Model County
M/S GREEN CITY ESTATES · Rangareddy · RERA P02400000584
MODEL COUNTY is a plotted development, or open-plot layout, in Mangalpalli, Ibrahimpatnam mandal, Ranga Reddy district, developed by registered promoter M/S Green City Estates. Its total site area is 41,013.78 sq. m., with a net area of 40,893.38 sq. m.; the supplied record does not state the number of plots, blocks or floors, or a plot-configuration schedule. The project is registered under TG-RERA number P02400000584, and its promoter-declared completion date is 15.03.2022.
📘 Project brochure from the promoter’s website ↗More from Green City Estates · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | MODEL COUNTY RERA record |
| Project type | Plotted development / open-plot layout RERA record RERA filing |
| Phase / registered portion | Phase not specified; registration covers the project as recorded |
| TG-RERA registration | P02400000584 |
| Registration validity | 10/04/2019 to 15/03/2022; certificate says “2 years.” No extension is recorded in the supplied certificate |
| RERA status in supplied record | Registration certificate states validity ended 15/03/2022; current registration status is not established by the supplied record |
| Registered promoter | M/S Green City Estates RERA record |
| Entity type | Partnership RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Mangalpalli RERA record RERA filing |
| Mandal | Ibrahimpatnam RERA record RERA filing |
| District | Ranga Reddy RERA record RERA filing |
| PIN | 501510 RERA record |
| Project survey numbers | Sy. No. 284/A and Sy. No. 285 RERA filing |
| Subdivisions | The RERA record names 284/A and 285; subdivision details for Sy. No. 285 are not specified in the project identity fields RERA filing |
| Total site area | 41,013.78 sq. m. RERA filing |
| Area affected by road widening / FTL / nala widening | 120.400 sq. m. RERA filing |
| Net area | 40,893.38 sq. m. RERA filing |
| Boundaries | East: SY NO 271 AND 284; West: SY NO 231; North: SY NO 286 AND 289; South: SY NO 293 RERA filing |
Development identity
| Field | Project record |
|---|---|
| Planning / sanctioning authorities recorded | HMDA technical layout approval; Adibatla Municipality proceedings concerning the draft residential layout Approvals record |
| Principal layout proceedings | Proc.Roc.No.G1/253/(67)/LO/2018-19, dated 15.03.2019, Adibatla Municipality Approvals record |
| HMDA technical approval | Approval No. 02\\LOlPlg/HMDA/20'18, dated 27-01-2018; file number 102692lLO/Pto/HMDA/2014 Approvals record |
| Approved built-up area | 25,552.88 sq. m., as recorded in the RERA fields; the supplied material does not clarify how this building-area field applies to the plotted layout RERA filing |
| Mortgage area | 5,650.13 sq. m., as recorded in the RERA fields RERA filing |
| Buildings / floors / parking levels | Not disclosed in the supplied project record; this is a plotted-layout project RERA filing |
| Approved versus RERA-declared plot counts | Not disclosed in the supplied record Layout record |
Offering and status
| Field | Project record |
|---|---|
| Offering | Plots; RERA-filed plot count, plot-size schedule and plot-wise availability are not supplied RERA filing Layout record |
| Construction / development stage | The RERA amenity record reports 43% for several infrastructure items; this is a reported progress figure, not independent site verification RERA amenities |
| Promoter-declared completion date | 15.03.2022 |
| Original / revised completion dates | The supplied material gives 15.03.2022 as the promoter’s undertaking; no revised date is provided |
| Occupancy / completion certificate | No OC or completion certificate is identified in the supplied materials; phase or portion-specific certificate status is not established Document index |
2. The project story
MODEL COUNTY is registered as a plotted development in Mangalpalli village, Ibrahimpatnam mandal, Ranga Reddy district, on Sy. Nos. 284/A and 285. Its recorded site area is 41,013.78 sq. m., with a net area of 40,893.38 sq. m. after the recorded 120.400 sq. m. affected area. The approved material describes an open-plot layout, rather than an apartment or multi-storey residential project. RERA record RERA filing
The RERA filing identifies the project as a “New Project,” and the promoter’s Form B undertaking gives 15.03.2022 as the completion date. The available RERA amenity data reports 43% progress for internal roads and footpaths, water supply, sewerage, green strip/park, street lighting, rainwater harvesting and the electrical meter room/substation/receiving station. These figures are reported project data; the supplied evidence does not independently verify completed works or establish plot-by-plot delivery. RERA filing RERA amenities
The supplied record does not identify the number of plots, their RERA-filed sizes, booking or availability status, or a current completion/OC position. The registration certificate’s stated validity period ended on 15/03/2022; registration validity and physical completion are separate matters. Layout record
3. Master plan, architecture & building design
The supplied approval material concerns a proposed draft open-plot layout in Sy. Nos. 284/a and 285. HMDA’s letter dated 27-01-2018 records technical approval and refers the matter to the local Executive Authority for further action and release of the draft layout permission after collection of necessary fees. Adibatla Municipality proceedings dated 15.03.2019 refer to an HMDA-sanctioned draft residential layout and set out road and open-space development conditions.
The Adibatla Municipality proceedings describe road formation and surfacing, side drains/gutters, and central medians for roads 18 mts and above. They also require open space to be developed with an ornamental compound wall and grill under the stated conditions. The supplied extracts do not include a layout drawing from which plot arrangement, internal-road geometry, park areas, utility-land allocation or phase boundaries can be described.
No building count, floor configuration, building footprint, tower height, or apartment design information is supplied. The RERA fields state an approved built-up area of 25,552.88 sq. m.; the supplied record does not explain its application to this plotted-layout project. No FSI-counted, gross, saleable or carpet-area measurements are supplied for plots. RERA filing Floor plans
4. Homes, configurations & floor plans
This is a plotted project; the supplied RERA record does not provide a plot inventory, plot count, configuration schedule, plot-wise area, booking status or availability schedule. RERA filing Layout record
The developer’s brochure describes plots of 150–600 Sq yds, but this is a marketing statement, not a RERA-filed inventory schedule.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
The supplied floor-plan record contains two drawings, both scans pending measurement; no drawing-based area or room measurements are available. Apartment carpet-area comparisons therefore do not apply to the evidence provided for this plotted layout. Floor plans
5. Parking & vehicle circulation
The supplied project record does not establish sanctioned parking counts, visitor or accessible parking, parking allocation to plots, or vehicle-entry and internal-driveway details. No parking levels are recorded for this plotted layout. The Adibatla Municipality proceedings do refer to road development, including carriageway and drainage works, but do not provide a complete road plan or vehicle-circulation drawing. Layout record
6. Amenities, recreation & open spaces
The RERA amenity record reports the following infrastructure progress. The listed percentages are reported progress figures; no independent completion verification is supplied. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Size not supplied | RERA amenity record RERA amenities | 43% reported; not independently verified |
| Water supply | Details and capacity not supplied | RERA amenity record RERA amenities | 43% reported; not independently verified |
| Sewerage | Listed as “Chamber, Lines, Septic Tank, STP”; configuration and capacity not supplied | RERA amenity record RERA amenities | 43% reported; not independently verified |
| Green strip / tot lot / park | Area and number not supplied | RERA amenity record RERA amenities | 43% reported; not independently verified |
| Street lighting | Quantity and specification not supplied | RERA amenity record RERA amenities | 43% reported; not independently verified |
| Water conservation / rainwater harvesting | Quantity and capacity not supplied | RERA amenity record RERA amenities | 43% reported; not independently verified |
| Electrical meter room / substation / receiving station | Capacity and configuration not supplied | RERA amenity record RERA amenities | 43% reported; not independently verified |
| Storm-water drains | Details not supplied | RERA amenity record RERA amenities | 0% reported |
| Community buildings | Type, size and capacity not supplied | RERA amenity record RERA amenities | 0% reported |
| Treatment and disposal of sewage and sullage water | Details not supplied | RERA amenity record RERA amenities | 0% reported |
| Solid-waste management and disposal | Details not supplied | RERA amenity record RERA amenities | 0% reported |
| Energy management | Details not supplied | RERA amenity record RERA amenities | 0% reported |
| Fire protection and fire-safety requirements | Details not supplied | RERA amenity record RERA amenities | 0% reported |
| Aggregate recreational open space | Area not supplied | RERA amenity record RERA amenities | 0% reported |
The Adibatla Municipality proceedings name street lights, transformer, avenue plantation, park development, rainwater-harvesting pits, overhead tank, assured water-supply source and electrical supply lines among the layout amenities and infrastructure. The extract does not quantify these items or establish their completion.
The promoter’s brochure separately markets an all-round compound wall, entrance gate, 30’ and 40’ wide CC roads, two major parks, avenue plantation, water connections to plots, an overhead tank, underground electricity and drainage, security and water-harvesting pits. These are brochure claims, not evidence of delivered facilities.
7. Utilities, building services & safety
The RERA amenity record includes water supply, sewerage, rainwater harvesting, street lighting and an electrical meter room/substation/receiving station. It reports 43% progress for those listed items; capacities, detailed designs and independent completion verification are not supplied. Storm-water drains, sewage treatment/disposal, solid-waste management, energy management and fire protection are each recorded at 0% in the same amenity data. RERA amenities
The Adibatla Municipality proceedings identify an assured water-supply source and overhead tank, rainwater-harvesting pits, electrical supply lines, street lights and transformer. They do not specify source yield, storage capacity, treatment arrangements, electrical capacity, backup power, security systems or accessibility provisions.
The brochure claims water connections to each plot, underground drainage and underground electricity, among other features; these are marketing claims and are not treated here as verified delivered services.
8. Location, access & connectivity
The RERA-recorded location is Mangalpalli village, Ibrahimpatnam mandal, Ranga Reddy district, Telangana, PIN 501510. The supplied location record places the cadastral parcel centroid at 17.212002147726675, 78.58452245677158. RERA record Location record
The nearest sampled Outer Ring Road interchange is listed at approximately 4.8 km. No other independently measured distances, public-transport details or approach-road information are supplied. Location record
9. Developer & development status
The registered promoter is M/S Green City Estates, recorded as a partnership. The RERA filing names KONDRAJU SRINIVASA RAJU as an authorised signatory and lists KONDRAJU SRINIVASA RAJU, KONDRAJU VENKATA RAMANAMMA and KONDRAJU SUBBARAJU as partners. The supplied record lists its address as SIVA SAI COMPLEX, POGATHOTA, MANGALPALLI, Ibrahimpatnam, Ranga Reddy, 501510. RERA record RERA filing Parties record
Form B is a promoter declaration signed through Managing Partner Sri K Subba Raju, verified at Hyderabad on 5th day of Apr1l20l9. It undertakes completion by 15.03.2022 and includes declarations concerning title, encumbrances, project funds, audits and pending approvals. These are promoter declarations, not independent verification of the matters declared.
The registration certificate states validity from 10/04/2019 to 15/03/2022, and the supplied certificate does not record an extension. The RERA amenity record reports partial progress for specified infrastructure, but the evidence does not include independent site verification or a current completion certificate. RERA amenities
10. Approvals, official records & documents
| Details | MODEL COUNTY, P02400000584; issued 10/04/2019; stated validity to 15/03/2022; plotted project in Sy. Nos. 284/A and 285 |
|---|
| Details | Approval No. 02\\LOlPlg/HMDA/20'18, dated 27-01-2018; file no. 102692lLO/Pto/HMDA/2014; proposed draft open-plot layout in Sy. Nos. 284/a and 285 |
|---|
| Details | Proc.Roc.No.G1/253/(67)/LO/2018-19, dated 15.03.2019; proceedings concerning an HMDA-sanctioned draft residential layout and conditions for roads and open-space development |
|---|
| Details | Green City Estates declaration, verified in Hyderabad on 5th day of Apr1l20l9; includes promoter undertaking to complete by 15.03.2022 |
|---|
| Details | Listed as a requested layout-plan document, but the supplied record does not provide an extracted plan for review |
|---|---|
| Evidence | Document index |
| Details | No such certificate identified in the supplied materials |
|---|---|
| Evidence | Document index |
The supplied HMDA letter says the draft layout permission was to be released by the local Executive Authority after further action and collection of necessary fees. The project record does not include an extracted stamped final layout plan or a completion/occupancy certificate. Document index
1. Project at a glance
Project identity
Registered project name: MODEL COUNTY
Project type: Plotted development / open-plot layout
Phase / registered portion: Phase not specified; registration covers the project as recorded
TG-RERA registration: P02400000584
Registration validity: 10/04/2019 to 15/03/2022; certificate says “2 years.” No extension is recorded in the supplied certificate
RERA status in supplied record: Registration certificate states validity ended 15/03/2022; current registration status is not established by the supplied record
Registered promoter: M/S Green City Estates
Entity type: Partnership
Land and geographic identity
Locality / revenue village: Mangalpalli
Mandal: Ibrahimpatnam
District: Ranga Reddy
PIN: 501510
Project survey numbers: Sy. No. 284/A and Sy. No. 285
Subdivisions: The RERA record names 284/A and 285; subdivision details for Sy. No. 285 are not specified in the project identity fields
Total site area: 41,013.78 sq. m.
Area affected by road widening / FTL / nala widening: 120.400 sq. m.
Net area: 40,893.38 sq. m.
Boundaries: East: SY NO 271 AND 284; West: SY NO 231; North: SY NO 286 AND 289; South: SY NO 293
Development identity
Planning / sanctioning authorities recorded: HMDA technical layout approval; Adibatla Municipality proceedings concerning the draft residential layout
Principal layout proceedings: Proc.Roc.No.G1/253/(67)/LO/2018-19, dated 15.03.2019, Adibatla Municipality
HMDA technical approval: Approval No. 02\\LOlPlg/HMDA/20'18, dated 27-01-2018; file number 102692lLO/Pto/HMDA/2014
Approved built-up area: 25,552.88 sq. m., as recorded in the RERA fields; the supplied material does not clarify how this building-area field applies to the plotted layout
Mortgage area: 5,650.13 sq. m., as recorded in the RERA fields
Buildings / floors / parking levels: Not disclosed in the supplied project record; this is a plotted-layout project
Approved versus RERA-declared plot counts: Not disclosed in the supplied record
Offering and status
Offering: Plots; RERA-filed plot count, plot-size schedule and plot-wise availability are not supplied
Construction / development stage: The RERA amenity record reports 43% for several infrastructure items; this is a reported progress figure, not independent site verification
Promoter-declared completion date: 15.03.2022
Original / revised completion dates: The supplied material gives 15.03.2022 as the promoter’s undertaking; no revised date is provided
Occupancy / completion certificate: No OC or completion certificate is identified in the supplied materials; phase or portion-specific certificate status is not established
2. The project story
MODEL COUNTY is registered as a plotted development in Mangalpalli village, Ibrahimpatnam mandal, Ranga Reddy district, on Sy. Nos. 284/A and 285. Its recorded site area is 41,013.78 sq. m., with a net area of 40,893.38 sq. m. after the recorded 120.400 sq. m. affected area. The approved material describes an open-plot layout, rather than an apartment or multi-storey residential project.
The RERA filing identifies the project as a “New Project,” and the promoter’s Form B undertaking gives 15.03.2022 as the completion date. The available RERA amenity data reports 43% progress for internal roads and footpaths, water supply, sewerage, green strip/park, street lighting, rainwater harvesting and the electrical meter room/substation/receiving station. These figures are reported project data; the supplied evidence does not independently verify completed works or establish plot-by-plot delivery.
The supplied record does not identify the number of plots, their RERA-filed sizes, booking or availability status, or a current completion/OC position. The registration certificate’s stated validity period ended on 15/03/2022; registration validity and physical completion are separate matters.
3. Master plan, architecture & building design
The supplied approval material concerns a proposed draft open-plot layout in Sy. Nos. 284/a and 285. HMDA’s letter dated 27-01-2018 records technical approval and refers the matter to the local Executive Authority for further action and release of the draft layout permission after collection of necessary fees. Adibatla Municipality proceedings dated 15.03.2019 refer to an HMDA-sanctioned draft residential layout and set out road and open-space development conditions.
The Adibatla Municipality proceedings describe road formation and surfacing, side drains/gutters, and central medians for roads 18 mts and above. They also require open space to be developed with an ornamental compound wall and grill under the stated conditions. The supplied extracts do not include a layout drawing from which plot arrangement, internal-road geometry, park areas, utility-land allocation or phase boundaries can be described.
No building count, floor configuration, building footprint, tower height, or apartment design information is supplied. The RERA fields state an approved built-up area of 25,552.88 sq. m.; the supplied record does not explain its application to this plotted-layout project. No FSI-counted, gross, saleable or carpet-area measurements are supplied for plots.
4. Homes, configurations & floor plans
This is a plotted project; the supplied RERA record does not provide a plot inventory, plot count, configuration schedule, plot-wise area, booking status or availability schedule.
The developer’s brochure describes plots of 150–600 Sq yds, but this is a marketing statement, not a RERA-filed inventory schedule.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
The supplied floor-plan record contains two drawings, both scans pending measurement; no drawing-based area or room measurements are available. Apartment carpet-area comparisons therefore do not apply to the evidence provided for this plotted layout.
5. Parking & vehicle circulation
The supplied project record does not establish sanctioned parking counts, visitor or accessible parking, parking allocation to plots, or vehicle-entry and internal-driveway details. No parking levels are recorded for this plotted layout. The Adibatla Municipality proceedings do refer to road development, including carriageway and drainage works, but do not provide a complete road plan or vehicle-circulation drawing.
6. Amenities, recreation & open spaces
The RERA amenity record reports the following infrastructure progress. The listed percentages are reported progress figures; no independent completion verification is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Size not supplied | RERA amenity record | 43% reported; not independently verified |
| Water supply | Details and capacity not supplied | RERA amenity record | 43% reported; not independently verified |
| Sewerage | Listed as “Chamber, Lines, Septic Tank, STP”; configuration and capacity not supplied | RERA amenity record | 43% reported; not independently verified |
| Green strip / tot lot / park | Area and number not supplied | RERA amenity record | 43% reported; not independently verified |
| Street lighting | Quantity and specification not supplied | RERA amenity record | 43% reported; not independently verified |
| Water conservation / rainwater harvesting | Quantity and capacity not supplied | RERA amenity record | 43% reported; not independently verified |
| Electrical meter room / substation / receiving station | Capacity and configuration not supplied | RERA amenity record | 43% reported; not independently verified |
| Storm-water drains | Details not supplied | RERA amenity record | 0% reported |
| Community buildings | Type, size and capacity not supplied | RERA amenity record | 0% reported |
| Treatment and disposal of sewage and sullage water | Details not supplied | RERA amenity record | 0% reported |
| Solid-waste management and disposal | Details not supplied | RERA amenity record | 0% reported |
| Energy management | Details not supplied | RERA amenity record | 0% reported |
| Fire protection and fire-safety requirements | Details not supplied | RERA amenity record | 0% reported |
| Aggregate recreational open space | Area not supplied | RERA amenity record | 0% reported |
The Adibatla Municipality proceedings name street lights, transformer, avenue plantation, park development, rainwater-harvesting pits, overhead tank, assured water-supply source and electrical supply lines among the layout amenities and infrastructure. The extract does not quantify these items or establish their completion.
The promoter’s brochure separately markets an all-round compound wall, entrance gate, 30’ and 40’ wide CC roads, two major parks, avenue plantation, water connections to plots, an overhead tank, underground electricity and drainage, security and water-harvesting pits. These are brochure claims, not evidence of delivered facilities.
7. Utilities, building services & safety
The RERA amenity record includes water supply, sewerage, rainwater harvesting, street lighting and an electrical meter room/substation/receiving station. It reports 43% progress for those listed items; capacities, detailed designs and independent completion verification are not supplied. Storm-water drains, sewage treatment/disposal, solid-waste management, energy management and fire protection are each recorded at 0% in the same amenity data.
The Adibatla Municipality proceedings identify an assured water-supply source and overhead tank, rainwater-harvesting pits, electrical supply lines, street lights and transformer. They do not specify source yield, storage capacity, treatment arrangements, electrical capacity, backup power, security systems or accessibility provisions.
The brochure claims water connections to each plot, underground drainage and underground electricity, among other features; these are marketing claims and are not treated here as verified delivered services.
8. Location, access & connectivity
The RERA-recorded location is Mangalpalli village, Ibrahimpatnam mandal, Ranga Reddy district, Telangana, PIN 501510. The supplied location record places the cadastral parcel centroid at 17.212002147726675, 78.58452245677158.
The nearest sampled Outer Ring Road interchange is listed at approximately 4.8 km. No other independently measured distances, public-transport details or approach-road information are supplied.
9. Developer & development status
The registered promoter is M/S Green City Estates, recorded as a partnership. The RERA filing names KONDRAJU SRINIVASA RAJU as an authorised signatory and lists KONDRAJU SRINIVASA RAJU, KONDRAJU VENKATA RAMANAMMA and KONDRAJU SUBBARAJU as partners. The supplied record lists its address as SIVA SAI COMPLEX, POGATHOTA, MANGALPALLI, Ibrahimpatnam, Ranga Reddy, 501510.
Form B is a promoter declaration signed through Managing Partner Sri K Subba Raju, verified at Hyderabad on 5th day of Apr1l20l9. It undertakes completion by 15.03.2022 and includes declarations concerning title, encumbrances, project funds, audits and pending approvals. These are promoter declarations, not independent verification of the matters declared.
The registration certificate states validity from 10/04/2019 to 15/03/2022, and the supplied certificate does not record an extension. The RERA amenity record reports partial progress for specified infrastructure, but the evidence does not include independent site verification or a current completion certificate.
10. Approvals, official records & documents
| Details | MODEL COUNTY, P02400000584; issued 10/04/2019; stated validity to 15/03/2022; plotted project in Sy. Nos. 284/A and 285 |
|---|
| Details | Approval No. 02\\LOlPlg/HMDA/20'18, dated 27-01-2018; file no. 102692lLO/Pto/HMDA/2014; proposed draft open-plot layout in Sy. Nos. 284/a and 285 |
|---|
| Details | Proc.Roc.No.G1/253/(67)/LO/2018-19, dated 15.03.2019; proceedings concerning an HMDA-sanctioned draft residential layout and conditions for roads and open-space development |
|---|
| Details | Green City Estates declaration, verified in Hyderabad on 5th day of Apr1l20l9; includes promoter undertaking to complete by 15.03.2022 |
|---|
| Details | Listed as a requested layout-plan document, but the supplied record does not provide an extracted plan for review |
|---|
| Details | No such certificate identified in the supplied materials |
|---|
The supplied HMDA letter says the draft layout permission was to be released by the local Executive Authority after further action and collection of necessary fees. The project record does not include an extracted stamped final layout plan or a completion/occupancy certificate.
Frequently asked questions
Is MODEL COUNTY registered with Telangana RERA?
Yes. MODEL COUNTY is registered with the Telangana Real Estate Regulatory Authority as P02400000584; the registration status is New Project.
Who is the developer of MODEL COUNTY?
The promoter named in the RERA registration is M/S GREEN CITY ESTATES.
Where is MODEL COUNTY located?
MODEL COUNTY is in MANGALPALLI, Ibrahimpatnam, Rangareddy, Telangana (501510).
When will MODEL COUNTY be completed?
The promoter's proposed date of completion filed with RERA is 15/03/2022. This is the promoter's declaration, not a guarantee.