Sign in

THE COMMUNITTEE by VeeKay

VEEKAY INFRASTRUCTURES · Rangareddy · RERA P02400003530

THE COMMUNITTEE by VeeKay is a residential apartment project in Mokila, Shankarpalle mandal, Ranga Reddy district, developed by the registered promoter Veekay Infrastructures. The registered site extent is 7,668.66 sq. m., and the HMDA technical approval describes Block A with 2 Cellar + 1 Ground + 7, Blocks B and C with 1 Ground + 7 each, and a club house with 1 Ground + 4. The RERA-filed homes comprise 88 2BHK units with a saleable area of 115.39 sq. m. and 79 3BHK units with a saleable area of 147.78 sq. m. The project is registered under TG-RERA P02400003530, with proposed completion on 21/09/2025.

01What we found

Period endedTG-RERA registration ran to 21 Sep 2025 - check its extension on TG-RERA
23documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 6 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemTG-RERA record
Registered project nameTHE COMMUNITTEE by VeeKay RERA record
Project typeResidential apartment project RERA record
Phase / registered portionThe registration identifies the project; a separately named phase is not disclosed. The HMDA technical approval describes Blocks A, B and C and a club house.
TG-RERA registrationP02400003530
Registration validity21/10/2021 to 21/09/2025; the certificate records three years and no extension in the supplied record. This is registration validity, not a statement of current construction or occupancy status.
Registered promoterVeekay Infrastructures (also styled M/s. VEEKAY INFRASTRUCTURES in filed documents) RERA record Corporate record
RERA status in supplied recordRegistration certificate issued under section 5. No later extension or current-status record is supplied.

Land and geographic identity

ItemRecord
Locality / revenue villageMokila / Mokila RERA record
MandalShankarpalle RERA record
DistrictRanga Reddy RERA record
PIN501203 RERA record
Project survey numbers and subdivisionsSurvey Nos. 112, 112/A1, 112/A2 and 112/A3 RERA record Land records
Registered site extent7,668.66 sq. m. RERA filing
Net / total areaThe RERA land record states 7,668.66 sq. m. net and 7,668.66 sq. m. total; affected area is recorded as 0 sq. m. RERA filing
Boundaries in RERA recordEast: OTHER LAND; West: ROAD WIDTH; North: OTHER LAND; South: OTHER LAND RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the technical approval directs the applicant to seek sanction and release from Mokila Grama Panchayat. Approvals record
Principal approvalTechnical Approval No. 040774/SKP/R1/U6/HMDA/25112020, dated 24/09/2021 Approvals record
Approved built-up areaHMDA parameters list 23,602.9 sq. m. as total built-up area; the same record separately lists 24,107.1 sq. m. as “Total Built up Area.” These are recorded figures, not independently reconciled measurements.
Buildings in HMDA technical approvalBlock A: 2 Cellar + 1 Ground + 7; Blocks B and C: 1 Ground + 7 each; club house: 1 Ground + 4
Building count in RERA land details4 units/buildings as per approved plan and 4 proposed as per agreement RERA filing
Parking levels / countBlock A’s approved configuration includes 2 cellar levels. A project-wide parking-space count and allocation schedule are not disclosed in the supplied records. RERA amenities
RERA unit count172 total units in the portal-derived unit record, including filed common-area and unclassified rows; 167 are listed in the 2BHK and 3BHK configurations. RERA unit table RERA unit details

Offering and status

ItemRecord
RERA-filed homes2BHK: 88 units; 3BHK: 79 units RERA unit table RERA unit details
RERA-filed saleable area2BHK: 115.39 sq. m.; 3BHK: 147.78 sq. m. RERA unit table RERA unit details
Booked / available2BHK: 39 booked / 49 available; 3BHK: 24 booked / 55 available. Counts are indicative portal figures; the record provides no as-of date. RERA unit table RERA unit details
Construction stageNo independently verified site-progress record is supplied. The RERA amenity schedule records 0% against its listed progress items. RERA amenities
Completion datesThe RERA project record gives proposed completion as 21/09/2025; the Form B declaration contains a completion undertaking rendered as “2l10912025.” No revised completion date is supplied. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The HMDA technical approval requires an occupancy certificate before occupation. This does not establish whether any building has since received one.

The project story

THE COMMUNITTEE by VeeKay is registered as a residential apartment project in Mokila village, Shankarpalle mandal, Ranga Reddy district. Its RERA-filed land identity is Survey Nos. 112, 112/A1, 112/A2 and 112/A3, with a recorded site extent of 7,668.66 sq. m. RERA record Land records

HMDA’s technical approval describes three residential blocks and a separate club house. The RERA unit schedule lists 2BHK and 3BHK homes, alongside separate entries for shared facilities and one unclassified filed label, “BABY CARE CENTER.” That label is not counted here as a home configuration. The portal-derived booking figures indicate 63 booked homes across the two stated configurations, but no as-of date is provided. RERA unit table RERA unit details

The supplied material does not establish current physical construction progress or completion of any tower. The registration’s proposed completion date was 21/09/2025; the supplied record contains no revised date and no occupancy certificate. The HMDA approval requires the relevant occupancy certificate before occupation. RERA record RERA amenities

Master plan, architecture & building design

The HMDA building schedule comprises Block A, Blocks B and C, and a club house. The residential blocks are recorded as Ground + 7, with Block A additionally showing 2 cellar levels; the club house is recorded as Ground + 4.

The HMDA approval lists built-up areas of 8,389.58 sq. m. for Block A, 7,828.34 sq. m. for Block B, 6,485.08 sq. m. for Block C and 899.9 sq. m. for the club house. It also records total built-up figures of 23,602.9 sq. m. and 24,107.1 sq. m. separately. The supplied material does not provide a verified breakdown of FSI-counted area, carpet area or common-area loading.

The approval states that 10% of built-up area is mortgaged to HMDA and records a required mortgage area of 2,360.29 sq. m. and provided mortgage area of 2,449.72 sq. m. Its conditions also say no parking or construction is permitted in setback areas, that open space and tot-lot areas are to be maintained as greenery, and that the mortgaged built-up area may be registered only after an occupancy certificate is produced. RERA filing

A filed floor-plan drawing identifies a club-house ground-floor plan and labels a multipurpose room, baby-care area and indoor badminton court. The drawing extraction does not supply approval particulars or land identifiers, so it supports identification of depicted spaces, not a conclusion about their approved or completed status.

Homes, configurations & floor plans

The following unit counts, booking figures and saleable areas are from the RERA filing. Booking counts are indicative because the portal record has no as-of date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK883949115.39 sq. m.Not measured from the supplied drawingsNot supplied
3BHK792455147.78 sq. m.Not measured from the supplied drawingsNot supplied

Eight drawing records are listed, but none were measured and none are identified as containing flats. Accordingly, no software-measured carpet area or room dimensions can be reported. RERA saleable area is the filed figure; it is not a drawing-derived carpet measurement. Floor plans

The RERA unit table also includes four not-for-sale facility rows—GYM, INDOOR GAMES, MULTIPURPOSE HALL and SPA SALOON—and one unclassified row labelled “BABY CARE CENTER.” These entries are not included in the two home configurations above. RERA unit table RERA unit details

Parking & vehicle circulation

The supplied approval and RERA records do not establish a total number of parking spaces, a resident/visitor split, accessible or two-wheeler spaces, unit-specific parking allocations, or a project-wide ramp and driveway arrangement. The approval does state that visitor parking is to be used only for its designated purpose and not misused or sold, and that parking or construction must not be placed in setback areas.

A parking bay shown in a plan, where present, would not by itself establish an exclusive unit allocation. No legally documented unit-wise parking allocation is supplied.

Amenities, recreation & open spaces

The RERA amenity schedule identifies project-level facilities and records progress as 0% for its listed items; “available: YES” in that schedule is not treated here as confirmation of physical completion. The HMDA approval separately includes facility and open-space conditions. RERA amenities

Club house
Description / sizeHMDA schedule: Ground + 4; built-up area 899.9 sq. m.
Evidence sourceHMDA technical approval
Declared progress / verified statusNo completion verification supplied
Multipurpose room
Description / sizeIdentified on club-house floor-plan drawing; no reliable size is supplied
Evidence sourceFiled drawing
Declared progress / verified statusDepicted; approval and completion status not established by that drawing
Baby care area
Description / sizeIdentified on club-house floor-plan drawing; no reliable size is supplied
Evidence sourceFiled drawing
Declared progress / verified statusDepicted; approval and completion status not established by that drawing
Indoor badminton court
Description / sizeIdentified on club-house floor-plan drawing; no reliable size is supplied
Evidence sourceFiled drawing
Declared progress / verified statusDepicted; approval and completion status not established by that drawing
Tot-lot / recreational green space
Description / sizeHMDA conditions require the tot-lot to be fenced and maintained as greenery; no area is supplied
Evidence sourceHMDA technical approval; RERA amenity schedule
Declared progress / verified statusRERA schedule records Green Strip/TOT LOT/Park at 0%; completion not verified
Open space / greenery
Description / sizeHMDA conditions require the earmarked open space to be maintained and developed with greenery
Evidence sourceHMDA technical approval
Declared progress / verified statusCompletion not verified

The promoter’s marketing material lists additional features, including a swimming pool, spa, gym and landscaped areas; these are not presented as RERA-declared or delivered facilities here. Promoter website

Utilities, building services & safety

HMDA’s technical approval lists a transformer, garbage house, rainwater-harvesting structures, sewage treatment plant, refuse chute, solar water-heating system and solar lighting system. These are approval-record provisions, not evidence that the systems are installed or operating. The RERA amenity schedule marks water supply, sewerage/STP, green strip/tot-lot, rainwater harvesting and the electrical meter/sub-station/receiving station as “YES,” while recording 0% progress for its listed items. RERA amenities

The HMDA approval requires provision for solar water heating and solar lighting, refers to fire-service NOC conditions, and requires an occupancy certificate before occupation. It also says permanent HMWS & SB and T.S. Transco connections are not to be provided until the occupancy certificate is produced. The supplied records do not establish water source or storage capacity, STP capacity, treated-water reuse, electrical backup capacity, lift count or capacity, fire-system installation, waste-segregation arrangements, CCTV coverage or accessibility provisions.

Location, access & connectivity

The registered revenue location is Mokila village, Shankarpalle mandal, Ranga Reddy district, Telangana, PIN 501203. The RERA-filed site boundaries identify “ROAD WIDTH” to the west and “OTHER LAND” on the other three sides; the HMDA approval refers to 18 mt. road widths and an approach-road width as indicated in the technically approved plans. RERA record RERA filing

A supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 12.8 km from the cadastral parcel centroid. This is a sampled distance, not a stated travel time. Location record

Developer & development status

The registered promoter is VEEKAY INFRASTRUCTURES, identified in the RERA record as a partnership. The supplied corporate identifier is GSTIN 36AAMFV1279N1ZE. The RERA certificate lists the promoter office as “Village: Mandal: District: Hyderabad, Pin: 500032”; a fuller registered office address and official contact details are not disclosed in the supplied project record. Corporate record Parties record

The RERA filing identifies CHENNUPATI VINAY KUMAR as authorized signatory and CHENNUPATI SWARANA as partner. The Form B declaration was made by CH. VINAY KUMAR as partner of VEEKAY INFRASTRUCTURES and includes the promoter’s completion undertaking, rendered in the document as “2l10912025.” Parties record

Approvals, official records & documents

RecordWhat the supplied record establishes
TG-RERA registration certificate, P02400003530FORM C certificate for THE COMMUNITTEE by VeeKay; issued 21/10/2021, valid through 21/09/2025; no extension is recorded in the supplied certificate.
HMDA Technical Approval No. 040774/SKP/R1/U6/HMDA/25112020Dated 24/09/2021; describes Blocks A, B and C and a club house on Survey Nos. 112, 112/A1, 112/A2 and 112/A3, Mokila. The approval directs the applicant to seek sanction and release from Mokila Grama Panchayat.
Commencement / plan recordThe supplied document is titled “Commencement Certificates for each building in each phase,” while its extraction identifies it as HMDA’s technical approval letter. Separate building-specific commencement certificates are not supplied in the extracted material.
Floor-plan drawingClub-house plan drawing identifies a multipurpose room, baby-care area and indoor badminton court; the extraction contains no approval particulars or land identifiers.
Form B affidavit-cum-declarationPromoter declaration by CH. VINAY KUMAR dated 16 September 2021, including title, encumbrance, completion, project-account and pending-approval statements. These are recorded as promoter declarations.
Occupancy / completion certificateNone supplied. The HMDA approval requires an occupancy certificate before occupation.
Layout approval / stamped layout planA RERA document entry requests a layout approval or stamped layout plan, but the supplied entry is not itself an extracted approval or plan. Document index

Frequently asked questions

Is THE COMMUNITTEE by VeeKay registered with Telangana RERA?

Yes. THE COMMUNITTEE by VeeKay is registered with the Telangana Real Estate Regulatory Authority as P02400003530; the registration status is New Project.

Who is the developer of THE COMMUNITTEE by VeeKay?

The promoter named in the RERA registration is VEEKAY INFRASTRUCTURES.

Where is THE COMMUNITTEE by VeeKay located?

THE COMMUNITTEE by VeeKay is in MOKILA, Shankarpalle, Rangareddy, Telangana (501203).

When will THE COMMUNITTEE by VeeKay be completed?

The promoter's proposed date of completion filed with RERA is 21/09/2025. This is the promoter's declaration, not a guarantee.