Sree Laxmi Narasimha Residency
Vision Construction · Medchal-Malkajgiri · RERA P02200006943
Sree Laxmi Narasimha Residency is a residential apartment project in Bowrampet, SIMHAPURI COLONY, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The registered promoter is Vision Construction, stated as a partnership. The project covers 668.73 sq m and comprises one building with 1 Stilt + 5 upper floors and 20 2BHK units. It is registered under TG-RERA number P02200006943, with a proposed completion date of 30/04/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | TG-RERA / filed information |
|---|---|
| Registered project | Sree Laxmi Narasimha Residency RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | A single registered project is identified; the filed approval describes one residential building on Plots C-84 and C-85. A separate phase number is not disclosed. RERA record |
| TG-RERA registration | P02200006943 RERA record |
| Registration validity | 13 September 2023–30 April 2025, as stated on the registration certificate; no extension is recorded in the supplied registration data. This is the registration period, not an occupancy certificate. RERA record |
| Registered promoter | Vision Construction, stated as a partnership RERA filing Corporate record |
| RERA status | The filing identifies the project as a “New Project.” The supplied record gives a proposed completion date of 30 April 2025; it does not establish current construction completion or occupancy certification. RERA filing RERA record |
Land and geographic identity
| Field | Filed information |
|---|---|
| Locality / colony | Bowrampet; SIMHAPURI COLONY RERA record |
| Revenue village | Bowrampet RERA record RERA filing |
| Mandal | Dundigal Gandimaisamma RERA record |
| District | Medchal-Malkajgiri RERA record |
| PIN | 500043 RERA record |
| Project survey number(s) | Survey No. 447; no subdivision is stated in the supplied project record. RERA filing |
| Site / land area | 668.73 sq m total and net area; road-affected area is recorded as 0 sq m. RERA filing |
| Plot identifiers | Plots C-84 and C-85 RERA filing |
| Boundaries | East: Plot C-86; West: Plot C-83; North: Plots C-96 and C-97; South: 30 metre-wide road. RERA filing |
Development identity
| Field | Filed / sanctioned information |
|---|---|
| Sanctioning authority | Dundigal Municipality/Municipal Corporation Approvals record |
| Principal building approval | 0035/BP/3144/2023, dated 13 February 2023 Approvals record |
| Related file number | 011268/BP/DTCP/3144/0049/2022 Approvals record |
| Approved building configuration | One building: 1 Stilt + 5 upper floors |
| Building height | 14.99 m |
| Approved area figures | Residential upper floors area: 1,623.25 sq m; stilt area: 349.83 sq m. The approval separately records site area as 668.73 sq m. These are the figures and labels in the supplied approval extraction. |
| Units | The sanctioned-unit count is not separately stated in the supplied approval extraction. The TG-RERA unit record lists 20 units. RERA unit table |
| Parking levels | The approval says the cellar and stilts shown for parking are to be used exclusively for vehicle parking; the extracted floor configuration identifies one stilt and does not give a parking-space count. |
Offering and status
| Field | Filed information |
|---|---|
| Configuration | 2BHK RERA unit table |
| Filed saleable area | 35.77 sq m RERA unit table |
| Booked / available | 0 booked; 20 available, as last read from the TG-RERA portal. The portal record supplied here has no as-of date, so these counts are indicative. RERA unit table |
| Construction stage | Not established by the supplied evidence. RERA record RERA amenities |
| Completion date | Promoter’s Form B declaration gives 30/04/2025 as the completion undertaking; this is a declared deadline, not proof of completion. |
| Original / revised completion dates | The supplied record gives the 30/04/2025 undertaking; no revised date is recorded. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project evidence. The approval states that an occupancy certificate is required before occupation. |
2. The project story
Sree Laxmi Narasimha Residency is filed as a residential apartment project in Bowrampet, within SIMHAPURI COLONY, on Plots C-84 and C-85 in Survey No. 447. The sanctioned building is described as one structure with a stilt and five upper floors; the RERA unit record identifies 20 two-bedroom apartments. RERA record RERA filing RERA unit table
The promoter’s Form B undertaking sets 30 April 2025 as the completion deadline. The supplied record does not establish the present construction stage, completion of the building, or issue of an occupancy certificate. The project amenities record marks listed items at 0% progress; that is a filed progress entry, not an independent site inspection. RERA amenities
3. Master plan, architecture & building design
The building permit records a 668.73 sq m site, with 1,623.25 sq m of residential upper-floor area and 349.83 sq m of stilt area. It sanctions a single residential building, 14.99 m high, configured as 1 Stilt + 5 upper floors. The supplied extraction does not set out a separate FSI-counted area, building footprint, floor-by-floor apartment arrangement, flats per floor, lift or stair count, or detailed internal circulation plan.
The approval records three rainwater-harvesting structures, a transformer space and a garbage house. It also includes conditions for tree planting around the site and a fenced tot-lot maintained as greenery; the extracted area for the tot-lot is recorded as “NA.” These are approval conditions or recorded provisions, not evidence that the works have been completed.
The approval refers to a sanctioned plan, but no drawing-derived measurements or detailed floor-plan information sufficient to describe room layouts or building arrangement are supplied here. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 35.77 sq m | Not established from the supplied measured drawing data | Not supplied |
The unit count, booking count, availability and saleable area are from the TG-RERA filing; booking figures are indicative because the portal record has no as-of date. The floor-plan data reports no 2BHK design successfully measured for this configuration, so no software-measured carpet area or room dimensions can be stated. RERA unit table RERA unit details Floor plans
Saleable area and carpet area are distinct measurements: the filed saleable figure is reported above, while no verified carpet measurement is available in the supplied drawing data. The supplied materials do not provide a supported breakdown of balcony, utility or common-area loading for these units. RERA unit table Floor plans
5. Parking & vehicle circulation
The building approval states that the cellar and stilts approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted sanctioned configuration identifies a stilt; it does not establish a cellar in the floor configuration, a number of parking spaces, parking allocation by apartment, visitor or accessible parking, or two-wheeler capacity.
No evidence supplied here establishes ramps, internal vehicle circulation, pedestrian separation, mechanical parking, EV charging, or exclusive parking rights for an individual apartment. A parking provision in the building plan is not, by itself, evidence of an individually allotted space.
6. Amenities, recreation & open spaces
| Description / size | Approval requires peripheral tree planting and a fenced tot-lot maintained as greenery; recorded tot-lot area: “NA.” |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Approval condition / RERA-listed item; amenities record shows 0%. Completion not independently verified. |
| Description / size | Approval specifies 3 rainwater-harvesting structures; the RERA amenities record lists rainwater harvesting. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Required / listed; amenities record shows 0%. Completion not independently verified. |
| Description / size | Listed in the RERA amenities record; no size or description supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded; completion not independently verified. |
| Description / size | Listed in the RERA amenities record; no further description supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded; completion not independently verified. |
| Description / size | Aggregate area is listed in the RERA amenities record, but no area is supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded; completion not independently verified. |
The RERA amenities record also lists water supply, sewerage/STP, storm-water drains, street lighting, sewage and sullage treatment, solid-waste management, energy management, fire protection and an electrical meter room/sub-station/receiving station; those site services are covered in the next section. RERA amenities
7. Utilities, building services & safety
| Evidence in the supplied record | Water supply is marked “YES” in the RERA amenities record. The approval requires water-supply connections to be provided only on production of an occupancy certificate. No source, storage capacity or treatment details are supplied. RERA amenities |
|---|---|
| Status / limitation | Listed / approval condition; completion not independently verified. |
| Evidence in the supplied record | Sewerage, including chamber, lines, septic tank and STP, is marked “YES”; storm-water drains and sewage/sullage treatment are also listed. No capacities, reuse arrangements or completion evidence are supplied. RERA amenities |
|---|---|
| Status / limitation | Listed; amenities progress is recorded as 0%. |
| Evidence in the supplied record | The approval specifies 3 structures and requires a rainwater-harvesting structure (percolation pit). |
|---|---|
| Status / limitation | Required / listed; completed status not verified. |
| Evidence in the supplied record | Electrical meter room/sub-station/receiving station is marked “YES”; approval requires space for a transformer. No supply capacity or backup capacity is given in the project filing supplied here. RERA amenities |
|---|---|
| Status / limitation | Listed / approval condition; completion not verified. |
| Evidence in the supplied record | Fire protection and fire-safety requirements are listed in the RERA amenities record. The building approval places responsibility for structural and fire safety on the owner, builder/developer, architect and site engineer, and requires relevant services to be executed under qualified technical supervision. RERA amenities |
|---|---|
| Status / limitation | Listed / responsibility and supervision conditions; no completion certificate or independent compliance verification supplied. |
| Evidence in the supplied record | Solid-waste management is listed; the approval requires a garbage house within the premises. RERA amenities |
|---|---|
| Status / limitation | Listed / approval condition; completion not verified. |
| Evidence in the supplied record | The approval mentions lifts among services but provides no lift count, capacity or accessibility details. No ramp or accessible-circulation information is supplied. |
|---|---|
| Status / limitation | Not established. |
The approval states that an occupancy certificate is compulsory before occupation and that public amenities such as water and electricity connections are to be provided only on production of that certificate. No such certificate is included in the supplied evidence.
8. Location, access & connectivity
The registered location is Bowrampet village, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, PIN 500043. The building approval identifies SIMHAPURI COLONY and a road frontage described in the land record as a 30 metre-wide road; the approval extraction also refers to an 18 m road-width condition. RERA record RERA filing
The supplied location data gives HITEC City as an anchor at 11.6 km. It supplies no measured distances to public transport, schools or other landmarks, and no supported travel times. Location record
9. Developer & development status
The TG-RERA-registered promoter is Vision Construction, identified in the project record as a partnership. The supplied corporate identifier is GSTIN 36AAVFV5078Q1ZU. The project record names Kopparapu Janardhan as partner and authorised signatory, and Narsimha Reddy Chitla as partner. Corporate record Parties record RERA filing
The project registration certificate records the promoter’s office as “Village: Mandal: District: Ranga Reddy, Pin: 500090.” The supplied materials do not provide an official website or contact details.
The promoter’s Form B declaration undertakes completion by 30/04/2025. The supplied materials do not establish actual construction progress, a revised completion date, or occupancy certification. The RERA amenities record shows 0% for the listed progress entries; this is a filed record, not independently verified site status. RERA amenities
10. Approvals, official records & documents
| Identifier / date | P02200006943; issued 13 September 2023; validity stated through 30 April 2025 |
|---|---|
| What the supplied record establishes | Form C registration for Sree Laxmi Narasimha Residency, naming Vision Construction as promoter and Survey No. 447 / Plots C-84 and C-85. |
| Identifier / date | 0035/BP/3144/2023; 13 February 2023 |
|---|---|
| What the supplied record establishes | Dundigal Municipality/Municipal Corporation approval for a residential building at Plots C-84 and C-85, Bowrampet, Survey No. 447. |
| Identifier / date | 011268/BP/DTCP/3144/0049/2022 |
|---|---|
| What the supplied record establishes | File number recorded in the building approval. |
| Identifier / date | Verified at Hyderabad, 23 March 2023 |
|---|---|
| What the supplied record establishes | Promoter declaration covering the land-title basis, encumbrance statement, 30/04/2025 completion undertaking and other undertakings. |
| Identifier / date | No extracted plan supplied |
|---|---|
| What the supplied record establishes | A layout-plan document is listed in the project documents, but it is not extracted here; no layout detail can be described from the supplied evidence. Document index |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The approval states that an occupancy certificate is required before occupation; the supplied document set contains no such certificate. |
The building approval also records contractor’s all-risk policy number 431600/44/2023/192, dated 26 October 2022, with validity stated through 25 October 2028.
1. Project at a glance
Project identity
Registered project: Sree Laxmi Narasimha Residency
Project type: Residential apartment project
Phase / registered portion: A single registered project is identified; the filed approval describes one residential building on Plots C-84 and C-85. A separate phase number is not disclosed.
TG-RERA registration: P02200006943
Registration validity: 13 September 2023–30 April 2025, as stated on the registration certificate; no extension is recorded in the supplied registration data. This is the registration period, not an occupancy certificate.
Registered promoter: Vision Construction, stated as a partnership
RERA status: The filing identifies the project as a “New Project.” The supplied record gives a proposed completion date of 30 April 2025; it does not establish current construction completion or occupancy certification.
Land and geographic identity
Locality / colony: Bowrampet; SIMHAPURI COLONY
Revenue village: Bowrampet
Mandal: Dundigal Gandimaisamma
District: Medchal-Malkajgiri
PIN: 500043
Project survey number(s): Survey No. 447; no subdivision is stated in the supplied project record.
Site / land area: 668.73 sq m total and net area; road-affected area is recorded as 0 sq m.
Plot identifiers: Plots C-84 and C-85
Boundaries: East: Plot C-86; West: Plot C-83; North: Plots C-96 and C-97; South: 30 metre-wide road.
Development identity
Sanctioning authority: Dundigal Municipality/Municipal Corporation
Principal building approval: 0035/BP/3144/2023, dated 13 February 2023
Related file number: 011268/BP/DTCP/3144/0049/2022
Approved building configuration: One building: 1 Stilt + 5 upper floors
Building height: 14.99 m
Approved area figures: Residential upper floors area: 1,623.25 sq m; stilt area: 349.83 sq m. The approval separately records site area as 668.73 sq m. These are the figures and labels in the supplied approval extraction.
Units: The sanctioned-unit count is not separately stated in the supplied approval extraction. The TG-RERA unit record lists 20 units.
Parking levels: The approval says the cellar and stilts shown for parking are to be used exclusively for vehicle parking; the extracted floor configuration identifies one stilt and does not give a parking-space count.
Offering and status
Configuration: 2BHK
Filed saleable area: 35.77 sq m
Booked / available: 0 booked; 20 available, as last read from the TG-RERA portal. The portal record supplied here has no as-of date, so these counts are indicative.
Construction stage: Not established by the supplied evidence.
Completion date: Promoter’s Form B declaration gives 30/04/2025 as the completion undertaking; this is a declared deadline, not proof of completion.
Original / revised completion dates: The supplied record gives the 30/04/2025 undertaking; no revised date is recorded.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project evidence. The approval states that an occupancy certificate is required before occupation.
2. The project story
Sree Laxmi Narasimha Residency is filed as a residential apartment project in Bowrampet, within SIMHAPURI COLONY, on Plots C-84 and C-85 in Survey No. 447. The sanctioned building is described as one structure with a stilt and five upper floors; the RERA unit record identifies 20 two-bedroom apartments.
The promoter’s Form B undertaking sets 30 April 2025 as the completion deadline. The supplied record does not establish the present construction stage, completion of the building, or issue of an occupancy certificate. The project amenities record marks listed items at 0% progress; that is a filed progress entry, not an independent site inspection.
3. Master plan, architecture & building design
The building permit records a 668.73 sq m site, with 1,623.25 sq m of residential upper-floor area and 349.83 sq m of stilt area. It sanctions a single residential building, 14.99 m high, configured as 1 Stilt + 5 upper floors. The supplied extraction does not set out a separate FSI-counted area, building footprint, floor-by-floor apartment arrangement, flats per floor, lift or stair count, or detailed internal circulation plan.
The approval records three rainwater-harvesting structures, a transformer space and a garbage house. It also includes conditions for tree planting around the site and a fenced tot-lot maintained as greenery; the extracted area for the tot-lot is recorded as “NA.” These are approval conditions or recorded provisions, not evidence that the works have been completed.
The approval refers to a sanctioned plan, but no drawing-derived measurements or detailed floor-plan information sufficient to describe room layouts or building arrangement are supplied here.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 35.77 sq m | Not established from the supplied measured drawing data | Not supplied |
The unit count, booking count, availability and saleable area are from the TG-RERA filing; booking figures are indicative because the portal record has no as-of date. The floor-plan data reports no 2BHK design successfully measured for this configuration, so no software-measured carpet area or room dimensions can be stated.
Saleable area and carpet area are distinct measurements: the filed saleable figure is reported above, while no verified carpet measurement is available in the supplied drawing data. The supplied materials do not provide a supported breakdown of balcony, utility or common-area loading for these units.
5. Parking & vehicle circulation
The building approval states that the cellar and stilts approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted sanctioned configuration identifies a stilt; it does not establish a cellar in the floor configuration, a number of parking spaces, parking allocation by apartment, visitor or accessible parking, or two-wheeler capacity.
No evidence supplied here establishes ramps, internal vehicle circulation, pedestrian separation, mechanical parking, EV charging, or exclusive parking rights for an individual apartment. A parking provision in the building plan is not, by itself, evidence of an individually allotted space.
6. Amenities, recreation & open spaces
| Description / size | Approval requires peripheral tree planting and a fenced tot-lot maintained as greenery; recorded tot-lot area: “NA.” |
|---|---|
| Declared progress / verified status | Approval condition / RERA-listed item; amenities record shows 0%. Completion not independently verified. |
| Description / size | Approval specifies 3 rainwater-harvesting structures; the RERA amenities record lists rainwater harvesting. |
|---|---|
| Declared progress / verified status | Required / listed; amenities record shows 0%. Completion not independently verified. |
| Description / size | Listed in the RERA amenities record; no size or description supplied. |
|---|---|
| Declared progress / verified status | 0% recorded; completion not independently verified. |
| Description / size | Listed in the RERA amenities record; no further description supplied. |
|---|---|
| Declared progress / verified status | 0% recorded; completion not independently verified. |
| Description / size | Aggregate area is listed in the RERA amenities record, but no area is supplied. |
|---|---|
| Declared progress / verified status | 0% recorded; completion not independently verified. |
The RERA amenities record also lists water supply, sewerage/STP, storm-water drains, street lighting, sewage and sullage treatment, solid-waste management, energy management, fire protection and an electrical meter room/sub-station/receiving station; those site services are covered in the next section.
7. Utilities, building services & safety
| Evidence in the supplied record | Water supply is marked “YES” in the RERA amenities record. The approval requires water-supply connections to be provided only on production of an occupancy certificate. No source, storage capacity or treatment details are supplied. |
|---|---|
| Status / limitation | Listed / approval condition; completion not independently verified. |
| Evidence in the supplied record | Sewerage, including chamber, lines, septic tank and STP, is marked “YES”; storm-water drains and sewage/sullage treatment are also listed. No capacities, reuse arrangements or completion evidence are supplied. |
|---|---|
| Status / limitation | Listed; amenities progress is recorded as 0%. |
| Evidence in the supplied record | The approval specifies 3 structures and requires a rainwater-harvesting structure (percolation pit). |
|---|---|
| Status / limitation | Required / listed; completed status not verified. |
| Evidence in the supplied record | Electrical meter room/sub-station/receiving station is marked “YES”; approval requires space for a transformer. No supply capacity or backup capacity is given in the project filing supplied here. |
|---|---|
| Status / limitation | Listed / approval condition; completion not verified. |
| Evidence in the supplied record | Fire protection and fire-safety requirements are listed in the RERA amenities record. The building approval places responsibility for structural and fire safety on the owner, builder/developer, architect and site engineer, and requires relevant services to be executed under qualified technical supervision. |
|---|---|
| Status / limitation | Listed / responsibility and supervision conditions; no completion certificate or independent compliance verification supplied. |
| Evidence in the supplied record | Solid-waste management is listed; the approval requires a garbage house within the premises. |
|---|---|
| Status / limitation | Listed / approval condition; completion not verified. |
| Evidence in the supplied record | The approval mentions lifts among services but provides no lift count, capacity or accessibility details. No ramp or accessible-circulation information is supplied. |
|---|---|
| Status / limitation | Not established. |
The approval states that an occupancy certificate is compulsory before occupation and that public amenities such as water and electricity connections are to be provided only on production of that certificate. No such certificate is included in the supplied evidence.
8. Location, access & connectivity
The registered location is Bowrampet village, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, PIN 500043. The building approval identifies SIMHAPURI COLONY and a road frontage described in the land record as a 30 metre-wide road; the approval extraction also refers to an 18 m road-width condition.
The supplied location data gives HITEC City as an anchor at 11.6 km. It supplies no measured distances to public transport, schools or other landmarks, and no supported travel times.
9. Developer & development status
The TG-RERA-registered promoter is Vision Construction, identified in the project record as a partnership. The supplied corporate identifier is GSTIN 36AAVFV5078Q1ZU. The project record names Kopparapu Janardhan as partner and authorised signatory, and Narsimha Reddy Chitla as partner.
The project registration certificate records the promoter’s office as “Village: Mandal: District: Ranga Reddy, Pin: 500090.” The supplied materials do not provide an official website or contact details.
The promoter’s Form B declaration undertakes completion by 30/04/2025. The supplied materials do not establish actual construction progress, a revised completion date, or occupancy certification. The RERA amenities record shows 0% for the listed progress entries; this is a filed record, not independently verified site status.
10. Approvals, official records & documents
| Identifier / date | P02200006943; issued 13 September 2023; validity stated through 30 April 2025 |
|---|---|
| What the supplied record establishes | Form C registration for Sree Laxmi Narasimha Residency, naming Vision Construction as promoter and Survey No. 447 / Plots C-84 and C-85. |
| Identifier / date | 0035/BP/3144/2023; 13 February 2023 |
|---|---|
| What the supplied record establishes | Dundigal Municipality/Municipal Corporation approval for a residential building at Plots C-84 and C-85, Bowrampet, Survey No. 447. |
| Identifier / date | 011268/BP/DTCP/3144/0049/2022 |
|---|---|
| What the supplied record establishes | File number recorded in the building approval. |
| Identifier / date | Verified at Hyderabad, 23 March 2023 |
|---|---|
| What the supplied record establishes | Promoter declaration covering the land-title basis, encumbrance statement, 30/04/2025 completion undertaking and other undertakings. |
| Identifier / date | No extracted plan supplied |
|---|---|
| What the supplied record establishes | A layout-plan document is listed in the project documents, but it is not extracted here; no layout detail can be described from the supplied evidence. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The approval states that an occupancy certificate is required before occupation; the supplied document set contains no such certificate. |
The building approval also records contractor’s all-risk policy number 431600/44/2023/192, dated 26 October 2022, with validity stated through 25 October 2028.
Frequently asked questions
Is Sree Laxmi Narasimha Residency registered with Telangana RERA?
Yes. Sree Laxmi Narasimha Residency is registered with the Telangana Real Estate Regulatory Authority as P02200006943; the registration status is New Project.
Who is the developer of Sree Laxmi Narasimha Residency?
The promoter named in the RERA registration is Vision Construction.
Where is Sree Laxmi Narasimha Residency located?
Sree Laxmi Narasimha Residency is in Bowrampet, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500043).
When will Sree Laxmi Narasimha Residency be completed?
The promoter's proposed date of completion filed with RERA is 30/04/2025. This is the promoter's declaration, not a guarantee.