Sign in

Green Scapes

AKSARA CONSTRUCTIONS AND OTHERS · Medchal-Malkajgiri · RERA P02200006119

GREEN SCAPES is a residential villa development in Bowrampet, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District, developed by the registered promoter AKSARA CONSTRUCTIONS AND OTHERS. The registered site has a net area of 120543.71 sqmts, and the RERA configuration data identifies 327 homes: 326 “DUPLEX VILLA” and 1 “DUIPLEX VILLA,” with saleable areas of 209.79 sqm and 212.63 sqm, respectively. The project is registered under TG-RERA registration number P02200006119, registered 24/04/2023, with proposed completion 30/08/2028.

01What we found

RegisteredTG-RERA - valid till 30 Apr 2028
137documents on file - each fact links to its page
17court cases on this project's land (survey 435, 436, 437, 454, 460, 461 and 3 more, Bowrampet)
8items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameGREEN SCAPES RERA record
Project type / registered portionResidential villa development; the RERA record identifies the project type as residential and the category as villa. The filed approval describes a gated community with housing. RERA record RERA filing
PhasePhase/registered portion not separately named in the supplied record. RERA record
TG-RERA registrationP02200006119; registered 24/04/2023; certificate states validity to 30/04/2028 and no extension. Registration validity is separate from the project completion date. RERA record Approvals record
Registered promoterAKSARA CONSTRUCTIONS AND OTHERS (also printed on the certificate as “Aksara Constructions And Others”). RERA record Corporate record
RERA statusThe supplied record labels this a New Project. Registration is recorded; a current construction-stage verification and occupancy/completion certificate are not supplied. RERA record Approvals record

Land and geographic identity

ItemProject record
Locality / revenue villageBowrampet; revenue village: Bowrampet. RERA record RERA filing
Mandal / district / PINDundigal Gandimaisamma; Medchal-Malkajgiri; 500043. RERA record RERA filing
All project survey numbers and subdivisions435/P, 436/P, 437/P, 454/P, 460/P, 461/P, 462/P, 463/P & 464/P. RERA record Land records
Registered site extentThe filed land details give Total Area 120720.75 sqmts, affected area 177.04 sqmts, and Net Area 120543.71 sqmts. RERA filing Land records
BoundariesEast: Road; West, North and South: Neighbours Land. RERA filing Land records
Cadastral recordBhu Bharati GIS records supplied for whole surveys 435: 37932.29 sqm, 437: 84367.67 sqm, and 461: 75532.01 sqm; these are whole-survey records, not project-parcel extents. Cadastral map

Development identity

ItemProject record
Principal sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the filed municipal proceeding records release of the draft layout by Dundigal Municipality based on HMDA approval. Approvals record
Principal layout approval15/LO/PIg/HMDA/2022, dated 30-04-2022 in the approval extraction. The RERA registration record also prints 15/LO/Plg/HMDA/2022. Approvals record
Approved built-up area76520.28 sqmts is recorded as approved built-up area in the project filing. RERA filing
Building / block countThe RERA unit data reports 328 blocks; this is not a reliable count of residential homes because the filing also includes three floor-labelled rows that are not identified as homes on sale. RERA unit table
Sanctioned floor configurationA project-wide villa floor schedule (such as ground/upper floors per villa) is not established in the supplied project-specific approval extracts. The project is described as a gated-community layout with houses/villas. RERA record
Parking levels / sanctioned parking countNot disclosed in the supplied project-specific material. Document index Approvals record
Unit countsThe RERA configuration data identifies 327 homes: 326 “DUPLEX VILLA” and 1 “DUIPLEX VILLA.” The unit table also contains three floor-labelled entries; these are not treated as homes for sale in the normalized record. RERA unit table RERA unit details
RERA-declared unitsThe registration fields state 328 total building units as per approved plan and 328 proposed units as per agreement. These figures are the filed fields; the configuration table separately itemizes 327 homes. RERA filing

Offering and status

ItemProject record
RERA-filed home types and saleable area“DUPLEX VILLA”: 209.79 sqm; “DUIPLEX VILLA”: 212.63 sqm. These are RERA-filed saleable areas, not carpet areas. RERA unit table RERA unit table
Booked / availablePortal-derived counts read in the supplied record: 27 booked and 300 available across the 327 normalized homes (26/300 for “DUPLEX VILLA”; 1/0 for “DUIPLEX VILLA”). The portal record has no as-of date, so treat counts as indicative. RERA unit table RERA unit details
Construction stageThe RERA record labels this a New Project; no independently verified site-progress assessment is supplied. The filed QPR summary reports progress percentages for facilities, but does not establish overall construction completion. RERA record RERA amenities
Completion datesPromoter Form B undertaking: completion by 30 APRIL 2028. Project header: proposed completion 30/08/2028. RERA record
Occupancy / completion certificateNo project occupancy certificate or completion certificate is included in the supplied documents; status is therefore not established from the supplied record. No phase/tower-wise OC status is provided. Document index

2. The project story

  • GREEN SCAPES is registered as a residential villa project in Bowrampet revenue village, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District. The filed approval material describes a gated-community layout with housing and a compound wall, over a recorded net site area of 120543.71 sqmts. The site identifiers are surveys 435/P, 436/P, 437/P, 454/P, 460/P, 461/P, 462/P, 463/P and 464/P. RERA record Land records
  • The RERA unit table records 326 “DUPLEX VILLA” homes and one “DUIPLEX VILLA” home. It separately lists “FIRST FLOOR,” “GROUND FLOOR” and “SECOND FLOOR” rows; the supplied normalization identifies these as floor labels, not homes for sale. The filing’s 328-unit fields and its 327-home configuration breakdown are both presented as filed data; the supplied evidence does not explain the distinction. RERA unit table RERA unit table RERA filing
  • The promoter’s Form B states a completion undertaking of 30 APRIL 2028, while the project header records proposed completion of 30/08/2028. No construction inspection, overall progress certificate, or occupancy/completion certificate is supplied here, so the current physical stage and completion of any particular villa or phase cannot be independently described. RERA record Document index

3. Master plan, architecture & building design

  • The filed approval describes an HMDA-approved draft layout with housing under a gated community and compound wall, with a Dundigal Municipality proceeding releasing the draft layout based on HMDA approval. The approval material gives a site extent of 1,20,543.71 Sq. Mt. and the project land filing records 120720.75 sqmts total area, 177.04 sqmts affected area and 120543.71 sqmts net area. RERA filing
  • The registration filing lists approved built-up area as 76520.28 sqmts. This is the filed approved built-up area; the supplied extracts do not establish whether it represents gross built-up area, FSI-counted area, or another area basis. No project-wide drawings in the supplied data establish villa footprints, heights, floor-by-floor arrangement, villa plot configuration, internal circulation dimensions, or the distribution of residential and common-area built-up area. RERA filing Document index
  • The project-specific approval extracts list roads, open spaces and development amenities, but do not provide a verified project-wide building schedule or detailed final layout area statement. A separate proposed layout extraction is not relied on for project quantities because its survey and land-use entries do not identify the registered project survey schedule.

4. Homes, configurations & floor plans

The following unit counts and saleable areas are from the TG-RERA unit filing. Booked and available figures are portal-derived and have no supplied as-of date. “Measured carpet area” is not available: the supplied floor-plan set contains 92 drawings, none measured, with all 92 scans pending. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
DUPLEX VILLA32626300209.79 sqmNot measuredNot supplied
DUIPLEX VILLA110212.63 sqmNot measuredNot supplied

The RERA filing labels the homes “DUPLEX VILLA” and “DUIPLEX VILLA.” No room layouts, room dimensions, orientation, balcony or utility areas are established by the supplied project-specific drawing measurements. The vendor data’s apartment configuration and carpet-area statement is not a TG-RERA disclosure and is not used here to describe the registered villa offering. RERA unit table Floor plans Promoter website

5. Parking & vehicle circulation

  • The supplied project-specific approval extracts do not state a sanctioned parking-space count, visitor or accessible parking provision, parking levels, or a documented parking-allocation arrangement for individual homes. The filed HMDA approval identifies reserved/mortgaged villa numbers but does not establish parking rights or exclusive parking allocation. Document index
  • The HMDA approval states that Villa Nos. 251 to 256 and 314 to 324, covering 4265.79 Sq.Mtrs, are mortgaged in favour of HMDA and are not permitted for sale under that approval. This is an approval condition concerning those villa numbers, not a parking allocation.

6. Amenities, recreation & open spaces

The filed layout approval and municipal proceeding identify the following planned development items. The RERA amenities table gives reported percentages but does not establish independent on-site verification; a “YES” entry indicates filing status, not proof of completion. RERA amenities

Park development / green open space
Description / sizePark development and open spaces are listed; no project-specific area is established in the approval extraction.
Evidence sourceHMDA approval and municipal proceeding
Declared progress / verified statusRERA table lists “Green Strip/TOT LOT/Park” as YES, 0%; not independently verified. RERA amenities
Avenue plantation
Description / sizeListed as a layout development item; quantity/area not stated.
Evidence sourceHMDA approval and municipal proceeding
Declared progress / verified statusCompletion status not independently verified.
Community buildings
Description / sizeRERA facilities table lists community buildings.
Evidence sourceRERA amenities record RERA amenities
Declared progress / verified statusListed as YES, 69%; declared record, not independently verified.
Recreational open space
Description / sizeListed in RERA facilities table; area not supplied.
Evidence sourceRERA amenities record RERA amenities
Declared progress / verified status0% shown; area and completion not established. RERA amenities
Internal roads and footpaths
Description / sizeInternal roads/footpaths are listed.
Evidence sourceRERA amenities record RERA amenities
Declared progress / verified statusListed as YES, 39%; declared record, not independently verified.
Clubhouse, pool, sports and other advertised facilities
Description / sizeNot established in the supplied RERA project-specific approval or amenity schedule.
Evidence sourceNo qualifying project-specific evidence supplied.
Declared progress / verified statusNot confirmed as sanctioned, RERA-declared or delivered.

7. Utilities, building services & safety

The HMDA approval and municipal proceeding list common septic tank/STP, internal water-supply pipelines and overhead tank, transformer, rainwater-harvesting pits, storm-water drains, underground drainage lines and street lights. The municipal proceeding also requires an STP and septic tank to be provided to standard specification, while its approval conditions refer to fire-service norms and the National Building Code. These are approval requirements/listed works, not evidence of completed facilities or statutory compliance.

Water
Evidence in the supplied recordInternal water-supply pipelines and overhead tank are listed; the RERA amenities table lists water supply as YES, 79%. Source and storage capacity are not stated. RERA amenities
Status limitationDeclared progress only; no independent verification supplied.
Sewerage / drainage
Evidence in the supplied recordCommon septic tank/STP, underground drainage lines and storm-water drains are listed. RERA table reports sewerage and storm-water drains at 0%. RERA amenities
Status limitationNo capacity, treatment process, reuse arrangement or completed-system verification supplied.
Rainwater management
Evidence in the supplied recordRainwater-harvesting pits are listed in the layout approval.
Status limitationQuantity, capacity and completion status not supplied.
Electrical
Evidence in the supplied recordTransformer and street lights are listed; RERA table lists electrical meter room/sub-station/receiving station as YES, 20%. RERA amenities
Status limitationSupply capacity, backup and completion are not established.
Fire / life safety
Evidence in the supplied recordThe municipal proceeding requires following fire-service norms and lists NBC among its conditions.
Status limitationNo fire-system design, clearance certificate or verified installation status supplied.
Lifts, waste, security and accessibility
Evidence in the supplied recordNo project-specific capacities, systems or accessibility provisions are established in the supplied record. Document index
Status limitationNot disclosed in the supplied project-specific evidence.

8. Location, access & connectivity

  • The registered location is Bowrampet, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District, Telangana, PIN 500043. The land filing records the eastern boundary as Road and the other three boundaries as neighbours’ land. RERA record RERA filing RERA filing
  • The supplied location record identifies JNTU College Metro as the nearest metro, at 7.2 km. No other measured project-to-landmark distances, approach-road names or public-transport details are supplied from the registered-location evidence. Location record

9. Developer & development status

  • The TG-RERA registered promoter is AKSARA CONSTRUCTIONS AND OTHERS. The filing describes the organization type as “Others” and the description as “JOINT DEVELOPERS”; the legal entity type is otherwise not established. The supplied corporate identifier is GSTIN 36ABFFA3184R1ZW. The RERA certificate lists a promoter office at Village Madhapur, Mandal Serilingampally, District Ranga Reddy, PIN 500081; the project header separately gives an address at Pardhas Picasa, 9th Floor, Durgham Cheruvu, Bowrampet. RERA record RERA filing Corporate record
  • Mr. P.V.S.N. Raju is identified as an authorized signatory in the project documents. In Form B, he declares development rights under Development Agreement-cum-General Power of Attorney Nos. 11071/2013, 11713/2018, 23531/2018 and 27783/2018, and undertakes completion by 30 APRIL 2028. The project header records a proposed completion date of 30/08/2028. No project-wide construction-progress certification or independent site assessment is supplied. RERA record

10. Approvals, official records & documents

RecordWhat the supplied project document establishes
TG-RERA registration certificateFORM C registration for GREEN SCAPES, P02200006119, issued 24/04/2023, valid to 30/04/2028; certificate identifies promoter Aksara Constructions And Others and the registered survey schedule.
HMDA layout approvalDraft layout with housing under a gated community and compound wall; approval reference 15/LO/PIg/HMDA/2022, dated 30-04-2022 in the extraction; identifies the registered project land extent and HMDA-mortgaged villa numbers.
Dundigal Municipality proceedingProceeding G1/449/1/DUN/TPS/MPL/2022, recording release of the draft layout based on HMDA approval and listing development conditions.
Form B promoter declarationProject declaration by authorized signatory P.V.S.N. Raju, including the promoter’s title/development-rights statements, separate-account undertaking and completion undertaking.
Layout plan in the RERA fileA proposed gated-community layout plan is present, but its extraction does not establish it as the final sanctioned layout; it is not used here for project-wide plot or land-use quantities.
Occupancy / completion certificateNo project-specific OC or completion certificate is included in the supplied document set. Document index

The project approval and registration records do not supply a project-specific final OC status, detailed building-by-building sanctions, or verified completed-works certificate in the materials reviewed for this overview.

Frequently asked questions

Is GREEN SCAPES registered with Telangana RERA?

Yes. GREEN SCAPES is registered with the Telangana Real Estate Regulatory Authority as P02200006119; the registration status is New Project.

Who is the developer of GREEN SCAPES?

The promoter named in the RERA registration is AKSARA CONSTRUCTIONS AND OTHERS.

Where is GREEN SCAPES located?

GREEN SCAPES is in Bowrampet, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500043).

When will GREEN SCAPES be completed?

The promoter's proposed date of completion filed with RERA is 30/08/2028. This is the promoter's declaration, not a guarantee.

More projects in Bowrampet