Sunrise City Phase II

CHEEKATI VENKATA APPARAO AND OTHERS · Khammam · RERA P00800008744

SUNRISE CITY PHASE II is a plotted development in Somavaram, Wyra Mandal, Khammam District. The registered promoter is CHEEKATI VENKATA APPARAO AND OTHERS. The registered site extent is 34,903.30 sq.m, and the tentative residential layout comprises 133 plots, with plot sizes ranging from 100.53 sq.m to 189.69 sq.m; no apartment or villa configurations are stated. Its TG-RERA registration number is P00800008744, and the promoter’s Form B declares completion by 23/01/2025.

01What we found

Period endedTG-RERA registration ran to 23 Jan 2025 - check its extension on TG-RERA
13documents on file - each fact links to its page
0court cases on this project's land in the court records searched
12items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Somavaram, Wyra, Khammam · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameSUNRISE CITY PHASE II RERA record
Project typePlotted development: a proposed residential layout with open plots. RERA record
Phase / registered portionPhase II; the registration identifies the project land by the survey numbers listed below. RERA record
TG-RERA registrationP00800008744; registered promoter: CHEEKATI VENKATA APPARAO AND OTHERS. RERA record
Registration validityCertificate states validity from 06/09/2024 to 23/01/2025, unless extended by the Authority. This is the registration period, not a construction-completion or occupancy-certificate finding.
RERA status in supplied recordThe project is identified as a New Project. The supplied materials do not establish a later extension or current registration status. RERA record

Land and geographic identity

ItemRecord
Locality / revenue villageWYRA / Somavaram (also described in the layout document as Somavaram Revenue Village). RERA record
Mandal / district / PINWyra Mandal / Khammam / 507165. RERA record
Project survey numbers and subdivisions80 D1/1, 80 C1/1, 80 D1/2, 80 C1/2, 80 A2, 80 F, 80 F1/1, 80 B1, 80 D2, 85 A1/1 & 85/B/1/2. RERA record
Registered site extent34,903.30 sq.m (RERA land-details entry). RERA record RERA filing
Layout-plan area34,902.24 sq.m (the layout approval-plan extraction).
Boundaries (RERA filing)East: OTHERS LAND; west: LAND OF KATTA MALLIKARJUN; north: WIDE ROAD EXISTING 9 14; south: LAND OF BHOOMAYYA. RERA filing
Cadastral recordBhu Bharati record is reported for whole Survey No. 80; it is not a project-parcel-specific extent match. Cadastral map

Development identity

ItemRecord
Layout sanctioning authorityWyra Municipality; the filed tentative layout approval identifies approval no. 0009/LO/3088/2023, dated 24 January, 2023.
Other approval reference on fileApproval no. G1/KMC/TP/1630/2020, dated 03-11-2022; application/permit no. TS/068761/2022. Approvals record
Approved development formTentative residential layout of 133 plots.
Built-up area / buildingsThe layout-plan extraction records proposed built-up area as 0.00 (including and excluding parking), proposed coverage as 0.00, and proposed parking as 0. It is a plotted layout, not a building scheme in the supplied approval record.
Layout land-use statementPlotted area 21,243.85 sq.m (60.87%); roads 9,284.32 sq.m (26.60%); organized open space/park 3,150.36 sq.m (9.03%); social infrastructure 872.64 sq.m (2.50%); utility area 351.07 sq.m (1.01%); amenity area 0.00.

Offering and status

ItemRecord
OfferingResidential plots; no apartment or villa configurations are evidenced in the supplied project record. Layout record
Plot count and size informationDrawing-derived schedule identifies 133 plots. Software-read plot sizes range from 100.53 sq.m to 189.69 sq.m, with median 167.23 sq.m; verify the plot schedule against the drawing. Layout record
Booked / available countsNot disclosed in the supplied evidence. RERA record
Declared completion datePromoter’s Form B declares completion by 23/01/2025. This is a promoter undertaking, not independent confirmation of completion.
Construction / development stageNo independently verified site-progress assessment is supplied. The layout approval requires the applicant to undertake layout infrastructure and development works.
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied project documents. The project is a plotted layout; the record provided does not establish the completion or certification status of its infrastructure works. Document index

2. The project story

SUNRISE CITY PHASE II is presented in its TG-RERA filing as a residential plotted development at Somavaram, Wyra Mandal, Khammam District. The approved layout-plan materials describe 133 open plots, with the remainder of the layout allocated principally to roads, open space/park, social infrastructure and utilities. The layout extraction records no proposed building area or parking provision, so this overview does not describe apartment blocks or constructed homes. RERA record

The tentative layout approval places responsibility for infrastructure and layout works on the applicant/developer and describes works including road formation, drainage, water-supply infrastructure, electrical lines, street lighting, park development and rainwater-harvesting pits. The supplied record does not provide verified on-site progress or establish that those works are complete.

3. Master plan, architecture & building design

The project is organized as a plot layout rather than a multi-storey building development. The approved-plan extraction records a total/net layout area of 34,902.24 sq.m and a land-use schedule allocating 21,243.85 sq.m (60.87%) to plots, 9,284.32 sq.m (26.60%) to roads, 3,150.36 sq.m (9.03%) to organized open space/park, 872.64 sq.m (2.50%) to social infrastructure and 351.07 sq.m (1.01%) to utilities. The plan lists no amenity-area allocation.

The tentative layout approval identifies 133 plots and road widths of 9.14 MT, 18.28m and 9.14m. A separate mortgage condition covers specified plots pending completion and release under the approval conditions; the approval describes the mortgage as a measure to secure development-condition compliance.

The layout approval also states that detached single-family dwelling houses may be built on sites, subject to prior approval for future development. No house designs, building floor configurations, building heights or house-by-house construction plans are evidenced here.

4. Homes, configurations & floor plans

This is a plotted project; the supplied evidence contains no RERA apartment-configuration schedule. The layout drawing’s plot schedule was read by software and should be checked against the drawing. Layout record

Plot size band (sq.yd; source also gives sq.m band)Plots
100–150 (84–125 sq.m)21
150–200 (125–167 sq.m)3
200–250 (167–209 sq.m)109

The software-derived overall plot-size range is 100.53–189.69 sq.m (120.2–226.9 sq.yd), with a median of 167.23 sq.m (200.0 sq.yd). These are drawing-derived plot areas, not RERA-filed apartment saleable or carpet areas. No plot-specific booking, availability, price, allotment, or exclusive plot allocation is established by the supplied records. Layout record

5. Parking & vehicle circulation

The layout-plan extraction records 0 proposed parking spaces and 0.00 sq.m common parking area. The layout approval identifies internal roads, including road widths of 9.14 MT, 18.28m and 9.14m; it does not provide a parking-allocation schedule, visitor or accessible parking provision, or a documented arrangement for exclusive parking rights.

6. Amenities, recreation & open spaces

The following are shown in the layout approval or listed in the RERA amenity record. The supplied materials do not independently verify completion; the amenity-record progress entries shown are 0. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Organized open space / park3,150.36 sq.m (9.03%) in the layout-plan land-use statementApproved layout-plan extractionAllocation shown; completion not verified
Green strip / tot lot / parkListed as available in the RERA amenity recordRERA amenity record RERA amenitiesProgress 0; completion not verified
Social infrastructure land872.64 sq.m (2.50%)Approved layout-plan extractionLand allocation shown; facility specification/completion not established
Community buildingsListed in the RERA amenity record, without a size or facility descriptionRERA amenity record RERA amenitiesProgress 0; completion not verified

7. Utilities, building services & safety

The tentative layout approval describes proposed infrastructure and utilities; these are approval conditions or listed amenities, not evidence of completed or independently tested services.

Water
Evidence in the project recordApproval describes an assured water-supply source, internal water-supply pipelines and an overhead tank; utilities land is listed as 351.07 sq.m (1.01%) in the layout-plan extraction.
Status evidencedRequired/proposed works; capacity, source details and completion are not established.
Sewerage and drainage
Evidence in the project recordApproval describes underground drainage lines, storm-water drains and a common septic tank / STP; the RERA amenity record lists sewerage and sewage/sullage treatment.
Status evidencedProposed/listed; treatment capacity and completion are not established. RERA amenities
Rainwater and water conservation
Evidence in the project recordApproval describes rainwater-harvesting pits; the RERA amenity record lists water conservation/rainwater harvesting.
Status evidencedProposed/listed; completion is not verified. RERA amenities
Electrical supply and lighting
Evidence in the project recordApproval describes electrical supply lines, a transformer and street lights; the RERA amenity record lists an electrical meter room/sub-station/receiving station.
Status evidencedProposed/listed; capacity and completion are not established. RERA amenities
Solid waste
Evidence in the project recordApproval describes solid-waste-management infrastructure; the RERA amenity record lists solid-waste management and disposal.
Status evidencedProposed/listed; operating arrangements and completion are not established. RERA amenities
Fire and accessibility
Evidence in the project recordThe RERA amenity record lists fire-protection and fire-safety requirements; no detailed system, clearance, accessible route or compliance evidence is supplied.
Status evidencedProgress shown as 0; details and completion are not established. RERA amenities

8. Location, access & connectivity

The registered location is Somavaram, Wyra Mandal, Khammam District, Telangana, PIN 507165. The layout drawing identifies the project as within Wyra Municipality limits and shows its north boundary as WIDE ROAD EXISTING 9 14. The cadastral-parcel centroid is given as 17.192167662893436, 80.3486064133162. RERA record Cadastral map

A supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 179.4 km away. No public-transport information, other measured landmark distances or verified travel times are supplied. Location record

9. Developer & development status

The registered promoter is CHEEKATI VENKATA APPARAO AND OTHERS. The RERA filing describes the organization type as Proprietorship and identifies CHEEKATI VENKATA APPARAO as authorized signatory. The supplied record does not provide a company registration number or a verified official website/contact listing. RERA record Corporate record Parties record

The promoter’s Form B declares a completion period ending 23/01/2025 and contains project-fund and approval undertakings. These are promoter declarations; the supplied evidence does not establish current construction progress, completed layout works, an extended registration period, or an occupancy/completion certificate.

10. Approvals, official records & documents

RecordWhat it establishes in the supplied materials
TG-RERA Form C registration certificate, P00800008744Registration of SUNRISE CITY PHASE II; identifies promoter, location, project surveys and validity from 06/09/2024 to 23/01/2025, unless extended by the Authority.
Tentative layout approval, 0009/LO/3088/2023, dated 24 January, 2023Wyra Municipality approval record for a tentative residential layout of 133 plots, with stated land-use allocations, development conditions and infrastructure works.
Layout-plan document, approval reference G1/KMC/TP/1630/2020, dated 03-11-2022Layout drawing/extraction with plot schedule, survey references, land-use statement and road widths.
Form B promoter declarationPromoter’s title-basis, encumbrance and completion-period declarations, including the stated completion date of 23/01/2025.
Land title search reportAdvocate’s title investigation report is filed; it is a title-related document, not a substitute for the approval records.
Mortgage deed referenceLayout approval records mortgage deed 4435/2022, dated 19 December, 2022, in connection with the layout conditions.
Occupancy/completion certificateNo such certificate is identified in the supplied project document set. Document index

Other registrations of Sunrise City

Frequently asked questions

Is SUNRISE CITY PHASE II registered with Telangana RERA?

Yes. SUNRISE CITY PHASE II is registered with the Telangana Real Estate Regulatory Authority as P00800008744; the registration status is New Project.

Who is the developer of SUNRISE CITY PHASE II?

The promoter named in the RERA registration is CHEEKATI VENKATA APPARAO AND OTHERS.

Where is SUNRISE CITY PHASE II located?

SUNRISE CITY PHASE II is in WYRA, Somavaram, Wyra Mandal, Khammam, Telangana (507165).

When will SUNRISE CITY PHASE II be completed?

The promoter's proposed date of completion filed with RERA is 23/01/2025. This is the promoter's declaration, not a guarantee.

More projects in Somavaram