Sign in

Sri P Chenna Ramulus MAHAAN BLOCK A

SPJV MAHALAXMI INFRA PVT. LTD · Rangareddy · RERA P02400005750

Sri P Chenna Ramulus MAHAAN BLOCK A is a residential apartment project in Shadnagar, Farooqnagar Mandal, Ranga Reddy District, developed by registered promoter SPJV MAHALAXMI INFRA PVT. LTD. The registered site extent is 3,797.08 Sq. Mt., with one building of 1 Stilt + 5 upper floors and 90 apartments: 70 2BHK units with saleable area of 97.88 sqm and 20 3BHK units with saleable area of 121.71 sqm. The project is registered under TG-RERA number P02400005750, issued 13/03/2023, and the promoter’s stated completion date is 05 November, 2025.

More from Spjv Mahalaxmi Infra Pvt. Ltd · 2 projects →

01What we found

Period endedTG-RERA registration ran to 5 Nov 2025 - check its extension on TG-RERA
11documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from aurumproptech.in
Shadnagar, Farooqnagar, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered nameSri P Chenna Ramulus MAHAAN BLOCK A RERA record
Project type / useResidential apartment project RERA record
Registered portionBlock A; the registration record identifies one building. No broader phase description is disclosed. RERA record RERA filing
TG-RERA registrationP02400005750, issued 13/03/2023; stated validity from 13/03/2023 to 05/11/2025. The certificate records two years’ validity and says extension would require Authority approval; the supplied record does not show an extension. RERA record
Registered promoterSPJV MAHALAXMI INFRA PVT. LTD RERA record Corporate record
Registration statusThe certificate’s stated validity ended 05/11/2025. Current registration status is not established by the supplied evidence; validity is not the same as construction completion or occupancy certification.

Land and geographic identity

ItemProject record
Locality / revenue villageShadnagar; the project record identifies the village as Shadnagar. RERA record RERA filing
Mandal / district / PINFarooqnagar / Ranga Reddy / 509216 RERA record
Project survey numbers232/EE and 232/AA1 RERA record Land records
Registered site extent3,797.08 Sq. Mt. RERA filing
Total and net areaTotal area 3797.08 sq.mts; net area 3797.08 sq.mts. RERA filing
BoundariesEast: 33 Feet Road and Bhageeratha Colony Park; West: land in Sy No 232 EE; North: Bhageeratha Colony; South: land in Sy No 232 AA1. RERA filing

Development identity

ItemProject record
Sanctioning authorityShadnagar Municipality / Municipal Corporation; the approval is filed under HMDA-related numbering. Approvals record
Principal building permit006672/BP/HMDA/1328/SMD/2022, dated 05 November, 2022; proceedings no. 001713/BP/HMDA/SMD/2022. Approvals record
Approved built-up area11,219.80 Sq.mts in the building-permit extraction. The project information record separately lists approved built up area as 8907.50 Sqmts; the evidence does not explain the different figures. RERA filing
Building count / arrangementOne building is recorded; the permit describes a proposed residential building. RERA filing
Sanctioned configuration1 Stilt + 5 upper floors; stilt/cellar is identified as exclusively for parking. No basement, podium or separate parking-level count is disclosed.
Mortgage areaPermit extraction states 893.52 Sq.mts provided as mortgage area; the RERA land record also lists mortgage area 893.52. RERA filing
Unit count90 units in the RERA unit record: 70 2BHK and 20 3BHK. RERA unit table RERA unit table

Offering and status

ItemProject record
RERA-filed configurations70 2BHK units and 20 3BHK units. RERA unit table RERA unit table
RERA-filed saleable area2BHK: 97.88 sqm; 3BHK: 121.71 sqm. RERA unit table RERA unit table
Booked / availablePortal-derived counts show 0 booked and 70 available 2BHK; 0 booked and 20 available 3BHK. Counts are indicative: the record provides no as-of date. RERA unit table RERA unit table
Construction stageNo independently verified site progress is supplied. TG-RERA amenity/infrastructure entries report 0% progress for the listed items; these are portal-recorded figures, not an independent site inspection. RERA amenities
Completion deadlinePromoter’s Form B undertaking states completion within three years from permission, “i.e, 5th November, 2025.” This is a declared completion date, separate from registration validity.
OC / completion certificateNo completion or occupancy certificate is supplied; the building-permit extraction records completion certified as false. Document index

2. The project story

This is a single-building residential apartment development registered as Sri P Chenna Ramulus MAHAAN BLOCK A, in Shadnagar village, Farooqnagar Mandal, Ranga Reddy District. Its RERA-identified land is Survey Nos. 232/EE and 232/AA1, with a recorded site extent of 3,797.08 Sq. Mt. RERA record Land records

The filed offering is 90 apartments: 70 two-bedroom and 20 three-bedroom units. The building permit describes a proposed building of 1 Stilt + 5 upper floors, with the stilt/cellar exclusively for parking. The permit and promoter declaration describe the development as proposed and set a completion target of 05 November 2025; the supplied evidence does not establish actual construction progress or that the building is complete or occupied. RERA unit table

3. Master plan, architecture & building design

The building-permit extraction describes one residential building on 3,797.08 Sq. Mt., configured as 1 Stilt + 5 upper floors. It lists approved built-up area as 11,219.80 Sq.mts and states that the stilt/cellar is exclusively for parking. The RERA project information record also gives an approved built-up area of 8907.50 Sqmts; the supplied materials do not clarify the difference. These are recorded built-up-area figures, not carpet or saleable area. RERA filing

A floor-plan upload is identified in the RERA documents, but the document record is marked not extracted. Software-measured unit information is available from drawing document 294144 for selected flat designs, but the supplied evidence does not establish building footprint, flats per floor, lift or stair count, entrances, internal circulation, landscape area, or residential/common-area area breakdown. Document index

The permit lists an STP, transformer, garbage house and rainwater-harvesting structures as amenities/utilities, without capacities. It also specifies a minimum approach-road width of 4.5mts.

4. Homes, configurations & floor plans

The RERA filing records 70 2BHK and 20 3BHK apartments. Its area figures are identified as saleable area. Separate software measurement from the floor-plan drawings estimates carpet area; this is not a RERA-filed measurement and the drawing-based measurement is stated to need review. Carpet area excludes the identified balcony or utility spaces; saleable area is a different measure and includes the home’s share of common areas according to the supplied measurement caveat. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK7007097.88 sqm60.4–68.0 sqm; median 63.2 sqm (software-measured)35%
3BHK20020121.71 sqm82.4–83.6 sqm; median 82.8 sqm (software-measured)32%

The portal-derived booking counts have no stated as-of date and should be treated as indicative. Drawing measurements cover 27 2BHK designs and 8 3BHK designs. The measured 2BHK example includes two bedrooms, kitchen, living room and utility; the utility is excluded from the measured carpet area. The measured 3BHK example includes three bedrooms, living room, dining/kitchen, toilet, puja room and utility; the utility is excluded. Dimensions and room areas are drawing-based software measurements, not RERA disclosures. RERA unit table RERA unit details Floor plans

5. Parking & vehicle circulation

The building permit states that the stilt/cellar is exclusively for parking and prohibits parking or construction in setback areas. It does not provide a total number of parking spaces, separate resident or visitor counts, accessible spaces, or a parking-allocation schedule.

The RERA unit record marks both 2BHK and 3BHK configurations as mortgaged, while the permit records a mortgage of 893.52 Sq.mts in favour of MC, HMDA. The supplied evidence does not establish individual apartment parking allocation or exclusive ownership of any particular parking bay. RERA unit table

6. Amenities, recreation & open spaces

Sewerage / treatment
Description / sizeSTP; capacity not stated
Evidence sourceBuilding permit; RERA amenities RERA amenities
Declared progress / verified statusPermit lists it; RERA infrastructure entry reports 0%; no independent completion verification supplied
Water conservation
Description / sizeRainwater-harvesting structures; capacity not stated
Evidence sourceBuilding permit; RERA amenities RERA amenities
Declared progress / verified statusPermit lists them; RERA entry reports 0%; no independent completion verification supplied
Electrical infrastructure
Description / sizeTransformer; specifications not stated
Evidence sourceBuilding permit
Declared progress / verified statusPermit lists it; completion status not established
Waste management
Description / sizeGarbage house; capacity or operating details not stated
Evidence sourceBuilding permit
Declared progress / verified statusPermit lists it; completion status not established
Green/open space
Description / sizeRERA amenities record lists “Green Strip/TOT LOT/Park” as available “YES”; no area or plan is supplied
Evidence sourceRERA amenities
Declared progress / verified statusPortal progress is 0%; no independent completion verification supplied
Other RERA-listed site infrastructure
Description / sizeInternal roads and footpaths, water supply, sewerage, storm-water drains, street lighting, community buildings, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection, electrical meter room/sub-station/receiving station, and aggregate recreational open space
Evidence sourceRERA amenities
Declared progress / verified statusEach entry reports 0% progress; no independent completion verification supplied

The supplied project-specific record does not provide evidence of clubhouse, gym, pool or other indoor or sports facilities. Promotional amenity listings are not treated here as RERA-filed or delivered project facilities. RERA amenities Promoter website

7. Utilities, building services & safety

The building permit lists an STP, transformer, garbage house and rainwater-harvesting structures. It specifies that the owner/developer shall provide STP facilities as per standard specification and develop rainwater-harvesting structures, but supplies no capacity, design details or evidence of completion. RERA amenity entries also list water supply, sewerage, storm-water drains, solid-waste management, energy management, fire protection and electrical meter-room/sub-station infrastructure; the listed entries report 0% progress. RERA amenities

The permit requires submission of a commencement notice before work starts and a completion notice after completion, with an occupancy certificate before occupation. It also states that the building is to be constructed according to the technically approved plans and that the minimum 4.5mts. approach road is to be developed and maintained as a black-topped road before release of the occupancy certificate. These are permit conditions, not evidence that the work or certificate has been completed.

No project-specific evidence is supplied for water source or storage capacity, treated-water reuse, backup power capacity, lifts, fire-system specifications, escape-stair arrangements, CCTV, security operations, or accessible circulation. Document index RERA amenities

8. Location, access & connectivity

The registered location is Shadnagar, Shadnagar village, Farooqnagar Mandal, Ranga Reddy District, PIN 509216. The recorded site boundaries include a 33 Feet Road and Bhageeratha Colony Park to the east and Bhageeratha Colony to the north. The building permit requires a minimum approach-road width of 4.5mts. RERA record RERA filing RERA filing

A supplied location record gives Financial District (Nanakramguda) at 1.2 km from a cadastral parcel-centroid coordinate, but does not provide a project-specific approach route or public-transport details. No travel-time estimate is supplied. Location record

9. Developer & development status

The registered promoter is SPJV MAHALAXMI INFRA PVT. LTD, a private limited company, GSTIN 36ABGCS0283F1ZE. The project record names SRINIVAS PABBA as authorised signatory and VENKATESH JEKSANI as director; the board-resolution record authorises PABBA SRINIVAS for specified Telangana RERA matters. Corporate record Parties record

The RERA registration certificate records the promoter office as “Village: Mandal: Secunderabad, District: Hyderabad, Pin: 500009.” The supplied evidence does not complete the village and mandal fields or provide official contact details or an official website.

The promoter’s Form B declaration dated 9 January 2023 undertakes completion within three years from permission, stated as 5 November 2025. The available record does not independently establish the construction stage or completion. No occupancy or completion certificate is supplied.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400005750; issued 13/03/2023; stated validity through 05/11/2025
What the supplied record establishesForm C certificate under section 5 for this project; certificate validity is recorded separately from completion and occupancy status.
Building permit order
Identifier / date006672/BP/HMDA/1328/SMD/2022; 05 November, 2022
What the supplied record establishesPermit extraction describes a residential building of 1 Stilt + 5 upper floors on Survey Nos. 232/EE and 232/AA1, Shadnagar; also records conditions and a mortgage area.
Proceedings number
Identifier / date001713/BP/HMDA/SMD/2022; 05 November, 2022
What the supplied record establishesRecorded with the building-permit approval.
Promoter Form B declaration
Identifier / date9 January 2023
What the supplied record establishesPromoter declaration on title, encumbrances, project funds, pending approvals and completion target.
Floor-plan document
Identifier / date294144
What the supplied record establishesListed as a building floor-plan upload; not extracted in the document register. Software-measured unit information in this report is identified as drawing-based rather than RERA-filed. Document index
Layout approval document
Identifier / date294146
What the supplied record establishesListed as a layout-plan document, not extracted; no layout number is disclosed in the supplied project record. Document index
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesNo certificate is evidenced in the supplied materials; the permit extraction records completion certified as false.

Other registrations of Sri P Chenna Ramulus MAHAAN

Frequently asked questions

Is Sri P Chenna Ramulus MAHAAN BLOCK A registered with Telangana RERA?

Yes. Sri P Chenna Ramulus MAHAAN BLOCK A is registered with the Telangana Real Estate Regulatory Authority as P02400005750; the registration status is New Project.

Who is the developer of Sri P Chenna Ramulus MAHAAN BLOCK A?

The promoter named in the RERA registration is SPJV MAHALAXMI INFRA PVT. LTD.

Where is Sri P Chenna Ramulus MAHAAN BLOCK A located?

Sri P Chenna Ramulus MAHAAN BLOCK A is in Shadnagar, Farooqnagar, Farooqnagar, Rangareddy, Telangana (509216).

When will Sri P Chenna Ramulus MAHAAN BLOCK A be completed?

The promoter's proposed date of completion filed with RERA is 05/11/2025. This is the promoter's declaration, not a guarantee.

More projects in Shadnagar