Sign in

The World Of Joy

ALLIANCE INN INDIA PRIVATE LIMITED · Sangareddy · RERA P01100009100

THE WORLD OF JOY is a residential apartment project in AMEENAPUR, AMEENPUR Mandal, Sangareddy District, developed by registered promoter ALLIANCE INN INDIA PRIVATE LIMITED. The registered site area is 43,895.12 sq m, and the revised HMDA permission describes five residential blocks (A–E) and a clubhouse: Block A has 2 cellars + 5 podiums + 41 floors, Blocks B–E each have 2 cellars + 4 podiums + 42 floors, and the clubhouse has ground + 5 floors. The TG-RERA unit filing lists 327 homes: 84 3BHK at 170.85 sq m and 243 4BHK at 215.48 sq m. The project is registered under TG-RERA number P01100009100, and the project header gives proposed completion as 30/04/2029.

More from Alliance Inn India Pvt Ltd · 5 projects →

01What we found

RegisteredTG-RERA
22documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemProject record
Registered project nameTHE WORLD OF JOY RERA record
Project typeResidential apartment project RERA record
Phase / registered portionThe TG-RERA certificate names the project THE WORLD OF JOY. The filed revised HMDA permission describes a five-block apartment complex and clubhouse; the registration evidence supplied does not specify a separate phase name.
TG-RERA registration numberP01100009100
Registration validity09/06/2023–31/12/2028, unless extended by the Authority; the certificate records no extension. This is the registration-validity period, not a construction or OC confirmation.
Registered promoterALLIANCE INN INDIA PRIVATE LIMITED
RERA statusRegistered; the registration certificate is Form C issued under section 5.

Land and geographic identity

ItemProject record
Locality / revenue villageAMEENAPUR (TG-RERA record); the HMDA permission identifies Ameenpur Village. RERA record
MandalAMEENPUR RERA record
District / PINSangareddy / 502033 RERA record
Project survey numbers170/P, 178/P, 179/P, 180/P and 181 (the HMDA permission lists Sy. Nos. 170/P, 178/P, 179/P, 180/P and 181/P).
Registered site area43,895.12 sq m total; 698.471 sq m affected by road widening/FTL/Nala; 43,196.65 sq m net, as recorded in the TG-RERA land details. RERA filing
Area in HMDA permission43,196.65 sq m extent stated in the revised building permission.
Boundaries in TG-RERA filingNorth: 100 FT ROAD OF SY NO 170; South: OWNERS LAND; East: MIYAPUR VILLAGE BOUNDARY; West: OWNERS LAND. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal building permissionRevised building permission No. 047109/SKP/R1/U6/HMDA/12072021, approved 09.06.2023.
Approved built-up areaThe TG-RERA filing records approved built-up area of 376,020.33 sq m. RERA filing
Buildings in revised permissionFive residential blocks (A–E) and a clubhouse. The RERA record separately lists one proposed building unit; the extracted HMDA permission describes five blocks. RERA filing
Sanctioned floor configuration stated in permissionBlock A: 2 cellars + 5 podiums + 41 floors; Blocks B, C, D and E: 2 cellars + 4 podiums + 42 floors each; clubhouse: ground + 5 floors.
ParkingPermission material refers to cellar/podium levels and records a parking area, but the supplied TG-RERA registration data does not state a unit-level parking allocation. See “Parking & vehicle circulation.”
Approved / RERA-declared unit countsThe supplied TG-RERA unit filing records 327 homes: 243 4BHK and 84 3BHK. The supplied HMDA permission extraction does not give a corresponding home count. RERA unit table RERA unit details

Offering and status

ItemProject record
Configurations and filed saleable area3BHK: 170.85 sq m; 4BHK: 215.48 sq m. RERA unit table RERA unit details
Booked / availablePortal-read figures show 0 booked and 84 available 3BHK homes, and 0 booked and 243 available 4BHK homes; the portal figures have no stated as-of date and are indicative. RERA unit table
Construction stageNo independently verified construction-progress evidence or percentage is supplied. RERA amenity entries show 0% progress for the listed infrastructure items. RERA amenities
Completion datesThe TG-RERA registration certificate is valid through 31/12/2028. The project header gives proposed completion as 30/04/2029; the promoter’s Form B declaration specifically for “THE WORLD OF JOY- TOWER ‘E’” states completion by 31/12/2028. These dates relate to different record fields and scopes; no revised completion order is supplied here. RERA record
OC / completion certificateNo completion or occupancy certificate is evidenced in the supplied documents; the HMDA permission extraction records completion certification as false.

The project story

THE WORLD OF JOY is registered as a residential apartment project in Ameenapur, Ameenpur Mandal, Sangareddy District. The project land record identifies survey subdivisions 170/P, 178/P, 179/P and 180/P, while the HMDA revised permission also includes 181/P. The permission describes a multi-storey development of five residential blocks, A–E, with a separate clubhouse. RERA record

The TG-RERA unit filing lists 327 homes across two configurations: 84 3BHK and 243 4BHK. The supplied portal-read booking figures show none booked at the time recorded, but the extract has no as-of date. These figures describe the filing/portal record, not independently verified sales or current availability. RERA unit table RERA unit details

The permission and filed drawings describe extensive upper-floor construction over cellar and podium levels. The evidence supplied does not establish the current on-site construction stage or independent progress. The promoter’s completion undertaking is specific to Tower E; the supplied record does not establish that any portion has received an occupancy certificate.

Master plan, architecture & building design

The revised HMDA permission describes Block A as 2 cellars, 5 podiums and 41 floors; Blocks B–E as 2 cellars, 4 podiums and 42 floors each; and a clubhouse with ground + 5 floors. These are the configurations stated in the permission extraction, not a report of completed construction.

The TG-RERA land details record 43,895.12 sq m total area, 698.471 sq m affected area and 43,196.65 sq m net area. A separate AAI-filed record reproduces an area schedule of 43,895.1 sq m total plot area, 698.5 sq m affected by Nala and 43,196.7 sq m net plot area; its purpose is height clearance, not a building-permission instrument. RERA filing

The AAI-filed area schedule lists total built-up area of 5,17,471.8 sq m and super built-up area of 376,020.3 sq m. These are the labels used in that document; the TG-RERA filing separately records “Approved Built up Area” as 376,020.33 sq m. The figures should not be treated as interchangeable area measures. RERA filing

A Phase 02 plan sheet (doc 485665) depicts five towers and a clubhouse and labels roadways/driveways, open-space reservations and Nala/FTL-buffer areas. That sheet has no approval number, issuing authority or sanction date in its extraction, so it is described here as a filed plan sheet, not as the principal sanctioned plan. The revised HMDA permission is the supplied principal building-permission record.

Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK84084170.85 sq mNot availableNot supplied
4BHK2430243215.48 sq mNot availableNot supplied

Source: TG-RERA unit figures; booking counts are indicative because no portal as-of date is supplied. RERA unit table RERA unit details

The floor-plan dataset reports nine drawings: seven scans pending, two sheets without flats and no measured drawings. No software-measured carpet areas or room dimensions are therefore available in the supplied material. Carpet area is not the same as RERA-filed saleable area; the supplied measurement note says saleable area also includes the home’s share of common areas. Floor plans

The filed unit data also contains the label “4BHJK 3T 3007 3009” with zero units recorded; it is not counted as a configuration. RERA unit table RERA unit details

Parking & vehicle circulation

The AAI-filed project record states a parking area of 1,41,451.4 sq m and lists 2,630 four-wheelers and 350 two-wheelers. This is a figure in the AAI document, not a unit-specific parking allocation. The revised HMDA permission describes cellar and podium levels, and the AAI material refers to driveways, including proposed driveways of 11.00 meters width and a turning radius of 14.00 meters.

The supplied evidence does not establish resident-versus-visitor or accessible-space counts, EV charging provision, parking allotment arrangements, or exclusive rights to any particular bay. A drawn or stated parking provision does not by itself establish an individual buyer’s allocated space.

Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
ClubhouseClubhouse with ground + 5 floors in the revised HMDA permission.HMDA permissionPermission describes the facility; completion not verified.
Green / recreational open spaceAAI-filed area schedule lists green area of 5,057.8 sq m.AAI-filed recordArea is stated in the record; completed condition not verified.
Green strip / park; aggregate recreational open spaceListed as “YES” in the TG-RERA amenity record. RERA amenitiesTG-RERA filing0% progress recorded.
Community buildingsListed as “YES” in the TG-RERA amenity record. RERA amenitiesTG-RERA filing0% progress recorded.

The supplied amenity record also lists internal roads and footpaths, water supply, sewerage, storm-water drains, street lighting, sewage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire protection and an electrical meter room/sub-station/receiving station. Each is shown as available “YES” with 0% progress in that record; this does not establish completion. RERA amenities

Utilities, building services & safety

The HMDA permission conditions require the project to provide rainwater-harvesting structures, a sewage treatment plant and recycled water for gardening, a transformer, a garbage house and refuse chutes. It also specifies a water-disinfection condition for the sump/overhead tanks and addresses water-supply and sewerage-source separation. These are permission conditions and provisions, not evidence that the systems are installed or operating.

The AAI-filed record states water requirement of 1902.4 KLD, fresh-water requirement of 1235.6 KLD, recycled treated wastewater of 666.8 KLD, wastewater generation of 1521.9 KLD and STP capacity of 2000 KLD. It also lists six 250 kVA DG sets. These are figures reported in that record; operational status is not established.

The HMDA permission requires fire-safety clearance from the Telangana State Fire Services Department before applying for occupancy and lists fire-fighting installations as required project provisions. The AAI-filed material sets out fire and life-safety requirements, including fire-fighting shafts/lifts, hydrants, alarms, sprinklers, pumps and fire-command facilities. The supplied evidence does not establish that these systems have been completed, inspected or certified for occupancy.

The available evidence does not specify lift counts or capacities, home-level backup, security/CCTV, access-control systems or accessibility provisions. Document index

Location, access & connectivity

The registered project location is AMEENAPUR, Ameenpur Mandal, Sangareddy District, PIN 502033. The TG-RERA filing gives the north boundary as “100 FT ROAD OF SY NO 170”; the other stated boundaries are owners’ land to the south and west and the Miyapur village boundary to the east. RERA record RERA filing

A sampled location record places the nearest sampled Outer Ring Road interchange approximately 8.4 km away. This is a software/location measurement and does not establish a route or travel time. No verified public-transport or landmark distances are supplied in the project location data. Location record

Developer & development status

The registered promoter is ALLIANCE INN INDIA PRIVATE LIMITED, a company. The supplied corporate record gives GSTIN 36AAHCA0643F1Z1 and CIN U45201KA2008PTC045791. The promoter-office address recorded on the TG-RERA certificate is Village Madhapur, Mandal Serilingampally, District Ranga Reddy, PIN 500081. RERA record Corporate record

The promoter’s Form B declaration dated 09/09/2024 states that “THE WORLD OF JOY- TOWER ‘E’” would be completed by 31/12/2028; this is a promoter declaration for the stated Tower E scope.

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100009100; issued 06/12/2024; valid 09/06/2023–31/12/2028
What the supplied evidence establishesRegistration of THE WORLD OF JOY under section 5 and the certificate’s registration conditions.
HMDA revised building permission
Identifier / date047109/SKP/R1/U6/HMDA/12072021; approved 09.06.2023
What the supplied evidence establishesRevised permission for a multi-storied residential apartment complex and clubhouse, with listed conditions and five residential blocks.
AAI height-clearance/NOC file
Identifier / dateApplication SIA/TG/MIS/294814/2022 (MODI-EC); document includes EC order EC21B039TG185599 dated 18.11.2021
What the supplied evidence establishesAAI height-clearance material and included environmental-clearance references; the AAI NOC itself is for height clearance.
Irrigation joint inspection report
Identifier / dateHMDA File No. 031313/SKP/R1/U6/03122019; endorsement EE/ID.No-1/ SRD/DB/DEE(T)/ HD2/527 dated 15.07.2021
What the supplied evidence establishesInspection report concerning land in survey nos. 178, 179, 180 and 181, including affected FTL/buffer and Nala/channel areas.
Phase 02 plan sheet
Identifier / dateDocument 485665
What the supplied evidence establishesFiled drawing extraction depicting five towers, clubhouse, roads and open-space/FTL-related labels; no approval number, authority or sanction date appears in the extraction.
Promoter Form B declaration
Identifier / date09/09/2024
What the supplied evidence establishesPromoter declaration covering accounts, funds, approvals and allottee treatment, with a completion undertaking for Tower E.

No occupancy or completion certificate is included in the supplied project evidence. The reviewed floor-plan drawings do not provide measured carpet areas because the available drawing set has scans pending and no measured sheets. Floor plans

Other registrations of The World Of Joy

Frequently asked questions

Is THE WORLD OF JOY registered with Telangana RERA?

Yes. THE WORLD OF JOY is registered with the Telangana Real Estate Regulatory Authority as P01100009100; the registration status is New Project.

Who is the developer of THE WORLD OF JOY?

The promoter named in the RERA registration is ALLIANCE INN INDIA PRIVATE LIMITED.

Where is THE WORLD OF JOY located?

THE WORLD OF JOY is in AMEENPUR, AMEENAPUR, Sangareddy, Telangana (502033).

When will THE WORLD OF JOY be completed?

The promoter's proposed date of completion filed with RERA is 30/04/2029. This is the promoter's declaration, not a guarantee.

More projects in Ameenapur