Sanjanas Interlaken T-4
TUMMALA · Medchal-Malkajgiri · RERA P02200000530
SANJANAS INTERLAKEN T-4 is a residential apartment project near Hanuman Temple in Maisammagudem, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The registered promoter is Mr./Ms. Tummala Srinivas Reddy. The project has a land area of 642.27 sq. m and comprises one building with 1 stilt + 5 upper floors and 20 2BHK apartments. It is registered under TG-RERA number P02200000530, with a proposed completion date of 30/09/2018.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | SANJANAS INTERLAKEN T-4 RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | T-4; phase-wise scope beyond the registered project name is not disclosed RERA record |
| TG-RERA registration | P02200000530 RERA record |
| Registration validity | Certificate states commencement on 22/03/2019 and end on 30/09/2018; it also records “0 years.” These are the certificate’s stated validity details |
| Registered promoter | Mr./Ms. Tummala Srinivas Reddy; the project record’s shortened promoter field says “TUMMALA” RERA filing |
| RERA status | On-Going Project, as recorded in the project information RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / address | NEAR HANUMAN TEMPLE; Maisammagudem / MAISAMMAGUDEM RERA record RERA filing |
| Revenue village | Dulapally; the title report spells it “Doolapally Village” RERA record RERA filing |
| Mandal | Dundigal Gandimaisamma RERA record RERA filing |
| District | Medchal-Malkajgiri RERA record RERA filing |
| PIN | 500055 RERA record RERA filing |
| Survey number(s) | Survey No. 8; no project subdivision is stated in the RERA land record Land records |
| Registered site extent | 642.27 sq. m RERA filing |
| Total / net land area | Total area 642.27 sq. m; net area 642.27 sq. m RERA filing |
| Boundaries | East: ROAD 9 MTS; West, North and South: VACANT RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); technical approval records delegation to the local Executive Authority for building-plan sanction Approvals record |
| Principal approval | 000395/MED/R1/U6/HMDA/30112016, approved 24/05/2017 Approvals record |
| Approved built-up area | 1917.07 sq. m, recorded as proposed built-up area in the technical approval RERA filing |
| Building count | One building / one proposed building unit RERA filing |
| Sanctioned floor configuration | 1 stilt + 5 upper floors |
| Parking levels | Stilt is designated for vehicle parking under the approval conditions; parking-space count is not provided |
| Unit count | RERA filing records 20 apartments; the land-details field separately states one building unit RERA unit table RERA filing |
Offering and status
| Field | Project record |
|---|---|
| Unit type | 2BHK RERA unit table RERA unit details |
| RERA-filed saleable area | 26.64 sq. m per recorded configuration RERA unit table RERA unit details |
| Booked / available | 20 booked; 0 available, as read from the TG-RERA portal. The record has no booking-count as-of date; figures are indicative RERA unit table |
| Construction stage | Project is recorded as “On-Going Project”; no independently verified site-progress percentage or current construction stage is supplied RERA filing RERA record |
| Completion dates | Original and revised proposed completion dates are both 30/09/2018 RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied project record. The approval requires an Executive Authority “Fit for Occupancy” certificate before occupation; this is an approval condition, not evidence that a certificate was issued |
Registration validity, the proposed completion date and occupancy-certificate status are separate record items; the supplied evidence does not establish that an OC was issued.
2. The project story
SANJANAS INTERLAKEN T-4 is registered as a residential apartment project on Survey No. 8 in Dulapally, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The RERA-filed site area is 642.27 sq. m, and the recorded scheme is one building with 20 2BHK apartments. RERA record Land records RERA unit table
The HMDA technical approval describes a residential building with one stilt and five upper floors. The project record identifies the development as on-going and gives a proposed completion date of 30/09/2018, but the supplied evidence does not provide a verified construction-progress report or confirm completion or occupancy certification. The RERA portal’s 20-booked, zero-available counts have no stated as-of date and should be treated as indicative rather than a live availability statement. RERA record RERA unit table RERA filing
3. Master plan, architecture & building design
The RERA land record gives a total and net site area of 642.27 sq. m, with 0 sq. m recorded as affected by road widening, FTL or nala widening. HMDA’s technical approval identifies one residential building, “PROP (BLG),” comprising 1 stilt + 5 upper floors. The approval records 1917.07 sq. m as proposed built-up area; the RERA filing records the same as approved built-up area. These are built-up-area figures, not carpet area or RERA saleable area. RERA filing RERA filing
The approval lists a building height of 14.9 and a sanctioned built-up area of 1571.35, alongside proposed built-up area of 1917.07; the supplied extract does not explain these different approval fields.
The approval states that the technically approved plans were subject to sanction by the local Executive Authority and specifies site inspections and construction conditions. The supplied drawings data does not provide a readable, measured floor-plan schedule: two drawings are recorded, none measured, one scan is pending and one has no flats. Accordingly, flat arrangement, floor-by-floor unit count, footprint, lifts, stairs, circulation and open-space design cannot be described from the available drawing-derived evidence. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 20 | 0 | 26.64 sq. m | Not measured in supplied drawing data | Not supplied |
The configuration, counts and saleable-area figure above are TG-RERA filing data; booking counts are portal figures without an as-of date. The supplied drawings have not yielded software-measured carpet-area or room measurements. Saleable area and carpet area are different measures; no carpet-area, balcony/utility or common-area-loading figures are available here. RERA unit table RERA unit details Floor plans
5. Parking & vehicle circulation
The HMDA approval directs that the stilt/cellar be used exclusively for vehicle parking and not converted, and the RERA filing records 200.07 sq. m as mortgage area. The approval also refers to a common parking floor and requires the construction to follow the sanctioned plan. No number of parking bays, visitor or accessible spaces, parking-allocation terms, ramp configuration, driveway or EV-charging provision is supplied. A stated parking use or drawn provision does not, by itself, establish exclusive parking rights for an apartment. RERA filing RERA filing
6. Amenities, recreation & open spaces
The project’s RERA amenity fields report the following. The percentages and availability entries are portal declarations; independent completion verification is not supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No source, storage or capacity specified | RERA amenities | Available: YES; 100% declared; not independently verified |
| Sewerage (chamber, lines, septic tank, STP) | No capacity specified | RERA amenities | Available: YES; 100% declared; not independently verified |
| Water conservation / rainwater harvesting | No size or capacity specified | RERA amenities | Available: YES; 100% declared; not independently verified |
| Electrical meter room, sub-station, receiving station | No capacity specified | RERA amenities | Available: YES; 100% declared; not independently verified |
| Fire safety provision | No system details or capacity specified | RERA amenities | Available: YES; 100% declared; not independently verified |
| Internal roads and footpaths | No dimensions specified | RERA amenities | 0% recorded |
| Storm-water drains | No dimensions specified | RERA amenities | 0% recorded |
| Green strip / tot lot / park | No area specified | RERA amenities | 0% recorded |
| Street lighting | No details specified | RERA amenities | 0% recorded |
| Community buildings | No facility or area specified | RERA amenities | 0% recorded |
| Treatment and disposal of sewage and sullage water | No system details specified | RERA amenities | 0% recorded |
| Solid-waste management and disposal | No system details specified | RERA amenities | 0% recorded |
| Energy management | No system details specified | RERA amenities | 0% recorded |
| Aggregate recreational open space | Area not specified | RERA amenities | 0% recorded |
The HMDA approval also specifies a transformer, garbage house and septic tank as provisions to be made, and rainwater-harvesting structures. These are approval requirements; the supplied evidence does not verify installation or completion.
7. Utilities, building services & safety
HMDA’s technical approval sets out utility and safety conditions, including a water-supply source and sewerage-disposal source within the site; bore and water-disinfection requirements; septic-tank and treated-sewage disposal arrangements; rainwater harvesting; transformer and garbage-house provisions; and fire-safety requirements. It also calls for a generator as an alternative power source, emergency lighting in common passages and staircases, a manually operated alarm system, and an automatic sprinkler system if the basement area exceeds 200 sq. m. These are approval conditions, not evidence that the systems have been installed, tested or certified.
The RERA amenity record declares water supply, sewerage, water conservation/rainwater harvesting, electrical meter room/sub-station/receiving station and fire-safety provision as available at 100%, without supplying capacities or independent verification. No lift details, accessibility provisions, CCTV, access-control arrangements, waste-segregation details, STP capacity or confirmed utility-source data are supplied. RERA amenities
8. Location, access & connectivity
The registered location is NEAR HANUMAN TEMPLE, Maisammagudem, Dulapally, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, Telangana 500055. The RERA boundary record describes a 9-metre road on the east and vacant land on the other three sides. RERA record RERA filing RERA filing
A supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 3.0 km. No public-transport or landmark distances beyond that record are provided in the project evidence. Location record
9. Developer & development status
The TG-RERA certificate names Mr./Ms. Tummala Srinivas Reddy as the registered promoter; the Form B affidavit identifies T. Srinivas Reddy as promoter and declares an undertaking to complete the project within three years. The promoter’s legal-entity type, corporate registration identifiers, registered office and official contact details are not disclosed in the supplied evidence. Corporate record
The project is recorded as on-going, with original and revised proposed completion dates of 30/09/2018. No current, independently verified construction-stage assessment, completion certificate or occupancy certificate is supplied. The promoter’s completion undertaking is a filed declaration, not independent confirmation of completion. RERA filing RERA record
10. Approvals, official records & documents
| Details | Form C; project SANJANAS INTERLAKEN T-4; P02200000530; certificate records issue/commencement 22/03/2019 and stated end 30/09/2018 |
|---|
| Details | Approval no. 000395/MED/R1/U6/HMDA/30112016; dated 24/05/2017; Survey No. 8; residential building, 1 stilt + 5 floors |
|---|
| Details | GP Form No. 37 miscellaneous receipt no. 6856, dated 03/07/2017; records payment but does not establish a building or layout approval |
|---|
| Details | T. Srinivas Reddy’s declaration, including title and encumbrance statements and a three-year completion undertaking |
|---|
| Details | Advocate C. Manohar’s title opinion dated 30-11-2018; includes instruments and revenue records concerning land in Doolapally Village |
|---|
| Details | Not identified in the supplied project documents |
|---|---|
| Evidence | Document index |
The available HMDA approval is a technical approval letter that states the building plans are to be sanctioned by the local Executive Authority in conformity with the technically approved plans. The supplied evidence does not include an occupancy certificate.
1. Project at a glance
Project identity
Registered name: SANJANAS INTERLAKEN T-4
Project type: Residential apartment project
Phase / registered portion: T-4; phase-wise scope beyond the registered project name is not disclosed
TG-RERA registration: P02200000530
Registration validity: Certificate states commencement on 22/03/2019 and end on 30/09/2018; it also records “0 years.” These are the certificate’s stated validity details
Registered promoter: Mr./Ms. Tummala Srinivas Reddy; the project record’s shortened promoter field says “TUMMALA”
RERA status: On-Going Project, as recorded in the project information
Land and geographic identity
Locality / address: NEAR HANUMAN TEMPLE; Maisammagudem / MAISAMMAGUDEM
Revenue village: Dulapally; the title report spells it “Doolapally Village”
Mandal: Dundigal Gandimaisamma
District: Medchal-Malkajgiri
PIN: 500055
Survey number(s): Survey No. 8; no project subdivision is stated in the RERA land record
Registered site extent: 642.27 sq. m
Total / net land area: Total area 642.27 sq. m; net area 642.27 sq. m
Boundaries: East: ROAD 9 MTS; West, North and South: VACANT
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); technical approval records delegation to the local Executive Authority for building-plan sanction
Principal approval: 000395/MED/R1/U6/HMDA/30112016, approved 24/05/2017
Approved built-up area: 1917.07 sq. m, recorded as proposed built-up area in the technical approval
Building count: One building / one proposed building unit
Sanctioned floor configuration: 1 stilt + 5 upper floors
Parking levels: Stilt is designated for vehicle parking under the approval conditions; parking-space count is not provided
Unit count: RERA filing records 20 apartments; the land-details field separately states one building unit
Offering and status
Unit type: 2BHK
RERA-filed saleable area: 26.64 sq. m per recorded configuration
Booked / available: 20 booked; 0 available, as read from the TG-RERA portal. The record has no booking-count as-of date; figures are indicative
Construction stage: Project is recorded as “On-Going Project”; no independently verified site-progress percentage or current construction stage is supplied
Completion dates: Original and revised proposed completion dates are both 30/09/2018
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied project record. The approval requires an Executive Authority “Fit for Occupancy” certificate before occupation; this is an approval condition, not evidence that a certificate was issued
Registration validity, the proposed completion date and occupancy-certificate status are separate record items; the supplied evidence does not establish that an OC was issued.
2. The project story
SANJANAS INTERLAKEN T-4 is registered as a residential apartment project on Survey No. 8 in Dulapally, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The RERA-filed site area is 642.27 sq. m, and the recorded scheme is one building with 20 2BHK apartments.
The HMDA technical approval describes a residential building with one stilt and five upper floors. The project record identifies the development as on-going and gives a proposed completion date of 30/09/2018, but the supplied evidence does not provide a verified construction-progress report or confirm completion or occupancy certification. The RERA portal’s 20-booked, zero-available counts have no stated as-of date and should be treated as indicative rather than a live availability statement.
3. Master plan, architecture & building design
The RERA land record gives a total and net site area of 642.27 sq. m, with 0 sq. m recorded as affected by road widening, FTL or nala widening. HMDA’s technical approval identifies one residential building, “PROP (BLG),” comprising 1 stilt + 5 upper floors. The approval records 1917.07 sq. m as proposed built-up area; the RERA filing records the same as approved built-up area. These are built-up-area figures, not carpet area or RERA saleable area.
The approval lists a building height of 14.9 and a sanctioned built-up area of 1571.35, alongside proposed built-up area of 1917.07; the supplied extract does not explain these different approval fields.
The approval states that the technically approved plans were subject to sanction by the local Executive Authority and specifies site inspections and construction conditions. The supplied drawings data does not provide a readable, measured floor-plan schedule: two drawings are recorded, none measured, one scan is pending and one has no flats. Accordingly, flat arrangement, floor-by-floor unit count, footprint, lifts, stairs, circulation and open-space design cannot be described from the available drawing-derived evidence.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 20 | 0 | 26.64 sq. m | Not measured in supplied drawing data | Not supplied |
The configuration, counts and saleable-area figure above are TG-RERA filing data; booking counts are portal figures without an as-of date. The supplied drawings have not yielded software-measured carpet-area or room measurements. Saleable area and carpet area are different measures; no carpet-area, balcony/utility or common-area-loading figures are available here.
5. Parking & vehicle circulation
The HMDA approval directs that the stilt/cellar be used exclusively for vehicle parking and not converted, and the RERA filing records 200.07 sq. m as mortgage area. The approval also refers to a common parking floor and requires the construction to follow the sanctioned plan. No number of parking bays, visitor or accessible spaces, parking-allocation terms, ramp configuration, driveway or EV-charging provision is supplied. A stated parking use or drawn provision does not, by itself, establish exclusive parking rights for an apartment.
6. Amenities, recreation & open spaces
The project’s RERA amenity fields report the following. The percentages and availability entries are portal declarations; independent completion verification is not supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No source, storage or capacity specified | Available: YES; 100% declared; not independently verified | |
| Sewerage (chamber, lines, septic tank, STP) | No capacity specified | Available: YES; 100% declared; not independently verified | |
| Water conservation / rainwater harvesting | No size or capacity specified | Available: YES; 100% declared; not independently verified | |
| Electrical meter room, sub-station, receiving station | No capacity specified | Available: YES; 100% declared; not independently verified | |
| Fire safety provision | No system details or capacity specified | Available: YES; 100% declared; not independently verified | |
| Internal roads and footpaths | No dimensions specified | 0% recorded | |
| Storm-water drains | No dimensions specified | 0% recorded | |
| Green strip / tot lot / park | No area specified | 0% recorded | |
| Street lighting | No details specified | 0% recorded | |
| Community buildings | No facility or area specified | 0% recorded | |
| Treatment and disposal of sewage and sullage water | No system details specified | 0% recorded | |
| Solid-waste management and disposal | No system details specified | 0% recorded | |
| Energy management | No system details specified | 0% recorded | |
| Aggregate recreational open space | Area not specified | 0% recorded |
The HMDA approval also specifies a transformer, garbage house and septic tank as provisions to be made, and rainwater-harvesting structures. These are approval requirements; the supplied evidence does not verify installation or completion.
7. Utilities, building services & safety
HMDA’s technical approval sets out utility and safety conditions, including a water-supply source and sewerage-disposal source within the site; bore and water-disinfection requirements; septic-tank and treated-sewage disposal arrangements; rainwater harvesting; transformer and garbage-house provisions; and fire-safety requirements. It also calls for a generator as an alternative power source, emergency lighting in common passages and staircases, a manually operated alarm system, and an automatic sprinkler system if the basement area exceeds 200 sq. m. These are approval conditions, not evidence that the systems have been installed, tested or certified.
The RERA amenity record declares water supply, sewerage, water conservation/rainwater harvesting, electrical meter room/sub-station/receiving station and fire-safety provision as available at 100%, without supplying capacities or independent verification. No lift details, accessibility provisions, CCTV, access-control arrangements, waste-segregation details, STP capacity or confirmed utility-source data are supplied.
8. Location, access & connectivity
The registered location is NEAR HANUMAN TEMPLE, Maisammagudem, Dulapally, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, Telangana 500055. The RERA boundary record describes a 9-metre road on the east and vacant land on the other three sides.
A supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 3.0 km. No public-transport or landmark distances beyond that record are provided in the project evidence.
9. Developer & development status
The TG-RERA certificate names Mr./Ms. Tummala Srinivas Reddy as the registered promoter; the Form B affidavit identifies T. Srinivas Reddy as promoter and declares an undertaking to complete the project within three years. The promoter’s legal-entity type, corporate registration identifiers, registered office and official contact details are not disclosed in the supplied evidence.
The project is recorded as on-going, with original and revised proposed completion dates of 30/09/2018. No current, independently verified construction-stage assessment, completion certificate or occupancy certificate is supplied. The promoter’s completion undertaking is a filed declaration, not independent confirmation of completion.
10. Approvals, official records & documents
| Details | Form C; project SANJANAS INTERLAKEN T-4; P02200000530; certificate records issue/commencement 22/03/2019 and stated end 30/09/2018 |
|---|
| Details | Approval no. 000395/MED/R1/U6/HMDA/30112016; dated 24/05/2017; Survey No. 8; residential building, 1 stilt + 5 floors |
|---|
| Details | GP Form No. 37 miscellaneous receipt no. 6856, dated 03/07/2017; records payment but does not establish a building or layout approval |
|---|
| Details | T. Srinivas Reddy’s declaration, including title and encumbrance statements and a three-year completion undertaking |
|---|
| Details | Advocate C. Manohar’s title opinion dated 30-11-2018; includes instruments and revenue records concerning land in Doolapally Village |
|---|
| Details | Not identified in the supplied project documents |
|---|
The available HMDA approval is a technical approval letter that states the building plans are to be sanctioned by the local Executive Authority in conformity with the technically approved plans. The supplied evidence does not include an occupancy certificate.
Frequently asked questions
Is SANJANAS INTERLAKEN T-4 registered with Telangana RERA?
Yes. SANJANAS INTERLAKEN T-4 is registered with the Telangana Real Estate Regulatory Authority as P02200000530; the registration status is On-Going Project.
Who is the developer of SANJANAS INTERLAKEN T-4?
The promoter named in the RERA registration is TUMMALA.
Where is SANJANAS INTERLAKEN T-4 located?
SANJANAS INTERLAKEN T-4 is in NEAR HANUMAN TEMPLE, Dulapally, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500055).
When will SANJANAS INTERLAKEN T-4 be completed?
The promoter's proposed date of completion filed with RERA is 30/09/2018. This is the promoter's declaration, not a guarantee.
More projects in Dulapally