Sign in

Dream City

SUN INFRA PROJECTS · Mahabubnagar · RERA P01400007040

DREAM CITY is a plotted development in Mothighanapur, Balanagar Mandal, Mahabubnagar District, developed by registered promoter SUN INFRA PROJECTS. The project has a total site area of 40,461.79 sq.m. and the submitted layout drawing shows 167 residential plots, with plot sizes ranging from 80.34–291.38 sq.m. The supplied records do not state a tower or block count or floors. DREAM CITY is registered under TG-RERA number P01400007040, with registration validity through 24/06/2026; the promoter’s Form B declares completion by 12-07-2026.

01What we found

Period endedTG-RERA registration ran to 24 Jun 2026 - check its extension on TG-RERA
15documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldRecord
Registered project nameDREAM CITY RERA record
Project typePlotted development; the filed plan describes a proposed residential open-plots layout. RERA record
Phase / registered portionRegistered portion not separately described as a phase; the registration identifies the project land as Survey Nos. 501/P, 502/P, 503/P and 504/P.
TG-RERA registration numberP01400007040
Registration validity04/10/2023 to 24/06/2026, unless extended by the Authority. The supplied certificate extract says it has not been extended.
Registered promoterSUN INFRA PROJECTS RERA record
RERA status in supplied recordRegistered under section 5; the registration certificate records its stated validity dates above.

Land and geographic identity

FieldRecord
Locality / revenue villageMothighanapur (also rendered “Mothiganapur” / “Mothighanpur” in supplied records). RERA record RERA filing
MandalBalanagar RERA record RERA filing
DistrictMahabubnagar RERA record RERA filing
PIN509202 RERA record
Project survey numbers and subdivisions501/P, 502/P, 503/P and 504/P RERA record
Site extent40,461.79 sq.m. total; 305.66 sq.m. is recorded as affected by road widening/road impact; net area is 40,156.13 sq.m. RERA filing
Boundaries recorded in RERA land detailsEast: RAMESHWARAM GANGADHARPALLY; West: LAND OF DEVENDER REDDY; North: LAND IN SY NO 503 AND 504; South: LAND IN SY NO 501. RERA filing

Development identity

FieldRecord
Sanctioning authority shown on layout planMahabubnagar Urban Development Authority (MUDA)
Principal plan / permit numberTS/039386/2023; the submitted MUDA layout-permit reference is 295946/LP/GP/204899/0010/2023. Approvals record
Plan date shown in drawing extraction06-06-2023
Approved built-up areaThe plan extraction records total proposed built-up area as 0.00 both excluding and including parking; this is a plotted layout, not a building plan.
Plot count167 plots, as read from the submitted layout drawing. Layout record
Buildings, floors and building parking levelsNot disclosed / not applicable in the supplied plotted-layout records.

Offering and status

FieldRecord
Offered unit typeResidential plots
Plot size rangeSoftware-read from the submitted drawing: 80.34–291.38 sq.m. (96.1–348.5 sq.yd.). Layout record
Booked / available countsNot supplied.
Construction / infrastructure stageRERA-filed infrastructure progress percentages are listed in the amenities section below; they are promoter-reported percentages, not independent site verification. RERA amenities
Completion datesRERA registration certificate validity ends 24/06/2026. The promoter’s Form B declares completion by 12-07-2026. These are registration validity and promoter-declared completion timing respectively.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project records. The project is a plotted layout; certificate status for any buildings is not applicable or not disclosed.

The project story

DREAM CITY is registered as a plotted development in Mothighanapur revenue village, Balanagar Mandal, Mahabubnagar District. The RERA registration and submitted plan identify the land as Survey Nos. 501/P, 502/P, 503/P and 504/P. The submitted drawing describes a proposed residential open-plots layout containing 167 plots, with internal roads, parks/open space, social infrastructure and utility land. RERA record

The plan’s area statement allocates 22,001.48 sq.m. to plots, 13,103.55 sq.m. to roads, 3,636.13 sq.m. to organized open space/park, 1,010.08 sq.m. to social infrastructure and 404.88 sq.m. to utilities. It shows no amenity-area allocation. These are drawing-recorded allocations; they do not establish that the corresponding infrastructure or facilities have been completed.

The RERA-filed amenity schedule reports varying progress percentages for certain layout infrastructure. Those figures are reported progress, not independent verification of on-site completion. No building construction, residential occupancy or building-level completion status is established by the supplied material. RERA amenities

Master plan, architecture & building design

The submitted drawing is a residential plotted-layout plan, not a building design. Its area statement records a total site area of 40,461.79 sq.m., road-affected area of 305.66 sq.m., net area of 40,156.13 sq.m. and balance plot area of 39,136.38 sq.m. The same plan lists a vacant plot area of 40,156.13 sq.m. and a mortgage area of 3,402.23 sq.m.

Layout land useAreaShare stated in drawing
Plotted area22,001.48 sq.m.54.79%
Road area13,103.55 sq.m.32.63%
Organized open space / park area3,636.13 sq.m.9.05%
Social infrastructure area1,010.08 sq.m.2.52%
Utility area404.88 sq.m.1.01%
Amenity area0.00 sq.m.0.00%
LIG plotted area0.00 sq.m.0.00%
EWS plotted area0.00 sq.m.0.00%
Buffer-zone area0.00 sq.m.0.00%
Green-belt area0.00 sq.m.0.00%
Common-parking area0.00 sq.m.0.00%

The drawing lists 9.14 m, 12.19 m and 18.00 m wide roads, as well as a 12.19 m wide main access road. It labels a tot-lot, social-infrastructure area and utility area. No building count, floor configuration, building footprint, building height or building-specific circulation is provided.

The plot schedule and plot sizes are software-read from the drawing and are not RERA-disclosed unit measurements. The drawing-extraction record states that plot areas sum to the plotted area in the plan’s area statement; the schedule should still be checked against the original drawing. Layout record

Homes, configurations & floor plans

This is a plotted project, so the offering is plots rather than apartments. The submitted layout drawing contains 167 plots. Software-read plot sizes range from 80.34 sq.m. (96.1 sq.yd.) to 291.38 sq.m. (348.5 sq.yd.), with a median of 125.31 sq.m. (149.9 sq.yd.). These are drawing-derived measurements, not RERA-filed saleable-area figures. Layout record

Plot size band (sq.yd.)Equivalent band (sq.m.) in supplied drawing analysisPlots
0–1000–842
100–15084–125109
150–200125–16744
200–250167–2097
250–300209–2513
300–400251–3342

The most common drawing-listed sizes are 125.31 sq.m. (44 plots), 111.42 sq.m. (37), 166.55 sq.m. (7), 138.44 sq.m. (7) and 147.55 sq.m. (6). The supplied floor-plan record contains no measured floor plans or apartment layouts. Layout record Floor plans

Parking & vehicle circulation

The layout plan allocates 0.00 sq.m. to common parking and records no sanctioned parking-space count, individual plot parking allocation or visitor parking provision. It shows internal roads and a main access road, but the supplied information does not establish separate pedestrian routes, vehicle-entry/exit arrangements, EV charging or parking allotment rights.

Amenities, recreation & open spaces

Landscape / open space
FacilityOrganized open space / park
Description / size3,636.13 sq.m.; 9.05% in the layout area statement
Declared progress / verified statusLayout allocation shown; project amenity schedule reports 10% progress. Completion not independently verified. RERA amenities
Landscape / open space
FacilityGreen strip / tot-lot / park
Description / sizeFacility listed in the RERA-filed amenity schedule; plan labels a tot-lot
Evidence sourceRERA amenities
Declared progress / verified statusSchedule reports 5% progress; completion not independently verified.
Sports / recreation
FacilityNo separate sports facility identified
Description / sizeNot disclosed
Evidence sourceRERA amenities
Declared progress / verified statusNot established by supplied records.
Convenience / community
FacilitySocial infrastructure area / community buildings
Description / size1,010.08 sq.m. allocated to social infrastructure in the layout; community buildings also appear in the filed schedule
Evidence sourceRERA amenities
Declared progress / verified statusSchedule reports 5% progress; no building specification or independent completion evidence supplied.
Convenience / community
FacilityUtility area
Description / size404.88 sq.m. allocated in the layout
Declared progress / verified statusArea allocation shown; completion status not established.
Convenience / community
FacilityAmenity area
Description / size0.00 sq.m. in the layout area statement
Declared progress / verified statusNo amenity-area allocation shown.

The RERA-filed amenity schedule also reports internal roads and footpaths at 5%, water supply at 10%, sewerage infrastructure at 5%, water conservation/rainwater harvesting at 10%, and aggregate recreational open space at 10%. These are reported progress figures, not independently verified completion. RERA amenities

Utilities, building services & safety

The filed amenity schedule lists water supply at 10% progress; sewerage (chambers, lines, septic tank, STP) at 5%; and water conservation/rainwater harvesting at 10%. It lists storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management and disposal, energy management, and fire protection/fire-safety requirements at 0% or without a stated available status. No capacity, water source, treatment specification, reuse arrangement, electrical supply capacity, backup system or fire-system detail is provided. RERA amenities

An electrical meter room/sub-station/receiving-station facility is listed as available in the schedule, with 0% progress. The schedule does not provide lift or building-service details, which are not established for this plotted layout. Accessibility details beyond the road and footpath entry are not supplied. RERA amenities

Location, access & connectivity

The registered project location is Mothighanapur revenue village, Balanagar Mandal, Mahabubnagar District, Telangana, PIN 509202. The supplied geocode identifies a cadastral parcel centroid at 16.99991, 78.17167. RERA record Location record

The submitted plan labels a 12.19 m wide main access road and internal roads of 9.14 m, 12.19 m and 18.00 m widths. The nearest sampled Outer Ring Road interchange is listed at approximately 37.5 km. No public-transport information, additional landmark distances or travel-time claims are supplied. Location record

Developer & development status

The registered promoter is SUN INFRA PROJECTS, identified in the RERA record as a partnership. Its supplied GSTIN is 37ADRFS1747E1ZQ. The promoter address recorded in the project data is VIP TOWERS, SIRIPURAM, MOTHIGHANPUR VILLAGE, BALNAGAR, Balanagar, Mahabubnagar, 509202. RERA record Corporate record Parties record

Kintali Govinda Rao is identified as managing partner and authorized signatory in project documents. The promoter’s Form B declares a completion date of 12-07-2026 and states that it will obtain pending approvals and meet project fund-management and audit obligations. These are promoter declarations. The RERA registration certificate separately records validity through 24/06/2026; registration validity and the declared completion date are distinct.

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01400007040; issued 04/10/2023
What the supplied record establishesForm C records DREAM CITY as registered under section 5, with stated validity through 24/06/2026 and registration conditions.
Layout plan / drawing
Identifier / dateTS/039386/2023; drawing date 06-06-2023
What the supplied record establishesSubmitted drawing describes the proposed residential layout for Survey Nos. 501/P, 502/P, 503/P and 504/P, with 167 plots and area-use allocations.
MUDA layout-permit reference
Identifier / date295946/LP/GP/204899/0010/2023; fee-intimation letter dated 12-06-2023
What the supplied record establishesThe filed letter describes the layout proposal as under process, seeks charges and states conditions; it is not a final layout approval certificate.
Promoter declaration, Form B
Identifier / date12/07/2023
What the supplied record establishesPromoter declaration for DREAM CITY, including its declared completion date and statements on title, encumbrances, fund management and pending approvals.

The supplied records do not include an occupancy or completion certificate. The submitted drawing records a proposed plotted layout and shows proposed built-up area as 0.00. Document index

Frequently asked questions

Is DREAM CITY registered with Telangana RERA?

Yes. DREAM CITY is registered with the Telangana Real Estate Regulatory Authority as P01400007040; the registration status is New Project.

Who is the developer of DREAM CITY?

The promoter named in the RERA registration is SUN INFRA PROJECTS.

Where is DREAM CITY located?

DREAM CITY is in BALNAGAR, Mothighanapur, Balanagar, Mahabubnagar, Telangana (509202).

When will DREAM CITY be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.

More projects in Mothighanapur