Vasavi Park
PRAKASH · Adilabad · RERA P00100003080
VASAVI PARK is a plotted development in MAVALA MERGED VILLAGE IN ADILABAD MUNICIPALITY, Mavala Mandal, Adilabad District. The registered promoter is “Mr./Ms. Prakash B”. The project has a site area of 4807.6 sq. m. and is registered as a plotted layout; a definitive plot count and plot-size configurations are not established in the supplied records. Its TG-RERA registration number is P00100003080, and the proposed completion date is 22/03/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | VASAVI PARK RERA record |
| Project type / registered portion | Plotted development; the registration is for the project identified under survey no. 183/3/3/1. RERA record Approvals record |
| TG-RERA registration | P00100003080; Form ‘C’ states registration from 23/06/2021 to 22/03/2024. The certificate records no extension. Registration validity is distinct from the project’s completion deadline. Approvals record |
| Registered promoter | The certificate names “Mr./Ms. Prakash B”; the project filing also identifies PRAKASH, while Form B identifies BOCHU PRAKASH. The legal entity type is not disclosed in the supplied record. RERA record Corporate record |
| RERA status | The supplied certificate records a grant under section 5; it does not establish current registration validity after 22/03/2024. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | MAVALA MERGED VILLAGE IN ADILABAD MUNICIPALITY; revenue village recorded as Mavala. RERA record RERA filing |
| Mandal / district / PIN | Mavala / Adilabad / 504001. RERA record RERA filing |
| Project survey number and subdivision | Sy. No. 183/3/3/1. RERA record Land records |
| Site area in RERA filing | Total area 4807.6 sq. m.; net area 4807.60 sq. m.; affected area in road widening/FTL/nala widening recorded as 0 sq. m. Land records |
| Boundaries in RERA filing | East: OTHERS LAND; West: ROAD; North: OTHERS LAND; South: OTHERS LAND. Land records |
| Project location reference | Software-recorded cadastral parcel centroid: 19.63388, 78.50567. Location record Cadastral map |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority / principal approval | Director of Town and Country Planning, Government of Telangana; Draft-TLP No.74/2021/W. The RERA filing gives approval date 23/03/2021. Approvals record |
| Approved layout area / land-use figures | The extracted draft approval records “Ac.1.712 Cents” and lists open space, roads, plotted area and mortgage area; parts of the extracted area and percentage text are corrupted, so those component figures are not reliably readable here. |
| Approved built-up area | RERA filing: 4807.6 sq. m. RERA filing |
| Building / floor configuration | Not disclosed in the supplied project records; this is a plotted layout, not a tower or apartment-building scheme. RERA record |
| Plot count | The draft approval extraction contains conflicting/garbled text (“10 Numbers. (SIXTEEN ONLY”); a definitive approved plot count cannot be established from that extraction. |
| Mortgage area | RERA filing records 785 sq. m. RERA filing |
Offering and status
| Item | Record |
|---|---|
| Registered offering | Plots; unit-level plot count, plot schedule and plot-size bands are not established by the supplied RERA unit records. RERA record RERA unit table |
| Construction stage | No independently verified site-progress measurement is supplied. RERA amenity records show 0% for listed progress fields. RERA amenities |
| Completion deadline | RERA registration record gives proposed completion as 22/03/2024. This is separate from the registration-validity end date. RERA record Approvals record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied; the project is a plotted development. Document index Approvals record |
The project story
- VASAVI PARK is registered with TG-RERA as a plotted development in Mavala, within the merged Adilabad Municipality area. The registration identifies Sy. No. 183/3/3/1 and a filed site extent of 4807.6 sq. m. RERA record Land records
- The RERA file includes a Draft Technical Layout Pattern approval for a plotted layout, with internal roads, reserved open space and plots, and conditions concerning mortgage of plots and transfer of open space and roads to the municipality by registered gift deed before final layout release. The approval extraction’s plot-count text is unclear, so the number of plots is not stated here as settled.
- The project’s proposed completion date recorded in the RERA filing was 22/03/2024. The supplied materials do not provide a verified current construction update, plot-by-plot availability, or a completion/occupancy certificate. RERA amenity progress fields are recorded as 0%; this is a filed status, not an independent site inspection. RERA record RERA amenities Document index
Master plan, architecture & building design
- This is a plotted layout rather than a multi-storey building project. The RERA filing records a 4807.6 sq. m. site and 4807.6 sq. m. approved built-up area; the latter is the filed figure and is not described in the supplied material as a building-floor area. Land records RERA filing
- The layout approval extraction identifies plotted land, roads, open space and mortgage land. The component schedule is partly corrupted in the extraction, and its plot-count wording is inconsistent, so precise component areas and total plot count cannot be reliably reported from that text.
- The draft approval lists proposed infrastructure including internal roads, street lighting, protected water supply, sewerage disposal, side drains, nala channelization, rainwater-harvesting pits and avenue planting in public open spaces. These are approval-document descriptions and do not establish that the facilities have been completed.
- No building arrangement, floor configuration, apartment count, tower height, building footprint or building-level plan is supplied. The approved layout plan itself is listed in the project documents but was not extracted for review. Document index
Homes, configurations & floor plans
The registered project is a plotted development. The supplied RERA data does not establish a plot inventory table, individual plot areas, or booked and available counts. RERA record RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Not established | Not supplied | Not supplied | Not supplied | Not applicable | Not supplied |
The supplied floor-plan record contains two drawings, but both are scans pending measurement; no software-measured carpet areas are available. The third-party vendor data lists plot-size claims, but the supplied RERA records do not substantiate those figures, so they are not presented as the registered offering. Floor plans Promoter website
Parking & vehicle circulation
The RERA filing records a mortgage area of 785 sq. m.; this is not a parking provision. The layout approval extraction refers to internal roads and to plots proposed for mortgage to the Commissioner, Adilabad Municipality, but it does not establish a parking count or parking allocation to purchasers. RERA filing
No sanctioned or RERA-filed parking-space count, visitor or accessible parking provision, vehicle-entry arrangement, driveway dimensions, or parking-allotment terms are supplied. Document index RERA amenities
Amenities, recreation & open spaces
The RERA amenity record lists facilities and shows 0% progress where a progress value is provided. The draft layout approval also describes open space and infrastructure provisions, but the available extraction does not reliably establish their final areas or delivered status. RERA amenities
| Facility | Green Strip/TOT LOT/Park |
|---|---|
| Description / size | Size not reliably readable in the extracted layout schedule. |
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed in RERA amenity record; 0% recorded. Not independently verified complete. |
| Facility | Community Buildings |
|---|---|
| Description / size | Size and quantity not supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed; 0% recorded. Not independently verified complete. |
| Facility | Aggregate area of recreational Open Space |
|---|---|
| Description / size | Area not supplied in the readable record. |
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed; 0% recorded. Not independently verified complete. |
| Facility | Internal Roads & Footpaths |
|---|---|
| Description / size | Dimensions not supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed in RERA amenity record; 0% recorded. Not independently verified complete. |
The approval extraction also lists avenue planting in public open spaces and fencing of open spaces. It does not establish that these works have been completed.
Utilities, building services & safety
- The draft layout approval describes proposed protected water supply, sewerage disposal, rainwater-harvesting pits, street lighting and electricity facilities, side drains, and construction of drains and nala channelization. These are approval-document descriptions; the supplied record does not give capacities, operating details or evidence of completion.
- The RERA amenity register lists water supply, sewerage (including chamber, lines, septic tank and STP), storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, water conservation/rainwater harvesting, energy management, and an electrical meter room/sub-station/receiving station. The supplied entries do not specify capacities or establish completion; listed progress is 0% where shown. RERA amenities
- No project-specific information is supplied about water source or storage, treatment capacity, electrical backup, fire-system design, emergency access, security systems, or accessible circulation. RERA amenities Document index
Location, access & connectivity
- The registered location is MAVALA MERGED VILLAGE IN ADILABAD MUNICIPALITY, Mavala Mandal, Adilabad District, PIN 504001. RERA record RERA filing
- The RERA-filed site boundaries identify a road on the western side and other land on the north, east and south. The supplied location data lists Sheshanna Chennawar Eye Hospital at 1.3 km and the nearest sampled Outer Ring Road interchange at approximately 222.8 km; these are recorded location measurements, not travel-time estimates. Land records Location record
- No public-transport details or additional approach-road and landmark information are supplied. Location record
Developer & development status
- The RERA certificate names the promoter as “Mr./Ms. Prakash B”; the Form B declaration identifies BOCHU PRAKASH as promoter, and the project filing lists PRAKASH. The legal entity type, corporate registration identifiers, registered-office details beyond the supplied address record, and official promoter contact details are not established in the available materials. RERA record Corporate record
- The promoter’s Form B declaration states that the land is free from encumbrances and records a completion undertaking. The supplied extraction renders that undertaking as “17/06/2021”; it is a promoter declaration, not an independently verified completion status.
- The RERA filing records proposed completion on 22/03/2024, while the registration certificate records validity through 22/03/2024 and no extension on that certificate. No current verified progress report or completion certificate is supplied. RERA record RERA amenities
Approvals, official records & documents
| Supplied evidence | Form ‘C’, P00100003080, issued 23/06/2021; validity recorded through 22/03/2024, with no extension shown on the certificate. |
|---|---|
| Scope / note | VASAVI PARK, Sy. No. 183/3/3/1. |
| Supplied evidence | Draft Technical Layout Pattern approval, Draft-TLP No.74/2021/W, issued by the Director of Town and Country Planning, Government of Telangana. |
|---|---|
| Scope / note | Proposed plotted layout; approval extraction records conditions and states the permission is not proof of title. |
| Supplied evidence | Promoter affidavit-cum-declaration, verified at Adilabad on 17 June 2021. |
|---|---|
| Scope / note | Includes promoter declarations concerning title, encumbrances and project undertakings. |
| Supplied evidence | A layout-plan/approval document is listed in the RERA file, but its extraction is unavailable. |
|---|---|
| Scope / note | Drawing details cannot be confirmed from the supplied material. |
| Supplied evidence | Advocate’s title opinion dated 17-06-2021 is listed in the project documents. |
|---|---|
| Scope / note | The full title assessment is addressed in the Land & Title section. |
| Supplied evidence | Filed statement covering 07-01-1989 to 26-06-2021. |
|---|---|
| Scope / note | Search period is limited to the stated dates. |
| Supplied evidence | Not supplied in the available project documents. Document index |
|---|---|
| Scope / note | No certificate status beyond the absence of a supplied document can be confirmed here. |
Project at a glance
Project identity
Registered project name: VASAVI PARK
Project type / registered portion: Plotted development; the registration is for the project identified under survey no. 183/3/3/1.
TG-RERA registration: P00100003080; Form ‘C’ states registration from 23/06/2021 to 22/03/2024. The certificate records no extension. Registration validity is distinct from the project’s completion deadline.
Registered promoter: The certificate names “Mr./Ms. Prakash B”; the project filing also identifies PRAKASH, while Form B identifies BOCHU PRAKASH. The legal entity type is not disclosed in the supplied record.
RERA status: The supplied certificate records a grant under section 5; it does not establish current registration validity after 22/03/2024.
Land and geographic identity
Locality / revenue village: MAVALA MERGED VILLAGE IN ADILABAD MUNICIPALITY; revenue village recorded as Mavala.
Mandal / district / PIN: Mavala / Adilabad / 504001.
Project survey number and subdivision: Sy. No. 183/3/3/1.
Site area in RERA filing: Total area 4807.6 sq. m.; net area 4807.60 sq. m.; affected area in road widening/FTL/nala widening recorded as 0 sq. m.
Boundaries in RERA filing: East: OTHERS LAND; West: ROAD; North: OTHERS LAND; South: OTHERS LAND.
Project location reference: Software-recorded cadastral parcel centroid: 19.63388, 78.50567.
Development identity
Sanctioning authority / principal approval: Director of Town and Country Planning, Government of Telangana; Draft-TLP No.74/2021/W. The RERA filing gives approval date 23/03/2021.
Approved layout area / land-use figures: The extracted draft approval records “Ac.1.712 Cents” and lists open space, roads, plotted area and mortgage area; parts of the extracted area and percentage text are corrupted, so those component figures are not reliably readable here.
Approved built-up area: RERA filing: 4807.6 sq. m.
Building / floor configuration: Not disclosed in the supplied project records; this is a plotted layout, not a tower or apartment-building scheme.
Plot count: The draft approval extraction contains conflicting/garbled text (“10 Numbers. (SIXTEEN ONLY”); a definitive approved plot count cannot be established from that extraction.
Mortgage area: RERA filing records 785 sq. m.
Offering and status
Registered offering: Plots; unit-level plot count, plot schedule and plot-size bands are not established by the supplied RERA unit records.
Construction stage: No independently verified site-progress measurement is supplied. RERA amenity records show 0% for listed progress fields.
Completion deadline: RERA registration record gives proposed completion as 22/03/2024. This is separate from the registration-validity end date.
Occupancy / completion certificate: No occupancy or completion certificate is supplied; the project is a plotted development.
The project story
- VASAVI PARK is registered with TG-RERA as a plotted development in Mavala, within the merged Adilabad Municipality area. The registration identifies Sy. No. 183/3/3/1 and a filed site extent of 4807.6 sq. m.
- The RERA file includes a Draft Technical Layout Pattern approval for a plotted layout, with internal roads, reserved open space and plots, and conditions concerning mortgage of plots and transfer of open space and roads to the municipality by registered gift deed before final layout release. The approval extraction’s plot-count text is unclear, so the number of plots is not stated here as settled.
- The project’s proposed completion date recorded in the RERA filing was 22/03/2024. The supplied materials do not provide a verified current construction update, plot-by-plot availability, or a completion/occupancy certificate. RERA amenity progress fields are recorded as 0%; this is a filed status, not an independent site inspection.
Master plan, architecture & building design
- This is a plotted layout rather than a multi-storey building project. The RERA filing records a 4807.6 sq. m. site and 4807.6 sq. m. approved built-up area; the latter is the filed figure and is not described in the supplied material as a building-floor area.
- The layout approval extraction identifies plotted land, roads, open space and mortgage land. The component schedule is partly corrupted in the extraction, and its plot-count wording is inconsistent, so precise component areas and total plot count cannot be reliably reported from that text.
- The draft approval lists proposed infrastructure including internal roads, street lighting, protected water supply, sewerage disposal, side drains, nala channelization, rainwater-harvesting pits and avenue planting in public open spaces. These are approval-document descriptions and do not establish that the facilities have been completed.
- No building arrangement, floor configuration, apartment count, tower height, building footprint or building-level plan is supplied. The approved layout plan itself is listed in the project documents but was not extracted for review.
Homes, configurations & floor plans
The registered project is a plotted development. The supplied RERA data does not establish a plot inventory table, individual plot areas, or booked and available counts.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Not established | Not supplied | Not supplied | Not supplied | Not applicable | Not supplied |
The supplied floor-plan record contains two drawings, but both are scans pending measurement; no software-measured carpet areas are available. The third-party vendor data lists plot-size claims, but the supplied RERA records do not substantiate those figures, so they are not presented as the registered offering.
Parking & vehicle circulation
The RERA filing records a mortgage area of 785 sq. m.; this is not a parking provision. The layout approval extraction refers to internal roads and to plots proposed for mortgage to the Commissioner, Adilabad Municipality, but it does not establish a parking count or parking allocation to purchasers.
No sanctioned or RERA-filed parking-space count, visitor or accessible parking provision, vehicle-entry arrangement, driveway dimensions, or parking-allotment terms are supplied.
Amenities, recreation & open spaces
The RERA amenity record lists facilities and shows 0% progress where a progress value is provided. The draft layout approval also describes open space and infrastructure provisions, but the available extraction does not reliably establish their final areas or delivered status.
| Facility | Green Strip/TOT LOT/Park |
|---|---|
| Description / size | Size not reliably readable in the extracted layout schedule. |
| Declared progress / verified status | Listed in RERA amenity record; 0% recorded. Not independently verified complete. |
| Facility | Community Buildings |
|---|---|
| Description / size | Size and quantity not supplied. |
| Declared progress / verified status | Listed; 0% recorded. Not independently verified complete. |
| Facility | Aggregate area of recreational Open Space |
|---|---|
| Description / size | Area not supplied in the readable record. |
| Declared progress / verified status | Listed; 0% recorded. Not independently verified complete. |
| Facility | Internal Roads & Footpaths |
|---|---|
| Description / size | Dimensions not supplied. |
| Declared progress / verified status | Listed in RERA amenity record; 0% recorded. Not independently verified complete. |
The approval extraction also lists avenue planting in public open spaces and fencing of open spaces. It does not establish that these works have been completed.
Utilities, building services & safety
- The draft layout approval describes proposed protected water supply, sewerage disposal, rainwater-harvesting pits, street lighting and electricity facilities, side drains, and construction of drains and nala channelization. These are approval-document descriptions; the supplied record does not give capacities, operating details or evidence of completion.
- The RERA amenity register lists water supply, sewerage (including chamber, lines, septic tank and STP), storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, water conservation/rainwater harvesting, energy management, and an electrical meter room/sub-station/receiving station. The supplied entries do not specify capacities or establish completion; listed progress is 0% where shown.
- No project-specific information is supplied about water source or storage, treatment capacity, electrical backup, fire-system design, emergency access, security systems, or accessible circulation.
Location, access & connectivity
- The registered location is MAVALA MERGED VILLAGE IN ADILABAD MUNICIPALITY, Mavala Mandal, Adilabad District, PIN 504001.
- The RERA-filed site boundaries identify a road on the western side and other land on the north, east and south. The supplied location data lists Sheshanna Chennawar Eye Hospital at 1.3 km and the nearest sampled Outer Ring Road interchange at approximately 222.8 km; these are recorded location measurements, not travel-time estimates.
- No public-transport details or additional approach-road and landmark information are supplied.
Developer & development status
- The RERA certificate names the promoter as “Mr./Ms. Prakash B”; the Form B declaration identifies BOCHU PRAKASH as promoter, and the project filing lists PRAKASH. The legal entity type, corporate registration identifiers, registered-office details beyond the supplied address record, and official promoter contact details are not established in the available materials.
- The promoter’s Form B declaration states that the land is free from encumbrances and records a completion undertaking. The supplied extraction renders that undertaking as “17/06/2021”; it is a promoter declaration, not an independently verified completion status.
- The RERA filing records proposed completion on 22/03/2024, while the registration certificate records validity through 22/03/2024 and no extension on that certificate. No current verified progress report or completion certificate is supplied.
Approvals, official records & documents
| Supplied evidence | Form ‘C’, P00100003080, issued 23/06/2021; validity recorded through 22/03/2024, with no extension shown on the certificate. |
|---|---|
| Scope / note | VASAVI PARK, Sy. No. 183/3/3/1. |
| Supplied evidence | Draft Technical Layout Pattern approval, Draft-TLP No.74/2021/W, issued by the Director of Town and Country Planning, Government of Telangana. |
|---|---|
| Scope / note | Proposed plotted layout; approval extraction records conditions and states the permission is not proof of title. |
| Supplied evidence | Promoter affidavit-cum-declaration, verified at Adilabad on 17 June 2021. |
|---|---|
| Scope / note | Includes promoter declarations concerning title, encumbrances and project undertakings. |
| Supplied evidence | A layout-plan/approval document is listed in the RERA file, but its extraction is unavailable. |
|---|---|
| Scope / note | Drawing details cannot be confirmed from the supplied material. |
| Supplied evidence | Advocate’s title opinion dated 17-06-2021 is listed in the project documents. |
|---|---|
| Scope / note | The full title assessment is addressed in the Land & Title section. |
| Supplied evidence | Filed statement covering 07-01-1989 to 26-06-2021. |
|---|---|
| Scope / note | Search period is limited to the stated dates. |
| Supplied evidence | Not supplied in the available project documents. |
|---|---|
| Scope / note | No certificate status beyond the absence of a supplied document can be confirmed here. |
Frequently asked questions
Is VASAVI PARK registered with Telangana RERA?
Yes. VASAVI PARK is registered with the Telangana Real Estate Regulatory Authority as P00100003080; the registration status is New Project.
Who is the developer of VASAVI PARK?
The promoter named in the RERA registration is PRAKASH.
Where is VASAVI PARK located?
VASAVI PARK is in MAVALA MERGED VILLAGE IN ADILABAD MUNICIPALITY, Mavala, Adilabad, Telangana (504001).
When will VASAVI PARK be completed?
The promoter's proposed date of completion filed with RERA is 22/03/2024. This is the promoter's declaration, not a guarantee.