NANDAN LAKE BREEZE AND NANDAN NEST is a residential project in Patancheru, Patancheru Mandal, Sangareddy District, developed by registered promoter MANTOOR INFRASTRUCTURE PRIVATE LIMITED. The registered site extent is 317754.47 sq m; the RERA filing gives 1085 total building units as per approved plan and 1085 proposed building units as per agreement, and records 1,752 1BHK homes, 1,087 2BHK homes and 2 unspecified “BHK” homes. Individual HMDA sanction drawings show differing floor descriptions, including G+1, G+2, 3+1 and 4+1 floors. The TG-RERA registration is P01100007622, and the RERA Form B declares completion by 12/06/2028.
More from Mantoor Infrastructure Pvt Ltd · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | NANDAN LAKE BREEZE AND NANDAN NEST RERA record |
| Project type | RERA record: Residential; the filed HMDA layout permission describes a draft residential layout with housing and villas. RERA filing |
| Phase / registered portion | No separate phase name is stated in the supplied registration record. The registration covers the listed project land; confirm any unit’s phase and plot against the registered plan and unit-specific documents. RERA record |
| TG-RERA registration | P01100007622 RERA record |
| Registration validity | Certificate states 30/01/2024 to 12/06/2028; no extension is recorded. This is registration validity, not an occupancy certificate or proof of completion. |
| Registered promoter | MANTOOR INFRASTRUCTURE PRIVATE LIMITED, a company; CIN U45400TG2015PTC099325. RERA record Corporate record |
| RERA status | The supplied record labels the project “New Project.” Registration certificate issued under section 5. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Patancheru / PATANCHERU RERA record RERA filing |
| Revenue village | Chitkul, as stated in the HMDA draft layout permission and RERA certificate. The RERA project fields also state Patancheru; the revenue-village identification for the scheduled land is Chitkul. |
| Mandal | Patancheru / PATANCHERU RERA record |
| District | Sangareddy; the registration certificate also records Sangareddy. RERA record |
| PIN | 502307 RERA record RERA filing |
| Project survey numbers and subdivisions | 36/P, 37, 38, 45, 49, 50, 51, 541, 545, 552, 554/P, 555, 556, 557, 558/P, 559, 560, 561, 562, 563, 564, 565, 566 RERA record Land records |
| Registered site extent | 317754.47 sq m; also stated in the HMDA layout permission as Ac.78-20½ Gts. RERA filing |
| Total / net area; affected area | RERA fields state total area 317754.47 sq m, net area 317754.47 sq m, and area affected in road widening/FTL/nala widening as 0 sq m. These are filed figures, not an independent survey measurement. RERA filing |
| Boundaries | East: ROAD WIDTH - 60; west: ROAD WIDTH -100; north: OTHRES LAND; south: OTHERS LAND. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the Chitkul Gram Panchayat proceedings also refer to HMDA approval. Approvals record |
| Principal layout approval | Draft Layout Permit No. 19/LO/Plg/HMDA/2023, dated 13-06-2023, for a draft residential layout with housing. The permission records HMDA mortgage sets and conditions. |
| Approved built-up area | RERA fields state 227176.70 sq m. This is the filed “Approved Built up Area” figure; no separate verified FSI-counted, gross built-up, or carpet-area project total is supplied. RERA filing |
| Buildings / blocks | The RERA filing gives 1085 total building units as per approved plan and 1085 proposed building units as per agreement. Other supplied counts use different labels (see below); no single reconciled building/block count is established here. RERA filing RERA unit table |
| Floors | Individual HMDA sanction drawings show dwelling-unit designs with differing floor descriptions, including G+1, G+2, 3+1 and 4+1 floors. The supplied drawing records do not establish a single project-wide floor configuration. |
| Parking levels | Not established by the supplied project-level evidence. RERA unit table Document index |
| Unit count | RERA unit configuration records total 2,841 homes across filed categories; the portal-derived overall unit record says 2,850 total units, while the RERA land-details field states 1,085 building units. These counts have different labels and are not reconciled in the supplied evidence. RERA unit table RERA unit details RERA filing |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configurations | 1BHK: 1,752 units; 2BHK: 1,087; unspecified “BHK”: 2. The RERA-filed table also contains 9 rows coded as floor labels or individual numbers, which are not treated as homes on sale. RERA unit table RERA unit details |
| RERA-filed saleable area | 1BHK: 55.96–112.0 sq m; 2BHK: 99.06–112.0 sq m; unspecified BHK: 98.0 sq m. RERA unit table RERA unit details |
| Booked / available | Portal-derived counts show 0 booked and 2,841 available across the three home configurations. The portal record has no as-of date, so these counts are indicative, not a current inventory confirmation. RERA unit table |
| Construction stage | The project is listed as “New Project”; a reliable, independently verified site-progress stage is not supplied. RERA record RERA filing |
| Completion dates | RERA Form B declares completion by 12/06/2028; the project header separately lists proposed completion as 12/10/2028. The supplied evidence does not establish a revised completion date. RERA record |
| Occupancy / completion certificate | No project occupancy or completion certificate is identified in the supplied record. The RERA registration remains valid to 12/06/2028; validity alone does not establish completion or OC status. Document index |
2. The project story
NANDAN LAKE BREEZE AND NANDAN NEST is registered with TG-RERA as a residential project promoted by MANTOOR INFRASTRUCTURE PRIVATE LIMITED. Its filed land schedule is in Chitkul village, Patancheru Mandal, Sangareddy District, across the 23 survey numbers and subdivisions listed above. HMDA’s filed draft layout permission describes housing in a 317754.47 sq m site and records that specified villa plots are mortgaged to HMDA; it says sales are permitted only for plots other than the mortgaged plots. RERA record Land records
The project is presented in RERA records as residential, while the supporting HMDA material describes a layout with housing and individual dwelling-unit plans. The supplied plans show varied unit designs and floor descriptions, but do not provide a reliable single project-wide schedule of building heights, construction progress, or completed/occupied portions. The RERA filing reports 1,752 1BHK and 1,087 2BHK homes, plus two unspecified BHK units; its portal inventory indicates no bookings, but has no as-of date. These are filing/portal records, not independent site or sales verification. RERA filing RERA unit table RERA unit details
The promoter’s Form B declares completion by 12/06/2028. No occupancy or completion certificate, independently verified construction update, or phase/tower-specific completion status is included in the supplied evidence. Document index
3. Master plan, architecture & building design
The principal project-wide approval evidence is HMDA’s Draft Layout Permit No. 19/LO/Plg/HMDA/2023, dated 13-06-2023. It covers the Chitkul site and requires layout infrastructure, including roads, storm-water drains, underground drainage, water supply, electrical lines, street lights, transformer, avenue planting, park development and rainwater-harvesting pits. The permission also states that HMDA does not take up the layout development works and sets a five-year period from issue for completing the specified development works.
RERA records 317754.47 sq m total and net site area, 0 sq m affected area, and approved built-up area of 227176.70 sq m. The supplied drawing set includes individual dwelling-unit sanction drawings and a separate amenity drawing; it does not provide a consolidated, readable project-wide schedule of footprints, building heights, floor-by-floor area, residential/common-area split, or phase organization. The individual drawings variously identify G+1, G+2, 3+1 and 4+1-floor designs, so those details should be confirmed against the approved plan applicable to the specific purchase. RERA filing RERA filing
The plans identify dwelling-unit layouts, plot numbers and access roads, and some drawings show percolation or rainwater-harvesting pits. These drawing-specific details should not be read as a complete project-wide design schedule. No measured carpet area is available: the drawing review reports 60 drawings, 0 measured and 60 scans pending. Floor plans
4. Homes, configurations & floor plans
The following configuration counts and saleable areas are from the TG-RERA portal filing. The portal inventory has no supplied as-of date. “Saleable area” is the RERA-filed figure; it is not a drawing-measured carpet area. The supplied floor-plan review has not yet measured any drawings, so carpet area and loading are not available. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 1BHK | 1,752 | 0 | 1,752 | 55.96–112.0 sq m | Not measured | Not supplied |
| 2BHK | 1,087 | 0 | 1,087 | 99.06–112.0 sq m | Not measured | Not supplied |
| Unspecified BHK | 2 | 0 | 2 | 98.0 sq m | Not measured | Not supplied |
The RERA filing also contains 9 records coded as “First Floor,” “Ground Floor,” or individual numbers. Those are not treated as home configurations or saleable homes in this table. RERA unit table RERA unit details
The supplied vendor material describes “3 BHK Villa” and “4 BHK Villa” configurations and gives carpet-area figures of 1503 sq.ft and 2142, respectively. These are vendor claims, not RERA-filed configuration counts or drawing-measured areas; no floor-plan drawings have been measured to verify them. Promoter website Floor plans
5. Parking & vehicle circulation
Parking counts and a project-wide arrangement (surface, covered, visitor, accessible, or mechanical) are not established in the supplied project-level records. The vendor lists “covered car parking,” but supplies no space count, location, allocation terms, or supporting project drawing in the material provided; treat it as a vendor claim, not an established sanctioned or exclusive entitlement. Promoter website RERA unit table Document index
The filed HMDA layout permission identifies layout roads, but the supplied material does not establish parking-level plans, ramp arrangements, pedestrian separation, EV charging, or unit-specific parking allocation. A drawn or marketed parking space should not be assumed to be an exclusive legal entitlement without the relevant sanctioned plan and registered sale documents. Document index
6. Amenities, recreation & open spaces
The RERA amenities record lists 14 project facilities. Its “available” entries are portal-field responses; the supplied record shows 0% progress for each and provides no independent confirmation of completion. HMDA’s layout permission separately lists infrastructure and development conditions. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | No size supplied | RERA amenities RERA amenities | RERA field: “YES”; 0% progress; not independently verified |
| Water supply | No source, capacity or storage details supplied here | RERA amenities RERA amenities; HMDA layout conditions | RERA field: “YES”; 0% progress; not independently verified |
| Sewerage (chambers, lines, septic tank, STP) | No capacity supplied | RERA amenities RERA amenities; HMDA layout conditions | RERA field: “YES”; 0% progress; not independently verified |
| Storm-water drains | No size supplied | RERA amenities RERA amenities; HMDA layout conditions | RERA amenities record: 0% progress; not independently verified |
| Green strip / tot lot / park | No area supplied | RERA amenities RERA amenities; HMDA layout conditions | RERA amenities record: 0% progress; not independently verified |
| Street lighting | No quantity or specification supplied | RERA amenities RERA amenities; HMDA layout conditions | RERA amenities record: 0% progress; not independently verified |
| Community buildings | No size or capacity supplied | RERA amenities RERA amenities | RERA amenities record: 0% progress; not independently verified |
| Sewage and sullage treatment/disposal | No capacity supplied | RERA amenities RERA amenities | RERA amenities record: 0% progress; not independently verified |
| Solid-waste management and disposal | No system or capacity supplied | RERA amenities RERA amenities | RERA amenities record: 0% progress; not independently verified |
| Water conservation / rainwater harvesting | No project-wide capacity supplied | RERA amenities RERA amenities; HMDA layout conditions | RERA field: “YES”; 0% progress; not independently verified |
| Energy management | No details supplied | RERA amenities RERA amenities | RERA amenities record: 0% progress; not independently verified |
| Fire protection and fire-safety requirements | No systems or specifications supplied | RERA amenities RERA amenities | RERA amenities record: 0% progress; not independently verified |
| Electrical meter room / substation / receiving station | No capacity supplied | RERA amenities RERA amenities; HMDA layout conditions | RERA field: “YES”; 0% progress; not independently verified |
| Aggregate recreational open space | No area supplied | RERA amenities RERA amenities; HMDA layout conditions | RERA amenities record: 0% progress; not independently verified |
| Swimming pool, gym, children’s play area, clubhouse | No size or capacity supplied | Vendor material Promoter website | Vendor-listed; not established as sanctioned or completed |
| Avenue planting | No count or area supplied | HMDA layout conditions | Required in the permission; completion not independently verified |
| Park development | No area supplied | HMDA layout conditions | Required in the permission; completion not independently verified |
7. Utilities, building services & safety
Water and drainage: RERA records water supply, sewerage (including septic tank/STP), storm-water drains, treatment/disposal and rainwater harvesting. HMDA’s layout permission specifies internal water-supply pipelines, an overhead tank, storm-water drains, underground drainage, a common septic tank/STP and rainwater-harvesting pits. The supplied evidence does not state capacities, water source, treatment performance, reuse quantities, or verified completion. RERA amenities
Electrical: The RERA amenities record lists an electrical meter room, substation or receiving station. HMDA’s permission lists electrical supply lines, a transformer and street lights. No supply capacity, backup-generation provision, or EV-charging provision is established in the project-level evidence. RERA amenities
Building services and safety: Some individual dwelling-unit drawings show percolation or recharge pits. The Gram Panchayat permission directs installation of fire equipment as per National Building Code rules; that is a stated condition, not evidence that equipment has been installed or that a project-wide fire clearance has been obtained. The supplied material does not establish lifts, lift capacities, fire stairs, fire-service access, accessibility provisions, CCTV, security systems, or waste-segregation arrangements.
8. Location, access & connectivity
The registered project location is Patancheru, Patancheru Mandal, Sangareddy District, PIN 502307; the HMDA layout and Gram Panchayat records identify the revenue village as Chitkul. HMDA drawing extracts show internal road widths in some plan sheets, including 7.77 m, 9.75 m, 9.84 m and 10.0 m; these are drawing-specific, not a consolidated road schedule. RERA record
The supplied cadastral/geocoding record gives a parcel centroid of 17.41528, 78.35459. A supplied connectivity record lists Financial District (Nanakramguda) at 1.2 km; this is a supplied measured distance, with no route or travel time specified. Vendor material separately lists Patancheru Railway Station (2.7 Km), schools, and a shopping centre; those are vendor-provided distances, not independent route measurements. Location record Promoter website
9. Developer & development status
The registered legal promoter is MANTOOR INFRASTRUCTURE PRIVATE LIMITED, a company with CIN U45400TG2015PTC099325 and GSTIN 36AAJCM7957J2ZO. The project record gives the promoter address as Shamrock Apartments, Opp Sai Colony, Chitkul, Patancheru, Sangareddy, 502307; no official website or project contact details are established in the supplied project data. Corporate record Parties record
Mantoor Ravinder Reddy is listed as authorized signatory; Lakshmangari Sudhakar Reddy is listed as director. In Form B, Mantoor Ravinder Reddy signs as authorized signatory and declares completion by 12/06/2028, land free from encumbrances, and the stated RERA account and compliance undertakings. These are promoter declarations. The RERA record shows the project as “New Project”; independently verified construction progress and phase-/tower-specific completion or occupancy status are not supplied. Parties record RERA record
10. Approvals, official records & documents
| Record | Supplied evidence and scope |
|---|---|
| TG-RERA registration | FORM C registration P01100007622, issued 30/01/2024; valid until 12/06/2028. |
| HMDA draft layout permission | Draft Layout Permit No. 19/LO/Plg/HMDA/2023, dated 13-06-2023; residential layout with housing on the listed Chitkul survey numbers. The permission includes infrastructure and development conditions and identifies HMDA-mortgaged villa plots. |
| Chitkul Gram Panchayat proceedings | GP/Chitkul/Proceeding/02/2024, dated 11/01/2024; proceedings refer to HMDA’s layout permission and list the project survey numbers. |
| HMDA dwelling-unit drawings | Individual sanction drawings are filed for dwelling-unit designs and plots; examples include east-facing and west-facing units, with varying floor descriptions. They generally describe HMDA technical approval forwarded to the municipality/local body for final sanction; they are not a consolidated project-wide plan summary. |
| Promoter Form B | Form-B affidavit by Mantoor Ravinder Reddy as authorized signatory, with a declaration date rendered as “30.... DEC day of. 2023”; includes the promoter’s completion undertaking of 12/06/2028. |
| Occupancy / completion record | No project occupancy or completion certificate is identified in the supplied documents. Document index |
| Layout portal lookup | HMDA DPMS approved-layout lookup is not publicly reachable in the supplied research record; no public layout lookup result is available from that source. HMDA |
| Project-wide progress and measured drawings | Supplied floor-plan review: 60 drawings, 0 measured, 60 scans pending. No independently verified construction progress is supplied. Floor plans RERA record |
1. Project at a glance
Project identity
Registered name: NANDAN LAKE BREEZE AND NANDAN NEST
Project type: RERA record: Residential; the filed HMDA layout permission describes a draft residential layout with housing and villas.
Phase / registered portion: No separate phase name is stated in the supplied registration record. The registration covers the listed project land; confirm any unit’s phase and plot against the registered plan and unit-specific documents.
TG-RERA registration: P01100007622
Registration validity: Certificate states 30/01/2024 to 12/06/2028; no extension is recorded. This is registration validity, not an occupancy certificate or proof of completion.
Registered promoter: MANTOOR INFRASTRUCTURE PRIVATE LIMITED, a company; CIN U45400TG2015PTC099325.
RERA status: The supplied record labels the project “New Project.” Registration certificate issued under section 5.
Land and geographic identity
Locality: Patancheru / PATANCHERU
Revenue village: Chitkul, as stated in the HMDA draft layout permission and RERA certificate. The RERA project fields also state Patancheru; the revenue-village identification for the scheduled land is Chitkul.
Mandal: Patancheru / PATANCHERU
District: Sangareddy; the registration certificate also records Sangareddy.
PIN: 502307
Project survey numbers and subdivisions: 36/P, 37, 38, 45, 49, 50, 51, 541, 545, 552, 554/P, 555, 556, 557, 558/P, 559, 560, 561, 562, 563, 564, 565, 566
Registered site extent: 317754.47 sq m; also stated in the HMDA layout permission as Ac.78-20½ Gts.
Total / net area; affected area: RERA fields state total area 317754.47 sq m, net area 317754.47 sq m, and area affected in road widening/FTL/nala widening as 0 sq m. These are filed figures, not an independent survey measurement.
Boundaries: East: ROAD WIDTH - 60; west: ROAD WIDTH -100; north: OTHRES LAND; south: OTHERS LAND.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the Chitkul Gram Panchayat proceedings also refer to HMDA approval.
Principal layout approval: Draft Layout Permit No. 19/LO/Plg/HMDA/2023, dated 13-06-2023, for a draft residential layout with housing. The permission records HMDA mortgage sets and conditions.
Approved built-up area: RERA fields state 227176.70 sq m. This is the filed “Approved Built up Area” figure; no separate verified FSI-counted, gross built-up, or carpet-area project total is supplied.
Buildings / blocks: The RERA filing gives 1085 total building units as per approved plan and 1085 proposed building units as per agreement. Other supplied counts use different labels (see below); no single reconciled building/block count is established here.
Floors: Individual HMDA sanction drawings show dwelling-unit designs with differing floor descriptions, including G+1, G+2, 3+1 and 4+1 floors. The supplied drawing records do not establish a single project-wide floor configuration.
Parking levels: Not established by the supplied project-level evidence.
Unit count: RERA unit configuration records total 2,841 homes across filed categories; the portal-derived overall unit record says 2,850 total units, while the RERA land-details field states 1,085 building units. These counts have different labels and are not reconciled in the supplied evidence.
Offering and status
RERA-filed configurations: 1BHK: 1,752 units; 2BHK: 1,087; unspecified “BHK”: 2. The RERA-filed table also contains 9 rows coded as floor labels or individual numbers, which are not treated as homes on sale.
RERA-filed saleable area: 1BHK: 55.96–112.0 sq m; 2BHK: 99.06–112.0 sq m; unspecified BHK: 98.0 sq m.
Booked / available: Portal-derived counts show 0 booked and 2,841 available across the three home configurations. The portal record has no as-of date, so these counts are indicative, not a current inventory confirmation.
Construction stage: The project is listed as “New Project”; a reliable, independently verified site-progress stage is not supplied.
Completion dates: RERA Form B declares completion by 12/06/2028; the project header separately lists proposed completion as 12/10/2028. The supplied evidence does not establish a revised completion date.
Occupancy / completion certificate: No project occupancy or completion certificate is identified in the supplied record. The RERA registration remains valid to 12/06/2028; validity alone does not establish completion or OC status.
2. The project story
NANDAN LAKE BREEZE AND NANDAN NEST is registered with TG-RERA as a residential project promoted by MANTOOR INFRASTRUCTURE PRIVATE LIMITED. Its filed land schedule is in Chitkul village, Patancheru Mandal, Sangareddy District, across the 23 survey numbers and subdivisions listed above. HMDA’s filed draft layout permission describes housing in a 317754.47 sq m site and records that specified villa plots are mortgaged to HMDA; it says sales are permitted only for plots other than the mortgaged plots.
The project is presented in RERA records as residential, while the supporting HMDA material describes a layout with housing and individual dwelling-unit plans. The supplied plans show varied unit designs and floor descriptions, but do not provide a reliable single project-wide schedule of building heights, construction progress, or completed/occupied portions. The RERA filing reports 1,752 1BHK and 1,087 2BHK homes, plus two unspecified BHK units; its portal inventory indicates no bookings, but has no as-of date. These are filing/portal records, not independent site or sales verification.
The promoter’s Form B declares completion by 12/06/2028. No occupancy or completion certificate, independently verified construction update, or phase/tower-specific completion status is included in the supplied evidence.
3. Master plan, architecture & building design
The principal project-wide approval evidence is HMDA’s Draft Layout Permit No. 19/LO/Plg/HMDA/2023, dated 13-06-2023. It covers the Chitkul site and requires layout infrastructure, including roads, storm-water drains, underground drainage, water supply, electrical lines, street lights, transformer, avenue planting, park development and rainwater-harvesting pits. The permission also states that HMDA does not take up the layout development works and sets a five-year period from issue for completing the specified development works.
RERA records 317754.47 sq m total and net site area, 0 sq m affected area, and approved built-up area of 227176.70 sq m. The supplied drawing set includes individual dwelling-unit sanction drawings and a separate amenity drawing; it does not provide a consolidated, readable project-wide schedule of footprints, building heights, floor-by-floor area, residential/common-area split, or phase organization. The individual drawings variously identify G+1, G+2, 3+1 and 4+1-floor designs, so those details should be confirmed against the approved plan applicable to the specific purchase.
The plans identify dwelling-unit layouts, plot numbers and access roads, and some drawings show percolation or rainwater-harvesting pits. These drawing-specific details should not be read as a complete project-wide design schedule. No measured carpet area is available: the drawing review reports 60 drawings, 0 measured and 60 scans pending.
4. Homes, configurations & floor plans
The following configuration counts and saleable areas are from the TG-RERA portal filing. The portal inventory has no supplied as-of date. “Saleable area” is the RERA-filed figure; it is not a drawing-measured carpet area. The supplied floor-plan review has not yet measured any drawings, so carpet area and loading are not available.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 1BHK | 1,752 | 0 | 1,752 | 55.96–112.0 sq m | Not measured | Not supplied |
| 2BHK | 1,087 | 0 | 1,087 | 99.06–112.0 sq m | Not measured | Not supplied |
| Unspecified BHK | 2 | 0 | 2 | 98.0 sq m | Not measured | Not supplied |
The RERA filing also contains 9 records coded as “First Floor,” “Ground Floor,” or individual numbers. Those are not treated as home configurations or saleable homes in this table.
The supplied vendor material describes “3 BHK Villa” and “4 BHK Villa” configurations and gives carpet-area figures of 1503 sq.ft and 2142, respectively. These are vendor claims, not RERA-filed configuration counts or drawing-measured areas; no floor-plan drawings have been measured to verify them.
5. Parking & vehicle circulation
Parking counts and a project-wide arrangement (surface, covered, visitor, accessible, or mechanical) are not established in the supplied project-level records. The vendor lists “covered car parking,” but supplies no space count, location, allocation terms, or supporting project drawing in the material provided; treat it as a vendor claim, not an established sanctioned or exclusive entitlement.
The filed HMDA layout permission identifies layout roads, but the supplied material does not establish parking-level plans, ramp arrangements, pedestrian separation, EV charging, or unit-specific parking allocation. A drawn or marketed parking space should not be assumed to be an exclusive legal entitlement without the relevant sanctioned plan and registered sale documents.
6. Amenities, recreation & open spaces
The RERA amenities record lists 14 project facilities. Its “available” entries are portal-field responses; the supplied record shows 0% progress for each and provides no independent confirmation of completion. HMDA’s layout permission separately lists infrastructure and development conditions.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | No size supplied | RERA amenities | RERA field: “YES”; 0% progress; not independently verified |
| Water supply | No source, capacity or storage details supplied here | RERA amenities; HMDA layout conditions | RERA field: “YES”; 0% progress; not independently verified |
| Sewerage (chambers, lines, septic tank, STP) | No capacity supplied | RERA amenities; HMDA layout conditions | RERA field: “YES”; 0% progress; not independently verified |
| Storm-water drains | No size supplied | RERA amenities; HMDA layout conditions | RERA amenities record: 0% progress; not independently verified |
| Green strip / tot lot / park | No area supplied | RERA amenities; HMDA layout conditions | RERA amenities record: 0% progress; not independently verified |
| Street lighting | No quantity or specification supplied | RERA amenities; HMDA layout conditions | RERA amenities record: 0% progress; not independently verified |
| Community buildings | No size or capacity supplied | RERA amenities | RERA amenities record: 0% progress; not independently verified |
| Sewage and sullage treatment/disposal | No capacity supplied | RERA amenities | RERA amenities record: 0% progress; not independently verified |
| Solid-waste management and disposal | No system or capacity supplied | RERA amenities | RERA amenities record: 0% progress; not independently verified |
| Water conservation / rainwater harvesting | No project-wide capacity supplied | RERA amenities; HMDA layout conditions | RERA field: “YES”; 0% progress; not independently verified |
| Energy management | No details supplied | RERA amenities | RERA amenities record: 0% progress; not independently verified |
| Fire protection and fire-safety requirements | No systems or specifications supplied | RERA amenities | RERA amenities record: 0% progress; not independently verified |
| Electrical meter room / substation / receiving station | No capacity supplied | RERA amenities; HMDA layout conditions | RERA field: “YES”; 0% progress; not independently verified |
| Aggregate recreational open space | No area supplied | RERA amenities; HMDA layout conditions | RERA amenities record: 0% progress; not independently verified |
| Swimming pool, gym, children’s play area, clubhouse | No size or capacity supplied | Vendor material | Vendor-listed; not established as sanctioned or completed |
| Avenue planting | No count or area supplied | HMDA layout conditions | Required in the permission; completion not independently verified |
| Park development | No area supplied | HMDA layout conditions | Required in the permission; completion not independently verified |
7. Utilities, building services & safety
Water and drainage: RERA records water supply, sewerage (including septic tank/STP), storm-water drains, treatment/disposal and rainwater harvesting. HMDA’s layout permission specifies internal water-supply pipelines, an overhead tank, storm-water drains, underground drainage, a common septic tank/STP and rainwater-harvesting pits. The supplied evidence does not state capacities, water source, treatment performance, reuse quantities, or verified completion.
Electrical: The RERA amenities record lists an electrical meter room, substation or receiving station. HMDA’s permission lists electrical supply lines, a transformer and street lights. No supply capacity, backup-generation provision, or EV-charging provision is established in the project-level evidence.
Building services and safety: Some individual dwelling-unit drawings show percolation or recharge pits. The Gram Panchayat permission directs installation of fire equipment as per National Building Code rules; that is a stated condition, not evidence that equipment has been installed or that a project-wide fire clearance has been obtained. The supplied material does not establish lifts, lift capacities, fire stairs, fire-service access, accessibility provisions, CCTV, security systems, or waste-segregation arrangements.
8. Location, access & connectivity
The registered project location is Patancheru, Patancheru Mandal, Sangareddy District, PIN 502307; the HMDA layout and Gram Panchayat records identify the revenue village as Chitkul. HMDA drawing extracts show internal road widths in some plan sheets, including 7.77 m, 9.75 m, 9.84 m and 10.0 m; these are drawing-specific, not a consolidated road schedule.
The supplied cadastral/geocoding record gives a parcel centroid of 17.41528, 78.35459. A supplied connectivity record lists Financial District (Nanakramguda) at 1.2 km; this is a supplied measured distance, with no route or travel time specified. Vendor material separately lists Patancheru Railway Station (2.7 Km), schools, and a shopping centre; those are vendor-provided distances, not independent route measurements.
9. Developer & development status
The registered legal promoter is MANTOOR INFRASTRUCTURE PRIVATE LIMITED, a company with CIN U45400TG2015PTC099325 and GSTIN 36AAJCM7957J2ZO. The project record gives the promoter address as Shamrock Apartments, Opp Sai Colony, Chitkul, Patancheru, Sangareddy, 502307; no official website or project contact details are established in the supplied project data.
Mantoor Ravinder Reddy is listed as authorized signatory; Lakshmangari Sudhakar Reddy is listed as director. In Form B, Mantoor Ravinder Reddy signs as authorized signatory and declares completion by 12/06/2028, land free from encumbrances, and the stated RERA account and compliance undertakings. These are promoter declarations. The RERA record shows the project as “New Project”; independently verified construction progress and phase-/tower-specific completion or occupancy status are not supplied.
10. Approvals, official records & documents
TG-RERA registration: FORM C registration P01100007622, issued 30/01/2024; valid until 12/06/2028.
HMDA draft layout permission: Draft Layout Permit No. 19/LO/Plg/HMDA/2023, dated 13-06-2023; residential layout with housing on the listed Chitkul survey numbers. The permission includes infrastructure and development conditions and identifies HMDA-mortgaged villa plots.
Chitkul Gram Panchayat proceedings: GP/Chitkul/Proceeding/02/2024, dated 11/01/2024; proceedings refer to HMDA’s layout permission and list the project survey numbers.
HMDA dwelling-unit drawings: Individual sanction drawings are filed for dwelling-unit designs and plots; examples include east-facing and west-facing units, with varying floor descriptions. They generally describe HMDA technical approval forwarded to the municipality/local body for final sanction; they are not a consolidated project-wide plan summary.
Promoter Form B: Form-B affidavit by Mantoor Ravinder Reddy as authorized signatory, with a declaration date rendered as “30.... DEC day of. 2023”; includes the promoter’s completion undertaking of 12/06/2028.
Occupancy / completion record: No project occupancy or completion certificate is identified in the supplied documents.
Layout portal lookup: HMDA DPMS approved-layout lookup is not publicly reachable in the supplied research record; no public layout lookup result is available from that source.
Project-wide progress and measured drawings: Supplied floor-plan review: 60 drawings, 0 measured, 60 scans pending. No independently verified construction progress is supplied.
Frequently asked questions
Is NANDAN LAKE BREEZE AND NANDAN NEST registered with Telangana RERA?
Yes. NANDAN LAKE BREEZE AND NANDAN NEST is registered with the Telangana Real Estate Regulatory Authority as P01100007622; the registration status is New Project.
Who is the developer of NANDAN LAKE BREEZE AND NANDAN NEST?
The promoter named in the RERA registration is MANTOOR INFRASTRUCTURE PRIVATE LIMITED.
Where is NANDAN LAKE BREEZE AND NANDAN NEST located?
NANDAN LAKE BREEZE AND NANDAN NEST is in PATANCHERU, Sangareddy, Telangana (502307).
When will NANDAN LAKE BREEZE AND NANDAN NEST be completed?
The promoter's proposed date of completion filed with RERA is 12/10/2028. This is the promoter's declaration, not a guarantee.
More projects in Patancheru