SITARA A4 is a residential apartment project in Kapra, Keesara mandal, Medchal-Malkajgiri district, developed by the registered promoter JANAPRIYA PROJECTS. It is one building/block with 277 2BHK apartments; the RERA land record gives a total land area of 51,536.02 sq m, and the approved configuration for Block A4 is 2 cellars, stilt ground and Ground Floor+9 Upper Floor. Its TG-RERA registration number is P02200000369, and its proposed and revised proposed completion date is 19/08/2024.

More from Janapriya Projects · 8 projects →

01What we found

Period endedTG-RERA registration ran to 19 Aug 2024 - check its extension on TG-RERA
26documents on file - each fact links to its page
1court case on this project's land (survey 663, 671, Kapra)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from housing.comPhoto from housing.com
▦ View all 2 photos
Kapra, Keesara, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameSITARA A4 RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionSITARA-A4; the Form B declaration lists it among separately named projects within a larger development
TG-RERA registrationP02200000369; registration certificate issued 01/03/2019, stated valid from 01/03/2019 to 19/08/2024. The certificate says extension would require Authority approval; the supplied certificate records no extension Approvals record
Registered promoterJANAPRIYA PROJECTS; the Form B identifies M/s. Janapriya Projects as a partnership RERA record Parties record
RERA status in project record“On-Going Project”; the registration validity end date is 19/08/2024 RERA filing Approvals record

Land and geographic identity

FieldRecord
LocalityKapra RERA record RERA filing
Revenue villageKapra RERA record Land records
MandalKeesara (also rendered “Kesara” in the building permit) RERA record
DistrictMedchal-Malkajgiri RERA record
PIN500062 RERA record
Project survey numbers663(P), 667, 668 and 671/P RERA record Land records
Registered site extent51,536.02 sq m in the building permit
Net / total land areaRERA land record: total 51,536.02 sq m, affected area 1,619.0 sq m, net area 49,917.02 sq m. The occupancy certificate also records 49,917.02 m² as site area Land records
Boundaries in RERA land recordNorth: A2; South: B; East: LAND; West: PARK AND A3 Land records

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalBuilding Permit Order 53506/HO/EZ/Cir-1/2016, approved 20-08-2018 Approvals record
Approved building configurationThe permit describes blocks A2, A3, A4, B, C1 and EWS/LIG as 2-cellars, ground + 9 upper floors; the amenities block is cellar, ground + 6 upper floors
Approved built-up areaNot stated as a single approved built-up-area figure in the supplied extracted record. The RERA land record lists 28,368.85 sq m as “Approved Built up Area”; the occupancy certificate records floor area of 19,820.8 m² for Block A4 RERA filing
Building / block scopeThe registered portion is Block A4, within the broader permit’s multi-block development
Sanctioned unitsPermit states 1,268 residential units + 37 LIG + 63 EWS for the broader development; no A4-only sanctioned unit count is given in the extracted permit details
RERA-filed units277 apartments in one building/block, all filed as 2BHK RERA unit table RERA unit details

Offering and status

FieldRecord
Unit type2BHK apartments RERA unit table RERA unit details
RERA-filed saleable area15.3 sq m as recorded in the normalized RERA unit data; the evidence does not provide a measured carpet area RERA unit details RERA unit table
Booked / available229 booked and 48 available, as last read from the TG-RERA portal; the portal record supplies no as-of date, so figures are indicative RERA unit table
Construction stageArchitect’s Form 1A certifies the registered SITARA A4 project complete in all aspects as of 30.06.2024. GHMC issued an occupancy certificate for Residential Apartment (Block A4) on 06 May 2024
Completion datesRERA record: proposed and revised proposed completion 19/08/2024. Form B separately states a May 2022 completion undertaking RERA record RERA filing
Occupancy-certificate scopeGHMC OC 0975/GHMC/LBN/2024-OC is for Residential Apartment (Block A4), covering surveys 663/P, 667, 668 and 671/P

2. The project story

SITARA A4 is the RERA-registered apartment portion of a larger residential development in Kapra village, Keesara mandal, Medchal-Malkajgiri district. The RERA filing records one building/block and 277 apartments, all identified as 2BHK. The wider GHMC permit covers multiple residential blocks, an EWS/LIG block and an amenities block; the Form B declaration identifies SITARA-A4 as one of several separately named projects in that development RERA record RERA unit table.

The project’s RERA completion date is recorded as 19/08/2024. GHMC issued an OC for Block A4 on 06 May 2024, and the architect’s certificate dated 30.06.2024 states that the registered project is complete in all aspects. These documents establish the stated certificate scope and architect’s certification; they are not an independent site inspection for this report RERA record.

3. Master plan, architecture & building design

The GHMC building permit is a revised permit for a multi-block residential development on 51,536.02 sq m in Kapra. It specifies two cellar levels, ground and nine upper floors for blocks A2, A3, A4, B, C1 and EWS/LIG, and a cellar, ground and six upper floors for the amenities block. The RERA registration is for SITARA-A4, not for the entire wider development.

For A4 specifically, the GHMC OC describes the residential apartment block as 2 cellars, stilt ground and upper floors, and records “Ground Floor+9 Upper Floor.” Its listed floor area is 19,820.8 m² and height 29.95 m. The RERA land record separately gives 28,368.85 sq m as “Approved Built up Area”; these are differently labelled figures and should not be treated as interchangeable RERA filing.

The permit lists 43,063.58 sq m for cellar area, 5,548.59 sq m for tot-lot, and 1,619.0 sq m for road-affected area. It also requires organized open spaces and roads to be handed to GHMC by registered gift deed before obtaining an occupancy certificate. The supplied records do not include extracted floor plans sufficient to describe apartment positions, flats per floor, lift/stair arrangements, building footprint, or detailed circulation.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2772294815.3 sq m, as recorded in the RERA unit dataNot measured from drawingsNot supplied

RERA unit details RERA unit table

The filed configuration is 2BHK. The TG-RERA unit record is the source for counts, booking status and filed saleable area. Ten drawing records are listed, but none has been measured: all 10 are pending scans. Consequently, no drawing-based carpet area or room dimensions can be reported. Carpet area, saleable area and any common-area loading are distinct measures; no loading figure is supplied here RERA unit details Floor plans.

5. Parking & vehicle circulation

The building permit requires the approved cellars and stilts to be used exclusively for vehicle parking and not to be partitioned or converted to another use. The A4 occupancy certificate records a parking area of 5,548.59 m². The supplied evidence does not establish the number of parking spaces, visitor or accessible parking provision, parking allocation to individual apartments, or detailed ramp and driveway arrangements. A parking area shown or recorded does not by itself establish an exclusive parking right for a buyer.

6. Amenities, recreation & open spaces

The RERA amenity record reports the following percentage-progress entries. The supplied data does not identify the inspection date or establish independent verification of completion.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot-lot / parkPermit includes a tot-lot area of 5,548.59 sq mRERA amenities80% in amenity record; not independently verified
Community buildingsNo size or facility detail suppliedRERA amenities20%; not independently verified
Internal roads and footpathsNo dimensions suppliedRERA amenities75%; not independently verified
Street lightingNo quantity or specification suppliedRERA amenities80%; not independently verified

The permit requires the tot-lot to be fenced and maintained as greenery. The Form B declaration says the separately named SITARA LAKEFRONT AMENITIES project is to be developed after work on the last project in the larger development is completed; it does not establish that this separate amenities project has been delivered for A4.

7. Utilities, building services & safety

ServiceEvidence in the project record
Water and rainwaterRERA amenity record lists water supply at 100% and water conservation/rainwater harvesting at 20%. The permit requires construction of a rainwater-harvesting percolation pit and records 45 RWHPS RERA amenities
Sewerage and drainageRERA amenity record lists sewerage (chambers, lines, septic tank, STP) at 100%, treatment and disposal of sewage/sullage at 50%, and storm-water drains at 30%. The permit requires an STP; capacities and operating status are not supplied RERA amenities
ElectricalThe permit requires space for a transformer. The RERA amenity record lists electrical meter room/sub-station/receiving station at 90% and energy management at 90%; details of supply, backup or capacity are not given RERA amenities
Fire and life safetyThe RERA amenity record lists fire protection and fire-safety requirements at 90%. The permit requires fire-safety installations and compliance with conditions of the revised provisional Fire Services NOC. The supplied record does not provide system specifications or capacities RERA amenities
WasteThe permit requires a garbage house. Solid-waste management and disposal has 0% in the RERA amenity record; no further operating details are supplied RERA amenities
Lifts and accessibilityThe permit refers to lifts as services to be executed under qualified technical supervision. Lift count, capacity, accessibility provisions and accessible routes are not supplied

These figures are RERA-filed progress entries or permit conditions, not independent confirmation that each system is complete or operational.

8. Location, access & connectivity

The registered site identity is Kapra village, Keesara mandal, Medchal-Malkajgiri district, PIN 500062, on surveys 663(P), 667, 668 and 671/P. The RERA record lists the parcel boundaries as north A2, south B, east LAND, and west PARK AND A3 RERA record Land records.

A supplied location record gives the cadastral parcel centroid as 17.41528, 78.35459. It lists Financial District (Nanakramguda) at 1.2 km, but does not provide a route, measurement method or as-of date; no travel-time claim is supplied Location record.

9. Developer & development status

The registered promoter is JANAPRIYA PROJECTS, identified in the RERA project record as a partnership. The Form B affidavit is by Sri Nanda Nandan Reddy, partner and authorised representative, and states the project’s completion undertaking as May 2022. The RERA project record separately shows proposed and revised completion dates of 19/08/2024 Parties record Corporate record RERA record.

The Form B places SITARA-A4 within a larger development and lists other separately named projects, including SITARA-A1, SITARA-A2, SITARA-A3, SITARA-B, LAKEFRONT-D, LAKEFRONT-C1, LAKEFRONT-EWS and SITARA LAKEFRONT AMENITIES. It declares that some projects would be developed and marketed later; these statements describe the promoter’s filing, not the construction status of those other projects.

GHMC’s A4 occupancy certificate is dated 06 May 2024, and the architect’s Form 1A dated 30.06.2024 certifies the registered project complete in all aspects. No promoter website, official contact details or registered office address is established in the supplied project evidence beyond the project-filed promoter information Corporate record.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200000369; issued 01/03/2019; stated validity to 19/08/2024
Scope and sourceSITARA A4; Form C certificate
GHMC revised building permit
Identifier / date53506/HO/EZ/Cir-1/2016; 20-08-2018
Scope and sourceMulti-block development including A4; permit file no. 153570 / 01 / 12 / 2017 / HO
GHMC occupancy certificate
Identifier / date0975/GHMC/LBN/2024-OC; 06 May 2024; application 002953/GHMC/1430/LBN1/2024-OC
Scope and sourceResidential Apartment (Block A4), surveys 663/P, 667, 668 and 671/P
Architect’s completion certificate
Identifier / dateForm 1A, dated 30.06.2024
Scope and sourceCertifies SITARA A4 complete in all aspects and cites the GHMC OC
Promoter Form B declaration
Identifier / dateDated 30 November 2018
Scope and sourceTitle, encumbrance, project-account and completion declarations for SITARA-A4
RERA-filed land and unit records
Identifier / dateCaptured in project record
Scope and sourceLand identity/area and apartment counts; booking figures have no recorded as-of date Land records RERA unit table

The GHMC occupancy certificate states that open space and roads must be handed over to GHMC free of cost through a registered gift deed before release of the Final Occupancy Certificate. The supplied evidence does not include the referenced gift deed or a final-layout document.

Frequently asked questions

Is SITARA A4 registered with Telangana RERA?

Yes. SITARA A4 is registered with the Telangana Real Estate Regulatory Authority as P02200000369; the registration status is On-Going Project.

Who is the developer of SITARA A4?

The promoter named in the RERA registration is JANAPRIYA PROJECTS.

Where is SITARA A4 located?

SITARA A4 is in KAPRA, Keesara, Medchal-Malkajgiri, Telangana (500062).

When will SITARA A4 be completed?

The promoter's proposed date of completion filed with RERA is 19/08/2024. This is the promoter's declaration, not a guarantee.