SLN TWIN TOWERS BLOCK - A is a residential apartment project in Bachupally, Bachupally Mandal, Medchal-Malkajgiri district. The registered promoter is SLN DEVELOPERS. The project occupies 494.06 sq. m and comprises one building with 1 Stilt + 5 upper floors, with 10 3BHK units. It is registered under TG-RERA number P02200007192, and the project header records a proposed completion date of 30/11/2026.

More from Sln Developers · 2 projects →

01What we found

Period endedTG-RERA registration ran to 2 Mar 2026 - check its extension on TG-RERA
21documents on file - each fact links to its page
76court cases on this project's land (survey 167, 168, 169, 175, 176, 177 and 1 more, Bachupally)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from commonfloor.comPhoto from commonfloor.com
▦ View all 2 photos
Bachupally, Bachupally, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project nameSLN TWIN TOWERS BLOCK - A RERA record
Project typeResidential apartment project RERA record Approvals record
Phase / registered portionBlock - A; the registration and approval identify this block/building. A wider project-phase schedule is not disclosed. RERA record
TG-RERA registrationP02200007192
Registration validity04/11/2023 to 02/03/2026, as stated on the certificate; no extension is recorded in the supplied evidence. Registration validity is distinct from the stated completion deadline.
Registered promoterSLN DEVELOPERS (also styled “S.L.N. DEVELOPERS” in filed approval documents) RERA record Corporate record
RERA statusThe supplied certificate records the project as registered. It does not establish current registration validity beyond the stated end date.

Land and geographic identity

ItemProject record
LocalityBachupally RERA record
Revenue villageBachupally RERA record Land records
MandalBachupally RERA record Land records
DistrictMedchal-Malkajgiri RERA record Land records
PIN500090 RERA record
Project survey numbers / subdivisions167 PART, 168, 169 PART, 175 PART, 176 PART, 177, 178 PART RERA record Land records
Plot referencePlot No. 318/A PART OF EASE AND SOUTH SIDE PART in the RERA certificate; the approval describes Plot 318A/PART, part of the east and south sides.
Registered site extent494.06 sq. m
RERA land areaTotal area 494.06 sq. m; net area 494.06 sq. m; recorded affected area 0 sq. m. RERA filing
Boundaries as recordedNorth: PLOT NO 318A PART; South: SCHOOL PLACE; East: PLOT NO 318A PART EAST AND SOUTH SIDE PART; West: 30 FEET WIDE ROAD. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); approval records delegation to Nizampet Municipal Corporation for local-body action. Approvals record
Principal approvalBuilding approval 008554/BP/HMDA/1740/MED/2022, dated 04 March, 2023. Approvals record
Approved built-up area1,662.92 sq. m
Building countOne proposed building/block in the filed approval.
Sanctioned floor configuration1 Stilt + 5 upper floors; building height recorded as 14.99 (the supplied extract does not state a unit for this figure).
Parking levels / provisionStilt is designated for vehicle parking; a parking-space count and allocation schedule are not available in the supplied records.
UnitsApproved-plan record: one building; unit record: 10 proposed 3BHK apartments. The supplied approval extract does not state an approved apartment count. RERA filing RERA unit table RERA unit details

Offering and status

ItemProject record
Unit type3BHK apartments; RERA filing records 10 units. RERA unit table RERA unit details
RERA saleable area163.97 sq. m per filed 3BHK configuration. RERA unit table RERA unit details
Booked / available0 booked; 10 available, as last read from the TG-RERA portal; the supplied record gives no as-of date, so counts are indicative. RERA unit table
Construction stageNo verified construction-progress percentage or independent site inspection result is supplied. RERA amenity-progress entries shown are 0%; these entries do not establish overall physical construction progress. RERA amenities
Completion datesForm-B promoter declaration: 04/03/2026. Project header proposed completion: 30/11/2026. The supplied evidence does not explain the relationship between these dates. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied records. The HMDA approval states that an occupancy certificate is required before occupation.

2. The project story

The TG-RERA record describes SLN TWIN TOWERS BLOCK - A as a residential apartment project at Plot 318/A PART in Bachupally, Medchal-Malkajgiri. The registered land schedule names seven survey references—167 PART, 168, 169 PART, 175 PART, 176 PART, 177 and 178 PART—and records a site area of 494.06 sq. m. RERA record Land records

The filed HMDA building approval is for one residential building with 1 Stilt + 5 upper floors. The RERA unit schedule lists ten 3BHK homes. The available evidence identifies the project as proposed/new and does not supply a verified construction-stage assessment or an occupancy certificate; therefore, physical completion and readiness for occupation cannot be established from this record. RERA record RERA unit details Document index

The project registration certificate’s validity period, the promoter’s Form-B completion undertaking and the header’s proposed completion date are separate record items; the available documents do not explain their differing dates. RERA record

3. Master plan, architecture & building design

The HMDA technical approval describes a single residential building on the 494.06 sq. m site, comprising 1 Stilt + 5 upper floors. It records approved built-up area of 1,662.92 sq. m, proposed built-up area of 1,365.60, and building height of 14.99; the supplied extract does not specify the height unit. These are approval-record figures, not carpet-area or saleable-area measurements.

The approved document identifies a minimum approach-road width of 4.5mts. and says the stilt/cellar is to be used exclusively for vehicle parking without partition walls. No floor-by-floor apartment arrangement, footprint drawing, number of flats per floor, lift or stair details, internal circulation plan, or landscaped/open-space dimensions are available in the supplied extracts.

The HMDA approval also lists a transformer, garbage house, STP, rainwater-harvesting structures, an underground static water-storage tank of 25,000 lts., a terrace tank of 25,000 lts. capacity, and a generator. These are approval-record provisions; the supplied evidence does not verify installation or operation.

4. Homes, configurations & floor plans

The TG-RERA unit record lists ten 3BHK apartments, with zero booked and ten available in the portal reading supplied. The booking snapshot has no stated as-of date. The two drawing sheets in the evidence are not yet software-measured, so no drawing-based carpet area or room dimensions can be reported. RERA unit details RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010163.97 sq. mNot measured; two drawings are pending scan/measurementNot supplied

The 163.97 sq. m figure is the RERA-filed saleable area, not a measured carpet area. No measured carpet-area figure, balcony or utility dimensions, common-area loading, or room-by-room plan measurement is supplied. RERA unit details Floor plans

5. Parking & vehicle circulation

The HMDA approval designates the stilt/cellar for vehicle parking and prohibits parking or construction in setback areas. The supplied records do not establish the number of parking spaces, visitor or accessible parking provision, two-wheeler capacity, ramp arrangement, EV charging, or unit-specific parking allocations. A parking bay shown in a plan, if any, would not by itself establish an exclusive legal allocation.

6. Amenities, recreation & open spaces

The project’s RERA amenity record lists 14 items. Where a percentage is shown, it is recorded as 0%; the evidence does not provide independent verification of completed facilities. The HMDA approval’s listed site provisions are included separately below as approval-record items. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsNo size suppliedRERA amenity record RERA amenities0%; not independently verified
Water SupplyNo source or capacity specified in this amenity entryRERA amenity record RERA amenitiesListed “YES”; 0%; not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)No capacity suppliedRERA amenity record RERA amenitiesListed “YES”; 0%; not independently verified
Storm Water DrainsNo size suppliedRERA amenity record RERA amenities0%; not independently verified
Green Strip/TOT LOT/ParkNo area suppliedRERA amenity record RERA amenitiesListed “YES”; 0%; not independently verified
Street LightingNo quantity suppliedRERA amenity record RERA amenities0%; not independently verified
Community BuildingsNo description or size suppliedRERA amenity record RERA amenities0%; not independently verified
Treatment and Disposal of Sewage and Sullage WaterNo capacity suppliedRERA amenity record RERA amenities0%; not independently verified
Solid Waste Management and DisposalNo system detail suppliedRERA amenity record RERA amenities0%; not independently verified
Water Conservation, Rain Water HarvestingNo capacity suppliedRERA amenity record RERA amenitiesListed “YES”; 0%; not independently verified
Energy managementNo system detail suppliedRERA amenity record RERA amenities0%; not independently verified
Fire Protection and Fire Safety RequirementsNo system detail suppliedRERA amenity record RERA amenities0%; not independently verified
Electrical Meter Room, Sub-Station, Receiving StationNo capacity suppliedRERA amenity record RERA amenitiesListed “YES”; 0%; not independently verified
Aggregate area of recreational Open SpaceNo area suppliedRERA amenity record RERA amenities0%; not independently verified
STPApproval lists an STP; capacity not suppliedHMDA approvalApproval-record provision; installation/status not verified
Rainwater-harvesting structuresApproval lists structures; capacity not suppliedHMDA approvalApproval-record provision; installation/status not verified
Transformer and garbage houseApproval lists both within the premises; capacity/size not suppliedHMDA approvalApproval-record provision; installation/status not verified

7. Utilities, building services & safety

The HMDA approval lists an STP, rainwater-harvesting structures, a transformer and garbage house, plus separate underground and terrace water tanks, each with a stated capacity of 25,000 lts. It also lists a generator. The supplied records do not specify the water source, treatment capacity, sewer reuse, storm-water design, generator capacity, electrical backup coverage, or whether the listed installations are complete.

The approval assigns structural-safety and fire-safety requirements to the owner, builder/developer, architect and structural engineer, including provision of fire-fighting installations as stipulated in the National Building Code of India, 2005. It also requires CCTV cameras and says occupancy is to follow completion in accordance with the technically approved plans and an occupancy certificate. These are approval conditions; this review does not establish installed systems or completed statutory inspections.

No lift or service-lift count or capacity, escape-stair details, accessibility provisions, security-access arrangements, waste-segregation details, or fire-system commissioning evidence is supplied. Document index

8. Location, access & connectivity

The registered location is Bachupally, Bachupally Mandal, Medchal-Malkajgiri District, Telangana, PIN 500090. The land schedule identifies the west boundary as a 30 FEET WIDE ROAD; HMDA’s building approval separately specifies a minimum approach-road width of 4.5mts. and requires the indicated approach road to be developed and maintained as a black-topped road before occupancy release. RERA record Land records

A supplied location record gives HITEC City — 9.0 km from the project location reference; the record identifies its coordinates as a cadastral parcel centroid at 17.52177270570552, 78.39710241233476. No public-transport routes, measured distances to other landmarks, or verified travel times are provided. Location record Cadastral map

9. Developer & development status

The TG-RERA registered promoter is SLN DEVELOPERS, recorded as a partnership. The project materials name PODAPATI MALLIKARJUNA RAO as managing partner/authorized signatory and PODAPATI DHANALAKSHMI as partner. The supplied corporate identifiers include GSTIN 36ACLFS3735M1ZJ; the promoter PAN is masked in the record as xxxxxx735M. Corporate record Parties record RERA record

The promoter address recorded in the project data is PMR HEIGHTS, Lahari Estates, Bachupally, Medchal-Malkajgiri, Telangana 500090. No official promoter website, project contact number, email address, or verified construction-progress report is supplied here. Parties record RERA record

The promoter’s Form-B affidavit, dated 30/10/2023, declares completion by 04/03/2026. The project header separately records 30/11/2026 as the proposed completion date. No physical-progress certification or occupancy certificate is supplied, and the evidence does not state whether any completion-date change was approved. RERA record Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200007192; issued 04/11/2023; stated validity through 02/03/2026
What the supplied evidence establishesForm C identifies SLN TWIN TOWERS BLOCK - A and the registered promoter. No extension is recorded in the supplied certificate.
HMDA building approval
Identifier / date008554/BP/HMDA/1740/MED/2022; 04 March, 2023
What the supplied evidence establishesTechnical building approval for the residential building at Plot 318A/PART, 1 Stilt + 5 upper floors, on the stated Bachupally survey land.
HMDA approval and mortgage records
Identifier / dateMortgage documents 5107/2023 and 5108/2023, both dated 28 February, 2023
What the supplied evidence establishesApproval extracts record HMDA mortgages over first-floor built-up areas. The approval also states occupancy certification is required before occupation.
Promoter Form-B declaration
Identifier / date30/10/2023
What the supplied evidence establishesPromoter declaration of title, encumbrance status, project-account obligations and a completion undertaking of 04/03/2026.
Layout plan submission
Identifier / dateDocument 354424
What the supplied evidence establishesThe TG-RERA document entry requests a layout approval letter or authority-stamped layout plan, or a declaration/equivalent document if not applicable; the listed document is not extracted as an approval plan in the supplied evidence. Document index
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied evidence establishesNo certificate is included in the available project records. Document index

Other registrations of Sln Twin Towers

Frequently asked questions

Is SLN TWIN TOWERS BLOCK - A registered with Telangana RERA?

Yes. SLN TWIN TOWERS BLOCK - A is registered with the Telangana Real Estate Regulatory Authority as P02200007192; the registration status is New Project.

Who is the developer of SLN TWIN TOWERS BLOCK - A?

The promoter named in the RERA registration is SLN DEVELOPERS.

Where is SLN TWIN TOWERS BLOCK - A located?

SLN TWIN TOWERS BLOCK - A is in BACHUPALLY, Medchal-Malkajgiri, Telangana (500090).

When will SLN TWIN TOWERS BLOCK - A be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.