Sign in

R K R Residency

JNR BUILDERS · Rangareddy · RERA P02400000916

R K R RESIDENCY is a residential apartment project in HASTINAPUR, Saroornagar mandal, Ranga Reddy district. Registered promoter JNR BUILDERS is developing it on a site of 583.37 sq. m, with one residential building, Stilt + 5, and 15 2BHK units. Its TG-RERA registration number is P02400000916, and its proposed completion date is 20/04/2024.

More from Jnr Builders · 23 projects →

01What we found

Period endedTG-RERA registration ran to 20 Apr 2024 - check its extension on TG-RERA
17documents on file - each fact links to its page
32court cases on this project's land (survey 59, Karmanghat)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameR K R RESIDENCY RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo phase name or phase number disclosed; the registration covers the project recorded on Survey No. 59 PART, at Plot Nos. 164 and 165 RERA filing
TG-RERA registrationP02400000916 Approvals record
Registration validity19/06/2019–20/04/2024; certificate states four years, unless extended by the Authority. No extension is recorded in the supplied certificate Approvals record
Registered promoterJNR BUILDERS, partnership RERA filing
RERA-recorded statusOn-Going Project RERA filing
Status in this reviewRegistration validity has ended on the supplied record; the recorded completion deadline is 20/04/2024. The supplied evidence does not establish a later extension or an occupancy/completion certificate RERA record Approvals record

Land and geographic identity

ItemProject record
Locality / site descriptionHASTINAPUR; the building permit describes the location as Vishweshwarayya Engineering Colony RERA filing
Revenue villageKarmanghat RERA record RERA filing
MandalSaroornagar RERA record
DistrictRanga Reddy RERA record
PIN500070 in the project record RERA record
Project survey identifierSurvey No. 59 PART; no project-specific subdivision beyond “PART” is identified RERA filing
Plot identifiers164 AND 165 RERA filing
Site extent583.37 sq. m; total and net area are both recorded as 583.37 sq. m, with road-affected area 0 in the project filing and permit extraction RERA filing
Boundaries (RERA filing)East: PLOT NO 163; West: 40 WIDE ROAD; North: 30 WIDE ROAD; South: PLOT NO 162 AND 166 RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalBuilding Permit Order 2/C23/06830/2018, File No. 2/C23/02003/2018, approved 20 April, 2018 Approvals record
Approved building formOne residential building, Stilt + 5; the permit lists 5 upper floors and a height of 14.99 m
Approved built-up areaThe project filing records 1,398.06 sq. m. The building-permit extraction lists residential area 1,398.05 m² and separate stilt area 421.56 m² RERA filing
Building / block countOne building is recorded RERA filing
Parking levels and countThe permit identifies a stilt and requires approved parking areas to be used for parking; a parking-space count is not available in the supplied material
Unit countsGHMC-sanctioned unit count is not stated in the supplied permit extraction. The TG-RERA unit record lists 15 units RERA filing RERA unit table

Offering and status

ItemProject record
RERA-filed configuration2BHK RERA unit table
RERA-filed saleable area112.41 sq. m RERA unit table
Booked / available15 booked; 0 available, as last read from the TG-RERA portal. The record has no as-of date, so these counts are indicative RERA unit table
Promoter-filed proposed completion20/04/2024; revised proposed completion also 20/04/2024 RERA record
Construction stageRERA status is “On-Going Project”; no independently verified current site-stage evidence is supplied RERA filing RERA record
Occupancy / completion certificateNot present in the supplied evidence; certificate status and phase/tower scope are therefore not established Document index Approvals record

2. The project story

R K R RESIDENCY is a registered residential apartment project on Plot Nos. 164 and 165, Survey No. 59 PART, in Karmanghat village, Saroornagar mandal, Ranga Reddy district. The registered site is 583.37 sq. m. GHMC’s permit describes one residential building at Vishweshwarayya Engineering Colony, with a stilt and five upper floors. RERA filing

The TG-RERA unit record identifies fifteen 2BHK apartments, all shown as booked and none as available, although the portal extract does not provide an as-of date. The registration and promoter-filed completion date run through 20 April 2024; the supplied material does not show an extension, an occupancy/completion certificate, or an independently verified current construction stage. The RERA status field continues to identify the project as “On-Going Project.” RERA unit table RERA record RERA filing

3. Master plan, architecture & building design

The GHMC building permit describes a single residential building, Stilt + 5, with a sanctioned height of 14.99 m. It records 1,398.05 m² of residential area and 421.56 m² of stilt area on a 583.37 m² site. The project filing separately reports approved built-up area of 1,398.06 sq. m. These are the figures as recorded in the respective project and permit materials; the supplied material does not identify FSI-counted area or provide a measured building footprint. RERA filing

The permit specifies 3.5 m setbacks on each of Side I, Side II, Front and Rear. It also refers to a 50.53 RM compound wall, 2 No. of RWHPs, 25 Trees, transformer space and a garbage house. These are approval-document provisions, not confirmation that the features have been completed.

No detailed architectural drawing information establishing flat counts per floor, lift or stair arrangements, internal circulation, entrances, landscaping layout, or common-area distribution is available in the supplied material. The building permit requires one entry and one exit, with a minimum width of 4.5 m and height clearance of 5 m.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK15150112.41 sq. mSoftware-measured median 67.6 sq. m; range 59.9–89.6 sq. m40%

RERA records one saleable-area figure for the configuration. The carpet-area figures and loading are software measurements from the supplied floor-plan drawing material, not RERA-filed disclosures; the drawing-based measurements are marked as requiring review. The supplied drawing record reports six measured 2BHK designs. RERA unit table Floor plans

A measured first-floor plan example identifies a living/dining area, kitchen, two bedrooms and two toilets. The supplied room dimensions and areas are drawing-derived: living/dining 4.66 × 8.01 m (37.33 m²); kitchen 2.56 × 2.71 m (6.94 m²); bedrooms 2.9 × 3.55 m (10.29 m²) and 3.0 × 3.76 m (11.28 m²); toilets 1.49 × 2.12 m (3.16 m²) and 1.4 × 2.12 m (2.97 m²). These figures describe one measured plan example, not a RERA filing for every apartment. RERA unit details

Carpet area describes the measured internal area in the drawing; the RERA saleable area is a separately filed figure and includes the home’s share of common areas. The supplied evidence does not provide a RERA-filed carpet area or unit-specific allocation of balconies, utilities or common-area loading. Floor plans RERA unit table

5. Parking & vehicle circulation

The GHMC permit identifies the stilt for parking and states that approved stilt and cellar parking, where provided in the plan, must be used exclusively for vehicle parking and not partitioned or converted. The supplied evidence does not establish a cellar level, number or type of parking spaces, visitor or accessible parking, EV charging, or unit-specific parking allocation. A drawn or sanctioned parking area does not by itself establish exclusive ownership or allocation to a particular apartment.

The permit requires one entry and one exit, with a minimum width of 4.5 m and height clearance of 5 m. Details of ramps, internal driveways and pedestrian separation are not available in the supplied material.

6. Amenities, recreation & open spaces

The following items are identified in the GHMC permit as provisions or conditions. The source does not establish their present completion or independent verification.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
GreeneryTree plantation along the periphery and in front; 25 Trees recorded in the permit extractionGHMC building permitRequired / specified; completion not verified
Tot-lot / greeneryPermit lists 0 tot-lot area and requires the tot-lot, if provided, to be fenced and maintained as greeneryGHMC building permitArea recorded as 0; completion not applicable on supplied figures
Rainwater harvesting2 No. of RWHPs recorded; percolation pit required by permitGHMC building permitSpecified; completion not verified
Community buildingsNo community-building area or facility identified in the RERA amenity recordRERA amenity record RERA amenitiesProgress shown as 0%
Recreational open spaceAggregate area not specified in the RERA amenity recordRERA amenity record RERA amenitiesProgress shown as 0%

The supplied project evidence does not substantiate a clubhouse, swimming pool, fitness centre, indoor games room or children’s play facility as a RERA-filed or GHMC-sanctioned project facility. RERA amenities

7. Utilities, building services & safety

The permit and RERA amenity record identify several proposed or recorded services. Neither source establishes their current operating condition or independent completion.

Water supply and storage
Evidence in the project recordRERA amenity record marks water supply YES / 100%. Permit requires a separate underground static water tank of 25,000 lts. and a separate residential terrace tank of 25,000 lts. RERA amenities
Status / limitPortal-reported amenity percentage and permit requirements; capacity or service operation not independently verified
Sewerage and drainage
Evidence in the project recordRERA amenity record marks sewerage (chamber, lines, septic tank, STP) YES / 100% and storm-water drains YES / 100% RERA amenities
Status / limitThe record does not establish an STP’s design capacity, treated-water reuse, or verified operation
Rainwater harvesting
Evidence in the project recordPermit requires a rainwater-harvesting structure (percolation pit) and lists 2 No. of RWHPs
Status / limitSpecified; completion not verified
Electrical
Evidence in the project recordPermit requires transformer space and a generator as an alternate electric supply; the RERA amenity record marks electrical meter room, sub-station and receiving station YES / 100% RERA amenities
Status / limitNo generator capacity or independent completion evidence supplied
Fire and life safety
Evidence in the project recordRERA amenity record marks fire-protection and fire-safety requirements YES / 100%. Permit makes fire safety the responsibility of the owner, builder/developer, architect and site engineer; it specifies emergency lighting in corridors/common passages and staircases and fire-resistant swing doors for collapsible lifts RERA amenities
Status / limitRecorded / required provisions; no separate fire clearance or independent verification supplied
Lifts and accessibility
Evidence in the project recordPermit refers to lifts and requires services to be executed under qualified technical supervision; it also refers to accessible facilities for public and semi-public buildings above 300 sq. m
Status / limitLift count, capacity, accessibility features and applicability to this residential building are not established in the supplied evidence
Waste
Evidence in the project recordPermit requires a garbage house within the premises
Status / limitRequired; completion and waste-management arrangements not verified

8. Location, access & connectivity

The registered location is HASTINAPUR, Karmanghat village, Saroornagar mandal, Ranga Reddy district, PIN 500070. The building permit describes the site as Vishweshwarayya Engineering Colony and records access boundaries of 40 WIDE ROAD to the west and 30 WIDE ROAD to the north. RERA record RERA filing

A supplied location record reports the nearest sampled Outer Ring Road interchange at approximately 9.3 km. No other project-specific measured connectivity distances or public-transport details are supplied. Location record

9. Developer & development status

The registered promoter is JNR BUILDERS, identified in the project filing as a partnership. Its GST registration document records GSTIN 36AALFJ9917E1Z1 and identifies Pothula Jyothinandan Reddy as managing partner. The supplied project record lists Pothula Jyothinandan Reddy and Pothula Sujatha as partners, with Pothula Jyothinandan Reddy as authorized signatory. RERA filing Corporate record

The GHMC permit names D. Bharathi Devi and D. Pratap Reddy as applicants and JNR CONSTRUCTIONS as developer/builder; the RERA registration identifies JNR BUILDERS as promoter.

The promoter’s Form B is a filed declaration containing title, encumbrance, completion, separate-account and other undertakings; it is not independent verification of those statements. The supplied Form B leaves the completion-period field blank. The project record lists a proposed and revised completion date of 20/04/2024, and the TG-RERA certificate states registration through that date unless extended. No extension or occupancy/completion certificate is included in the supplied material. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400000916, Form C, issued 19/06/2019
What the supplied record establishesRegistration of R K R RESIDENCY under section 5; validity recorded through 20/04/2024, unless extended by the Authority
GHMC building permit order
Identifier / dateApproval 2/C23/06830/2018; File No. 2/C23/02003/2018; 20 April, 2018
What the supplied record establishesPermit for one Stilt + 5 residential building on Survey No. 59 PART; the order states that permission does not confer ownership rights
Layout / subdivision references
Identifier / dateLRS/7373/CR-3/EASTZONE/GHMC/2008; LRS/7375/CR-3/EZ/GHMC/2008
What the supplied record establishesReferences recorded in the building-permit extraction; a separate approved layout document is not available in the supplied evidence
TG-RERA Form B declaration
Identifier / dateDocument 36335
What the supplied record establishesPromoter-filed affidavit and undertakings
Project floor-plan material
Identifier / dateDocument 21447
What the supplied record establishesDrawing source used for software measurement of 2BHK plan areas; not a RERA-filed carpet-area disclosure
GST registration certificate
Identifier / dateGSTIN 36AALFJ9917E1Z1
What the supplied record establishesGST registration record for JNR BUILDERS; not a land or layout approval
Occupancy / completion certificate
Identifier / dateNot included in supplied evidence
What the supplied record establishesIssuance and scope not established Document index

The supplied material does not include a separately identified occupancy/completion certificate or a standalone approved-layout document. GHMC’s permit requires a completion notice and occupancy certificate before occupation.

Frequently asked questions

Is R K R RESIDENCY registered with Telangana RERA?

Yes. R K R RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02400000916; the registration status is On-Going Project.

Who is the developer of R K R RESIDENCY?

The promoter named in the RERA registration is JNR BUILDERS.

Where is R K R RESIDENCY located?

R K R RESIDENCY is in HASTINAPUR, Karmanghat, Saroornagar, Rangareddy, Telangana (500070).

When will R K R RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 20/04/2024. This is the promoter's declaration, not a guarantee.

More projects in Karmanghat