Sukrithi Avanthika Phase 3

SUBHA GRUHA PROJECTS INDIA PRIVATE LIMITED · Rangareddy · RERA P02400000267

SUKRITHI AVANTHIKA PHASE 3 is a residential open-plot layout at Kondakal, Shankarpalle Mandal, Ranga Reddy District, developed by Subha Gruha Projects India Private Limited. The layout covers 135106.13 sq.m and has a drawing-based count of 362 residential plots; towers, floors and plot configurations are not supplied. It is registered under TG-RERA number P02400000267, with a proposed completion date of 19/04/2018.

More from Subha Gruha Projects India Pvt Ltd · 8 projects →

01What we found

Period endedTG-RERA registration ran to 19 Apr 2018 - check its extension on TG-RERA
21documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameSUKRITHI AVANTHIKA PHASE 3 RERA record
Project typePlotted development / residential open layout RERA record
Phase / registered portionPhase 3; the RERA record identifies this registration as Phase 3. RERA record
TG-RERA registration numberP02400000267
Registration validityCertificate states commencement 01/02/2019 and end 19/04/2018; the supplied certificate also states “0 years.” This is the stated registration-validity entry, separate from the completion dates below.
Registered promoterSubha Gruha Projects India Private Limited RERA record
RERA statusRERA header labels the project On-Going Project. RERA record

Land and geographic identity

FieldRecord
Locality / revenue villageKondakal / Kondakal RERA record Land records
Mandal / district / PINShankarpalle / Ranga Reddy / 501203 RERA record
Project survey numbers and subdivisions, as recorded430/P, 431/P, 432/P, 435/P, 436/P, 437/P, 439/P, 440/P, 443/P, 478/P, 479/P Land records
Site extent135106.13 sq.m; the final layout letter states 1,35,106.13 Sqm. RERA filing
Net area135106.13 sq.m RERA filing
Boundaries in RERA land recordEast: neighbours land; West: neighbours land; North: HMDA layout; South: neighbours land. RERA filing
Cadastral recordBhu Bharati GIS record is a whole-survey match for survey 430/P431/P432/P435/P436/P437/P439/P440/P443/P478/P479/P, with extent 77230.34 sq.m; this is a cadastral record entry, not a stated project-site extent. The cadastral parcel centroid is reported at 17.45660, 78.18096. Cadastral map

Development identity

FieldRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal layout approval000060/LO/Plg/HMDA/2018, dated 19 April, 2018; final layout release dated 20 November, 2019.
Approved developmentResidential open-plot layout. Individual building permissions are to be considered separately under applicable building rules.
Approved built-up areaNot disclosed in the supplied records.
Towers / blocks and floorsNot applicable to the approved open-plot layout; no tower or floor configuration is supplied.
Land-use areas in the layout drawingPlotted area 79783.90 sq.m; roads 40904.22 sq.m; organized open space/park/utility area 11033.83 sq.m; social infrastructure 3384.26 sq.m.
Plot countDrawing-based software count: 362 plots, numbered 1 to 362; plot-size extraction is incomplete. Layout record
HMDA mortgage notation in draft approvalDraft approval identifies plots 187 to 252 (66 plots), extent 12123.85 Sq.mtrs, as mortgaged to the Metropolitan Commissioner, HMDA.

Offering and status

FieldRecord
Unit typeResidential plots; no apartment, villa or commercial unit configuration is recorded. RERA record
RERA-filed plot-size range / inventory countsNot supplied in the available normalized RERA unit records.
Drawing-derived plot count362 (software-read from the layout drawing; verify against the drawing). Layout record
Construction stageRERA header says On-Going Project; the supplied architect document includes a completion certificate stating the project was completed in all aspects, but the certificate’s scope and current status should be checked against the official record. RERA record
Completion datesRERA header proposed and revised completion dates: 19/04/2018. Form B dated 31-10 -2018 declares completion by 31-10-2021. These are completion entries, not registration-validity dates. RERA record
Occupancy / completion certificate statusThe project is a plotted layout, not a building phase with an apartment OC in the supplied record. An architect document is marked completion-certified and gives completion date 20.12. 2019; the supplied evidence does not establish a separate building-level OC.

2. The project story

SUKRITHI AVANTHIKA PHASE 3 is registered as a residential plotted development at Kondakal, Shankarpalle Mandal, Ranga Reddy District. HMDA’s final layout letter describes an open-plot residential layout over 1,35,106.13 Sqm. The plan allocates land to plots, internal roads, organized open space/park/utility area and social infrastructure; it does not describe a multi-tower or apartment scheme. RERA record

The layout drawing’s software-read count is 362 plots, with numbers 1 to 362; the extraction does not provide a complete plot-size schedule. The RERA header labels the project ongoing, while the supplied architect document records completion certification dated 20.12. 2019. These indicate different record entries, and the supplied materials do not establish current on-site progress or independently verify present completion. RERA record Layout record

3. Master plan, architecture & building design

The sanctioned development is an open residential layout. HMDA’s final layout letter states that each building site is for a residential dwelling house and that individual building permission is to be considered separately. No approved building plans, dwelling designs, building count, building footprints, floor configurations or building heights are supplied for this project.

The drawing states a total and net layout area of 135106.13 sq.m. Its land-use statement records 79783.90 sq.m as plotted area, 40904.22 sq.m as road area, 11033.83 sq.m as organized open space/park/utility area, and 3384.26 sq.m as social infrastructure. These are layout land-use figures, not built-up, saleable or carpet areas.

The RERA filing does not provide a complete plot-by-plot schedule in the supplied data. The layout record reports a software-read count of 362 plots, but states that plot extraction is incomplete and plot sizes are not available from that extraction. Layout record

4. Homes, configurations & floor plans

This is a plotted layout, not an apartment configuration. The supplied data does not provide RERA-filed plot counts by size, booked or available plot counts, or a complete RERA area schedule. The layout drawing’s plot count is software-measured and should be verified against the drawing. RERA record Layout record

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plotsRERA count not supplied; drawing count 362Not suppliedNot suppliedNot suppliedNot applicableNot supplied

The promoter/vendor listing contains plot-size entries ranging from 1080 sq.ft to 7407 sq.ft, including intermediate sizes, but these are vendor-sourced offering details rather than RERA-filed plot measurements. Promoter website The supplied floor-plan record contains one layout sheet and no measured floor plans; three scans are pending. Carpet-area measurements for homes therefore are not available. Floor plans

5. Parking & vehicle circulation

No project-wide sanctioned parking count, visitor or accessible parking provision, or plot-specific parking allocation is established by the supplied records. The approval is for an open-plot layout, and individual building permissions are separate.

The draft layout approval identifies plots 187 to 252 (66 plots), covering 12123.85 Sq.mtrs, as mortgaged to HMDA; those are reserved plots in the approval record, not a parking allocation.

6. Amenities, recreation & open spaces

The final layout letter records civic infrastructure and open-space provisions. RERA amenity data marks the listed items below as available at 100% where shown; that is a filing status, not independent confirmation of current site condition. The architect’s completion document also lists layout utilities and landscape works. RERA amenities

Internal roads & footpaths
Description / sizeLayout roads 40904.22 sq.m
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 100%; final layout letter records roads taken over by local authority.
Green strip / park / organized open space
Description / size11033.83 sq.m
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 100%; final layout letter records open spaces taken over by local authority.
Social infrastructure land
Description / size3384.26 sq.m
Declared progress / verified statusArea stated in the layout land-use record; facility use/details not supplied.
Community buildings
Description / sizeNo size/details supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record shows 0%.
Promoter/vendor-listed recreation
Description / sizeGym, children’s play area, meditation park, cycling/jogging/walking tracks, cricket net, badminton, tennis and basketball courts, clubhouse, swimming pool, landscaped gardens
Evidence sourcePromoter website
Declared progress / verified statusVendor-listed; not established as sanctioned or delivered by the supplied project documents.

7. Utilities, building services & safety

HMDA’s final layout letter lists water supply, sewerage, drainage disposal, street lighting, rainwater-harvesting structure and other civic amenities. The architect document additionally lists harvesting pits, avenue plantations, a sump, overhead water tank and transformer. These are approval/document descriptions; the supplied materials do not independently verify current operation, capacities or service levels.

The RERA amenity record marks water supply, sewerage (chambers, lines, septic tank/STP), street lighting and water conservation/rainwater harvesting at 100%. It records 0% for storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, energy management, fire protection and fire-safety requirements, and electrical meter room/sub-station/receiving station. RERA amenities

No specific lift, fire-system, backup-power, CCTV, security-access, accessibility or EV-charging provisions are established in the supplied project approval records. Vendor listings mention power backup and 24-hour security, but these are not confirmed as sanctioned or delivered facilities. Promoter website

8. Location, access & connectivity

The registered revenue location is Kondakal Village, Shankarpalle Mandal, Ranga Reddy District, Telangana, PIN 501203. RERA record

The supplied mapped connectivity record gives the nearest sampled Outer Ring Road interchange as approximately 11.7 km, BDL Township Hospital as 2.2 km, New Shopping Complex as 2.3 km, an unnamed park as 0.4 km, and an unnamed school as 2.1 km. These are mapped distance records; no travel times or route conditions are supplied. Location record

9. Developer & development status

The registered promoter is SUBHA GRUHA PROJECTS INDIA PRIVATE LIMITED, a private limited company. Its GSTIN is 36AAPCS0362R1ZC. The RERA record gives the promoter address as Lumbini Jewel Mall, 4th Floor, Road No. 2, Kondakal, Shankarpalle, Ranga Reddy, 501203; the listed official website is https://subhagruha.com/project/hyderabad/sukrithi-avanthika. Corporate record RERA record Parties record

The project record’s status is “On-Going Project.” The supplied Form B affidavit, dated 31-10 -2018, is a promoter declaration that the project would be completed by 31-10-2021. Separately, the architect document records overall completion certification and a completion date of 20.12. 2019. Current physical progress and the precise scope of that completion certification are not independently established by the supplied evidence. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400000267, issued 01/02/2019
What the supplied record statesForm C registration for SUKRITHI AVANTHIKA PHASE 3; certificate includes separate-account and other promoter conditions.
HMDA draft layout permission
Identifier / date000060/LO/Plg/HMDA/2018, 19 April, 2018; application 004546/SKP/LT/U6/HMDA/26102017
What the supplied record statesDraft open-plot layout permission forwarded to the local executive authority with conditions, including HMDA mortgage notation over plots 187–252.
HMDA final layout release
Identifier / date000060/LO/Plg/HMDA/2018, dated 20 November, 2019; file 026935/LT/SKP/FLT/U6/HMDA/16082019
What the supplied record statesFinal residential open-layout letter for 1,35,106.13 Sqm at Kondakal, covering the project’s listed survey numbers.
Registered gift deed cited in final layout letter
Identifier / date6999/2018, 21-07-2018
What the supplied record statesFinal layout letter records roads and open spaces as taken over by the local authority under this deed.
Relinquishment deed cited in final layout letter
Identifier / date11420/2019, 10/09/2019
What the supplied record statesFinal layout letter records a relinquishment deed concerning the mortgaged plots.
Architect’s completion document
Identifier / dateArchitect’s certificate; completion date 20.12. 2019
What the supplied record statesDocument is marked completion-certified and states the project was completed in all aspects; supplied material does not establish a separate building-level OC.
Promoter Form B declaration
Identifier / dateDated 31-10 -2018
What the supplied record statesPromoter declares legal title and no encumbrances, and undertakes completion by 31-10-2021.

The supplied records do not include a complete plot schedule or individual building permissions. The HMDA DPMS approved-layout lookup is reported unavailable through the public channel; this does not establish a refusal or approval status beyond the documents listed above. HMDA

Frequently asked questions

Is SUKRITHI AVANTHIKA PHASE 3 registered with Telangana RERA?

Yes. SUKRITHI AVANTHIKA PHASE 3 is registered with the Telangana Real Estate Regulatory Authority as P02400000267; the registration status is On-Going Project.

Who is the developer of SUKRITHI AVANTHIKA PHASE 3?

The promoter named in the RERA registration is SUBHA GRUHA PROJECTS INDIA PRIVATE LIMITED.

Where is SUKRITHI AVANTHIKA PHASE 3 located?

SUKRITHI AVANTHIKA PHASE 3 is in KONDAKAL, Shankarpalle, Rangareddy, Telangana (501203).

When will SUKRITHI AVANTHIKA PHASE 3 be completed?

The promoter's proposed date of completion filed with RERA is 19/04/2018. This is the promoter's declaration, not a guarantee.