ONE HYDERABAD is a Mixed Development (Residential & Commercial) in SOMAJIGUDA, KHAIRTABAD mandal, Hyderabad district, developed by BOORUGU INFRA PROJECTS PRIVATE LIMITED. It covers a site area of 18,401.89 m² and comprises five buildings: Blocks A, B and C, a commercial building, and a club-house building, with configurations ranging from 3 Cellar + Ground + 23 upper floors in Block A to Ground + 1 upper floors in the Club House. The TG-RERA filing records 172 units and lists 1BHK, 2BHK, 3BHK, 4BHK and entries with unspecified configuration. It is registered under TG-RERA **P02500001366**, with a proposed completion date of **19/06/2025**.

More from Boorugu Infra Projects Pvt Ltd · 5 projects →

01What we found

Period endedTG-RERA registration ran to 19 Jun 2025 - check its extension on TG-RERA
25documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered nameONE HYDERABAD
Project typeMixed Development (Residential & Commercial)
Phase / registered portionPhase is not separately identified in the supplied record; registration is for the project
TG-RERA registrationP02500001366
Registration validity11/11/2019 to 19/06/2025; the supplied certificate does not record an extension
Registered promoterBOORUGU INFRA PROJECTS PRIVATE LIMITED
RERA statusThe registration’s stated validity has ended. This is distinct from the project’s completion deadline and from the occupancy certificate issued for the commercial building.

RERA record

Land and geographic identity

FieldProject record
LocalitySOMAJIGUDA
Revenue village(s)SOMAJIGUDA; Khairatabad Village is also named in the title documents
Mandal / districtKHAIRTABAD / Hyderabad
PIN500082
Project survey numbers and subdivisions229, 231, of Khairatabad; 34/3 of Somajiguda
Site area18,401.89 m²
Road-affected area541.61 m²
Net area17,860.28 m²
BoundariesEast: RAJBHAVN QUARTERS; West: MAIN ROAD; North: NEIGHBOURS PROPERTY; South: ERRAMANZIL CRIMINAL COURT COMPLEX

RERA record RERA filing Land records

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Revised building permit1/C17/09929/2021, approved 11 October 2021
Approved built-up areaNot established by the supplied revised-permit extraction as a single total; it gives “Proposed Covered builtup area 27,030.00” without a unit.
Building/block countFive named buildings: Blocks A, B and C; a commercial building; and a club-house building
Sanctioned floor configurationBlock A: 3 Cellar + Ground + 23 upper floors; Block B: Ground + 23 upper floors; Commercial: Ground + 18 upper floors; Block C: Ground + 6 upper floors; Club House: Ground + 1 upper floors
Parking levels / provisionCellars are included in the sanctioned configuration for Block A; the revised permit requires approved cellar and stilt parking areas to be used exclusively for vehicle parking. The supplied extraction does not establish a complete parking count or all parking levels.
Unit count172 total units, as recorded by TG-RERA; 5 total building units are also stated in the project filing
Principal height figuresRevised-permit extraction: 74.95 m for Blocks A, B and Commercial; 21 m for Block C; 6.45 m for Club House

Approvals record RERA filing RERA unit table

Offering and status

FieldProject record
RERA-filed configurations1BHK, 2BHK, 3BHK, 4BHK and entries with unspecified configuration
RERA-filed saleable areas1BHK: 77.01 m²; 2BHK: 224.35 m²; 3BHK: 303.31 m²; 4BHK: 464.5 m². Unspecified entries span 220.0–6605.0 m² in the supplied normalized data.
Booked / available82 booked and 90 available, as last read from the TG-RERA portal; no as-of date is attached to these counts.
Completion deadlineRERA certificate and Form B undertaking: 19/06/2025.
Occupancy certificateGHMC issued an OC for the commercial building under 6183/GHMC/KHB/2024-OC, dated 24 September 2024. Its stated scope is the commercial building; it does not establish OC status for the residential blocks or clubhouse.
Construction stageRERA amenity/infrastructure entries report differing completion percentages; these are portal-reported figures, not independent site verification.

RERA unit table RERA amenities

2. The project story

ONE HYDERABAD is registered as a mixed residential and commercial development at Somajiguda, Hyderabad. The GHMC revised building-permit record describes a five-building scheme: three residential blocks, a commercial building and a clubhouse building. The approved configurations range from a ground-and-upper-floor clubhouse building to residential towers reaching 23 upper floors, alongside a commercial building with 18 upper floors. RERA record RERA filing

The RERA filing lists 172 units across five buildings. Its configuration register includes 1BHK, 2BHK, 3BHK and 4BHK homes, as well as entries whose configuration is not specified. The filed booking count is 82 booked and 90 available, but the portal record supplied here has no count “as of” date. RERA unit table

The development is not wholly described as either under construction or complete in the available record. GHMC issued an occupancy certificate for the commercial building in September 2024. The supplied record does not establish occupancy certification for the residential blocks or clubhouse. Separately, the promoter’s RERA undertaking states a project completion date of 19 June 2025, and the registration certificate states validity to that same date; these are different status measures and should not be treated as proof of whole-project completion or of an extension.

3. Master plan, architecture & building design

The GHMC revised building permit identifies a site area of 18,401.89 m², a road-affected area of 541.61 m² and net area of 17,860.28 m². It records a tot-lot of 2,367.85 m² and no nala-affected area. These are figures from the revised permit; the supplied extraction does not establish a complete site layout, building footprints, internal-road plan, or residential/commercial area split.

The sanctioned building arrangement is:

BuildingUse in permit recordSanctioned floors
BLDG-1 (BLOCK A)Residential3 Cellar + Ground + 23 upper floors
BLDG-1 (BLOCK B)ResidentialGround + 23 upper floors
BLDG-1 (COMMERCIAL)CommercialGround + 18 upper floors
BLDG-1 (BLOCK C)ResidentialGround + 6 upper floors
BLDG-1 (CLUB HOUSE)ClubhouseGround + 1 upper floors

The revised permit lists heights of 74.95 m for Blocks A and B and the commercial building, 21 m for Block C, and 6.45 m for the clubhouse. It records “Proposed Covered builtup area 27,030.00,” but the supplied extraction does not state a unit or provide a total that can safely be treated as an approved built-up-area figure. No FSI-counted area, carpet-area total, floor-by-floor residential unit schedule, lifts/stairs schedule, or complete architectural drawing measurements are available in the supplied material.

The permit requires the tot-lot to be fenced and maintained as greenery, a peripheral green strip, a rainwater-harvesting structure, a transformer space, a garbage house and an ETP. These are permit conditions; the supplied record does not independently verify their completion.

4. Homes, configurations & floor plans

The following configuration counts and saleable areas are from the TG-RERA unit record. The booked/available counts have no as-of date in the supplied data. Carpet-area figures are software measurements from approved floor-plan drawings, not RERA-filed carpet-area disclosures; the measurement record says some drawings need review. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
1BHK10177.01 m²52.7 m²32%
2BHK633224.35 m²164.0–208.7 m²; median 177.4 m²21%
3BHK442420303.31 m²148.2–285.8 m²; median 224.5 m²26%
4BHK884444464.5 m²Not suppliedNot supplied
Unspecified configuration291118220.0–6605.0 m² in the normalized recordNot suppliedNot supplied

The RERA filing also contains four records described as “GF UNIT NO,” “FIRST FLOOR” or “GROUND FLOOR.” They are not treated here as additional home configurations because the supplied classification identifies them as floor labels or other non-configuration entries. RERA unit table RERA unit details

The drawing-based measurements cover one 1BHK design, three 2BHK designs and 31 3BHK designs in document 201111. For example, a measured 2BHK ground-floor plan labels living, dining, bedrooms, kitchen, toilets and a utility area; the measurement record excludes the utility area from carpet area. A measured typical-floor 3BHK plan labels bedrooms, toilets, living/dining, kitchen and lobbies. These are drawing readings, not independently verified dimensions or RERA-filed carpet areas. Carpet area, any balcony/utility area, common-area share and RERA saleable area are distinct measures; no balcony-area schedule is supplied here. RERA unit details

5. Parking & vehicle circulation

The revised GHMC permit requires cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The five-building floor schedule identifies three cellars in Block A; the supplied extraction does not establish the complete parking-level arrangement across all buildings.

The commercial building OC records Parking Area (m²): 2367.85. This is an area entry, not a parking-space count. The RERA record and supplied permit extraction do not establish sanctioned car or two-wheeler counts, visitor or accessible parking counts, mechanical parking, EV charging, ramp arrangements, or unit-specific parking allocations. A parking area or drawn bay does not by itself establish exclusive ownership or allocation.

6. Amenities, recreation & open spaces

The RERA amenity register reports infrastructure and facility categories with portal progress percentages. These percentages are declarations in the supplied record, not independent verification of completion. The GHMC permit separately specifies certain site provisions, while the commercial OC records rainwater harvesting and a tot-lot/parking-area figure for its certified scope. RERA amenities

Green strip / tot-lot / park
Description / sizePermit records a tot-lot of 2,367.85 m²; it requires fencing and maintenance as greenery.
Declared progress / verified statusRERA “Green Strip/TOT LOT/Park”: 0%; completion not independently verified.
Community buildings
Description / sizeRERA facility category; permit identifies a clubhouse building, Ground + 1 upper floors.
Evidence sourceRERA amenities
Declared progress / verified statusRERA community buildings: 10%; clubhouse completion not independently verified.
Water supply
Description / sizeRERA infrastructure category.
Evidence sourceRERA amenities
Declared progress / verified statusRERA: 50%; source, storage capacity and treatment details are not established in the project-specific RERA amenity table.
Sewerage / sewage treatment
Description / sizeRERA category includes chambers, lines, septic tank and STP; permit also requires an ETP.
Evidence sourceRERA amenities
Declared progress / verified statusRERA sewerage: 10%; treatment/disposal category: 10%; completion not independently verified.
Storm-water drains
Description / sizeRERA infrastructure category.
Evidence sourceRERA amenities
Declared progress / verified statusRERA: 10%; completion not independently verified.
Solid-waste management
Description / sizeRERA infrastructure category; permit requires a garbage house within the premises.
Evidence sourceRERA amenities
Declared progress / verified statusRERA: 10%; completion not independently verified.
Rainwater harvesting
Description / sizePermit requires a rainwater-harvesting structure; commercial OC records one RWH entry.
Declared progress / verified statusRERA water-conservation/rainwater-harvesting category: 10%. OC records the feature for its certified commercial-building scope; broader delivery is not independently verified.
Fire protection and safety
Description / sizeRERA infrastructure category; the building-permit conditions require a Fire NOC before OC.
Evidence sourceRERA amenities
Declared progress / verified statusRERA: 10%; project-wide completion is not established by the supplied record.
Electrical meter room / substation / receiving station
Description / sizeRERA infrastructure category; permit requires space for a transformer.
Evidence sourceRERA amenities
Declared progress / verified statusRERA: 20%; completion not independently verified.
Internal roads and footpaths
Description / sizeRERA infrastructure category.
Evidence sourceRERA amenities
Declared progress / verified statusRERA: 0%; completion not independently verified.
Street lighting
Description / sizeRERA infrastructure category.
Evidence sourceRERA amenities
Declared progress / verified statusRERA: 0%; completion not independently verified.
Aggregate recreational open space
Description / sizeRERA infrastructure category.
Evidence sourceRERA amenities
Declared progress / verified statusRERA: 0%; no completed area is established by the supplied record.

7. Utilities, building services & safety

The project-specific GHMC revised permit requires a rainwater-harvesting structure, transformer space, an on-site garbage house and an ETP. It also requires a Fire NOC from the Director (EV&DM) before issue of an occupancy certificate, and states that an OC is compulsory before occupation. These are recorded approval conditions; the supplied material does not establish project-wide completion of all such services.

The TG-RERA infrastructure table reports water supply at 50%, sewerage and sewage/sullage treatment at 10%, storm-water drains at 10%, fire protection at 10%, solid-waste management at 10%, and electrical meter room/substation/receiving station at 20%. The supplied project-specific evidence does not give water-source or storage capacities, treatment-plant capacities, electrical or backup capacities, lift numbers or capacities, accessibility provisions, or a full fire/life-safety equipment schedule. These details are therefore not stated as delivered or verified. RERA amenities

8. Location, access & connectivity

The registered location is Somajiguda, Khairtabad mandal, Hyderabad district, Telangana, PIN 500082. The project record identifies the west boundary as “MAIN ROAD,” the east boundary as Rajbhavan Quarters, the north as neighbours’ property and the south as Erramanzil Criminal Court Complex. The revised GHMC permit records an 18 mt. road width. RERA record RERA filing

The supplied location record gives a geocoded point at 17.4186487, 78.462253 and one measured connectivity distance: HITEC City, 9.4 km. Other neighbourhood distances or travel times are not established in the supplied project-location record. Location record

9. Developer & development status

The registered promoter is BOORUGU INFRA PROJECTS PRIVATE LIMITED, a company, GSTIN 36AAGCB5911J1ZN. Its recorded address is H NO 8-2-293/A/1355B, Road No 45, Somajiguda, Khairtabad, Hyderabad, 500082. The supplied record identifies Ravi Kumar Boorugu as authorized signatory and Ashok Bandaru as director. It does not provide an official project contact number, email address or promoter website. Corporate record Parties record

The project filing identifies Hyderabad Securities and Enterprises Ltd (HSEL) as a landowner/promoter party under an area-share arrangement. This is distinct from the registered promoter named above. The promoter’s Form B declaration states a completion undertaking of 19 June 2025. The available record also shows an OC for the commercial building only; it does not establish the residential blocks’ or clubhouse’s OC status or independently verified whole-project completion. RERA filing Parties record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02500001366, issued 11/11/2019
Scope and evidenceRegistration certificate for ONE HYDERABAD; states validity through 19/06/2025.
Earlier GHMC building permit
Identifier / date1/C17/09503/2019, 19 June 2019
Scope and evidenceConditional building permit for residential, commercial and clubhouse construction; records the project survey land and associated conditions.
Revised GHMC building permit
Identifier / date1/C17/09929/2021, approved 11 October 2021
Scope and evidenceRevised permit for the multi-building development, including floor configurations, site-area figures and permit conditions.
GHMC occupancy certificate
Identifier / date6183/GHMC/KHB/2024-OC, 24 September 2024
Scope and evidenceOC record for the commercial building; the certificate describes 3 cellars + 1 ground + 18 upper floors.
Form B promoter declaration
Identifier / date14 September 2019
Scope and evidencePromoter declaration including the stated completion undertaking of 19 June 2025 and separate-account declarations.
RERA unit and amenity records
Identifier / datePortal records; capture details vary
Scope and evidenceUnit counts/configurations and facility progress entries supplied for this review; unit counts have no attached as-of date. RERA unit table RERA amenities

The supplied materials do not include an extracted approved layout plan, a complete architectural drawing set, or occupancy certificates for the residential blocks or clubhouse. The reported OC scope above is limited to the commercial building. Document index

Frequently asked questions

Is ONE HYDERABAD registered with Telangana RERA?

Yes. ONE HYDERABAD is registered with the Telangana Real Estate Regulatory Authority as P02500001366; the registration status is New Project.

Who is the developer of ONE HYDERABAD?

The promoter named in the RERA registration is BOORUGU INFRA PROJECTS PRIVATE LIMITED.

Where is ONE HYDERABAD located?

ONE HYDERABAD is in SOMAJIGUDA, KHAIRTABAD, Hyderabad, Telangana (500082).

When will ONE HYDERABAD be completed?

The promoter's proposed date of completion filed with RERA is 19/06/2025. This is the promoter's declaration, not a guarantee.

More projects in Somajiguda