Srinivasam
UDAYASRI INFRA · Rangareddy · RERA P02400008084
SRINIVASAM is a residential apartment project in Puppalguda, Gandipet mandal, Ranga Reddy district, developed by registered promoter Udayasri Infra. It covers 501.51 m² and comprises one residential building with a stilt and 5 upper floors, containing 10 3BHK apartments. Its TG-RERA registration is P02400008084, and the project header lists proposed completion as 30 November 2026.
More from Udayasri Infra · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SRINIVASAM RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | One residential building on Plot Nos. 155 & 156; no separate phase name is disclosed |
| TG-RERA registration | P02400008084 |
| Registration validity | 19 April 2024 to 12 April 2026; certificate says it is not extended |
| Registered promoter | Udayasri Infra |
| RERA status | Registration certificate issued under section 5; its stated validity ended on 12 April 2026. Current extension or registration status is not established by the supplied record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Puppalguda (also rendered “Puppal Gudavillage” in the plan) |
| Mandal | Gandipet |
| District | Ranga Reddy |
| PIN | 500089 |
| Project plots | Plot Nos. 155 & 156 |
| All project survey numbers and subdivisions | 61, 62, 64, 65, 68/1, 68/2, 69, 69/1, 70, 70/1, 71, 72, 72/1, 73, 76, 77, 85, 85/1, 86, 94, 120, 121, 122, 123, 124, 125 and 126 |
| Registered site extent | 501.51 m²; sanctioned net area is also 501.51 m² |
| Road-affected area | 0 m² in the sanction record |
| Boundaries | North: Plot No. 157; South: Plot No. 154; East: Plot Nos. 159 and 160; West: 30 m road, as recorded in the RERA project fields RERA filing |
| HMDA land-use zone | Not determined at survey level from the available image-only zoning sheets HMDA |
Development identity
| Field | Record |
|---|---|
| Principal sanction | Building construction approval 0058/BP/3128/2023, dated 13 April 2023; file no. 001872/BP/DTCP/3128/0034/2023 |
| Authority shown on sanction | Manikonda Municipality/Municipal Corporation |
| Approved building | One residential building, described as 1 Stilt + 5 upper floors |
| Sanctioned height | 14.99 m |
| Approved built-up area | 1,444.55 m² including parking, as stated on the proposed plan |
| Building count | One RERA filing |
| Parking floors | Sanction record lists cellar: 0; the plan labels net residential parking area 240.80, without a parking-space count in the supplied extraction |
| Unit count | 10 apartments in the plan; RERA unit record also lists 10 RERA unit table |
| Approval identifiers also appearing in the file | Permit no. TS/003335/2023, dated 12 January 2023; RERA project fields also list 0058/BP/3128/2023 RERA filing |
Offering and status
| Field | Record |
|---|---|
| Configuration | 3BHK RERA unit table |
| RERA-filed saleable area | 161.0 m² per unit RERA unit table |
| Booked / available | 0 booked and 10 available in the portal-derived unit record; the record has no as-of date, so counts are indicative RERA unit table |
| Construction stage | No verified site-progress statement is supplied. RERA amenity entries show 0% for listed works, but do not establish overall construction progress RERA amenities |
| Completion dates | RERA registration certificate states validity to 12 April 2026; Form B completion undertaking also states 12 April 2026. The project header lists proposed completion as 30 November 2026 RERA record |
| Occupancy / completion certificate | No OC or completion certificate is included in the supplied project documents Document index |
2. The project story
SRINIVASAM is filed with TG-RERA as a residential apartment project at Plot Nos. 155 and 156 in Puppalguda, Gandipet mandal, Ranga Reddy district. The registered land extent is 501.51 m², and the project is organized as one building rather than a multi-tower development.
The municipal building sanction describes one building with a stilt level and five upper floors, with a sanctioned height of 14.99 m. The plan extraction records 10 residential units, matching the project’s RERA unit record. RERA unit table
The available record does not establish whether the building has been completed or how much construction has occurred; portal amenity progress entries are recorded as 0%, not as independent site verification. RERA amenities
The RERA certificate and Form B give 12 April 2026 as the validity/completion date, while the project header lists 30 November 2026 as the proposed completion date. These dates are reported as separately stated records, not as confirmation of an approved extension or revised completion deadline. No occupancy certificate is supplied. RERA record Document index
3. Master plan, architecture & building design
The sanctioned site is 501.51 m², with net area also recorded as 501.51 m² and road-affected area as 0 m². The proposed plan states coverage of 48.01% (240.75) and total proposed built-up area including parking of 1,444.55 m². These are plan-record figures; the file does not provide a separate FSI-counted area or carpet-area total for the building.
The approved arrangement is a single residential building with one stilt and five upper floors. The sanction lists residential upper-floor area of 1,203.75 and stilt area of 227.88; the plan records a 14.99 m building height. No basement/cellar parking floor is recorded in the sanction extraction.
The drawing extraction identifies a first-floor plan and measures two 3BHK designs from the approved plan. It does not establish the number of flats per floor, lift count or capacity, stair count, or a complete circulation and landscape plan. The plan lists a 1.00 m wide green belt, rain-water harvesting, sump, septic tank, bore well, pit and lift as plan features; these are not evidence that the items are installed or operational. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 161.0 m² | Software-measured median 80.2 m²; measured range 76.0–84.5 m² | 50% |
RERA records the 3BHK saleable area as 161.0 m². Carpet-area figures above are software measurements from the approved floor-plan drawing, not RERA-filed carpet disclosures; the drawing measurement needs review. The drawing-based review covers two flat designs. Carpet area and saleable area are different measures: saleable area includes a share of common areas, while the supplied drawing measurement is carpet area. RERA unit table RERA unit details Floor plans
The extracted first-floor plan for flat 02 labels a hall, dining/kitchen, three bedrooms, two toilets and two utility areas. The drawing extraction records the utility areas separately from the measured carpet area. RERA unit details
5. Parking & vehicle circulation
The sanction record states that cellar floors are zero and requires any approved stilt/cellar parking to be used exclusively for vehicle parking. The proposed plan gives “NET RESI. PARKING 240.80,” but the supplied extraction does not state a number of car or two-wheeler spaces, visitor or accessible spaces, or a legally documented parking allocation for individual apartments.
The plan also records a 9.00 m wide existing road and a 9.00 m wide proposed road. Detailed ramp, driveway, pedestrian-separation, mechanical-parking and EV-charging information is not established in the supplied material. A drawn parking provision does not, by itself, establish exclusive allocation or ownership.
6. Amenities, recreation & open spaces
The following are RERA portal amenity entries. The listed progress percentages are 0%; they are not independent verification of completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not stated | RERA amenity record RERA amenities | 0%; completion not independently verified |
| Water Supply | Listed as “YES”; details not stated | RERA amenity record RERA amenities | 0% progress entry; not independently verified |
| Sewerage | Chamber, lines, septic tank and STP listed in the category; project-specific configuration not established | RERA amenity record RERA amenities | 0%; not independently verified |
| Storm Water Drains | Details not stated | RERA amenity record RERA amenities | 0%; not independently verified |
| Green Strip / Tot Lot / Park | Size not stated; sanction requires a tot-lot to be fenced and maintained as greenery before OC | RERA amenity record; sanction RERA amenities | 0%; not independently verified |
| Street Lighting | Details not stated | RERA amenity record RERA amenities | 0%; not independently verified |
| Community Buildings | Details not stated | RERA amenity record RERA amenities | 0%; not independently verified |
| Treatment and disposal of sewage and sullage water | Details not stated | RERA amenity record RERA amenities | 0%; not independently verified |
| Solid waste management and disposal | Details not stated | RERA amenity record RERA amenities | 0%; not independently verified |
| Water conservation / rain-water harvesting | Listed as “YES”; sanction identifies one rain-water-harvesting pit/structure | RERA amenity record; sanction RERA amenities | 0%; installation and operation not independently verified |
| Energy management | Listed as “YES”; details not stated | RERA amenity record RERA amenities | 0%; not independently verified |
| Fire protection and fire safety | Listed as an amenity category; systems and installation status not established | RERA amenity record RERA amenities | 0%; not independently verified |
| Electrical meter room / substation / receiving station | Listed as “YES”; sanction requires space for a transformer | RERA amenity record; sanction RERA amenities | 0%; not independently verified |
| Recreational open space | Aggregate area not stated | RERA amenity record RERA amenities | 0%; not independently verified |
7. Utilities, building services & safety
The proposed plan lists a sump, septic tank, bore well, rain-water harvesting and a pit. The sanction requires a rain-water-harvesting structure and provides for transformer space; it also requires a garbage house within the premises. No capacities or confirmation of installation and operation are supplied for these items.
The sanction specifies a generator as an alternate electricity source, emergency lighting in corridors/common passages and staircases, fire extinguishers, a manually operated alarm system, hose reel and down corner. It also specifies separate underground and terrace water-storage tanks of 25,000 litres each for residential buildings, and sprinkler provision if basement area exceeds 200 m². These are sanctioned conditions, not evidence of completed installation or statutory compliance.
The plan lists a lift, but the number of lifts, service-lift provision and capacities are not stated in the supplied extraction. Fire-stair configuration, accessible circulation, CCTV, security/access-control arrangements, waste segregation, sewage treatment and water-reuse arrangements are not established in the supplied material.
8. Location, access & connectivity
The registered location is Puppalguda, Gandipet mandal, Ranga Reddy district, PIN 500089; the project is identified on Plot Nos. 155 and 156. The sanctioned plan depicts a 9.00 m wide existing road and a 9.00 m wide proposed road.
The supplied location data gives these distances to listed places: Rush Clinic 0.2 km; Abdul Kalam Park 0.2 km; ICICI Bank 0.4 km; an unnamed school 0.6 km; Holy Mary College 1.6 km; Cyient Technologies pvt ltd 1.7 km; and Financial District (Nanakramguda) 3.7 km. These are supplied location-record distances; no travel times or public-transport details are provided. Location record
9. Developer & development status
The RERA-registered promoter is Udayasri Infra, identified in the project record as a partnership. Its GSTIN is 36AAEFU3096Q1ZE. The RERA file lists Eada Vijayasree Manimala as a partner and Eada Srinivasa Rao as authorized signatory; a partner resolution dated 14 February 2024 authorizes Eada Sreenivas Rao for the registration-related work. Corporate record Parties record
Form B, signed by Eada Sreenivasa Rao as authorized signatory, declares a completion period ending 12 April 2026 and declares the land free of encumbrances. Those statements are promoter declarations. The supplied evidence does not establish verified construction progress, an OC, or an extension of registration. Document index
The RERA record identifies three landowners under area-share arrangements: Kota Mrinalini, Kota Srinivasa Rao and Kota Sri Harsha. The development is recorded as a single building; no further phase-wise development is shown. Parties record RERA filing
10. Approvals, official records & documents
| Identifier / date | P02400008084, issued 19 April 2024; stated validity to 12 April 2026 |
|---|---|
| Scope and evidence | Registration certificate for SRINIVASAM; no extension is shown in the supplied certificate |
| Identifier / date | 0058/BP/3128/2023, 13 April 2023 |
|---|---|
| Scope and evidence | Manikonda Municipality/Municipal Corporation sanction for one residential building at Plot Nos. 155 & 156; file no. 001872/BP/DTCP/3128/0034/2023 |
| Identifier / date | TS/003335/2023, 12 January 2023 |
|---|---|
| Scope and evidence | Plan for the proposed residential apartment building; records 1 stilt + 5 upper floors and 10 units |
| Identifier / date | No separate commencement notice or occupancy/completion certificate supplied |
|---|---|
| Scope and evidence | The sanction requires commencement notice and an occupancy certificate before occupation |
| Identifier / date | No registration number or declaration date/place is stated in the OCR extraction |
|---|---|
| Scope and evidence | Promoter declaration on title, encumbrances, project funds and completion undertaking |
| Identifier / date | Document 405914 |
|---|---|
| Scope and evidence | Advocate’s title investigation report covering the project plots, title instruments, development agreement/GPA and municipal mortgage |
| Identifier / date | Statement no. 154671305, searched 1 January 1983 to 15 March 2024 |
|---|---|
| Scope and evidence | Filed encumbrance statement; the supplied record advises obtaining a fresh EC for current status |
| Identifier / date | Image-only zoning sheets; public HMDA DPMS lookup unavailable |
|---|---|
| Scope and evidence | The exact survey-level zoning and approved-layout lookup are not established in the supplied record HMDA |
1. Project at a glance
Project identity
Registered project name: SRINIVASAM
Project type: Residential apartment project
Phase / registered portion: One residential building on Plot Nos. 155 & 156; no separate phase name is disclosed
TG-RERA registration: P02400008084
Registration validity: 19 April 2024 to 12 April 2026; certificate says it is not extended
Registered promoter: Udayasri Infra
RERA status: Registration certificate issued under section 5; its stated validity ended on 12 April 2026. Current extension or registration status is not established by the supplied record
Land and geographic identity
Locality / revenue village: Puppalguda (also rendered “Puppal Gudavillage” in the plan)
Mandal: Gandipet
District: Ranga Reddy
PIN: 500089
Project plots: Plot Nos. 155 & 156
All project survey numbers and subdivisions: 61, 62, 64, 65, 68/1, 68/2, 69, 69/1, 70, 70/1, 71, 72, 72/1, 73, 76, 77, 85, 85/1, 86, 94, 120, 121, 122, 123, 124, 125 and 126
Registered site extent: 501.51 m²; sanctioned net area is also 501.51 m²
Road-affected area: 0 m² in the sanction record
Boundaries: North: Plot No. 157; South: Plot No. 154; East: Plot Nos. 159 and 160; West: 30 m road, as recorded in the RERA project fields
HMDA land-use zone: Not determined at survey level from the available image-only zoning sheets
Development identity
Principal sanction: Building construction approval 0058/BP/3128/2023, dated 13 April 2023; file no. 001872/BP/DTCP/3128/0034/2023
Authority shown on sanction: Manikonda Municipality/Municipal Corporation
Approved building: One residential building, described as 1 Stilt + 5 upper floors
Sanctioned height: 14.99 m
Approved built-up area: 1,444.55 m² including parking, as stated on the proposed plan
Building count: One
Parking floors: Sanction record lists cellar: 0; the plan labels net residential parking area 240.80, without a parking-space count in the supplied extraction
Unit count: 10 apartments in the plan; RERA unit record also lists 10
Approval identifiers also appearing in the file: Permit no. TS/003335/2023, dated 12 January 2023; RERA project fields also list 0058/BP/3128/2023
Offering and status
Configuration: 3BHK
RERA-filed saleable area: 161.0 m² per unit
Booked / available: 0 booked and 10 available in the portal-derived unit record; the record has no as-of date, so counts are indicative
Construction stage: No verified site-progress statement is supplied. RERA amenity entries show 0% for listed works, but do not establish overall construction progress
Completion dates: RERA registration certificate states validity to 12 April 2026; Form B completion undertaking also states 12 April 2026. The project header lists proposed completion as 30 November 2026
Occupancy / completion certificate: No OC or completion certificate is included in the supplied project documents
2. The project story
SRINIVASAM is filed with TG-RERA as a residential apartment project at Plot Nos. 155 and 156 in Puppalguda, Gandipet mandal, Ranga Reddy district. The registered land extent is 501.51 m², and the project is organized as one building rather than a multi-tower development.
The municipal building sanction describes one building with a stilt level and five upper floors, with a sanctioned height of 14.99 m. The plan extraction records 10 residential units, matching the project’s RERA unit record.
The available record does not establish whether the building has been completed or how much construction has occurred; portal amenity progress entries are recorded as 0%, not as independent site verification.
The RERA certificate and Form B give 12 April 2026 as the validity/completion date, while the project header lists 30 November 2026 as the proposed completion date. These dates are reported as separately stated records, not as confirmation of an approved extension or revised completion deadline. No occupancy certificate is supplied.
3. Master plan, architecture & building design
The sanctioned site is 501.51 m², with net area also recorded as 501.51 m² and road-affected area as 0 m². The proposed plan states coverage of 48.01% (240.75) and total proposed built-up area including parking of 1,444.55 m². These are plan-record figures; the file does not provide a separate FSI-counted area or carpet-area total for the building.
The approved arrangement is a single residential building with one stilt and five upper floors. The sanction lists residential upper-floor area of 1,203.75 and stilt area of 227.88; the plan records a 14.99 m building height. No basement/cellar parking floor is recorded in the sanction extraction.
The drawing extraction identifies a first-floor plan and measures two 3BHK designs from the approved plan. It does not establish the number of flats per floor, lift count or capacity, stair count, or a complete circulation and landscape plan. The plan lists a 1.00 m wide green belt, rain-water harvesting, sump, septic tank, bore well, pit and lift as plan features; these are not evidence that the items are installed or operational.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 161.0 m² | Software-measured median 80.2 m²; measured range 76.0–84.5 m² | 50% |
RERA records the 3BHK saleable area as 161.0 m². Carpet-area figures above are software measurements from the approved floor-plan drawing, not RERA-filed carpet disclosures; the drawing measurement needs review. The drawing-based review covers two flat designs. Carpet area and saleable area are different measures: saleable area includes a share of common areas, while the supplied drawing measurement is carpet area.
The extracted first-floor plan for flat 02 labels a hall, dining/kitchen, three bedrooms, two toilets and two utility areas. The drawing extraction records the utility areas separately from the measured carpet area.
5. Parking & vehicle circulation
The sanction record states that cellar floors are zero and requires any approved stilt/cellar parking to be used exclusively for vehicle parking. The proposed plan gives “NET RESI. PARKING 240.80,” but the supplied extraction does not state a number of car or two-wheeler spaces, visitor or accessible spaces, or a legally documented parking allocation for individual apartments.
The plan also records a 9.00 m wide existing road and a 9.00 m wide proposed road. Detailed ramp, driveway, pedestrian-separation, mechanical-parking and EV-charging information is not established in the supplied material. A drawn parking provision does not, by itself, establish exclusive allocation or ownership.
6. Amenities, recreation & open spaces
The following are RERA portal amenity entries. The listed progress percentages are 0%; they are not independent verification of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not stated | RERA amenity record | 0%; completion not independently verified |
| Water Supply | Listed as “YES”; details not stated | RERA amenity record | 0% progress entry; not independently verified |
| Sewerage | Chamber, lines, septic tank and STP listed in the category; project-specific configuration not established | RERA amenity record | 0%; not independently verified |
| Storm Water Drains | Details not stated | RERA amenity record | 0%; not independently verified |
| Green Strip / Tot Lot / Park | Size not stated; sanction requires a tot-lot to be fenced and maintained as greenery before OC | RERA amenity record; sanction | 0%; not independently verified |
| Street Lighting | Details not stated | RERA amenity record | 0%; not independently verified |
| Community Buildings | Details not stated | RERA amenity record | 0%; not independently verified |
| Treatment and disposal of sewage and sullage water | Details not stated | RERA amenity record | 0%; not independently verified |
| Solid waste management and disposal | Details not stated | RERA amenity record | 0%; not independently verified |
| Water conservation / rain-water harvesting | Listed as “YES”; sanction identifies one rain-water-harvesting pit/structure | RERA amenity record; sanction | 0%; installation and operation not independently verified |
| Energy management | Listed as “YES”; details not stated | RERA amenity record | 0%; not independently verified |
| Fire protection and fire safety | Listed as an amenity category; systems and installation status not established | RERA amenity record | 0%; not independently verified |
| Electrical meter room / substation / receiving station | Listed as “YES”; sanction requires space for a transformer | RERA amenity record; sanction | 0%; not independently verified |
| Recreational open space | Aggregate area not stated | RERA amenity record | 0%; not independently verified |
7. Utilities, building services & safety
The proposed plan lists a sump, septic tank, bore well, rain-water harvesting and a pit. The sanction requires a rain-water-harvesting structure and provides for transformer space; it also requires a garbage house within the premises. No capacities or confirmation of installation and operation are supplied for these items.
The sanction specifies a generator as an alternate electricity source, emergency lighting in corridors/common passages and staircases, fire extinguishers, a manually operated alarm system, hose reel and down corner. It also specifies separate underground and terrace water-storage tanks of 25,000 litres each for residential buildings, and sprinkler provision if basement area exceeds 200 m². These are sanctioned conditions, not evidence of completed installation or statutory compliance.
The plan lists a lift, but the number of lifts, service-lift provision and capacities are not stated in the supplied extraction. Fire-stair configuration, accessible circulation, CCTV, security/access-control arrangements, waste segregation, sewage treatment and water-reuse arrangements are not established in the supplied material.
8. Location, access & connectivity
The registered location is Puppalguda, Gandipet mandal, Ranga Reddy district, PIN 500089; the project is identified on Plot Nos. 155 and 156. The sanctioned plan depicts a 9.00 m wide existing road and a 9.00 m wide proposed road.
The supplied location data gives these distances to listed places: Rush Clinic 0.2 km; Abdul Kalam Park 0.2 km; ICICI Bank 0.4 km; an unnamed school 0.6 km; Holy Mary College 1.6 km; Cyient Technologies pvt ltd 1.7 km; and Financial District (Nanakramguda) 3.7 km. These are supplied location-record distances; no travel times or public-transport details are provided.
9. Developer & development status
The RERA-registered promoter is Udayasri Infra, identified in the project record as a partnership. Its GSTIN is 36AAEFU3096Q1ZE. The RERA file lists Eada Vijayasree Manimala as a partner and Eada Srinivasa Rao as authorized signatory; a partner resolution dated 14 February 2024 authorizes Eada Sreenivas Rao for the registration-related work.
Form B, signed by Eada Sreenivasa Rao as authorized signatory, declares a completion period ending 12 April 2026 and declares the land free of encumbrances. Those statements are promoter declarations. The supplied evidence does not establish verified construction progress, an OC, or an extension of registration.
The RERA record identifies three landowners under area-share arrangements: Kota Mrinalini, Kota Srinivasa Rao and Kota Sri Harsha. The development is recorded as a single building; no further phase-wise development is shown.
10. Approvals, official records & documents
| Identifier / date | P02400008084, issued 19 April 2024; stated validity to 12 April 2026 |
|---|---|
| Scope and evidence | Registration certificate for SRINIVASAM; no extension is shown in the supplied certificate |
| Identifier / date | 0058/BP/3128/2023, 13 April 2023 |
|---|---|
| Scope and evidence | Manikonda Municipality/Municipal Corporation sanction for one residential building at Plot Nos. 155 & 156; file no. 001872/BP/DTCP/3128/0034/2023 |
| Identifier / date | TS/003335/2023, 12 January 2023 |
|---|---|
| Scope and evidence | Plan for the proposed residential apartment building; records 1 stilt + 5 upper floors and 10 units |
| Identifier / date | No separate commencement notice or occupancy/completion certificate supplied |
|---|---|
| Scope and evidence | The sanction requires commencement notice and an occupancy certificate before occupation |
| Identifier / date | No registration number or declaration date/place is stated in the OCR extraction |
|---|---|
| Scope and evidence | Promoter declaration on title, encumbrances, project funds and completion undertaking |
| Identifier / date | Document 405914 |
|---|---|
| Scope and evidence | Advocate’s title investigation report covering the project plots, title instruments, development agreement/GPA and municipal mortgage |
| Identifier / date | Statement no. 154671305, searched 1 January 1983 to 15 March 2024 |
|---|---|
| Scope and evidence | Filed encumbrance statement; the supplied record advises obtaining a fresh EC for current status |
| Identifier / date | Image-only zoning sheets; public HMDA DPMS lookup unavailable |
|---|---|
| Scope and evidence | The exact survey-level zoning and approved-layout lookup are not established in the supplied record |
Frequently asked questions
Is SRINIVASAM registered with Telangana RERA?
Yes. SRINIVASAM is registered with the Telangana Real Estate Regulatory Authority as P02400008084; the registration status is New Project.
Who is the developer of SRINIVASAM?
The promoter named in the RERA registration is UDAYASRI INFRA.
Where is SRINIVASAM located?
SRINIVASAM is in PUPPALGUDA, Gandipet, Rangareddy, Telangana (500089).
When will SRINIVASAM be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.
More projects in Puppalguda





