North Crest

Sri Venkateshwara Developers · Medchal-Malkajgiri · RERA P02200007136

North Crest is a residential apartment project in Gundlapochampally, Medchal Mandal, Medchal-Malkajgiri District, developed by the registered promoter Sri Venkateshwara Developers, a partnership. The registered site extent is 10,736.31 sq.m, and the project comprises two residential towers, A and B, and a clubhouse block; Towers A and B have 1 Cellar + 1 Stilt + 10 upper floors, and the clubhouse has Ground + 5 upper floors. The RERA filing lists 160 3BHK homes, each with a saleable area of 262.13 sq.m. It is registered under TG-RERA number P02200007136, and the project header states a proposed completion date of 29/09/2028.

01What we found

RegisteredTG-RERA
38documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameNorth Crest RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNot separately identified in the supplied registration record; registration is for the project on Survey Nos. 41/1 and 48.
TG-RERA registrationP02200007136; registration certificate issued 21/10/2023. RERA record
Registration validityCertificate states validity from 21/10/2023 to 29/05/2028, unless extended by the Authority. No extension is recorded in the supplied certificate.
Registered promoterSri Venkateshwara Developers, a partnership. RERA record RERA filing
RERA statusThe supplied certificate records registration under section 5; the pack does not provide a later status update.

Land and geographic identity

FieldRecord
Locality / revenue villageGundlapochampally Municipality; revenue village recorded in the project documents as Gundlapochampally (also written “Gundla Pochampally”). RERA record RERA filing
Mandal / district / PINMedchal Mandal; Medchal-Malkajgiri District; 500043. RERA record
Project survey numbersSurvey No. 41/1 and Survey No. 48. Title documents also refer to parts and subdivisions, including 41/1 part, 48 part, 41/A, 48/A, and 48/1; the exact parcel mapping is not established by the overview record. RERA record Land records
Registered site extent10,736.31 sq.m. The project record reports total area and net area as the same figure; affected road-widening/FTL/nala area is recorded as 0 sq.m. RERA filing
BoundariesEast: Road; North: Road; West: Neighbours Land; South: Neighbours Land. RERA filing

Development identity

FieldRecord
Principal sanctioning authorityHMDA technical approval, with building permission released by Gundlapochampally Municipality. Approvals record
Principal approvalHMDA file/approval 007571/BP/HMDA/1531/MED/2022, dated 30-05-2023; municipal building-permission reference G1/686/TPS/GPM/03.10.2023, dated 03.10.2023. Approvals record
Approved built-up areaProject filing reports approved built-up area of 39,947.60 sq.m. The municipal permission extraction separately states “Commercial Net Built up Area: 10,763.31 Sq.mt”; its scope and relationship to the project-wide figure are not resolved here. RERA filing
Buildings / blocksThe RERA record reports 3 proposed building units: two residential blocks and one amenity block. The HMDA technical approval describes residential Towers A & B and a clubhouse; municipal permission describes a multi-storied building and clubhouse. RERA filing
Sanctioned floor configurationHMDA technical approval: Towers A & B, 1 Cellar + 1 Stilt + 10 upper floors; clubhouse, Ground + 5 upper floors. Municipal permission also records 1 Cellar + 1 Stilt + 10 upper floors and clubhouse Ground + 5 upper floors.
HeightsResidential building height: 29.90 m; clubhouse height: 20.90 m.
Parking levels / countsCellar and stilt are approved for parking use; the supplied material does not establish a total sanctioned parking-space count.
UnitsRERA filing lists 160 3BHK homes and a separate “Amenities” row with 0 homes. RERA unit table RERA unit details

Offering and status

FieldRecord
Configuration and filed saleable area3BHK; 262.13 sq.m saleable area per unit as filed with TG-RERA. RERA unit table RERA unit details
Booked / available38 booked; 122 available in the portal data supplied. The portal record has no as-of date, so treat these counts as indicative rather than a current inventory confirmation. RERA unit table
Construction stageNo reliable, current construction-stage assessment or independently verified site-progress report is supplied. The RERA amenity table records sewerage at 60% and community buildings at 50%; other listed items show 0%. These are recorded progress fields, not independent verification. RERA amenities
Completion datesThe Form B declaration undertakes completion by 29-05-2028. The project header states proposed completion 29/09/2028. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The approval requires an OC before occupation.

2. The project story

North Crest is registered as a residential apartment project at Gundlapochampally, Medchal Mandal, on land identified in the filing as Survey Nos. 41/1 and 48. Its sanctioned arrangement comprises two residential towers, A and B, together with a separate clubhouse block. The technical approval describes the towers as having one cellar, one stilt and ten upper floors, and the clubhouse as ground plus five upper floors. RERA record

The RERA unit schedule lists 160 three-bedroom homes, of which 38 are recorded as booked and 122 as available in the supplied portal data. That inventory has no recorded “as of” date. No current, independently verified construction progress is available; the progress percentages in the RERA amenity fields should therefore be read as filed status, not a site inspection. RERA unit table RERA amenities

The promoter’s Form B declaration states a completion undertaking of 29-05-2028. The project header gives a proposed completion date of 29/09/2028. Registration validity is a separate matter: the certificate states validity through 29/05/2028 unless extended. No OC is supplied, and the approval documents state that an occupancy certificate is required before occupation. RERA record

3. Master plan, architecture & building design

The HMDA technical approval covers land measuring 10,736.31 sq.m in Survey Nos. 41/1 and 48. It describes residential Towers A and B, each within the approved building-plan arrangement of 1 Cellar + 1 Stilt + 10 upper floors, and a clubhouse of Ground + 5 upper floors. The approval records heights of 29.90 m for the residential building and 20.90 m for the clubhouse.

The municipal building-permission extraction records the same floor arrangement and describes the permission as a multi-storied building and clubhouse. The RERA filing reports 39,947.60 sq.m approved built-up area; the municipal extraction separately gives 10,763.31 sq.m as “Commercial Net Built up Area.” These figures are retained under their supplied labels; the available record does not explain their scope or provide a reconciled area schedule. RERA filing

The approval refers to internal circulation, setbacks, open space, driveways and parking, but the supplied material does not include drawing-derived details such as building footprints, flat count per floor, lift or stair layouts, or measured open-space areas. The HMDA plan also requires the approved cellar and stilt floors to be used for parking, prohibits construction or parking in setbacks, and requires open space and circulation to follow the approved plan.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK16038122262.13 sq.mNot availableNot supplied

The 3BHK count, booking figures and saleable area are from the RERA filing; the inventory snapshot has no as-of date. Fourteen floor-plan drawings are listed, but all 14 are scans pending and none has been software-measured. Accordingly, no drawing-based carpet area, room dimensions, orientation or typical-floor arrangement can be reported. RERA unit details RERA unit table Floor plans

Saleable area is the RERA-filed figure. Carpet area is a separate measure; the supplied measurement guidance notes that saleable area also includes a home’s share of common areas. No carpet-area or loading figure is established in the available drawings or filing data. RERA unit details Floor plans

5. Parking & vehicle circulation

The sanctioned plan provides a cellar and stilt, and the approval states that these floors are to be used for parking. It also requires the designated visitor parking to be used for that purpose and not misused or sold. The municipal permission says the parking area must not be converted to another use.

The supplied documents do not establish the sanctioned total number of parking spaces, any accessible or two-wheeler-space count, a unit-by-unit parking allocation, ramp details, or a verified parking entitlement for a particular home. Although the promoter’s marketing material mentions “2 Covered Car Parkings per flat,” that is a marketing claim, not a verified sanctioned count or legal unit allocation. Promoter website

6. Amenities, recreation & open spaces

The RERA amenity schedule marks the following items as available in the project record. Its progress fields are reproduced as filed and are not independently verified. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Clubhouse / community buildingClubhouse block sanctioned as Ground + 5 upper floors; no area or facility schedule supplied.RERA amenitiesCommunity Buildings: 50% in RERA amenity fields; not independently verified.
Recreational open spaceAggregate area listed, but no size supplied.RERA amenities0% recorded; not independently verified.
Green strip / tot-lot / parkListed; no size or capacity supplied.RERA amenities0% recorded; not independently verified.
Internal roads and footpathsListed; no dimensions supplied.RERA amenities0% recorded; not independently verified.

Promoter marketing additionally advertises a rooftop terrace, sky pool, indoor badminton court, private cinema, gym, yoga pavilion, landscaped gardens, elders’ gazebo, jogging track and children’s play area. These are marketing claims; the supplied sanctioned-plan extraction and RERA amenity schedule do not establish their detailed specifications or delivery status. Promoter website

7. Utilities, building services & safety

ServiceEvidence in the project record
WaterThe approval directs the applicant to approach HMWS & SB for bulk supply and specifies separate underground and terrace storage tanks of 25,000 litres each for residential buildings. A water-treatment plant is listed in the technical-approval amenity/utility schedule; no capacity or completion verification is supplied.
Sewerage and drainageSewage treatment plant (STP), sewerage and storm-water drains are referenced in the approvals and RERA amenity schedule. The RERA fields record sewerage at 60%; no capacity, commissioning record or independent verification is supplied. RERA amenities
Rainwater / water conservationRainwater-harvesting structures are required by the approval, which also refers to roof-water storage and storm-water drains. No installed-system status is independently established.
ElectricalThe technical approval requires provision for a transformer and identifies electrical installations as a non-habitation use in part of the cellar. Energy management, a sub-station/receiving station and street lighting appear in the RERA amenity schedule; no equipment capacities or completion evidence are supplied. RERA amenities
Vertical transportationLift count, type and capacity are not established in the supplied record.
Fire and life safetyThe permissions require compliance with applicable fire-safety conditions and reference fire-service requirements and the National Building Code. No project-specific fire NOC or evidence of completed fire systems is included in the supplied extracts.
WasteA garbage house is required by the HMDA approval; the municipal extraction refers to a garbage facility. Solid-waste management is listed in the RERA amenity schedule, without capacity or completion evidence. RERA amenities
Accessibility / securityNo project-specific accessibility design, CCTV or access-control specification is established by the supplied RERA or approval records.

8. Location, access & connectivity

The registered location is Gundlapochampally Municipality, revenue village Gundlapochampally, Medchal Mandal, Medchal-Malkajgiri District, PIN 500043. The project parcel centroid supplied in the location data is 17.58246, 78.94834. RERA record RERA filing Location record

The land-boundary record identifies roads to the north and east. The location data records the nearest sampled Outer Ring Road interchange at 32.0 km (approx.). This is a supplied measured distance, not a travel-time estimate. No public-transport details or other independently verified landmark distances are supplied. RERA filing Location record

9. Developer & development status

The registered promoter is Sri Venkateshwara Developers, identified in the project filing as a partnership. Its GSTIN is 36AELFS8314J1ZK. The supplied registered address is Gundlapochampally Municipality, Medchal, Medchal-Malkajgiri, PIN 500043. The RERA filing names Venkat Reddy Akula and Venkata Ramana Reddy Gaddam as authorized signatories and Srinivas Reddy Aila and Satish Kumar Dontula as partners. RERA filing Corporate record Parties record

The RERA portal records 160 3BHK homes, with 38 booked and 122 available, but does not provide an as-of date for those counts. No independent construction inspection is supplied. The promoter’s Form B declares a completion date of 29-05-2028; the project header gives 29/09/2028 as the proposed completion date. The registration certificate runs through 29/05/2028, unless extended. No extension or occupancy/completion certificate is included in the supplied materials. RERA unit table RERA record

The promoter’s website is recorded as https://www.northcrest.in/. Parties record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for North Crest, registration P02200007136, issued 21/10/2023; stated validity through 29/05/2028 unless extended.
HMDA technical building approvalFile/approval 007571/BP/HMDA/1531/MED/2022, dated 30-05-2023; covers residential Towers A and B and clubhouse on Survey Nos. 41/1 and 48.
Municipal building permissionG1/686/TPS/GPM/03.10.2023, dated 03.10.2023; permission extraction identifies Survey Nos. 41/1 and 48.
Promoter declarationForm B affidavit dated 18/08/2023, recording promoter declarations and a completion undertaking of 29-05-2028.
Occupancy / completion certificateNot present in the supplied documents. The approvals require an occupancy certificate before occupation.
Floor-plan drawingsFourteen drawings are listed as scans pending; none has been measured for this review. Floor plans

The HMDA technical approval states that the building plans are to be sanctioned by the Municipality in conformity with HMDA’s technical approval and are subject to its listed conditions. The municipal permission is the supplied record of building-permission release; full conditions and their application are addressed in the approvals review.

Frequently asked questions

Is North Crest registered with Telangana RERA?

Yes. North Crest is registered with the Telangana Real Estate Regulatory Authority as P02200007136; the registration status is New Project.

Who is the developer of North Crest?

The promoter named in the RERA registration is Sri Venkateshwara Developers.

Where is North Crest located?

North Crest is in Gundlapochampally Muncipality, Gundlapochampally, Medchal, Medchal-Malkajgiri, Telangana (500043).

When will North Crest be completed?

The promoter's proposed date of completion filed with RERA is 29/09/2028. This is the promoter's declaration, not a guarantee.