Padma Elite
The DB Group · Mahabubnagar · RERA P01400008075
Padma Elite is a residential apartment project in Rajendra Nagar, Mahabubnagar Urban Mandal, Mahabubnagar District, being developed by the registered promoter The DB Group, identified as a partnership. The project covers 748.20 sq. m. of total plot area and comprises one building, Building A (1), with 1 stilt + 5 upper floors and 15 units: five 2BHK and ten 3BHK. It is registered with TG-RERA under P01400008075, and its proposed completion date is 17 October 2029.
More from The DB Group · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | TG-RERA record |
|---|---|
| Registered project name | Padma Elite RERA record [REGCERT-56814] |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration covers Padma Elite under registration number P01400008075 [REGCERT-56814] |
| TG-RERA registration number | P01400008075 RERA record [REGCERT-56814] |
| Registration validity | 19 April 2024 to 17 June 2029, as recorded on the registration certificate RERA record |
| Registered promoter | The DB Group, identified as a partnership RERA filing Parties record |
| RERA status | On-Going Project RERA record RERA filing |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Rajendra Nagar; the building approval describes the location as Rajendra Nagar, Sadalgundu RERA record |
| Revenue village | Saddalagundu in the project record; the approval and registration certificate also render it as Sadalgundu / Saddalagundu RERA record |
| Mandal | Mahabubnagar Urban RERA record RERA filing |
| District | Mahabubnagar RERA record RERA filing |
| PIN | 509001 RERA record |
| Project property identifiers | Plot No. 15, Ward No. 1, Block No. 3; H. No. 1-3-121/2, 1-3-122, and 1-3-122/1/C RERA filing |
| Survey numbers / subdivisions | Not disclosed in the supplied RERA land record Land records |
| Site extent | 748.20 sq. m. total plot area; net area 673.81 sq. m. |
| Road-affected / other deductions | Building approval records road-affected area 72.24 sq. m. and splay area 2.15 sq. m., total deduction 74.39 sq. m. |
| Boundaries in RERA record | North: House of Others; South and West: 30 feet wide road; East: H. No. 1-3-122 1 C RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Mahaboobnagar Municipality / Municipal Corporation; the filed plan identifies delegation to Mahabub Nagar Municipality |
| Principal building approval | No. 0032/BP/3063/2023, dated 17 June 2023 Approvals record |
| Related application / permit number | TS/031761/2023 Approvals record |
| Approved building | Building A (1), residential; 1 stilt + 5 upper floors |
| Building height | 14.75 m |
| Approved built-up area | The plan records 1,558.45 sq. m. net residential BUA; 1,908.25 sq. m. proposed BUA including parking; and total BUA of 1,911.66 sq. m. |
| Building count | One building |
| Sanctioned unit count | 15 dwelling units |
| RERA unit count | 15 units: five 2BHK and ten 3BHK RERA unit table RERA unit details |
| Sanctioned parking provision | Four proposed parking spaces; the sanction describes the stilt as parking |
Offering and status
| Field | Record |
|---|---|
| Configurations | 2BHK and 3BHK RERA unit table |
| RERA-filed saleable areas | 2BHK: 105.91 sq. m.; 3BHK: 158.39 sq. m. RERA unit table |
| Booked / available | Portal figures indicate 0 booked and 5 available 2BHK units, and 0 booked and 10 available 3BHK units. The portal record supplied here has no as-of date; counts are indicative RERA unit table RERA unit details |
| Construction stage | TG-RERA status is “On-Going Project”; no independently verified site-progress stage is supplied RERA record RERA amenities |
| Promoter-declared completion | The RERA header records 17 October 2029 as proposed and revised proposed completion RERA record |
| Occupancy certificate (OC) | No OC is recorded in the supplied documents. The building approval says an OC must be obtained before occupation; its extraction records completion as not certified |
| Registration validity vs completion | Registration validity ends 17 June 2029; the project header’s proposed/revised completion date is 17 October 2029. These are separate dates in the supplied records RERA record |
2. The project story
Padma Elite is a registered residential apartment project in Rajendra Nagar, in the Saddalagundu locality of Mahabubnagar Urban Mandal, Mahabubnagar District. The registered property is identified by plot, ward, block and house numbers; project survey numbers are not disclosed in the supplied RERA land record. The registration certificate identifies The DB Group as promoter and the project location as Plot No. 15, Ward No. 1, Block No. 3, with the stated house numbers RERA record RERA filing.
The sanctioned proposal is a single residential building, Building A, with one stilt and five upper floors, and 15 dwelling units. The RERA filing lists five 2BHK and ten 3BHK units. The project is marked “On-Going Project,” but the evidence supplied does not establish a specific current construction stage or independently verify progress at the site RERA unit table RERA record.
The building-permit extraction records that completion notice and an occupancy certificate are required after construction, and that occupation requires an OC. No OC or completion certificate is included in the supplied project documents.
3. Master plan, architecture & building design
The filed building plan records a 748.20 sq. m. plot, with a net plot area of 673.81 sq. m. after a total deduction of 74.39 sq. m. It records proposed coverage of 349.80 sq. m. (51.75%), net residential built-up area of 1,558.45 sq. m., proposed built-up area of 1,908.25 sq. m. including parking, and total BUA of 1,911.66 sq. m. These are distinct plan figures as recorded; the supplied information does not identify an FSI-counted area or carpet area for the building as a whole.
The approved arrangement is one building, Building A (1), with one stilt and five upper floors, at a height of 14.75 m. The plan also records 349.80 sq. m. of parking area and a mortgage area of 165.28 sq. m. The supplied drawing-derived data does not establish building footprint dimensions, flats per floor, lift or stair configuration, or a detailed arrangement of entrances, exits, circulation, landscaping and common areas.
The filed plan lists rainwater harvesting, visitor parking and parking as amenities/utilities. The building approval separately requires a rainwater-harvesting structure, transformer space, a garbage house, peripheral planting and a fenced tot-lot maintained as greenery before issue of OC.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 105.91 sq. m. | 65.2–81.7 sq. m.; median 73.5 sq. m. (791 sq. ft.) | 31% |
| 3BHK | 10 | 0 | 10 | 158.39 sq. m. | Not supplied | Not supplied |
The RERA filing lists 15 units: five 2BHK units and ten 3BHK units. The portal counts supplied show all 15 as available and none booked, but have no stated as-of date RERA unit table RERA unit details.
The 2BHK carpet-area figures are software measurements from two flat designs in the filed floor-plan material, not RERA-filed areas; the measurement record says they need review. The RERA figure is saleable area, which includes the home’s share of common areas, whereas carpet area is a drawing-based measurement of the home’s internal area. A balcony is separately identified in the measured 2BHK drawing and excluded from carpet area. The supplied information does not provide a measured carpet area for the 3BHK configuration RERA unit details Floor plans.
A measured 2BHK drawing identifies a hall, living/dining area, kitchen, two bedrooms, three toilets and a balcony. The dimensions and room areas recorded for that drawing are software-measured and should be checked against the drawing: hall 3.2 m × 4.21 m (13.47 sq. m.); living/dining 2.86 m × 6.5 m (18.59 sq. m.); kitchen 2.84 m × 3.99 m (11.33 sq. m.); and bedrooms 3.0 m × 3.24 m (9.72 sq. m.) and 3.0 m × 3.99 m (11.97 sq. m.). The drawing data identifies flat 04 on the “& 5 FLOOR PLAN” panel RERA unit details.
5. Parking & vehicle circulation
The sanctioned plan records four proposed parking spaces and 349.80 sq. m. of parking area; the approval identifies the stilt as parking and requires approved stilt parking to remain used exclusively for vehicle parking. The filed plan also lists visitor parking. No separate counts for resident, visitor, accessible or two-wheeler spaces, and no unit-specific parking allocations, are supplied.
The evidence does not establish parking ramps, separate vehicle entrances or exits, internal driveways, pedestrian separation, mechanical parking, EV charging or exclusive parking rights for any particular unit. The plan’s parking provision does not, by itself, establish an individual buyer’s parking allocation.
6. Amenities, recreation & open spaces
The RERA amenities record lists infrastructure and facilities, but the supplied progress percentages are 0% where shown; “YES” entries are filed availability declarations, not independent confirmation of completion. The building sanction also imposes conditions for specified site features RERA amenities.
| Description / size | No clubhouse or indoor recreation facility identified in the supplied RERA amenities or sanction records |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Not established |
| Description / size | Green Strip / Tot Lot / Park listed; sanction requires the tot-lot to be fenced and maintained as greenery before OC |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA record says “YES”; progress recorded as 0%. Completion not independently verified |
| Description / size | Peripheral planting and a strip of greenery are required by the sanction; aggregate recreational open-space area is not supplied |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress recorded as 0% for aggregate recreational open space; completion not independently verified |
| Description / size | Community buildings listed without a supplied description or size |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; no delivered facility established |
7. Utilities, building services & safety
| Evidence in the project record | RERA amenities list water supply as “YES” RERA amenities |
|---|---|
| Status / limitation | No source, capacity, storage or treatment details are supplied; progress is recorded as 0% |
| Evidence in the project record | RERA amenities list sewerage and treatment/disposal of sewage and sullage water; storm-water drains are also listed RERA amenities |
|---|---|
| Status / limitation | No STP capacity, reuse details or verified completion status is supplied; recorded progress is 0% where stated |
| Evidence in the project record | The plan lists rainwater harvesting; the building sanction requires a rainwater-harvesting structure and records four rainwater-harvesting pits |
|---|---|
| Status / limitation | Sanctioned/required provision; completion not independently verified |
| Evidence in the project record | The RERA amenities record lists an electrical meter room, sub-station or receiving station as “YES”; the sanction requires transformer space RERA amenities |
|---|---|
| Status / limitation | No electrical capacity or completed status is supplied; progress is recorded as 0% |
| Evidence in the project record | The sanction states that lifts, where applicable, are to be executed under qualified technical supervision |
|---|---|
| Status / limitation | Number, type and capacity of lifts are not supplied |
| Evidence in the project record | Fire protection and fire-safety requirements appear in the RERA amenities list; the sanction makes the owner, builder, architect and site engineer responsible for required fire-fighting installations RERA amenities |
|---|---|
| Status / limitation | No specific system, clearance or completion certificate is supplied |
| Evidence in the project record | The RERA amenities list solid-waste management and disposal; the sanction requires a garbage house within the premises RERA amenities |
|---|---|
| Status / limitation | No waste-system details or completion status are supplied; progress is recorded as 0% where stated |
| Evidence in the project record | The sanction contains a condition for facilities for physically handicapped persons in public and semi-public buildings above 300 sq. m. |
|---|---|
| Status / limitation | The supplied record does not establish accessible routes, ramps or project-specific accessibility provision |
8. Location, access & connectivity
The registered location is Plot No. 15, Ward No. 1, Block No. 3, H. Nos. 1-3-121/2, 1-3-122 and 1-3-122/1/C, at Saddalagundu, Mahabubnagar Urban, Mahabubnagar, PIN 509001. The approval describes the site as Rajendra Nagar, Sadalgundu.
The RERA land record gives 30 feet wide roads to the south and west. The filed plan also identifies road widths as 7.62 m and 9.14 m, described in the plan as existing and proposed roads; it does not establish a particular project access route or present road condition RERA filing.
The supplied location data records the nearest sampled Outer Ring Road interchange at approximately 69.4 km. No public-transport details or other independently supported landmark distances are supplied Location record.
9. Developer & development status
The registered promoter is The DB Group, recorded as a partnership, with GSTIN 36AAQFT1806M1ZP. The supplied registration certificate gives its registered office as Village Gandamguda, Mandal Gandipet, Ranga Reddy District, PIN 500091. The project record identifies Bhargava Kokkalla as an authorized signatory Parties record Corporate record.
The project is registered as an on-going project, with 17 October 2029 recorded as both proposed and revised proposed completion in the RERA header. No independently verified construction-progress measurement is supplied. No occupancy or completion certificate is included in the project documents; the building approval requires an occupancy certificate before occupation RERA record.
The supplied material does not provide an official promoter website, project contact details or a verified construction-stage update. A Form B declaration filed by the promoter states a completion undertaking of 17 June 2026; the overview reports that as a promoter declaration, not as independently verified progress.
10. Approvals, official records & documents
| Details | Padma Elite; P01400008075; registered promoter The DB Group; certificate records validity from 19 April 2024 to 17 June 2029 |
|---|
| Details | Approval No. 0032/BP/3063/2023, dated 17 June 2023; Mahaboobnagar Municipality / Municipal Corporation; Building A (1), 1 stilt + 5 upper floors |
|---|
| Details | TS/031761/2023; filed plan records approval dated 05-05-2023 |
|---|
| Details | Plan extraction records site area, net area, building configuration, BUA, parking and conditions |
|---|
| Details | Building-construction approval includes commencement-notice requirements and records completion as not certified |
|---|
| Details | Promoter declaration on title, encumbrance, financial undertakings and a stated completion undertaking |
|---|
| Details | The supplied document is an approval-plan extraction for the apartment building; no separate approved-layout number is disclosed |
|---|
| Details | Not present in the supplied documents |
|---|
1. Project at a glance
Project identity
Registered project name: Padma Elite [REGCERT-56814]
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; the registration covers Padma Elite under registration number P01400008075 [REGCERT-56814]
TG-RERA registration number: P01400008075 [REGCERT-56814]
Registration validity: 19 April 2024 to 17 June 2029, as recorded on the registration certificate
Registered promoter: The DB Group, identified as a partnership
RERA status: On-Going Project
Land and geographic identity
Locality: Rajendra Nagar; the building approval describes the location as Rajendra Nagar, Sadalgundu
Revenue village: Saddalagundu in the project record; the approval and registration certificate also render it as Sadalgundu / Saddalagundu
Mandal: Mahabubnagar Urban
District: Mahabubnagar
PIN: 509001
Project property identifiers: Plot No. 15, Ward No. 1, Block No. 3; H. No. 1-3-121/2, 1-3-122, and 1-3-122/1/C
Survey numbers / subdivisions: Not disclosed in the supplied RERA land record
Site extent: 748.20 sq. m. total plot area; net area 673.81 sq. m.
Road-affected / other deductions: Building approval records road-affected area 72.24 sq. m. and splay area 2.15 sq. m., total deduction 74.39 sq. m.
Boundaries in RERA record: North: House of Others; South and West: 30 feet wide road; East: H. No. 1-3-122 1 C
Development identity
Sanctioning authority: Mahaboobnagar Municipality / Municipal Corporation; the filed plan identifies delegation to Mahabub Nagar Municipality
Principal building approval: No. 0032/BP/3063/2023, dated 17 June 2023
Related application / permit number: TS/031761/2023
Approved building: Building A (1), residential; 1 stilt + 5 upper floors
Building height: 14.75 m
Approved built-up area: The plan records 1,558.45 sq. m. net residential BUA; 1,908.25 sq. m. proposed BUA including parking; and total BUA of 1,911.66 sq. m.
Building count: One building
Sanctioned unit count: 15 dwelling units
RERA unit count: 15 units: five 2BHK and ten 3BHK
Sanctioned parking provision: Four proposed parking spaces; the sanction describes the stilt as parking
Offering and status
Configurations: 2BHK and 3BHK
RERA-filed saleable areas: 2BHK: 105.91 sq. m.; 3BHK: 158.39 sq. m.
Booked / available: Portal figures indicate 0 booked and 5 available 2BHK units, and 0 booked and 10 available 3BHK units. The portal record supplied here has no as-of date; counts are indicative
Construction stage: TG-RERA status is “On-Going Project”; no independently verified site-progress stage is supplied
Promoter-declared completion: The RERA header records 17 October 2029 as proposed and revised proposed completion
Occupancy certificate (OC): No OC is recorded in the supplied documents. The building approval says an OC must be obtained before occupation; its extraction records completion as not certified
Registration validity vs completion: Registration validity ends 17 June 2029; the project header’s proposed/revised completion date is 17 October 2029. These are separate dates in the supplied records
2. The project story
Padma Elite is a registered residential apartment project in Rajendra Nagar, in the Saddalagundu locality of Mahabubnagar Urban Mandal, Mahabubnagar District. The registered property is identified by plot, ward, block and house numbers; project survey numbers are not disclosed in the supplied RERA land record. The registration certificate identifies The DB Group as promoter and the project location as Plot No. 15, Ward No. 1, Block No. 3, with the stated house numbers.
The sanctioned proposal is a single residential building, Building A, with one stilt and five upper floors, and 15 dwelling units. The RERA filing lists five 2BHK and ten 3BHK units. The project is marked “On-Going Project,” but the evidence supplied does not establish a specific current construction stage or independently verify progress at the site.
The building-permit extraction records that completion notice and an occupancy certificate are required after construction, and that occupation requires an OC. No OC or completion certificate is included in the supplied project documents.
3. Master plan, architecture & building design
The filed building plan records a 748.20 sq. m. plot, with a net plot area of 673.81 sq. m. after a total deduction of 74.39 sq. m. It records proposed coverage of 349.80 sq. m. (51.75%), net residential built-up area of 1,558.45 sq. m., proposed built-up area of 1,908.25 sq. m. including parking, and total BUA of 1,911.66 sq. m. These are distinct plan figures as recorded; the supplied information does not identify an FSI-counted area or carpet area for the building as a whole.
The approved arrangement is one building, Building A (1), with one stilt and five upper floors, at a height of 14.75 m. The plan also records 349.80 sq. m. of parking area and a mortgage area of 165.28 sq. m. The supplied drawing-derived data does not establish building footprint dimensions, flats per floor, lift or stair configuration, or a detailed arrangement of entrances, exits, circulation, landscaping and common areas.
The filed plan lists rainwater harvesting, visitor parking and parking as amenities/utilities. The building approval separately requires a rainwater-harvesting structure, transformer space, a garbage house, peripheral planting and a fenced tot-lot maintained as greenery before issue of OC.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 105.91 sq. m. | 65.2–81.7 sq. m.; median 73.5 sq. m. (791 sq. ft.) | 31% |
| 3BHK | 10 | 0 | 10 | 158.39 sq. m. | Not supplied | Not supplied |
The RERA filing lists 15 units: five 2BHK units and ten 3BHK units. The portal counts supplied show all 15 as available and none booked, but have no stated as-of date.
The 2BHK carpet-area figures are software measurements from two flat designs in the filed floor-plan material, not RERA-filed areas; the measurement record says they need review. The RERA figure is saleable area, which includes the home’s share of common areas, whereas carpet area is a drawing-based measurement of the home’s internal area. A balcony is separately identified in the measured 2BHK drawing and excluded from carpet area. The supplied information does not provide a measured carpet area for the 3BHK configuration.
A measured 2BHK drawing identifies a hall, living/dining area, kitchen, two bedrooms, three toilets and a balcony. The dimensions and room areas recorded for that drawing are software-measured and should be checked against the drawing: hall 3.2 m × 4.21 m (13.47 sq. m.); living/dining 2.86 m × 6.5 m (18.59 sq. m.); kitchen 2.84 m × 3.99 m (11.33 sq. m.); and bedrooms 3.0 m × 3.24 m (9.72 sq. m.) and 3.0 m × 3.99 m (11.97 sq. m.). The drawing data identifies flat 04 on the “& 5 FLOOR PLAN” panel.
5. Parking & vehicle circulation
The sanctioned plan records four proposed parking spaces and 349.80 sq. m. of parking area; the approval identifies the stilt as parking and requires approved stilt parking to remain used exclusively for vehicle parking. The filed plan also lists visitor parking. No separate counts for resident, visitor, accessible or two-wheeler spaces, and no unit-specific parking allocations, are supplied.
The evidence does not establish parking ramps, separate vehicle entrances or exits, internal driveways, pedestrian separation, mechanical parking, EV charging or exclusive parking rights for any particular unit. The plan’s parking provision does not, by itself, establish an individual buyer’s parking allocation.
6. Amenities, recreation & open spaces
The RERA amenities record lists infrastructure and facilities, but the supplied progress percentages are 0% where shown; “YES” entries are filed availability declarations, not independent confirmation of completion. The building sanction also imposes conditions for specified site features.
| Description / size | No clubhouse or indoor recreation facility identified in the supplied RERA amenities or sanction records |
|---|---|
| Declared progress / verified status | Not established |
| Description / size | Green Strip / Tot Lot / Park listed; sanction requires the tot-lot to be fenced and maintained as greenery before OC |
|---|---|
| Declared progress / verified status | RERA record says “YES”; progress recorded as 0%. Completion not independently verified |
| Description / size | Peripheral planting and a strip of greenery are required by the sanction; aggregate recreational open-space area is not supplied |
|---|---|
| Declared progress / verified status | Progress recorded as 0% for aggregate recreational open space; completion not independently verified |
| Description / size | Community buildings listed without a supplied description or size |
|---|---|
| Declared progress / verified status | Progress recorded as 0%; no delivered facility established |
7. Utilities, building services & safety
| Evidence in the project record | RERA amenities list water supply as “YES” |
|---|---|
| Status / limitation | No source, capacity, storage or treatment details are supplied; progress is recorded as 0% |
| Evidence in the project record | RERA amenities list sewerage and treatment/disposal of sewage and sullage water; storm-water drains are also listed |
|---|---|
| Status / limitation | No STP capacity, reuse details or verified completion status is supplied; recorded progress is 0% where stated |
| Evidence in the project record | The plan lists rainwater harvesting; the building sanction requires a rainwater-harvesting structure and records four rainwater-harvesting pits |
|---|---|
| Status / limitation | Sanctioned/required provision; completion not independently verified |
| Evidence in the project record | The RERA amenities record lists an electrical meter room, sub-station or receiving station as “YES”; the sanction requires transformer space |
|---|---|
| Status / limitation | No electrical capacity or completed status is supplied; progress is recorded as 0% |
| Evidence in the project record | The sanction states that lifts, where applicable, are to be executed under qualified technical supervision |
|---|---|
| Status / limitation | Number, type and capacity of lifts are not supplied |
| Evidence in the project record | Fire protection and fire-safety requirements appear in the RERA amenities list; the sanction makes the owner, builder, architect and site engineer responsible for required fire-fighting installations |
|---|---|
| Status / limitation | No specific system, clearance or completion certificate is supplied |
| Evidence in the project record | The RERA amenities list solid-waste management and disposal; the sanction requires a garbage house within the premises |
|---|---|
| Status / limitation | No waste-system details or completion status are supplied; progress is recorded as 0% where stated |
| Evidence in the project record | The sanction contains a condition for facilities for physically handicapped persons in public and semi-public buildings above 300 sq. m. |
|---|---|
| Status / limitation | The supplied record does not establish accessible routes, ramps or project-specific accessibility provision |
8. Location, access & connectivity
The registered location is Plot No. 15, Ward No. 1, Block No. 3, H. Nos. 1-3-121/2, 1-3-122 and 1-3-122/1/C, at Saddalagundu, Mahabubnagar Urban, Mahabubnagar, PIN 509001. The approval describes the site as Rajendra Nagar, Sadalgundu.
The RERA land record gives 30 feet wide roads to the south and west. The filed plan also identifies road widths as 7.62 m and 9.14 m, described in the plan as existing and proposed roads; it does not establish a particular project access route or present road condition.
The supplied location data records the nearest sampled Outer Ring Road interchange at approximately 69.4 km. No public-transport details or other independently supported landmark distances are supplied.
9. Developer & development status
The registered promoter is The DB Group, recorded as a partnership, with GSTIN 36AAQFT1806M1ZP. The supplied registration certificate gives its registered office as Village Gandamguda, Mandal Gandipet, Ranga Reddy District, PIN 500091. The project record identifies Bhargava Kokkalla as an authorized signatory.
The project is registered as an on-going project, with 17 October 2029 recorded as both proposed and revised proposed completion in the RERA header. No independently verified construction-progress measurement is supplied. No occupancy or completion certificate is included in the project documents; the building approval requires an occupancy certificate before occupation.
The supplied material does not provide an official promoter website, project contact details or a verified construction-stage update. A Form B declaration filed by the promoter states a completion undertaking of 17 June 2026; the overview reports that as a promoter declaration, not as independently verified progress.
10. Approvals, official records & documents
| Details | Padma Elite; P01400008075; registered promoter The DB Group; certificate records validity from 19 April 2024 to 17 June 2029 |
|---|
| Details | Approval No. 0032/BP/3063/2023, dated 17 June 2023; Mahaboobnagar Municipality / Municipal Corporation; Building A (1), 1 stilt + 5 upper floors |
|---|
| Details | TS/031761/2023; filed plan records approval dated 05-05-2023 |
|---|
| Details | Plan extraction records site area, net area, building configuration, BUA, parking and conditions |
|---|
| Details | Building-construction approval includes commencement-notice requirements and records completion as not certified |
|---|
| Details | Promoter declaration on title, encumbrance, financial undertakings and a stated completion undertaking |
|---|
| Details | The supplied document is an approval-plan extraction for the apartment building; no separate approved-layout number is disclosed |
|---|
| Details | Not present in the supplied documents |
|---|
Frequently asked questions
Is Padma Elite registered with Telangana RERA?
Yes. Padma Elite is registered with the Telangana Real Estate Regulatory Authority as P01400008075; the registration status is On-Going Project.
Who is the developer of Padma Elite?
The promoter named in the RERA registration is The DB Group.
Where is Padma Elite located?
Padma Elite is in Rajendra Nagar, Saddalagundu, Mahabubnagar Urban, Mahabubnagar, Telangana (509001).
When will Padma Elite be completed?
The promoter's proposed date of completion filed with RERA is 17/10/2029. This is the promoter's declaration, not a guarantee.
More projects in Mahabubnagar Urban