The Park Side

CAPITOL CONSTRUCTIONS · Rangareddy · RERA P02400006798

THE PARK SIDE is a residential apartment project in NALLAGANDLA, Serilingampally mandal, Ranga Reddy district, developed by the registered promoter CAPITOL CONSTRUCTIONS. The registered land area is 1737.14 sq m, and the project comprises one building with 1 Cellar + 1 Stilt + 5 upper floors and 40 homes: 25 2BHK and 15 3BHK apartments. It is registered under TG-RERA P02400006798, with proposed completion listed as 30/11/2026.

More from Capitol Constructions · 5 projects →

01What we found

Period endedTG-RERA registration ran to 13 Jun 2026 - check its extension on TG-RERA
12documents on file - each fact links to its page
6court cases on this project's land (survey 302, Nallagandla)
11items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameTHE PARK SIDE
Project type / phaseResidential apartment project; registered portion/phase not separately stated
TG-RERA registrationP02400006798
Registration validity30/08/2023 to 13/06/2026, unless extended by the Authority; the certificate records no extension. Registration validity is distinct from the completion undertaking and occupancy status.
Registered promoterCAPITOL CONSTRUCTIONS
RERA statusThe registration certificate records registration under section 5. The supplied record does not establish the current live status after the stated validity end date.

RERA record RERA filing

Land and geographic identity

ItemProject record
Locality / plotNALLAGANDLA; Group Housing Plot No. 36
Revenue villageNallagandla (also rendered “NALLAGANDLA” and “NALAGANDLA” in filed records)
Mandal / district / PINSerilingampally / Ranga Reddy / 500019
All project survey numbers302 TO 310, 320 TO 322, 324 TO 361, 363 TO 365, 384, 385, 387 TO 391 AND 399
Registered site extentRERA land details state total and net area as 1737.14 sq m. The building-permit extraction records plot area 1737.14 sq m and net plot area 1732.86 sq m.
Boundaries recorded in RERA land detailsEast: 9 MTS WIDE ROAD; West: ROAD WIDTH 9 MTS; North: ROAD WIDTH 9 MTS; South: PRIVATE LAND

RERA record RERA filing Land records

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building approvalBuilding Permit Order 1873/GHMC/SLP/2023-BP, dated 13 June, 2023; file no. 003141/GHMC/1542/SLP1/2023-BP
Approved built-up area6453.45 sq m in the RERA project information
Building arrangementOne building; the permit describes 1 Cellar + 1 Stilt + 5 upper floors
Height recorded in permit14.89 m
Parking provision recorded in permitCellar 1369.6 sq m and stilt 969.8 sq m are identified as parking; total parking area is recorded as 2380.3. No parking-space count is supplied.
UnitsRERA unit schedule: 40 total (25 2BHK and 15 3BHK). The permit extraction does not provide a separate approved unit count.

RERA record RERA filing RERA filing RERA unit table Approvals record

Offering and status

ItemProject record
Configurations2BHK and 3BHK apartments
RERA saleable area2BHK: 123.92 sq m; 3BHK: 153.97 sq m
Portal booking availability2BHK: 25 available, 0 booked; 3BHK: 15 available, 0 booked. These portal figures have no stated as-of date and are indicative.
Completion datesPromoter’s Form B undertaking: 13-06-2026. The RERA header lists proposed completion 30/11/2026.
Construction stageA current construction-progress percentage or independently verified site-stage report is not supplied.
Occupancy / completion certificateThe supplied building permit extraction says completion is not certified. No occupancy or completion certificate is included in the supplied project documents.

RERA unit table RERA record RERA filing

2. The project story

THE PARK SIDE is registered as a residential apartment project on Group Housing Plot No. 36 in Nallagandla, Serilingampally mandal, Ranga Reddy district. Its RERA land record identifies the project across Survey Nos. 302 TO 310, 320 TO 322, 324 TO 361, 363 TO 365, 384, 385, 387 TO 391 AND 399. The registered unit schedule contains 40 homes: 25 two-bedroom and 15 three-bedroom apartments. RERA record Land records RERA unit table

The GHMC building permit describes one residential building with a cellar, stilt and five upper floors. The project record includes the permit and a promoter completion undertaking, but the supplied evidence does not show a verified construction stage or an issued occupancy certificate. The proposed completion date in the project header and the completion date stated in the promoter’s declaration are reported separately above; neither should be treated as proof of completion. RERA record

3. Master plan, architecture & building design

The GHMC permit is for residential construction on Group Housing Plot No. 36 and records a building height of 14.89 m. It describes one building comprising 1 Cellar + 1 Stilt + 5 upper floors. The RERA project information gives approved built-up area as 6453.45 sq m. The permit extraction separately lists residential upper floors as 4,114.05, cellar parking as 1369.6, stilt parking as 969.8, and a tot lot of 106.72; these are reported as the permit extraction labels them, not as alternative measures of saleable or carpet area. RERA filing

The permit’s land figures are plot area 1737.14 sq m, net plot area 1732.86 sq m, and road-affected and nala-affected areas each 0.0. It also records setbacks as Front 3, Rear 5, Side I 6 and Side II 4. The supplied material does not establish a floor-by-floor apartment count, building footprint, lift or stair arrangement, or the distribution of common areas.

The separate layout-plan document is present in the RERA document register, but its drawing is not extracted in the supplied evidence. No phase-wise building organization is identified. Document index

4. Homes, configurations & floor plans

The RERA filing provides the unit counts and saleable areas below. Carpet-area figures are software measurements from the approved floor-plan drawing, not RERA-filed measurements; the drawing geometry is identified as needing review. Saleable area and carpet area are different measures: the former is the RERA-filed area for these units, while the latter is measured from the drawing and does not represent the home’s share of common areas. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK25025123.92 sq mSoftware-measured range: 71.8–99.2 sq m; median 82.0 sq m34%
3BHK15015153.97 sq mSoftware-measured range: 100.0–127.9 sq m; median 113.5 sq m26%

The drawing sample covers 10 measured 2BHK designs and 5 measured 3BHK designs. One extracted 2BHK plan labels kitchen, wash, dining, living, bedrooms and toilets; one 3BHK plan labels living, kitchen, wash, dining, bedrooms and toilets. The supplied room dimensions describe those individual drawing examples, not every apartment. RERA unit details Floor plans

5. Parking & vehicle circulation

The GHMC permit identifies cellar and stilt areas for parking: 1369.6 sq m in the cellar and 969.8 sq m in the stilt. Its sanctioned-parameters extraction records total parking area as 2380.3. The permit condition says the cellar and stilt approved for parking are to be used exclusively for vehicle parking and not converted to other uses. No count of car or two-wheeler spaces, visitor or accessible spaces, EV charging provision, parking allocation by apartment, or vehicle-ramp arrangement is supplied. A drawn or designated parking area does not by itself establish exclusive ownership or allocation to a buyer.

6. Amenities, recreation & open spaces

The RERA amenity schedule marks several infrastructure categories as available, while recording 0% progress for the listed items. That schedule is a filed status record, not evidence that facilities have been completed or independently inspected. The building permit separately requires a tot lot and greenery-related provisions. RERA amenities

Tot lot / recreational open space
Description / sizePermit extraction records 106.72; unit not stated in that field. Permit says the tot lot is to be fenced and maintained as greenery.
Evidence sourceGHMC building permit
Declared progress / verified statusRequired by permit; completion not established.
Green strip / tot lot / park
Description / sizeListed in the RERA amenity schedule. Permit says the southern-side park area is not to be disturbed and requires greenery on the site periphery.
Evidence sourceRERA amenity schedule; GHMC building permit
Declared progress / verified statusRERA schedule records 0%; no completion verification supplied.
Community buildings
Description / sizeListed in the RERA amenity schedule.
Evidence sourceRERA amenity schedule
Declared progress / verified status0%; delivered status not established.

RERA amenities

7. Utilities, building services & safety

The RERA amenity schedule lists water supply; sewerage, including chamber, lines, septic tank and STP; storm-water drains; sewage and sullage treatment/disposal; solid-waste management; rainwater harvesting; energy management; fire protection; and an electrical meter room, sub-station or receiving station. The schedule records 0% progress for these listed items; it does not establish completed or independently verified services. RERA amenities

The building permit requires 3 rainwater-harvesting pits, space for a transformer, a garbage house within the premises, and services including sanitation, plumbing, fire safety, lifts, and electrical installations under qualified technical supervision. It also requires an occupancy Fire NOC before an occupancy certificate and says occupancy is compulsory before occupation. These are permit conditions, not evidence that the works or clearances have been completed. The supplied records do not provide water-storage or treatment capacities, STP capacity, electrical backup details, lift count/capacity, CCTV or access-control specifications, or accessibility provisions.

8. Location, access & connectivity

The registered location is Nallagandla village, Serilingampally mandal, Ranga Reddy district, PIN 500019. The permit identifies the site as Group Housing Plot No. 36 in Nallagandla Residential Complex. The project geocode is recorded at 17.469434085454374, 78.30876146862201. RERA record RERA filing Location record

The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 6.4 km. No other measured road, public-transport or landmark distances are supplied in the project location data. Location record

9. Developer & development status

The registered promoter is CAPITOL CONSTRUCTIONS, identified in the RERA record as a partnership. Its GSTIN is 36AAPFC4794E1Z3. The registration certificate lists the promoter office as Village: Moosapet, Mandal: Balanagar, District: Medchal-Malkajgiri, PIN 500037. The supplied materials do not include an independently verified contact number or email. Corporate record RERA filing

The promoter’s Form B declaration undertakes completion by 13-06-2026 and includes declarations about project funds, audit, pending approvals and allottee non-discrimination. The verification date and place are incomplete in the extracted text. No current, independently verified construction-progress figure is supplied, and no occupancy or completion certificate is included.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400006798; issued 30/08/2023; stated validity through 13/06/2026
What the supplied record establishesRegistration of THE PARK SIDE under section 5; certificate includes project conditions, including the separate-account requirement.
GHMC Building Permit Order
Identifier / date1873/GHMC/SLP/2023-BP; 13 June, 2023; file no. 003141/GHMC/1542/SLP1/2023-BP
What the supplied record establishesSanctions a residential building described as 1 Cellar + 1 Stilt + 5 upper floors, subject to permit conditions.
RERA land-title documents
Identifier / dateLegal title report and deed materials, including documents 348854, 348855, 348856 and 348857
What the supplied record establishesProject-filed title and mortgage-related documents; the underlying title review and encumbrance analysis are addressed in the land-and-title section. Document index
Layout-plan document
Identifier / date348858
What the supplied record establishesListed in the RERA document register; the supplied extraction does not provide its layout drawing details.
Promoter declaration, Form B
Identifier / date349667
What the supplied record establishesPromoter-filed undertaking that includes the stated completion date and regulatory declarations.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesNo issued certificate is established by the documents provided; the building-permit extraction records completion as not certified.

Frequently asked questions

Is THE PARK SIDE registered with Telangana RERA?

Yes. THE PARK SIDE is registered with the Telangana Real Estate Regulatory Authority as P02400006798; the registration status is New Project.

Who is the developer of THE PARK SIDE?

The promoter named in the RERA registration is CAPITOL CONSTRUCTIONS.

Where is THE PARK SIDE located?

THE PARK SIDE is in NALLAGANDLA, Serilingampally, Rangareddy, Telangana (500019).

When will THE PARK SIDE be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.