Skyline Veda
VUPPALA · Rangareddy · RERA P02400007006
SKYLINE VEDA is a residential apartment project in Adibatla, Ibrahimpatnam Mandal, Ranga Reddy District, developed by registered promoter Vuppala Venkatesh. The RERA record states a land area of 9,294.55 sq.m and four building components: residential Blocks A, B and C, and an amenities building. Blocks A and B have 1 Stilt + 9 upper floors each, Block C has 1 Cellar + 1 Stilt + 9 upper floors, and the amenities building has 1 Ground + 4 upper floors; the homes are 2BHK and 3BHK. Registered under TG-RERA number P02400007006, the project fields state a proposed completion date of 23/12/2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SKYLINE VEDA RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not stated; the RERA record identifies the registered land as 118/PART RERA record |
| TG-RERA registration | P02400007006 RERA record |
| Registration validity | 21/09/2023 to 23/08/2028; the certificate describes a 4-year validity period |
| RERA status | New Project; certificate records registration granted under section 5. Portal registration details were captured 2026-09-10 15:44:25 RERA record Approvals record |
| Registered promoter | Vuppala Venkatesh; Form B identifies VENKATESH VUPPALA as promoter |
Land and geographic identity
| Item | Project record |
|---|---|
| Revenue village | Adibatla RERA record RERA filing |
| Locality / mandal | Ibrahimpatnam Mandal RERA record RERA filing |
| District / PIN | Ranga Reddy / 501510 RERA record RERA filing |
| Project survey number and subdivision | Sy.No. 118/PART RERA record Land records |
| RERA-filed site extent | 9,294.55 sq.m total area; 8,681.22 sq.m net area; 613.33 sq.m recorded as affected by road widening/FTL of tanks/nala widening RERA filing Land records |
| Building-permit site extent | 8,764.51 Sq. Mt. |
| Boundaries filed on RERA | East: ROAD; West: OTHERS LAND; North: ROAD AND VENDORS LAND; South: OTHERS LAND RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | HMDA; building permit order delegated to Adibatla Municipality / Municipal Corporation Approvals record |
| Principal approval | 003346/BP/HMDA/0681/SMD/2023, dated 23 August, 2023 Approvals record |
| Approved built-up area | Building-permit order states 43,374.16 sq.m total built-up area. The RERA project fields separately state 42,876.64 sq.m approved built-up area RERA filing |
| Buildings / blocks | Four permitted components: proposed Amenities and residential Blocks A, B and C. RERA record also states four total building units RERA filing |
| Sanctioned floor configuration | Amenities: 1 Ground + 4 upper floors; Block C: 1 Cellar + 1 Stilt + 9 upper floors; Blocks A and B: 1 Stilt + 9 upper floors |
| Height | Building-permit parameters state 26.1; the unit for this figure is not specified in the extracted record |
| Parking | Permit conditions specify that stilt/cellar areas are to be used exclusively for vehicle parking; no parking count or unit-by-unit allocation is established in the supplied records |
| Approved vs. RERA-declared units | Permit parameters state Residential 4; the RERA filing reports 284 total units, including 279 home units and a five-unit “Amenities” row not counted as homes RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Home configurations | 2BHK and 3BHK RERA unit table |
| RERA-filed saleable area | 2BHK: 105.42 sq.m; 3BHK: 149.87–153.45 sq.m RERA unit table |
| Booked / available | 2BHK: 34 booked / 65 available; 3BHK: 77 booked / 103 available. Counts are from the TG-RERA portal record, which has no stated booking-count as-of date, so they are indicative RERA unit table |
| Construction stage | No independently verified site progress or construction-stage report is supplied. The RERA amenity/infrastructure progress entries are reproduced in section 6 RERA amenities |
| Completion commitment | Form B declares completion by 23rd day of August 2028 |
| Proposed completion date in project fields | 23/12/2028 RERA record RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied project documents; the building permit says an OC is compulsory before occupation |
Registration validity, the promoter’s completion undertaking and the proposed completion date are separate record items; none by itself establishes that construction is complete or that an occupancy certificate has been issued.
2. The project story
SKYLINE VEDA is registered as a residential apartment development in Adibatla village, Ibrahimpatnam Mandal, Ranga Reddy District, on the RERA-identified portion Sy.No. 118/PART. The RERA record describes four building components: three residential blocks and a separate amenities building. The building permit identifies the residential components as Blocks A, B and C and permits an amenities component. RERA record RERA filing
The offering shown in the RERA unit record is 2BHK and 3BHK homes. It lists 99 two-bedroom homes and 180 three-bedroom homes when the two 3BHK filing rows are combined; the portal’s booked and available figures are indicative because no as-of date is supplied. The five-unit “Amenities” row is not a home offering. RERA unit table
The permit and RERA registration are on file, but the supplied material does not establish construction completion or an occupancy certificate for any block. The permit requires an occupancy certificate before occupation and a completion notice after building completion.
3. Master plan, architecture & building design
The building-permit order describes a residential scheme with three residential blocks and one amenities building. It gives the following floor arrangements: Blocks A and B each have 1 Stilt + 9 upper floors; Block C has 1 Cellar + 1 Stilt + 9 upper floors; and the amenities building has 1 Ground + 4 upper floors. The extracted permit parameters state building height 26.1, without specifying a unit in the supplied text.
The permit records total built-up area of 43,374.16 sq.m and provides component figures: Amenities 1,449.80 sq.m built-up area; Block A 11,641.25 sq.m; Block B 11,641.25 sq.m; and Block C 9,642.86 sq.m. The same extraction also lists separate “total built up area” figures by component, which are not treated here as interchangeable with the stated built-up-area figures. RERA’s project fields separately report approved built-up area of 42,876.64 sq.m. RERA filing
The building-permit order records a site extent of 8,764.51 Sq. Mt. and names Sy.No. 118/PART of Adibatla Village. The RERA land record gives a total area of 9,294.55 sq.m, net area of 8,681.22 sq.m and affected area of 613.33 sq.m; these are presented as their respective filed figures, not as architectural measurements. RERA filing Land records
The supplied extract does not provide a reliable description of building footprints, flats per floor, lift or stair counts, detailed circulation, landscaping/open-space dimensions, or a phase-wise drawing schedule. The permit states that stilt/cellar parking must not be partitioned or converted and prohibits parking or construction in setback areas.
4. Homes, configurations & floor plans
The RERA record lists 99 2BHK homes and 180 3BHK homes across two 3BHK rows. The grouped portal counts are indicative; the record has no booking-count as-of date. The carpet-area figures below are software measurements from approved floor-plan drawing geometry, not RERA disclosures, and are noted as requiring review. RERA unit table Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 99 | 34 | 65 | 105.42 sq.m | Software-measured range 52.0–84.3 sq.m; median 57.1 sq.m | 46% |
| 3BHK | 180 | 77 | 103 | 149.87–153.45 sq.m | Software-measured range 77.5–100.8 sq.m; median 92.4 sq.m | 39% |
The RERA saleable area is the filed area; the drawing-based carpet measurements are separate software measurements and are not a substitute for a RERA-filed carpet-area figure. The supplied measurement note explains that saleable area includes the home’s share of common areas and is therefore not the same measure as carpet area. RERA unit table Floor plans
The drawing extract includes an example 2BHK plan with two bedrooms, two toilets, a living/kitchen space and a utility; the utility is excluded from the measured carpet area. The example 3BHK plan shows three bedrooms, two toilets, a living/kitchen space and a balcony; the balcony is excluded from carpet area. These examples are from individual measured plans and do not establish that every unit of that configuration has the same arrangement or dimensions. RERA unit details
5. Parking & vehicle circulation
The building permit provides for stilt parking in Blocks A and B, and cellar plus stilt parking in Block C. It directs that these areas be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The permit also states that no parking or construction is to be made in setback areas.
No sanctioned vehicle-space count, resident/visitor split, accessible parking count, EV-charging provision in the sanctioned project documents, or unit-specific parking allocation is established by the supplied records. A parking area shown or described as part of a permit does not establish exclusive ownership or allocation to a particular home.
6. Amenities, recreation & open spaces
The permit identifies an amenities building with 1 Ground + 4 upper floors. The permit extraction also specifies certain project infrastructure and facilities. Separately, the RERA amenity table marks facilities as available and provides progress percentages; those percentages are reported as filed status, not independent site verification. RERA amenities
| Facility | Community Buildings |
|---|---|
| Description / size | No size or facility schedule supplied |
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | RERA record: 75%; not independently verified |
| Facility | Aggregate area of recreational Open Space |
|---|---|
| Description / size | Area not supplied |
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | RERA record: 0%; not independently verified |
| Facility | Green Strip/TOT LOT/Park |
|---|---|
| Description / size | Area not supplied |
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | RERA record: 0%; not independently verified |
| Facility | Amenities building |
|---|---|
| Description / size | 1 Ground + 4 upper floors; no internal facility schedule or size breakdown supplied |
| Evidence source | Building-permit order |
| Declared progress / verified status | Permitted; completion not established |
| Facility | Garbage house |
|---|---|
| Description / size | No size or capacity supplied |
| Evidence source | Building-permit order |
| Declared progress / verified status | Specified in permit extraction; completion not established |
Vendor-listed items such as a swimming pool, gym, clubhouse, play areas, jogging/cycling track and visitor parking are marketing/vendor claims, not established here as sanctioned or delivered facilities. Promoter website
7. Utilities, building services & safety
The building permit specifies an STP, transformer, garbage house, rainwater-harvesting structures, a separate underground static water-storage tank of 25,000 lts., and a separate terrace tank of 25,000 lts. The permit extraction does not establish a water source, treatment capacity, STP capacity, reuse arrangement, or whether these facilities are complete.
The RERA amenity record reports these infrastructure progress entries:
| Service / infrastructure | RERA-declared progress | Evidence / qualification |
|---|---|---|
| Water Supply | 50% | RERA amenity record; not independently verified RERA amenities |
| Sewerage (Chamber, Lines, Septic Tank, STP) | 0% | RERA amenity record; not independently verified RERA amenities |
| Treatment and Disposal of Sewage and Sullage Water | 0% | RERA amenity record; not independently verified RERA amenities |
| Storm Water Drains | 50% | RERA amenity record; not independently verified RERA amenities |
| Water Conservation, Rain water Harvesting | 0% | RERA amenity record; not independently verified RERA amenities |
| Electrical Meter Room, Sub-Station, Receiving Station | 50% | RERA amenity record; not independently verified RERA amenities |
| Fire Protection and Fire Safety Requirements | 0% | RERA amenity record; not independently verified RERA amenities |
| Solid Waste Management and Disposal | 0% | RERA amenity record; not independently verified RERA amenities |
| Street Lighting | 0% | RERA amenity record; not independently verified RERA amenities |
| Internal Roads & Footpaths | 50% | RERA amenity record; not independently verified RERA amenities |
The permit requires an STP and rainwater-harvesting structures, and requires a completion notice and occupancy certificate before occupation. The supplied evidence does not establish lift numbers or capacities, backup-power capacity, fire-system details, CCTV/security arrangements, accessibility provisions, or the completion of statutory safety installations.
8. Location, access & connectivity
The registered location is Adibatla Village, Ibrahimpatnam Mandal, Ranga Reddy District, Telangana 501510. The parcel-centroid coordinate supplied in the record is 17.23791040032299, 78.55710458668955; it is a cadastral parcel coordinate, not a surveyed site entrance. RERA record RERA filing Cadastral map Location record
The available connectivity record lists the nearest sampled Outer Ring Road interchange at approximately 0.8 km. No further approach-road route, public-transport detail, or landmark distance is supplied. Location record
9. Developer & development status
The RERA certificate identifies Vuppala Venkatesh as the promoter; the Form-B declaration names VENKATESH VUPPALA and identifies him as promoter, with Mr. Venkatesh Vuppala as authorized signatory. The promoter’s legal-entity type, corporate identifier, registered office and official contact details are not established in the supplied record. Corporate record
Form B is a promoter declaration dated 19.08.2023 undertaking completion by 23rd day of August 2028. The project fields separately state proposed completion on 23/12/2028. No independently verified construction-progress report or occupancy certificate is supplied. RERA record RERA filing
10. Approvals, official records & documents
| Reference and scope | P02400007006, SKYLINE VEDA; validity 21/09/2023–23/08/2028 |
|---|---|
| Evidence note | Form C certificate, issued 21/09/2023 |
| Reference and scope | 003346/BP/HMDA/0681/SMD/2023, dated 23 August, 2023 |
|---|---|
| Evidence note | HMDA permission recorded in the Adibatla Municipality / Municipal Corporation building-permit order; covers proposed Amenities and Blocks A, B and C, subject to conditions |
| Reference and scope | Dated 19.08.2023 |
|---|---|
| Evidence note | Promoter declaration covering title, encumbrance disclosure, separate-account commitments and completion undertaking |
| Reference and scope | Document 354775 |
|---|---|
| Evidence note | Supplied as drawing source for software-measured unit geometry; no additional layout-plan approval details are established here |
| Reference and scope | Not identified in supplied project documents |
|---|---|
| Evidence note | Building permit states OC is compulsory before occupation and requires a completion notice after building completion |
1. Project at a glance
Project identity
Registered project name: SKYLINE VEDA
Project type: Residential apartment project
Phase / registered portion: Phase not stated; the RERA record identifies the registered land as 118/PART
TG-RERA registration: P02400007006
Registration validity: 21/09/2023 to 23/08/2028; the certificate describes a 4-year validity period
RERA status: New Project; certificate records registration granted under section 5. Portal registration details were captured 2026-09-10 15:44:25
Registered promoter: Vuppala Venkatesh; Form B identifies VENKATESH VUPPALA as promoter
Land and geographic identity
Revenue village: Adibatla
Locality / mandal: Ibrahimpatnam Mandal
District / PIN: Ranga Reddy / 501510
Project survey number and subdivision: Sy.No. 118/PART
RERA-filed site extent: 9,294.55 sq.m total area; 8,681.22 sq.m net area; 613.33 sq.m recorded as affected by road widening/FTL of tanks/nala widening
Building-permit site extent: 8,764.51 Sq. Mt.
Boundaries filed on RERA: East: ROAD; West: OTHERS LAND; North: ROAD AND VENDORS LAND; South: OTHERS LAND
Development identity
Sanctioning authority: HMDA; building permit order delegated to Adibatla Municipality / Municipal Corporation
Principal approval: 003346/BP/HMDA/0681/SMD/2023, dated 23 August, 2023
Approved built-up area: Building-permit order states 43,374.16 sq.m total built-up area. The RERA project fields separately state 42,876.64 sq.m approved built-up area
Buildings / blocks: Four permitted components: proposed Amenities and residential Blocks A, B and C. RERA record also states four total building units
Sanctioned floor configuration: Amenities: 1 Ground + 4 upper floors; Block C: 1 Cellar + 1 Stilt + 9 upper floors; Blocks A and B: 1 Stilt + 9 upper floors
Height: Building-permit parameters state 26.1; the unit for this figure is not specified in the extracted record
Parking: Permit conditions specify that stilt/cellar areas are to be used exclusively for vehicle parking; no parking count or unit-by-unit allocation is established in the supplied records
Approved vs. RERA-declared units: Permit parameters state Residential 4; the RERA filing reports 284 total units, including 279 home units and a five-unit “Amenities” row not counted as homes
Offering and status
Home configurations: 2BHK and 3BHK
RERA-filed saleable area: 2BHK: 105.42 sq.m; 3BHK: 149.87–153.45 sq.m
Booked / available: 2BHK: 34 booked / 65 available; 3BHK: 77 booked / 103 available. Counts are from the TG-RERA portal record, which has no stated booking-count as-of date, so they are indicative
Construction stage: No independently verified site progress or construction-stage report is supplied. The RERA amenity/infrastructure progress entries are reproduced in section 6
Completion commitment: Form B declares completion by 23rd day of August 2028
Proposed completion date in project fields: 23/12/2028
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied project documents; the building permit says an OC is compulsory before occupation
Registration validity, the promoter’s completion undertaking and the proposed completion date are separate record items; none by itself establishes that construction is complete or that an occupancy certificate has been issued.
2. The project story
SKYLINE VEDA is registered as a residential apartment development in Adibatla village, Ibrahimpatnam Mandal, Ranga Reddy District, on the RERA-identified portion Sy.No. 118/PART. The RERA record describes four building components: three residential blocks and a separate amenities building. The building permit identifies the residential components as Blocks A, B and C and permits an amenities component.
The offering shown in the RERA unit record is 2BHK and 3BHK homes. It lists 99 two-bedroom homes and 180 three-bedroom homes when the two 3BHK filing rows are combined; the portal’s booked and available figures are indicative because no as-of date is supplied. The five-unit “Amenities” row is not a home offering.
The permit and RERA registration are on file, but the supplied material does not establish construction completion or an occupancy certificate for any block. The permit requires an occupancy certificate before occupation and a completion notice after building completion.
3. Master plan, architecture & building design
The building-permit order describes a residential scheme with three residential blocks and one amenities building. It gives the following floor arrangements: Blocks A and B each have 1 Stilt + 9 upper floors; Block C has 1 Cellar + 1 Stilt + 9 upper floors; and the amenities building has 1 Ground + 4 upper floors. The extracted permit parameters state building height 26.1, without specifying a unit in the supplied text.
The permit records total built-up area of 43,374.16 sq.m and provides component figures: Amenities 1,449.80 sq.m built-up area; Block A 11,641.25 sq.m; Block B 11,641.25 sq.m; and Block C 9,642.86 sq.m. The same extraction also lists separate “total built up area” figures by component, which are not treated here as interchangeable with the stated built-up-area figures. RERA’s project fields separately report approved built-up area of 42,876.64 sq.m.
The building-permit order records a site extent of 8,764.51 Sq. Mt. and names Sy.No. 118/PART of Adibatla Village. The RERA land record gives a total area of 9,294.55 sq.m, net area of 8,681.22 sq.m and affected area of 613.33 sq.m; these are presented as their respective filed figures, not as architectural measurements.
The supplied extract does not provide a reliable description of building footprints, flats per floor, lift or stair counts, detailed circulation, landscaping/open-space dimensions, or a phase-wise drawing schedule. The permit states that stilt/cellar parking must not be partitioned or converted and prohibits parking or construction in setback areas.
4. Homes, configurations & floor plans
The RERA record lists 99 2BHK homes and 180 3BHK homes across two 3BHK rows. The grouped portal counts are indicative; the record has no booking-count as-of date. The carpet-area figures below are software measurements from approved floor-plan drawing geometry, not RERA disclosures, and are noted as requiring review.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 99 | 34 | 65 | 105.42 sq.m | Software-measured range 52.0–84.3 sq.m; median 57.1 sq.m | 46% |
| 3BHK | 180 | 77 | 103 | 149.87–153.45 sq.m | Software-measured range 77.5–100.8 sq.m; median 92.4 sq.m | 39% |
The RERA saleable area is the filed area; the drawing-based carpet measurements are separate software measurements and are not a substitute for a RERA-filed carpet-area figure. The supplied measurement note explains that saleable area includes the home’s share of common areas and is therefore not the same measure as carpet area.
The drawing extract includes an example 2BHK plan with two bedrooms, two toilets, a living/kitchen space and a utility; the utility is excluded from the measured carpet area. The example 3BHK plan shows three bedrooms, two toilets, a living/kitchen space and a balcony; the balcony is excluded from carpet area. These examples are from individual measured plans and do not establish that every unit of that configuration has the same arrangement or dimensions.
5. Parking & vehicle circulation
The building permit provides for stilt parking in Blocks A and B, and cellar plus stilt parking in Block C. It directs that these areas be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The permit also states that no parking or construction is to be made in setback areas.
No sanctioned vehicle-space count, resident/visitor split, accessible parking count, EV-charging provision in the sanctioned project documents, or unit-specific parking allocation is established by the supplied records. A parking area shown or described as part of a permit does not establish exclusive ownership or allocation to a particular home.
6. Amenities, recreation & open spaces
The permit identifies an amenities building with 1 Ground + 4 upper floors. The permit extraction also specifies certain project infrastructure and facilities. Separately, the RERA amenity table marks facilities as available and provides progress percentages; those percentages are reported as filed status, not independent site verification.
| Facility | Community Buildings |
|---|---|
| Description / size | No size or facility schedule supplied |
| Evidence source | RERA amenity record |
| Declared progress / verified status | RERA record: 75%; not independently verified |
| Facility | Aggregate area of recreational Open Space |
|---|---|
| Description / size | Area not supplied |
| Evidence source | RERA amenity record |
| Declared progress / verified status | RERA record: 0%; not independently verified |
| Facility | Green Strip/TOT LOT/Park |
|---|---|
| Description / size | Area not supplied |
| Evidence source | RERA amenity record |
| Declared progress / verified status | RERA record: 0%; not independently verified |
| Facility | Amenities building |
|---|---|
| Description / size | 1 Ground + 4 upper floors; no internal facility schedule or size breakdown supplied |
| Evidence source | Building-permit order |
| Declared progress / verified status | Permitted; completion not established |
| Facility | Garbage house |
|---|---|
| Description / size | No size or capacity supplied |
| Evidence source | Building-permit order |
| Declared progress / verified status | Specified in permit extraction; completion not established |
Vendor-listed items such as a swimming pool, gym, clubhouse, play areas, jogging/cycling track and visitor parking are marketing/vendor claims, not established here as sanctioned or delivered facilities.
7. Utilities, building services & safety
The building permit specifies an STP, transformer, garbage house, rainwater-harvesting structures, a separate underground static water-storage tank of 25,000 lts., and a separate terrace tank of 25,000 lts. The permit extraction does not establish a water source, treatment capacity, STP capacity, reuse arrangement, or whether these facilities are complete.
The RERA amenity record reports these infrastructure progress entries:
| Service / infrastructure | RERA-declared progress | Evidence / qualification |
|---|---|---|
| Water Supply | 50% | RERA amenity record; not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | 0% | RERA amenity record; not independently verified |
| Treatment and Disposal of Sewage and Sullage Water | 0% | RERA amenity record; not independently verified |
| Storm Water Drains | 50% | RERA amenity record; not independently verified |
| Water Conservation, Rain water Harvesting | 0% | RERA amenity record; not independently verified |
| Electrical Meter Room, Sub-Station, Receiving Station | 50% | RERA amenity record; not independently verified |
| Fire Protection and Fire Safety Requirements | 0% | RERA amenity record; not independently verified |
| Solid Waste Management and Disposal | 0% | RERA amenity record; not independently verified |
| Street Lighting | 0% | RERA amenity record; not independently verified |
| Internal Roads & Footpaths | 50% | RERA amenity record; not independently verified |
The permit requires an STP and rainwater-harvesting structures, and requires a completion notice and occupancy certificate before occupation. The supplied evidence does not establish lift numbers or capacities, backup-power capacity, fire-system details, CCTV/security arrangements, accessibility provisions, or the completion of statutory safety installations.
8. Location, access & connectivity
The registered location is Adibatla Village, Ibrahimpatnam Mandal, Ranga Reddy District, Telangana 501510. The parcel-centroid coordinate supplied in the record is 17.23791040032299, 78.55710458668955; it is a cadastral parcel coordinate, not a surveyed site entrance.
The available connectivity record lists the nearest sampled Outer Ring Road interchange at approximately 0.8 km. No further approach-road route, public-transport detail, or landmark distance is supplied.
9. Developer & development status
The RERA certificate identifies Vuppala Venkatesh as the promoter; the Form-B declaration names VENKATESH VUPPALA and identifies him as promoter, with Mr. Venkatesh Vuppala as authorized signatory. The promoter’s legal-entity type, corporate identifier, registered office and official contact details are not established in the supplied record.
Form B is a promoter declaration dated 19.08.2023 undertaking completion by 23rd day of August 2028. The project fields separately state proposed completion on 23/12/2028. No independently verified construction-progress report or occupancy certificate is supplied.
10. Approvals, official records & documents
| Reference and scope | P02400007006, SKYLINE VEDA; validity 21/09/2023–23/08/2028 |
|---|---|
| Evidence note | Form C certificate, issued 21/09/2023 |
| Reference and scope | 003346/BP/HMDA/0681/SMD/2023, dated 23 August, 2023 |
|---|---|
| Evidence note | HMDA permission recorded in the Adibatla Municipality / Municipal Corporation building-permit order; covers proposed Amenities and Blocks A, B and C, subject to conditions |
| Reference and scope | Dated 19.08.2023 |
|---|---|
| Evidence note | Promoter declaration covering title, encumbrance disclosure, separate-account commitments and completion undertaking |
| Reference and scope | Document 354775 |
|---|---|
| Evidence note | Supplied as drawing source for software-measured unit geometry; no additional layout-plan approval details are established here |
| Reference and scope | Not identified in supplied project documents |
|---|---|
| Evidence note | Building permit states OC is compulsory before occupation and requires a completion notice after building completion |
Frequently asked questions
Is SKYLINE VEDA registered with Telangana RERA?
Yes. SKYLINE VEDA is registered with the Telangana Real Estate Regulatory Authority as P02400007006; the registration status is New Project.
Who is the developer of SKYLINE VEDA?
The promoter named in the RERA registration is VUPPALA.
Where is SKYLINE VEDA located?
SKYLINE VEDA is in Ibrahimpatnam Mandal, Adibatla, Ibrahimpatnam, Rangareddy, Telangana (501510).
When will SKYLINE VEDA be completed?
The promoter's proposed date of completion filed with RERA is 23/12/2028. This is the promoter's declaration, not a guarantee.