/24/01/2017/HO. The record describes a 135-plot tentative layout.
Final-layout proceedings: GHMC Proc. No. 1/C3/01943/2021-FLT, dated 18.03.2021; the final-layout record describes 154 open plots.
Approved built-up area: 22317.60 sqmts is entered as approved built-up area in the RERA project fields; it is not described in the supplied records as a building floor-area schedule.
Plot count: Final GHMC layout proceedings: 154-open plots. The supplied tentative approval records 135 plots.
Building / floor configuration: Not disclosed as a building layout. This is a plotted layout, and no sanctioned floor or tower schedule is supplied.
Parking: No sanctioned parking count, parking-level plan, or plot-wise parking allocation is supplied.
Offering and status
Offering: Residential plots in an open layout; plot-size bands, plot-by-plot areas, and booked/available counts are not disclosed in the supplied data.
RERA-filed proposed completion date: 30/06/2020.
Layout completion evidence: GHMC final-layout proceedings are dated 18.03.2021; a Form–1A architect’s certificate dated 26-10-2025 certifies completion of the open-layout project.
Completion / occupancy certificate status: The file includes GHMC final-layout proceedings, not a building occupancy certificate. The supplied records do not establish an OC applicable to a building or tower.
Construction stage: No current site inspection or independently verified construction-progress report is supplied. The architect’s Form–1A certificate reports completion of the open layout.
The project story
- CRYSTAL AVENUE is registered with TG-RERA as a plotted-development project in the Saheb Nagar area of Hayathnagar Mandal, Ranga Reddy District. The RERA identity cites Sy. No. 144; the GHMC layout and completion records specify Sy. No. 144/A and describe a residential open layout.
- The supplied record describes the layout at different approval stages: GHMC’s 21.02.2018 tentative-layout proceedings refer to 135 plots, while the final-layout proceedings dated 18.03.2021 refer to 154 open plots. The latter record says roads, park/open area, utility area and social-infrastructure land were handed over to GHMC. An architect’s Form–1A certificate dated 26-10-2025 certifies completion of the residential open layout. These are documentary records; no independent site inspection is supplied.
- The project’s RERA certificate states registration through 30/06/2020, and the promoter’s Form-B declares that date as the completion undertaking. Registration validity, the declared completion deadline and the later layout-completion evidence are distinct records; the supplied documents do not establish an applicable building OC.
Master plan, architecture & building design
- This is documented as a plotted layout, not a multi-storey residential-building scheme. The GHMC tentative approval describes a 135-plot layout in Sy. No. 144/A; the final-layout proceedings describe 154 open plots over 37785.86 Sq. mtrs. The RERA land record lists total area 40976.60 sqmts, affected area 3190.86 sqmts, and net area 37785.74 sqmts.
- The final-layout proceedings list 10870.36 Sq.mts for roads, 2859.21 Sq.mts for open area (park), 194.89 Sq.mts for utility area, and 971:14 Sq.mts for social infrastructure; they state a total area of 14895.60 Sq.mts handed over to GHMC. The record also lists 3190.86 Sq.mts as road-widening area.
- The RERA fields list 22317.60 sqmts as approved built-up area, but the supplied documents do not provide a building schedule, floor configuration, plot-size schedule, or drawing-derived layout measurements. The supplied floor-plan data records two drawings, both scans pending, with no measured plans available.
Homes, configurations & floor plans
The RERA and GHMC records describe a plotted residential layout, not an apartment configuration schedule. The final GHMC proceedings record 154-open plots, but plot-wise sizes, unit inventory, booked counts and available counts are not supplied.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 154 open plots in final-layout proceedings | Not disclosed | Not disclosed | Not disclosed | Not supplied | Not supplied |
The supplied floor-plan extraction records two drawings, with 0 measured and 2 scans pending; therefore no software-measured plot or home areas can be reported.
Parking & vehicle circulation
The supplied records do not establish a sanctioned parking count, visitor or accessible parking, parking layout, parking allocation to individual plots, or EV-charging provision. The GHMC records refer to layout roads and road handover, but do not provide road-width details beyond the tentative-approval conditions identifying proposed 30.0 M, 12.0 M & 9.0 M roads for the affected-land surrender.
Amenities, recreation & open spaces
The final-layout proceedings record land for a park/open area, utility area and social infrastructure, and state these areas were handed over to GHMC. The RERA amenities schedule marks a number of infrastructure and open-space items as available, but shows 0 progress for each listed item; this is a filed schedule, not independent verification of delivery.
| Facility | Open area (park) |
|---|---|
| Description / size | 2859.21 Sq.mts |
| Declared progress / verified status | GHMC proceedings record handover to GHMC; no independent site verification supplied. |
| Facility | Green Strip/TOT LOT/Park; aggregate recreational open space |
|---|---|
| Description / size | Size not disclosed |
| Declared progress / verified status | RERA schedule marks Green Strip/TOT LOT/Park “YES” and progress 0; aggregate recreational open-space progress is 0. |
| Facility | Social infrastructure |
|---|---|
| Description / size | 971:14 Sq.mts |
| Declared progress / verified status | GHMC proceedings record handover to GHMC; no facility specification or independent site verification supplied. |
| Facility | Community buildings |
|---|---|
| Description / size | Size and quantity not disclosed |
| Declared progress / verified status | Progress 0; no completed status established. |
Promoter-marketed amenity descriptions, including a gym, supermarket, tennis court, indoor games and swimming pool, are not treated here as RERA-filed or delivered facilities.
Utilities, building services & safety
The GHMC tentative-layout conditions call for underground drainage, street lighting, avenue plantation, a septic tank, and development of abutting roads before final-layout release. The RERA amenities schedule lists water supply, sewerage (including chamber, lines, septic tank and STP), storm-water drains, treatment and disposal of sewage and sullage water, rainwater harvesting, and an electrical meter room/sub-station/receiving station; each is shown with 0 progress. These entries do not establish installed capacity or independently verified completion.
| Evidence in supplied record | Listed in the RERA amenities schedule; source, storage and treatment details are not supplied. |
|---|---|
| Status / limits | “YES” is recorded; progress 0. |
| Evidence in supplied record | Tentative GHMC conditions call for underground drainage and a septic tank; RERA schedule lists sewerage, storm-water drains and sewage/sullage treatment and disposal. |
|---|---|
| Status / limits | RERA schedule progress 0; no capacity or commissioning evidence supplied. |
| Evidence in supplied record | Tentative GHMC conditions call for street lighting; RERA schedule lists street lighting and an electrical meter room/sub-station/receiving station. |
|---|---|
| Status / limits | RERA schedule progress 0; capacity and energisation are not established. |
| Evidence in supplied record | Rainwater harvesting is listed in the RERA schedule. |
|---|---|
| Status / limits | Progress 0; design and completion evidence not supplied. |
| Evidence in supplied record | Solid-waste management and disposal are listed in the RERA schedule. |
|---|---|
| Status / limits | Progress 0; no operational details supplied. |
| Evidence in supplied record | Fire-protection and fire-safety requirements appear in the RERA schedule; accessibility details are not supplied. |
|---|---|
| Status / limits | Progress 0; no compliance clearance or installed-system evidence supplied. |
Location, access & connectivity
- The RERA identity places the project in Saheb Nagar, Hayathnagar Mandal, Ranga Reddy District, PIN 500070. The GHMC layout records identify Saheb Nagar Kalan and Sy. No. 144/A. The supplied cadastral coordinate is a parcel-centroid location, 17.41528, 78.35459.
- No project-specific approach-road or public-transport schedule is supplied. The location data identifies Financial District (Nanakramguda) at 1.2 km as a connectivity point.
Developer & development status
- The registered promoter is Crystal Avenue, recorded as a proprietorship in the project fields; the Form-B declaration identifies Marupuru Damodar Reddy as promoter. The supplied RERA certificate lists a promoter-office address in Kukatpally, Medchal-Malkajgiri District, PIN 500072. The project record separately lists the address at Orchids, Bank Colony Road, Saheb Nagar, Hayathnagar, Ranga Reddy District, PIN 500070.
- The RERA-filed completion undertaking is 30.06"2020 as transcribed in Form-B; the registration certificate gives the end date as 30/06/2020. GHMC’s final-layout proceedings are dated 18.03.2021, and the architect’s Form–1A certificate dated 26-10-2025 certifies completion of the open layout. No independent site inspection, current plot-inventory statement, or building OC is supplied.
Approvals, official records & documents
| Issuer / date | TG-RERA; issued 18/04/2019 |
|---|---|
| What the supplied record identifies | Registration for CRYSTAL AVENUE, recorded through 30/06/2020. |
| Issuer / date | GHMC; 21.02.2018 |
|---|---|
| What the supplied record identifies | Tentative approval for a 135-plot layout in Sy. No. 144/A, with conditions and affected-land surrender requirements. |
| Issuer / date | GHMC; 18.03.2021 |
|---|---|
| What the supplied record identifies | Final layout with 154 open plots; records land handed over for roads, park/open area, utility area and social infrastructure. |
| Issuer / date | Architect; 26-10-2025 |
|---|---|
| What the supplied record identifies | Certifies completion of the CRYSTAL AVENUE residential open-layout project and cites a final-layout certificate. |
| Issuer / date | Promoter; completion undertaking stated as 30.06"2020 |
|---|---|
| What the supplied record identifies | Promoter declaration concerning title basis, encumbrances, completion undertaking and project-account handling. |
| Issuer / date | Document listed in RERA file |
|---|---|
| What the supplied record identifies | Registration Certificate is identified; further details are not supplied. |
The supplied final-layout record is a GHMC layout document; it is not a building occupancy certificate. The public HMDA DPMS approved-layout lookup is recorded as unavailable in the supplied evidence, so no additional portal result is reported.
Frequently asked questions
Is CRYSTAL AVENUE registered with Telangana RERA?
Yes. CRYSTAL AVENUE is registered with the Telangana Real Estate Regulatory Authority as P02400000631; the registration status is New Project.
Who is the developer of CRYSTAL AVENUE?
The promoter named in the RERA registration is CRYSTAL AVENUE.
Where is CRYSTAL AVENUE located?
CRYSTAL AVENUE is in SAHEB NAGAR, Hayathnagar, Rangareddy, Telangana (500070).
When will CRYSTAL AVENUE be completed?
The promoter's proposed date of completion filed with RERA is 30/06/2020. This is the promoter's declaration, not a guarantee.