RAICHANDANIs GURUKRUPA
RAICHANDANI CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200008435
RAICHANDANIs GURUKRUPA is a commercial project located in Kompally -Shivalayam, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The registered promoter is RAICHANDANI CONSTRUCTIONS, a partnership. The project has a registered site extent of 1915.69 sq mts and one commercial building with 2 Cellar + 1 Ground + 4 upper floors, comprising 44 commercial shops on the Ground and 1st–4th floors, with saleable areas of 43.94–198.35 sq m. Its TG-RERA registration number is P02200008435, and the proposed completion date is 27/09/2027.
More from Raichandani Constructions · 20 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | RAICHANDANIs GURUKRUPA RERA record |
| Project type / use | Commercial project; the building-permit record describes the building use as Commercial Building and sub-use as Shop. RERA record |
| Phase / registered portion | The supplied record identifies one building and does not identify a separately named phase. RERA filing |
| TG-RERA registration | P02200008435 RERA record |
| Registration validity | 28/06/2024 to 27/05/2027, unless extended by the Authority. This is registration validity, not a certificate of completion. RERA record |
| Registered promoter | RAICHANDANI CONSTRUCTIONS, a partnership. RERA record Corporate record |
| RERA status | The supplied certificate records registration; the portal record was captured 2026-09-10 15:26:44. Approvals record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / recorded project location | Kompally -Shivalayam, Kompally RERA record |
| Revenue village | Kompally -Shivalayam in the RERA project record; the building-permit document identifies Kompally. RERA record |
| Mandal | Dundigal Gandimaisamma RERA record |
| District | Medchal-Malkajgiri RERA record |
| PIN | 500043 RERA record |
| Survey numbers and subdivisions | SY NOS 91/A/1/2, 91/A/2, 91/RUU AND 91/A/1/1/2; the building-permit record lists 91/A/1/2, 91/A/2, 91/RUU, 91/A/1/1/2. RERA record |
| Registered site extent | The RERA land record gives Total Area: 1915.69 sq mts, Area affected in Road widening/FTL of Tanks/Nala Widening: 106.54 sq mts, and Net Area: 1809.15 sq mts. RERA filing |
| Boundaries | East: OTHERS LAND; West: MAIN ROAD AND NATIONAL HIGH WAY; North: OTHERS LAND; South: OTHERS LAND. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | HMDA building permit. The RERA record lists the authority as DTCP. Approvals record |
| Principal approval | 010189/BP/HMDA/2225/MED/2023, approved 27 May, 2024. Approvals record |
| Approved built-up area | Building-permit extraction states Total Built up Area (In Sq.mts) 7,588.54; it separately lists built-up area 4,874.22, required 10% mortgage area 487.42, and provided mortgage area 496.74 Sq.mts. |
| Building count | One commercial building is recorded. RERA filing |
| Sanctioned floor configuration | 2 Cellar + 1 Ground + 4 upper floors. |
| Parking levels / provision | Cellars are approved for parking. The permit extraction lists No of Cars Proposed: 39, TOTAL PARKING REQUIRED: 1608.50, and PARKING AREA: 2296.00; the units or allocation of the latter two figures are not stated in the supplied extraction. |
| Approved vs RERA-declared units | RERA records 1 total building unit and 44 commercial shops. The supplied permit extraction does not state an approved shop count. RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Unit type | Commercial shops, on Ground and 1st–4th floors. RERA unit table |
| RERA-filed saleable area | 43.94–198.35 sq m across the filed shops. RERA unit table |
| Booked / available | 0 booked / 44 available, as last read from the TG-RERA portal; the supplied unit record does not provide an as-of date, so counts are indicative. RERA unit table |
| Construction stage | No TG-RERA construction-progress percentage or independently verified site-progress record is supplied. A vendor statement reports structural works at 80%, external works at 100%, internal finishing at 100%, and MEP services including lift and staircases at 98%; this is a vendor-reported claim, not independently verified progress. Promoter website |
| Completion dates | The RERA header gives proposed completion 27/09/2027; the Form B declaration states completion within 27th M 2027. Registration validity ends 27/05/2027. These are distinct records and dates. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The building permit says occupancy requires an OC and prohibits occupation or delivery of possession before it is obtained. |
2. The project story
RAICHANDANIs GURUKRUPA is registered as a commercial development at Kompally, with a single commercial building and a shop-focused offering. The RERA filing identifies the site by survey numbers 91/A/1/2, 91/A/2, 91/RUU and 91/A/1/1/2 and places it in Kompally -Shivalayam, Dundigal Gandimaisamma, Medchal-Malkajgiri. The permit describes a building with two cellar levels, a ground floor and four upper floors. RERA record RERA filing
The RERA unit schedule lists 44 shops, from ground through the fourth floor. The filing reports all 44 as available and none booked, but the record has no booking-count as-of date. The supplied material does not establish construction progress through an independent site inspection. The construction percentages available are vendor-reported only. RERA unit table RERA unit details Promoter website
The project’s RERA proposed completion date, registration validity period and OC status should be read separately: the proposed completion date is 27/09/2027, registration validity is through 27/05/2027 unless extended, and no OC is present in the supplied documents. RERA record
3. Master plan, architecture & building design
The HMDA permit extraction describes one commercial building with 2 Cellar + 1 Ground + 4 upper floors, a listed building height of 14.99 MT. and a separate recorded height of 15.0M HT. The same record gives TOTAL PROPOSED BUILT UP AREA: 7588.54, while separately identifying TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING: 4874.24, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 7170.24, and PARKING AREA: 2296.00. These are figures as stated in the permit extraction; their area labels are retained rather than treated as interchangeable.
The RERA-filed shop schedule is organized across the ground and first to fourth floors, with 44 shop entries in total. The supplied extracts do not provide reliable details of shop arrangements per floor, building footprint, lift and stair configuration, entrances, internal circulation, or measured carpet areas. The floor-plan record reports two drawings, neither measured, and identifies both as having no flats; it supplies no software-measured shop areas. RERA unit details Floor plans
The building permit lists a vacant plot area of 798.60, road-affected area of 106.54, and net plot area of 1809.16. These are permit-extraction figures. No separate RERA-filed FSI-counted area, landscaping plan, or common-area schedule is supplied.
4. Homes, configurations & floor plans
This is a commercial shop offering, not a residential-home schedule. The RERA filing lists 44 individual shops across the ground and first to fourth floors. The smallest and largest filed saleable areas are 43.94 sq m and 198.35 sq m. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Commercial shops | 44 | 0 | 44 | 43.94–198.35 sq m | Not measured in supplied drawing record | Not supplied |
The unit record carries no dated booking snapshot, so booked and available figures are indicative. The floor-plan source says measurements are drawn from approved floor-plan geometry, but reports 0 measured drawings; no software-measured carpet area or room dimensions are available. Saleable area is the RERA-filed area; it should not be read as a carpet-area measurement. RERA unit table Floor plans RERA unit details
5. Parking & vehicle circulation
The building permit identifies two cellar levels and states that cellar/stilt parking areas are to be used exclusively for vehicle parking. It lists 39 proposed cars, PARKING AREA: 2296.00, and TOTAL PARKING REQUIRED: 1608.50; the supplied extraction does not state units for the latter two figures. The permit also records road widths including 4.5mts., 5mts., and a “minimum width of approach road as indicated in the plan.”
The permit calls for Electric Vehicle Charging Infrastructure in parking places. The supplied records do not give a separate visitor, accessible, or two-wheeler parking count, the number of spaces allotted to particular shops, or a detailed vehicle circulation plan. A listed parking provision does not by itself establish exclusive parking rights for a buyer.
6. Amenities, recreation & open spaces
The TG-RERA amenity schedule marks the following project facilities as available in the filing; each has a recorded progress value of 0. The supplied data does not define the meaning of that percentage, establish completion, or independently verify delivery. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip/TOT LOT/Park | Size not supplied | RERA amenity schedule | Marked “YES”; 0%; completion not independently verified. RERA amenities |
| Aggregate area of recreational Open Space | Area not supplied | RERA amenity schedule | Marked “YES”; 0%; completion not independently verified. RERA amenities |
| Community Buildings | No description or size supplied | RERA amenity schedule | Progress 0%; availability not stated. RERA amenities |
| Open Parking | No count supplied | Vendor-listed amenity | Vendor-listed; delivery not independently verified. Promoter website |
| Covered Parking | No count supplied | Vendor-listed amenity | Vendor-listed; delivery not independently verified. Promoter website |
No clubhouse or indoor recreation facilities are specified in the supplied project records. Site utilities and building services are summarised in the next section. RERA amenities
7. Utilities, building services & safety
The RERA amenity schedule marks water supply, sewerage, storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, rainwater harvesting, energy management, fire protection and fire safety requirements, electrical meter room/sub-station/receiving station, street lighting, internal roads and footpaths as available. The schedule records 0 progress for its listed items; it does not establish that these facilities are complete or independently verified. RERA amenities
The building-permit extraction lists a STP, transformer, garbage house, rainwater-harvesting structures, electric-vehicle charging infrastructure, dual piping, sump, septic tank and underground drainage. The permit requires rainwater harvesting and recycling of rainwater, CCTV cameras, and STP provision; it also states that the cellars are for parking. These are permit-recorded provisions or conditions, not evidence of installation or completion.
The permit’s conditions refer to fire safety and structural stability, automatic sprinklers where the basement area exceeds 200 Sq. Mtrs, and electrical-fire-safety certification. The supplied extracts do not establish fire-system installation, clearances, lift capacities, backup-power provision, accessibility features, waste-security arrangements beyond the listed garbage house and CCTV condition, or completion of any service.
8. Location, access & connectivity
The registered location is Kompally -Shivalayam, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana, 500043; the building-permit document identifies the revenue village as Kompally. The west boundary is recorded as MAIN ROAD AND NATIONAL HIGH WAY. The permit also records road widths of 17.26 M. WIDE PASSAGE, 68.00 MT WIDE EXISTING, 75.00 MT WIDE PROPOSED ROAD, 8.77 M, 5.69M, and 5.32 M. RERA record RERA filing
A supplied location record gives the Outer Ring Road (nearest sampled interchange, approx) at 42.8 km. No public-transport details or further measured landmark distances are supplied. Location record
9. Developer & development status
The registered promoter is RAICHANDANI CONSTRUCTIONS, identified as a Partnership with GSTIN 36AASFR4124J2ZT. The RERA record gives the promoter’s address as S B TOWERS, ROAD NO 1, KOMPALLY, KOMPALLY, Dundigal Gandimaisamma, Medchal-Malkajgiri, 500043. The supplied material does not provide a verified official contact number, email address or website. Corporate record Parties record
The promoter’s Form B declaration, dated 10th DAY OF JUN, 2024, states a project completion period of 27th M 2027 and declares a legal-title basis and that the land is free from encumbrances. These are promoter declarations in the filed affidavit.
The RERA record gives proposed completion as 27/09/2027. The permit requires a commencement notice before construction, a completion notice after completion, and an occupancy certificate before occupation or delivery of possession. No commencement notice, completion notice, or OC is included in the supplied documents. RERA record
10. Approvals, official records & documents
| Record | What the supplied record establishes |
|---|---|
| TG-RERA registration certificate P02200008435 | Form C registration certificate for RAICHANDANIs GURUKRUPA, naming Raichandani Constructions as promoter and recording validity from 28/06/2024 to 27/05/2027, unless extended. |
| HMDA building permit 010189/BP/HMDA/2225/MED/2023 | Building permit order approved 27 May, 2024 for a commercial building with 2 cellar, 1 ground and 4 upper floors, on the listed Kompally survey numbers. It includes construction and occupancy conditions. |
| Layout/building plan document 451782 | Plan extraction identifies the proposed commercial building, development dimensions and listed amenities/utilities and permit conditions. |
| Promoter Form B declaration 453646 | Promoter affidavit dated 10th DAY OF JUN, 2024, including completion, project-fund and title-related declarations. |
| Occupancy/completion certificate | No OC or completion certificate is present in the supplied material; the building permit makes an OC compulsory before occupation. |
The supplied approval and project records describe the scheme as a single commercial building. This overview summarises the filed and permit-extracted information; it does not establish that listed facilities or construction work are complete. RERA filing
1. Project at a glance
Project identity
Registered project name: RAICHANDANIs GURUKRUPA
Project type / use: Commercial project; the building-permit record describes the building use as Commercial Building and sub-use as Shop.
Phase / registered portion: The supplied record identifies one building and does not identify a separately named phase.
TG-RERA registration: P02200008435
Registration validity: 28/06/2024 to 27/05/2027, unless extended by the Authority. This is registration validity, not a certificate of completion.
Registered promoter: RAICHANDANI CONSTRUCTIONS, a partnership.
RERA status: The supplied certificate records registration; the portal record was captured 2026-09-10 15:26:44.
Land and geographic identity
Locality / recorded project location: Kompally -Shivalayam, Kompally
Revenue village: Kompally -Shivalayam in the RERA project record; the building-permit document identifies Kompally.
Mandal: Dundigal Gandimaisamma
District: Medchal-Malkajgiri
PIN: 500043
Survey numbers and subdivisions: SY NOS 91/A/1/2, 91/A/2, 91/RUU AND 91/A/1/1/2; the building-permit record lists 91/A/1/2, 91/A/2, 91/RUU, 91/A/1/1/2.
Registered site extent: The RERA land record gives Total Area: 1915.69 sq mts, Area affected in Road widening/FTL of Tanks/Nala Widening: 106.54 sq mts, and Net Area: 1809.15 sq mts.
Boundaries: East: OTHERS LAND; West: MAIN ROAD AND NATIONAL HIGH WAY; North: OTHERS LAND; South: OTHERS LAND.
Development identity
Sanctioning authority: HMDA building permit. The RERA record lists the authority as DTCP.
Principal approval: 010189/BP/HMDA/2225/MED/2023, approved 27 May, 2024.
Approved built-up area: Building-permit extraction states Total Built up Area (In Sq.mts) 7,588.54; it separately lists built-up area 4,874.22, required 10% mortgage area 487.42, and provided mortgage area 496.74 Sq.mts.
Building count: One commercial building is recorded.
Sanctioned floor configuration: 2 Cellar + 1 Ground + 4 upper floors.
Parking levels / provision: Cellars are approved for parking. The permit extraction lists No of Cars Proposed: 39, TOTAL PARKING REQUIRED: 1608.50, and PARKING AREA: 2296.00; the units or allocation of the latter two figures are not stated in the supplied extraction.
Approved vs RERA-declared units: RERA records 1 total building unit and 44 commercial shops. The supplied permit extraction does not state an approved shop count.
Offering and status
Unit type: Commercial shops, on Ground and 1st–4th floors.
RERA-filed saleable area: 43.94–198.35 sq m across the filed shops.
Booked / available: 0 booked / 44 available, as last read from the TG-RERA portal; the supplied unit record does not provide an as-of date, so counts are indicative.
Construction stage: No TG-RERA construction-progress percentage or independently verified site-progress record is supplied. A vendor statement reports structural works at 80%, external works at 100%, internal finishing at 100%, and MEP services including lift and staircases at 98%; this is a vendor-reported claim, not independently verified progress.
Completion dates: The RERA header gives proposed completion 27/09/2027; the Form B declaration states completion within 27th M 2027. Registration validity ends 27/05/2027. These are distinct records and dates.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The building permit says occupancy requires an OC and prohibits occupation or delivery of possession before it is obtained.
2. The project story
RAICHANDANIs GURUKRUPA is registered as a commercial development at Kompally, with a single commercial building and a shop-focused offering. The RERA filing identifies the site by survey numbers 91/A/1/2, 91/A/2, 91/RUU and 91/A/1/1/2 and places it in Kompally -Shivalayam, Dundigal Gandimaisamma, Medchal-Malkajgiri. The permit describes a building with two cellar levels, a ground floor and four upper floors.
The RERA unit schedule lists 44 shops, from ground through the fourth floor. The filing reports all 44 as available and none booked, but the record has no booking-count as-of date. The supplied material does not establish construction progress through an independent site inspection. The construction percentages available are vendor-reported only.
The project’s RERA proposed completion date, registration validity period and OC status should be read separately: the proposed completion date is 27/09/2027, registration validity is through 27/05/2027 unless extended, and no OC is present in the supplied documents.
3. Master plan, architecture & building design
The HMDA permit extraction describes one commercial building with 2 Cellar + 1 Ground + 4 upper floors, a listed building height of 14.99 MT. and a separate recorded height of 15.0M HT. The same record gives TOTAL PROPOSED BUILT UP AREA: 7588.54, while separately identifying TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING: 4874.24, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 7170.24, and PARKING AREA: 2296.00. These are figures as stated in the permit extraction; their area labels are retained rather than treated as interchangeable.
The RERA-filed shop schedule is organized across the ground and first to fourth floors, with 44 shop entries in total. The supplied extracts do not provide reliable details of shop arrangements per floor, building footprint, lift and stair configuration, entrances, internal circulation, or measured carpet areas. The floor-plan record reports two drawings, neither measured, and identifies both as having no flats; it supplies no software-measured shop areas.
The building permit lists a vacant plot area of 798.60, road-affected area of 106.54, and net plot area of 1809.16. These are permit-extraction figures. No separate RERA-filed FSI-counted area, landscaping plan, or common-area schedule is supplied.
4. Homes, configurations & floor plans
This is a commercial shop offering, not a residential-home schedule. The RERA filing lists 44 individual shops across the ground and first to fourth floors. The smallest and largest filed saleable areas are 43.94 sq m and 198.35 sq m.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Commercial shops | 44 | 0 | 44 | 43.94–198.35 sq m | Not measured in supplied drawing record | Not supplied |
The unit record carries no dated booking snapshot, so booked and available figures are indicative. The floor-plan source says measurements are drawn from approved floor-plan geometry, but reports 0 measured drawings; no software-measured carpet area or room dimensions are available. Saleable area is the RERA-filed area; it should not be read as a carpet-area measurement.
5. Parking & vehicle circulation
The building permit identifies two cellar levels and states that cellar/stilt parking areas are to be used exclusively for vehicle parking. It lists 39 proposed cars, PARKING AREA: 2296.00, and TOTAL PARKING REQUIRED: 1608.50; the supplied extraction does not state units for the latter two figures. The permit also records road widths including 4.5mts., 5mts., and a “minimum width of approach road as indicated in the plan.”
The permit calls for Electric Vehicle Charging Infrastructure in parking places. The supplied records do not give a separate visitor, accessible, or two-wheeler parking count, the number of spaces allotted to particular shops, or a detailed vehicle circulation plan. A listed parking provision does not by itself establish exclusive parking rights for a buyer.
6. Amenities, recreation & open spaces
The TG-RERA amenity schedule marks the following project facilities as available in the filing; each has a recorded progress value of 0. The supplied data does not define the meaning of that percentage, establish completion, or independently verify delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip/TOT LOT/Park | Size not supplied | RERA amenity schedule | Marked “YES”; 0%; completion not independently verified. |
| Aggregate area of recreational Open Space | Area not supplied | RERA amenity schedule | Marked “YES”; 0%; completion not independently verified. |
| Community Buildings | No description or size supplied | RERA amenity schedule | Progress 0%; availability not stated. |
| Open Parking | No count supplied | Vendor-listed amenity | Vendor-listed; delivery not independently verified. |
| Covered Parking | No count supplied | Vendor-listed amenity | Vendor-listed; delivery not independently verified. |
No clubhouse or indoor recreation facilities are specified in the supplied project records. Site utilities and building services are summarised in the next section.
7. Utilities, building services & safety
The RERA amenity schedule marks water supply, sewerage, storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, rainwater harvesting, energy management, fire protection and fire safety requirements, electrical meter room/sub-station/receiving station, street lighting, internal roads and footpaths as available. The schedule records 0 progress for its listed items; it does not establish that these facilities are complete or independently verified.
The building-permit extraction lists a STP, transformer, garbage house, rainwater-harvesting structures, electric-vehicle charging infrastructure, dual piping, sump, septic tank and underground drainage. The permit requires rainwater harvesting and recycling of rainwater, CCTV cameras, and STP provision; it also states that the cellars are for parking. These are permit-recorded provisions or conditions, not evidence of installation or completion.
The permit’s conditions refer to fire safety and structural stability, automatic sprinklers where the basement area exceeds 200 Sq. Mtrs, and electrical-fire-safety certification. The supplied extracts do not establish fire-system installation, clearances, lift capacities, backup-power provision, accessibility features, waste-security arrangements beyond the listed garbage house and CCTV condition, or completion of any service.
8. Location, access & connectivity
The registered location is Kompally -Shivalayam, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana, 500043; the building-permit document identifies the revenue village as Kompally. The west boundary is recorded as MAIN ROAD AND NATIONAL HIGH WAY. The permit also records road widths of 17.26 M. WIDE PASSAGE, 68.00 MT WIDE EXISTING, 75.00 MT WIDE PROPOSED ROAD, 8.77 M, 5.69M, and 5.32 M.
A supplied location record gives the Outer Ring Road (nearest sampled interchange, approx) at 42.8 km. No public-transport details or further measured landmark distances are supplied.
9. Developer & development status
The registered promoter is RAICHANDANI CONSTRUCTIONS, identified as a Partnership with GSTIN 36AASFR4124J2ZT. The RERA record gives the promoter’s address as S B TOWERS, ROAD NO 1, KOMPALLY, KOMPALLY, Dundigal Gandimaisamma, Medchal-Malkajgiri, 500043. The supplied material does not provide a verified official contact number, email address or website.
The promoter’s Form B declaration, dated 10th DAY OF JUN, 2024, states a project completion period of 27th M 2027 and declares a legal-title basis and that the land is free from encumbrances. These are promoter declarations in the filed affidavit.
The RERA record gives proposed completion as 27/09/2027. The permit requires a commencement notice before construction, a completion notice after completion, and an occupancy certificate before occupation or delivery of possession. No commencement notice, completion notice, or OC is included in the supplied documents.
10. Approvals, official records & documents
TG-RERA registration certificate P02200008435: Form C registration certificate for RAICHANDANIs GURUKRUPA, naming Raichandani Constructions as promoter and recording validity from 28/06/2024 to 27/05/2027, unless extended.
HMDA building permit 010189/BP/HMDA/2225/MED/2023: Building permit order approved 27 May, 2024 for a commercial building with 2 cellar, 1 ground and 4 upper floors, on the listed Kompally survey numbers. It includes construction and occupancy conditions.
Layout/building plan document 451782: Plan extraction identifies the proposed commercial building, development dimensions and listed amenities/utilities and permit conditions.
Promoter Form B declaration 453646: Promoter affidavit dated 10th DAY OF JUN, 2024, including completion, project-fund and title-related declarations.
Occupancy/completion certificate: No OC or completion certificate is present in the supplied material; the building permit makes an OC compulsory before occupation.
The supplied approval and project records describe the scheme as a single commercial building. This overview summarises the filed and permit-extracted information; it does not establish that listed facilities or construction work are complete.
Frequently asked questions
Is RAICHANDANIs GURUKRUPA registered with Telangana RERA?
Yes. RAICHANDANIs GURUKRUPA is registered with the Telangana Real Estate Regulatory Authority as P02200008435; the registration status is New Project.
Who is the developer of RAICHANDANIs GURUKRUPA?
The promoter named in the RERA registration is RAICHANDANI CONSTRUCTIONS.
Where is RAICHANDANIs GURUKRUPA located?
RAICHANDANIs GURUKRUPA is in KOMPALLY, Kompally -Shivalayam, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500043).
When will RAICHANDANIs GURUKRUPA be completed?
The promoter's proposed date of completion filed with RERA is 27/09/2027. This is the promoter's declaration, not a guarantee.
More projects in Kompally Shivalayam