BHARATH REALESTATE is a plotted development in BHONGIR, Bhongir Mandal, Yadadri Bhuvanagiri district, developed by the registered promoter BHARATHREALESTATE. The registered site area is 28,303 sq.m, and the layout drawing states 75 plots; plot-size configurations are not stated in the registration record. No towers or floors are identified. The TG-RERA registration is P02000002539, and the proposed completion date is 30/03/2024.

01What we found

Period endedTG-RERA registration ran to 30 Mar 2024 - check its extension on TG-RERA
17documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Husnabad, Bhongir, Yadadri Bhuvanagiri · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameBHARATH REALESTATE RERA record
Project typePlotted development / proposed residential layout RERA record
Phase or registered portionNot separately identified in the supplied registration record RERA record
TG-RERA registrationP02000002539, issued 1 February 2021; certificate states validity from 01/02/2021 to 30/03/2024 RERA record
Registration statusNew Project in the supplied header; the certificate says validity could be extended by the Authority, but no extension is recorded in the supplied evidence RERA record
Registered promoterBHARATHREALESTATE RERA record
Project completion date in registration dataProposed completion: 30/03/2024 RERA record

Land and geographic identity

FieldRecord
Locality / revenue-village wording in recordsBHONGIR is recorded as the locality in the project header; the layout drawing identifies HUSSAINABAD Village, while the TG-RERA certificate identifies Husnabad. Exact revenue-village identity should be checked against the parcel records. RERA record
MandalBhongir RERA record
DistrictYadadri Bhuvanagiri; the layout drawing uses “YADRADRI BHONGIR DIST” RERA record
PIN508116 in the project header and certificate; the certificate’s promoter-office line separately gives Pin: 500040 RERA record
Survey numbers / subdivisionsTG-RERA certificate: 197/A5, 198/E1. The layout drawing identifies 197/P, 198/P; the HMDA draft layout letter identifies 197/PART, 198/PART.
Registered site area28,303 sq.m total and 28,303.00 sq.m net in the RERA land details RERA record RERA filing
Layout-drawing extentAc.06 - 39.75 Gts./ 33850.09 Sq Yds / 28302.99 Sq Mts
Boundaries in RERA land detailsEast: OPEN LAND; West: OPEN LAND; North: OPEN LAND; South: EXSITING 100 WIDE ROAD RERA filing

Development identity

FieldRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) RERA record
Principal approval shown in project header000030/LO/Plg/HMDA/2, recorded as plan approval and RERA-filed RERA record Approvals record
HMDA layout permit in submitted layout drawingLP.NO.:000083/LO/Plg/HMDA/2019
HMDA draft layout letter000030/LO/Plg/HMDA/2021, approved date 12 January, 2021; final layout release is stated to depend on compliance with listed conditions
Approved built-up areaNot applicable / not disclosed for this plotted development. The header’s “Approved Built up Area” field states 28303; the supplied material describes this as site area, not building floor area. RERA filing
Buildings, floors and parking levelsNo buildings, floor configuration or parking levels are identified in the supplied layout records.
Plot count75 No's stated on the layout drawing; software reading of the drawing also identifies 75 plots. Layout record

Offering and status

FieldRecord
OfferingPlots in a proposed residential layout; the drawing states 75 No's. Individual plot availability and bookings are not supplied. RERA record
Plot-size rangeSoftware-measured from the layout drawing: 133.78–520.07 sqm (160–622 sq yd); these are drawing-derived figures, not RERA-filed saleable-area figures. Layout record
Mortgage plotsThe HMDA draft layout letter identifies Plots 31 to 39 and 74, 75 (Total 11 plots), extent 2553.98 Sqm, as mortgaged to HMDA; it says they are not to be sold until the stated conditions are met.
Construction / development stageThe supplied records do not establish current on-site progress. RERA registration data records the proposed completion date as 30/03/2024. RERA record
Occupancy / completion certificateNo project completion certificate or occupancy certificate is supplied. The HMDA document describes a draft layout letter and makes final layout release conditional on compliance.

2. The project story

  • BHARATH REALESTATE is registered as a plotted residential development, rather than an apartment or multi-storey building project. The RERA record describes land of 28,303 sq.m in the Bhongir area, with the registration identifying surveys 197/A5 and 198/E1. The submitted layout drawing labels the land as 197/P and 198/P in HUSSAINABAD Village and shows 75 plots, roads, a park, social-infrastructure land and utility land. RERA record RERA filing
  • The layout drawing depicts proposed 40' and 30' roads, an existing 100' road and a proposed 150' ZMP road. It also marks 11 mortgage plots. The HMDA draft layout letter states that final layout release and release of mortgaged plots depend on compliance with layout conditions, including development works and handover of specified roads and open-space/social-infrastructure areas.
  • The project’s RERA registration data gives 30/03/2024 as the proposed completion date. The supplied material does not provide a current site inspection, verified construction-progress update, plot-wise booking/availability statement, or completion/occupancy certificate; therefore, present delivery status cannot be established from these records. RERA record

3. Master plan, architecture & building design

  • This is a plotted layout, so the drawing concerns plot and infrastructure arrangement rather than building architecture. The submitted layout plan states an extent of Ac.06 - 39.75 Gts./ 33850.09 Sq Yds / 28302.99 Sq Mts and identifies 75 No's. Its land-use schedule lists 19892.57 Sq. yds / 16632.72 Sq.mts as proposed plotted area, 10067.97 Sq. yds / 8418.11 Sq.mts as proposed road area, 2539.61 Sq. yds / 2123.44 Sq.mts as proposed park area, 847.21 Sq. yds / 708.38 Sq.mts as social infrastructure, and 502.73 Sq. yds / 420.35 Sq.mts as utility area. The drawing separately states 15.36 % open space and marks mortgage plots 31–39 and 74–75.
  • The project header records plan approval number 000030/LO/Plg/HMDA/2 as RERA-filed. The submitted layout drawing bears LP.NO.:000083/LO/Plg/HMDA/2019; the HMDA draft layout letter bears 000030/LO/Plg/HMDA/2021. The latter describes a draft layout permission and says final release is conditional on compliance with its conditions. RERA record
  • The layout drawing labels proposed 40' and 30' roads, an existing 100' wide road and a proposed 150' wide ZMP road. It also identifies avenue planting, a sump, overhead water tank, transformer, septic tank, harvesting pits, dust bins, cycle track and manholes. These are drawing-listed provisions; the supplied evidence does not establish their current installation or operational status.

4. Homes, configurations & floor plans

The offering is plotted, not apartment-based. The layout drawing states 75 No's. Software measurement from that drawing identifies 75 plots with printed sizes; these measurements are drawing-derived and should be checked against the plan. Layout record

Plot-size bandPlotsEvidence
150–200 sq yd (125–167 sqm)4Software-measured from layout drawing Layout record
200–250 sq yd (167–209 sqm)48Software-measured from layout drawing Layout record
250–300 sq yd (209–251 sqm)12Software-measured from layout drawing Layout record
300–400 sq yd (251–334 sqm)7Software-measured from layout drawing Layout record
400–500 sq yd (334–418 sqm)3Software-measured from layout drawing Layout record
500–1000 sq yd (418–836 sqm)1Software-measured from layout drawing Layout record

The software-measured smallest plot is 133.78 sqm (160 sq yd), median 204.85 sqm (245 sq yd) and largest 520.07 sqm (622 sq yd). The drawing’s printed areas and dimensions are not RERA-filed carpet-area or saleable-area disclosures. No plot-wise booking, availability or saleable-area schedule is supplied. Layout record

5. Parking & vehicle circulation

The submitted layout drawing identifies roads and a cycle track but does not provide a count of car or two-wheeler parking spaces, visitor parking, accessible parking, or plot-specific parking allocation. It shows proposed 40' and 30' roads, an existing 100' road and a proposed 150' ZMP road; the HMDA draft letter also refers to road access and requires roads to be opened for neighbouring-site access.

The supplied evidence does not establish parking as an exclusive or allocated right attached to any plot, nor does it confirm present road or cycle-track completion.

6. Amenities, recreation & open spaces

The layout drawing lists proposed infrastructure and facilities. The separate RERA amenities record includes progress percentages, but the supplied material does not identify these as independently inspected or verified; percentages are reproduced as recorded. RERA amenities

Park / green strip
Description / sizeProposed park area: 2539.61 Sq. yds / 2123.44 Sq.mts on the layout drawing
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenities record: Green Strip/TOT LOT/Park 0%; no independent completion verification supplied
Social infrastructure / community buildings
Description / sizeLayout drawing allocates 847.21 Sq. yds / 708.38 Sq.mts; RERA amenities record lists Community Buildings
Evidence sourceRERA amenities
Declared progress / verified statusCommunity Buildings recorded at 100% in amenities data; no independent verification supplied
Cycle track
Description / sizeShown in the layout drawing
Declared progress / verified statusNo separate progress or verified-completion evidence supplied
Avenue plantations
Description / sizeListed in the layout drawing
Declared progress / verified statusNo separate progress or verified-completion evidence supplied
Internal roads and footpaths
Description / sizeRoad area listed as 10067.97 Sq. yds / 8418.11 Sq.mts; proposed 40' and 30' roads and proposed 150' ZMP road also shown
Evidence sourceRERA amenities
Declared progress / verified statusInternal Roads & Footpaths recorded at 100%; not independently verified
Street lighting
Description / sizeNo size or quantity supplied
Evidence sourceRERA amenities
Declared progress / verified statusRecorded at 100%; not independently verified

7. Utilities, building services & safety

The layout drawing lists a sump, overhead water tank, internal water-supply lines, transformer, septic tank, harvesting pits marked 4X4X4, dust bins and manholes. The HMDA draft layout letter also lists common septic tank / STP, internal water-supply pipelines and overhead tank, transformer, rainwater-harvesting pits and transformer yard. These records describe planned or specified facilities; they do not establish installed capacity or current operation.

Water
Evidence in the supplied recordWater supply, sump, overhead water tank and internal water-supply lines are listed
Status / limitationRERA amenities record marks Water Supply 100%; no independent verification or capacity data supplied RERA amenities
Sewerage / drainage
Evidence in the supplied recordSeptic tank, manholes and common septic tank / STP are listed
Status / limitationRERA amenities record marks sewerage and treatment/disposal 100%; no independent verification or treatment capacity supplied RERA amenities
Storm water / rainwater
Evidence in the supplied recordThe drawing lists harvesting pits marked 4X4X4; the draft letter refers to drainage and channelisation of nalas for storm-water runoff
Status / limitationRERA amenities record lists Storm Water Drains and Water Conservation/Rain Water Harvesting at 0%; installed status is not established RERA amenities
Electrical
Evidence in the supplied recordTransformer and transformer yard are listed; the RERA amenities record lists an electrical meter room/sub-station/receiving station RERA amenities
Status / limitationElectrical amenity recorded at 0%; no supply capacity or completion verification supplied
Waste
Evidence in the supplied recordDust bins are shown on the layout drawing; Solid Waste Management and Disposal appears in the RERA amenities record RERA amenities
Status / limitationSolid-waste item recorded at 0%; no operational details supplied
Fire and life safety
Evidence in the supplied recordFire Protection and Fire Safety Requirements appears in the RERA amenities record RERA amenities
Status / limitationRecorded at 0%; no fire-system design, clearance or completion evidence supplied
Accessibility
Evidence in the supplied recordNo accessible circulation or accessibility provisions are identified in the supplied records
Status / limitationNot disclosed

8. Location, access & connectivity

The project is recorded in the Bhongir area of Yadadri Bhuvanagiri district, PIN 508116. The project header gives locality BHONGIR; the layout drawing identifies HUSSAINABAD Village, while the registration certificate uses Husnabad. The HMDA draft layout letter describes the site as Hussainabad. RERA record

The layout drawing shows an existing 100' wide road and proposed roads of 40', 30' and 150' (ZMP). A Bhongir Municipality communication says the proposed site has access through an existing HMDA-approved layout and its internal 30' wide B.T. roads.

Supplied distance figures are: Outer Ring Road (nearest sampled interchange, approx.) 93.5 km; Gayathri Bank 0.7 km; TGSRTC Bus Station, Husnabad 0.7 km; and Government Hospital 1.3 km. The location record gives a cadastral parcel-centroid coordinate of 18.126650211211224, 79.20373446394578. Location record

9. Developer & development status

The registered promoter is BHARATHREALESTATE. The RERA filing identifies the organisation type as Partnership and gives GSTIN 36AAQFB8682B1ZC. The supplied project record names MD AWAIS UR RAAHMAN CHISTY as authorised signatory and MA MAJEED MAMATEEN and ASRA KHATOON ASRA as partners. RERA record RERA filing Corporate record Parties record

The RERA registration certificate records a validity period from 01/02/2021 to 30/03/2024; no extension is recorded in the supplied material. The project header records a proposed completion date of 30/03/2024. These are separate registration and project-timeline records; neither is evidence of current on-site progress or completion. RERA record

The supplied evidence does not establish a verified current construction stage, plot-wise sales or availability, or an occupancy/completion certificate. The registration certificate gives the promoter office as Village: Husnabad, Mandal: Bhongir, District: Yadadri Bhuvanagiri, Pin: 500040; the project header separately records the project PIN as 508116. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02000002539, issued 01/02/2021
What the supplied record establishesForm C registration for BHARATH REALESTATE; certificate states validity to 30/03/2024.
Principal plan approval recorded in project header
Identifier / date000030/LO/Plg/HMDA/2
What the supplied record establishesListed as plan approval and RERA-filed. RERA record Approvals record
HMDA submitted layout drawing
Identifier / dateLP.NO.:000083/LO/Plg/HMDA/2019
What the supplied record establishesProposed residential layout plan identifying 75 plots and land-use allocations.
HMDA draft layout letter
Identifier / date000030/LO/Plg/HMDA/2021, 12 January, 2021
What the supplied record establishesDraft open-plot layout letter for 197/PART and 198/PART; records mortgage plots and states final layout release is conditional on compliance.
Bhongir Municipality communication
Identifier / dateRoc.No.G1/2875/2020, 18.11.2020
What the supplied record establishesDescribes access through an existing HMDA-approved layout and says roads, open spaces and social-infrastructure areas were handed over by registered gift deed No. 17761/2019, dated 18.10.2019.
Commencement / occupancy / completion certificates
Identifier / dateNot supplied
What the supplied record establishesThe document indexed as a commencement-certificate item is extracted as an HMDA draft layout letter; no building commencement certificate or project completion/occupancy certificate is provided.

Frequently asked questions

Is BHARATH REALESTATE registered with Telangana RERA?

Yes. BHARATH REALESTATE is registered with the Telangana Real Estate Regulatory Authority as P02000002539; the registration status is New Project.

Who is the developer of BHARATH REALESTATE?

The promoter named in the RERA registration is BHARATHREALESTATE.

Where is BHARATH REALESTATE located?

BHARATH REALESTATE is in BHONGIR, Husnabad, Yadadri Bhuvanagiri, Telangana (508116).

When will BHARATH REALESTATE be completed?

The promoter's proposed date of completion filed with RERA is 30/03/2024. This is the promoter's declaration, not a guarantee.

More projects in Husnabad