MODEL COUNTY is a plotted development, or open-plot layout, in Mangalpalli, Ibrahimpatnam mandal, Ranga Reddy district, developed by registered promoter M/S Green City Estates. Its total site area is 41,013.78 sq. m., with a net area of 40,893.38 sq. m.; the supplied record does not state the number of plots, blocks or floors, or a plot-configuration schedule. The project is registered under TG-RERA number P02400000584, and its promoter-declared completion date is 15.03.2022.

📘 Project brochure from the promoter’s website ↗

More from Green City Estates · 4 projects →

01What we found

Period endedTG-RERA registration ran to 15 Mar 2022 - check its extension on TG-RERA
20documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameMODEL COUNTY RERA record
Project typePlotted development / open-plot layout RERA record RERA filing
Phase / registered portionPhase not specified; registration covers the project as recorded
TG-RERA registrationP02400000584
Registration validity10/04/2019 to 15/03/2022; certificate says “2 years.” No extension is recorded in the supplied certificate
RERA status in supplied recordRegistration certificate states validity ended 15/03/2022; current registration status is not established by the supplied record
Registered promoterM/S Green City Estates RERA record
Entity typePartnership RERA filing

Land and geographic identity

FieldProject record
Locality / revenue villageMangalpalli RERA record RERA filing
MandalIbrahimpatnam RERA record RERA filing
DistrictRanga Reddy RERA record RERA filing
PIN501510 RERA record
Project survey numbersSy. No. 284/A and Sy. No. 285 RERA filing
SubdivisionsThe RERA record names 284/A and 285; subdivision details for Sy. No. 285 are not specified in the project identity fields RERA filing
Total site area41,013.78 sq. m. RERA filing
Area affected by road widening / FTL / nala widening120.400 sq. m. RERA filing
Net area40,893.38 sq. m. RERA filing
BoundariesEast: SY NO 271 AND 284; West: SY NO 231; North: SY NO 286 AND 289; South: SY NO 293 RERA filing

Development identity

FieldProject record
Planning / sanctioning authorities recordedHMDA technical layout approval; Adibatla Municipality proceedings concerning the draft residential layout Approvals record
Principal layout proceedingsProc.Roc.No.G1/253/(67)/LO/2018-19, dated 15.03.2019, Adibatla Municipality Approvals record
HMDA technical approvalApproval No. 02\\LOlPlg/HMDA/20'18, dated 27-01-2018; file number 102692lLO/Pto/HMDA/2014 Approvals record
Approved built-up area25,552.88 sq. m., as recorded in the RERA fields; the supplied material does not clarify how this building-area field applies to the plotted layout RERA filing
Mortgage area5,650.13 sq. m., as recorded in the RERA fields RERA filing
Buildings / floors / parking levelsNot disclosed in the supplied project record; this is a plotted-layout project RERA filing
Approved versus RERA-declared plot countsNot disclosed in the supplied record Layout record

Offering and status

FieldProject record
OfferingPlots; RERA-filed plot count, plot-size schedule and plot-wise availability are not supplied RERA filing Layout record
Construction / development stageThe RERA amenity record reports 43% for several infrastructure items; this is a reported progress figure, not independent site verification RERA amenities
Promoter-declared completion date15.03.2022
Original / revised completion datesThe supplied material gives 15.03.2022 as the promoter’s undertaking; no revised date is provided
Occupancy / completion certificateNo OC or completion certificate is identified in the supplied materials; phase or portion-specific certificate status is not established Document index

2. The project story

MODEL COUNTY is registered as a plotted development in Mangalpalli village, Ibrahimpatnam mandal, Ranga Reddy district, on Sy. Nos. 284/A and 285. Its recorded site area is 41,013.78 sq. m., with a net area of 40,893.38 sq. m. after the recorded 120.400 sq. m. affected area. The approved material describes an open-plot layout, rather than an apartment or multi-storey residential project. RERA record RERA filing

The RERA filing identifies the project as a “New Project,” and the promoter’s Form B undertaking gives 15.03.2022 as the completion date. The available RERA amenity data reports 43% progress for internal roads and footpaths, water supply, sewerage, green strip/park, street lighting, rainwater harvesting and the electrical meter room/substation/receiving station. These figures are reported project data; the supplied evidence does not independently verify completed works or establish plot-by-plot delivery. RERA filing RERA amenities

The supplied record does not identify the number of plots, their RERA-filed sizes, booking or availability status, or a current completion/OC position. The registration certificate’s stated validity period ended on 15/03/2022; registration validity and physical completion are separate matters. Layout record

3. Master plan, architecture & building design

The supplied approval material concerns a proposed draft open-plot layout in Sy. Nos. 284/a and 285. HMDA’s letter dated 27-01-2018 records technical approval and refers the matter to the local Executive Authority for further action and release of the draft layout permission after collection of necessary fees. Adibatla Municipality proceedings dated 15.03.2019 refer to an HMDA-sanctioned draft residential layout and set out road and open-space development conditions.

The Adibatla Municipality proceedings describe road formation and surfacing, side drains/gutters, and central medians for roads 18 mts and above. They also require open space to be developed with an ornamental compound wall and grill under the stated conditions. The supplied extracts do not include a layout drawing from which plot arrangement, internal-road geometry, park areas, utility-land allocation or phase boundaries can be described.

No building count, floor configuration, building footprint, tower height, or apartment design information is supplied. The RERA fields state an approved built-up area of 25,552.88 sq. m.; the supplied record does not explain its application to this plotted-layout project. No FSI-counted, gross, saleable or carpet-area measurements are supplied for plots. RERA filing Floor plans

4. Homes, configurations & floor plans

This is a plotted project; the supplied RERA record does not provide a plot inventory, plot count, configuration schedule, plot-wise area, booking status or availability schedule. RERA filing Layout record

The developer’s brochure describes plots of 150–600 Sq yds, but this is a marketing statement, not a RERA-filed inventory schedule.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
PlotsNot disclosedNot disclosedNot disclosedNot disclosedNot applicable / not suppliedNot supplied

The supplied floor-plan record contains two drawings, both scans pending measurement; no drawing-based area or room measurements are available. Apartment carpet-area comparisons therefore do not apply to the evidence provided for this plotted layout. Floor plans

5. Parking & vehicle circulation

The supplied project record does not establish sanctioned parking counts, visitor or accessible parking, parking allocation to plots, or vehicle-entry and internal-driveway details. No parking levels are recorded for this plotted layout. The Adibatla Municipality proceedings do refer to road development, including carriageway and drainage works, but do not provide a complete road plan or vehicle-circulation drawing. Layout record

6. Amenities, recreation & open spaces

The RERA amenity record reports the following infrastructure progress. The listed percentages are reported progress figures; no independent completion verification is supplied. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsSize not suppliedRERA amenity record RERA amenities43% reported; not independently verified
Water supplyDetails and capacity not suppliedRERA amenity record RERA amenities43% reported; not independently verified
SewerageListed as “Chamber, Lines, Septic Tank, STP”; configuration and capacity not suppliedRERA amenity record RERA amenities43% reported; not independently verified
Green strip / tot lot / parkArea and number not suppliedRERA amenity record RERA amenities43% reported; not independently verified
Street lightingQuantity and specification not suppliedRERA amenity record RERA amenities43% reported; not independently verified
Water conservation / rainwater harvestingQuantity and capacity not suppliedRERA amenity record RERA amenities43% reported; not independently verified
Electrical meter room / substation / receiving stationCapacity and configuration not suppliedRERA amenity record RERA amenities43% reported; not independently verified
Storm-water drainsDetails not suppliedRERA amenity record RERA amenities0% reported
Community buildingsType, size and capacity not suppliedRERA amenity record RERA amenities0% reported
Treatment and disposal of sewage and sullage waterDetails not suppliedRERA amenity record RERA amenities0% reported
Solid-waste management and disposalDetails not suppliedRERA amenity record RERA amenities0% reported
Energy managementDetails not suppliedRERA amenity record RERA amenities0% reported
Fire protection and fire-safety requirementsDetails not suppliedRERA amenity record RERA amenities0% reported
Aggregate recreational open spaceArea not suppliedRERA amenity record RERA amenities0% reported

The Adibatla Municipality proceedings name street lights, transformer, avenue plantation, park development, rainwater-harvesting pits, overhead tank, assured water-supply source and electrical supply lines among the layout amenities and infrastructure. The extract does not quantify these items or establish their completion.

The promoter’s brochure separately markets an all-round compound wall, entrance gate, 30’ and 40’ wide CC roads, two major parks, avenue plantation, water connections to plots, an overhead tank, underground electricity and drainage, security and water-harvesting pits. These are brochure claims, not evidence of delivered facilities.

7. Utilities, building services & safety

The RERA amenity record includes water supply, sewerage, rainwater harvesting, street lighting and an electrical meter room/substation/receiving station. It reports 43% progress for those listed items; capacities, detailed designs and independent completion verification are not supplied. Storm-water drains, sewage treatment/disposal, solid-waste management, energy management and fire protection are each recorded at 0% in the same amenity data. RERA amenities

The Adibatla Municipality proceedings identify an assured water-supply source and overhead tank, rainwater-harvesting pits, electrical supply lines, street lights and transformer. They do not specify source yield, storage capacity, treatment arrangements, electrical capacity, backup power, security systems or accessibility provisions.

The brochure claims water connections to each plot, underground drainage and underground electricity, among other features; these are marketing claims and are not treated here as verified delivered services.

8. Location, access & connectivity

The RERA-recorded location is Mangalpalli village, Ibrahimpatnam mandal, Ranga Reddy district, Telangana, PIN 501510. The supplied location record places the cadastral parcel centroid at 17.212002147726675, 78.58452245677158. RERA record Location record

The nearest sampled Outer Ring Road interchange is listed at approximately 4.8 km. No other independently measured distances, public-transport details or approach-road information are supplied. Location record

9. Developer & development status

The registered promoter is M/S Green City Estates, recorded as a partnership. The RERA filing names KONDRAJU SRINIVASA RAJU as an authorised signatory and lists KONDRAJU SRINIVASA RAJU, KONDRAJU VENKATA RAMANAMMA and KONDRAJU SUBBARAJU as partners. The supplied record lists its address as SIVA SAI COMPLEX, POGATHOTA, MANGALPALLI, Ibrahimpatnam, Ranga Reddy, 501510. RERA record RERA filing Parties record

Form B is a promoter declaration signed through Managing Partner Sri K Subba Raju, verified at Hyderabad on 5th day of Apr1l20l9. It undertakes completion by 15.03.2022 and includes declarations concerning title, encumbrances, project funds, audits and pending approvals. These are promoter declarations, not independent verification of the matters declared.

The registration certificate states validity from 10/04/2019 to 15/03/2022, and the supplied certificate does not record an extension. The RERA amenity record reports partial progress for specified infrastructure, but the evidence does not include independent site verification or a current completion certificate. RERA amenities

10. Approvals, official records & documents

TG-RERA registration certificate
DetailsMODEL COUNTY, P02400000584; issued 10/04/2019; stated validity to 15/03/2022; plotted project in Sy. Nos. 284/A and 285
HMDA technical layout approval
DetailsApproval No. 02\\LOlPlg/HMDA/20'18, dated 27-01-2018; file no. 102692lLO/Pto/HMDA/2014; proposed draft open-plot layout in Sy. Nos. 284/a and 285
Adibatla Municipality proceedings
DetailsProc.Roc.No.G1/253/(67)/LO/2018-19, dated 15.03.2019; proceedings concerning an HMDA-sanctioned draft residential layout and conditions for roads and open-space development
RERA Form B declaration
DetailsGreen City Estates declaration, verified in Hyderabad on 5th day of Apr1l20l9; includes promoter undertaking to complete by 15.03.2022
Layout plan document in RERA file
DetailsListed as a requested layout-plan document, but the supplied record does not provide an extracted plan for review
EvidenceDocument index
Occupancy / completion certificate
DetailsNo such certificate identified in the supplied materials
EvidenceDocument index

The supplied HMDA letter says the draft layout permission was to be released by the local Executive Authority after further action and collection of necessary fees. The project record does not include an extracted stamped final layout plan or a completion/occupancy certificate. Document index

Frequently asked questions

Is MODEL COUNTY registered with Telangana RERA?

Yes. MODEL COUNTY is registered with the Telangana Real Estate Regulatory Authority as P02400000584; the registration status is New Project.

Who is the developer of MODEL COUNTY?

The promoter named in the RERA registration is M/S GREEN CITY ESTATES.

Where is MODEL COUNTY located?

MODEL COUNTY is in MANGALPALLI, Ibrahimpatnam, Rangareddy, Telangana (501510).

When will MODEL COUNTY be completed?

The promoter's proposed date of completion filed with RERA is 15/03/2022. This is the promoter's declaration, not a guarantee.