Sign in

Villa Verde By Cybercity

CYBERCITY BLUE EDGE LLP · Medchal-Malkajgiri · RERA P02200009074

VILLA VERDE BY CYBERCITY is a residential villa development in IDL ROAD TO BALANAGAR, Kukatpally mandal, Medchal-Malkajgiri district. It is being developed by registered promoter CYBERCITY BLUE EDGE LLP on **54,138.93 m²** of land, with **90 buildings/individual subplots** and **2168 dwellings**; residential buildings are shown as **1 Ground + 2 upper floors**, and the RERA unit table records 54 4BHK, 25 5BHK and 1 7BHK home. The project is registered under TG-RERA **P02200009074**, with proposed completion recorded as **09/02/2028**.

More from Cybercity Blue Edge LLP · 2 projects →

01What we found

RegisteredTG-RERA - valid till 9 Oct 2027
21documents on file - each fact links to its page
11court cases on this project's land (survey 1011, Idl Road To Balanagar)
6items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameVILLA VERDE BY CYBERCITY RERA record
Project type / phaseResidential villa development; the RERA record labels it a new project. The registered phase or phase number is not disclosed in the supplied record. RERA record RERA filing
TG-RERA registrationP02200009074; registered 9 October 2024, valid through 9 October 2027, subject to any extension by the Authority. Registration validity is not the same as the completion deadline. RERA record
Registered promoterCYBERCITY BLUE EDGE LLP (LLP). RERA record Corporate record
RERA statusRegistration certificate on file; the supplied record identifies the project as “New Project.” RERA filing

Land and geographic identity

ItemRecord
LocalityIDL ROAD TO BALANAGAR in the RERA project record. RERA record RERA filing
Revenue villageThe RERA land fields do not disclose a revenue village. The GHMC permit and plan identify Baghameer and Kukatpally (V) respectively; both are reproduced here as document-stated locations. Land records
MandalKukatpally is stated in the permit extraction; the RERA land fields do not disclose a mandal. Land records
District / PINMedchal-Malkajgiri; RERA registration record gives PIN 500033. RERA record
Survey numbers / subdivisionsRERA identifies 1011/2, 1011/1 and 1011/12. The GHMC permit extraction describes them as 1011/P, 1011/2P and 1011/12P. Land records
Registered site extent54,138.93 m² in the GHMC permit and layout-plan record. The RERA land form states total area and net area as 54,138.93 m². Land records
Boundaries in RERA recordEast: 100 FEET ROAD; west, north and south: NEIGHBOURS LAND. RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal approvalGHMC Layout with Housing Permit Order 3079/GHMC/KPL/2024-LO, dated 09 October 2024; file number 008197/GHMC/3825/KPL1/2024-LO. Approvals record
Approved built-up areaGHMC permit extraction: 54,821.38 m² total sanctioned built-up area. The plan extraction separately lists 51,825.38 m² proposed built-up area excluding parking and 54,176.76 m² including parking; these are distinct plan figures.
Building arrangementThe plan identifies 90 buildings/individual subplots, including residential villa plots and a clubhouse.
Sanctioned floor formResidential buildings are shown as 1 Ground + 2 upper floors in the plan; the permit extraction lists residential floors as Ground 1 and Upper floors 2, with building-height entries of 10 m and 12 m. The clubhouse is shown as 1 Cellar + 1 Ground + 3 upper floors, with a stated height of 14.85 m.
ParkingThe permit extraction records Cellar parking area 674.63 Sq.Mtrs. The supplied material does not establish a total number of parking spaces or buyer-specific allocations.
Unit countsGHMC permit extraction: 90 buildings and 2168 dwellings. The RERA unit table records 81 homes—54 4BHK, 25 5BHK and 1 7BHK—and one clubhouse row that is not a home for sale. RERA unit table
OC / completionNo completion or occupancy certificate is supplied. The GHMC permit states that an Occupancy Certificate is required before occupation; the permit extraction marks completion as not certified.

Offering and status

ItemRecord
RERA-filed home types4BHK: 54; 5BHK: 25; 7BHK: 1. RERA unit table
RERA-filed saleable area4BHK: 584.72 m²; 5BHK: 700.97 m²; 7BHK: 1,901.18 m². RERA unit table
Booked / availablePortal-derived counts show 0 booked and 54 available 4BHK, 0 booked and 25 available 5BHK, and 0 booked and 1 available 7BHK. The portal data has no supplied as-of date and should be treated as indicative. RERA unit table
Construction stageThe supplied record does not provide a verified site-progress report or construction stage. The plan and permit evidence approval, not completed construction. Document index
Completion deadlinePromoter’s Form B undertaking states 9 October 2027; the project header separately records proposed completion as 09/02/2028. These are recorded here as separate supplied completion-date entries without reconciling them. RERA record
Original / revised timelineThe supplied evidence does not label either date as an approved extension or identify a revised completion order. RERA record

2. The project story

The RERA-registered project is a residential villa development on land identified by survey numbers 1011/2, 1011/1 and 1011/12, within the locality recorded as IDL ROAD TO BALANAGAR. Its GHMC-sanctioned layout organizes the site into individual residential plots/buildings, internal roads, open space, utility land and a clubhouse. The plan calls for 90 buildings/individual subplots; the RERA unit table, by contrast, identifies 81 homes available in 4BHK, 5BHK and 7BHK configurations. RERA record Land records RERA unit table

The sanctioned plan and permit establish approved development scope, but the supplied material does not establish how much construction has occurred. No occupancy or completion certificate is included, and the permit extraction says completion is not certified. The promoter’s Form B undertaking gives a completion date of 9 October 2027; the project header records a proposed completion date of 09/02/2028. RERA record

3. Master plan, architecture & building design

The GHMC layout plan records a total/net layout area of 54,138.93 m². Its land-use statement allocates 29,227.45 m² (53.99%) to plotted area, 17,523.89 m² (32.37%) to roads, 5,486.23 m² (10.13%) to organized open space/park, 1,339.23 m² (2.47%) to amenity area and 562.20 m² (1.04%) to utility area. These are plan-stated allocations.

The layout drawing states 90 plots; software extraction identifies 88 plots with sizes and indicates that the plot-size data should be checked against the drawing. The measured sizes range from 248.29 m² (297.0 sq yd) to 487.92 m² (583.5 sq yd), with a median of 296.35 m² (354.4 sq yd). Layout record

The plan identifies residential buildings of 1 Ground + 2 upper floors and a clubhouse of 1 Cellar + 1 Ground + 3 upper floors. GHMC’s permit extraction gives residential building-height entries of 10 m and 12 m, and 14.85 m for the clubhouse. The record does not provide a reliable building-by-building schedule of heights or a complete unit-by-unit floor arrangement.

Area figures are stated separately because they describe different plan categories: GHMC’s permit extraction lists 54,821.38 m² as total sanctioned built-up area; the layout-plan extraction lists 51,825.38 m² proposed built-up area excluding parking and 54,176.76 m² including parking. These figures are reproduced as recorded, not treated as interchangeable.

The plans identify internal roads, including 12.00 mt. Wide InternalRoad, 18.00 mt. Wide InternalRoad and a 4.5m drive way. They also show a green strip, tot-lot, clubhouse and utility area. The supplied materials do not provide a complete drawing-based description of building footprints, home-by-home orientation, lifts, stairs or pedestrian/vehicle separation.

4. Homes, configurations & floor plans

RERA records three home configurations. The recorded saleable areas are RERA-filed figures; no RERA-filed carpet-area figure is supplied for these homes. The separate software-measured floor-plan data identifies a 1BHK drawing measurement, but that configuration is not shown in the RERA unit table and the measurement is flagged for review. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading
4BHK54054584.72 m²Not suppliedNot supplied
5BHK25025700.97 m²Not suppliedNot supplied
7BHK1011,901.18 m²Not suppliedNot supplied

The portal-derived booking and availability counts have no supplied as-of date. The clubhouse appears in the RERA unit table as a non-sale home/common-facility row and is not counted as a home for sale. RERA unit table

A software measurement from the approved drawing records a 1BHK design with a median carpet area of 491.2 m² (5,287 sqft), based on one measured design. It is not a RERA-filed configuration or area and is marked as needing review. Carpet area represents the measured internal floor-plan area; RERA saleable area is a separate filing measure and includes a share of common areas. No balcony, utility-area or loading figures are supplied for the RERA-listed villa configurations. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit extraction records 674.63 Sq.Mtrs of cellar parking area. The plan identifies a vehicular ramp and a 20.00 mt. long 2.40 mt. High 5.40 mt. Wide Vehicular Ramp. A separate plan extraction lists parking-area figures, but the supplied record does not establish a total bay count, visitor or accessible spaces, or parking allocation to particular homes.

The GHMC conditions state that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking and not partitioned or converted to another use. A drawn parking area does not, by itself, establish an individual buyer’s exclusive parking entitlement; no unit-specific allocation is supplied.

6. Amenities, recreation & open spaces

The RERA amenity record lists infrastructure and amenity categories as available, but records 0% progress for each item. The permit and layout documents identify facilities and site allocations; neither establishes that they have been completed or independently verified. RERA amenities

Clubhouse
Description / sizeOne clubhouse; plan shows 1 Cellar + 1 Ground + 3 upper floors and stated height 14.85 m. No clubhouse floor-area figure is established here.
Evidence sourceGHMC plan and permit
Declared progress / verified statusApproved/proposed in plan; completion not verified
Tot-lot / organized open space
Description / size5,486.23 m² organized open space/park in the layout statement; permit also identifies a tot-lot.
Evidence sourceGHMC plan and permit
Declared progress / verified statusPlan-stated; RERA amenity progress recorded as 0%
Green strip
Description / sizeIdentified on the plan; no separate area supplied.
Evidence sourceGHMC plan
Declared progress / verified statusPlan-stated; completion not verified
Internal roads and footpaths
Description / sizeLayout allocates 17,523.89 m² to roads; road widths include 12.00 mt. and 18.00 mt. internal roads.
Evidence sourceGHMC plan; RERA amenity list RERA amenities
Declared progress / verified statusRERA lists as available with 0% progress; completion not verified
Community buildings
Description / sizeListed as available in the RERA amenity record; clubhouse is identified in the plan.
Evidence sourceRERA amenity list; GHMC plan RERA amenities
Declared progress / verified statusRERA progress recorded as 0%; completion not verified

Promoter-marketed amenities are not used here as evidence of sanctioned or delivered facilities. The supplied RERA and approval records do not establish pools, sports facilities or other specific recreational features as completed. Promoter website RERA amenities

7. Utilities, building services & safety

The RERA amenity record lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection and fire safety, and electrical meter/substation/receiving facilities. Each is marked available, but the record gives 0% progress for each; these entries do not establish completed service or capacity. RERA amenities

The GHMC plan extraction identifies a sewage treatment plant, rainwater recharge pit, garbage house, utility area, transformer space, 500 KVA x 3 NOS DG AREA, and 1000 KVA x 2 NOS TRANSFORMER - 120 SQM. These are plan-listed provisions; the supplied evidence does not confirm installation or commissioning. The permit specifies separate underground static water storage and residential terrace tanks of 25,000 litres each.

The permit requires an Occupancy Fire NOC before the clubhouse Occupancy Certificate and identifies automatic sprinklers in the clubhouse cellar as a condition. It also states that the owner/developer is responsible for structural and fire-safety requirements. No Fire NOC, completion certificate, or evidence of completed fire systems is supplied.

8. Location, access & connectivity

The RERA locality is IDL ROAD TO BALANAGAR, Medchal-Malkajgiri district, PIN 500033. The RERA land record states the eastern boundary as 100 FEET ROAD. GHMC plan documents identify the site as Kukatpally (V) / Kukatpally Circle; the permit extraction also identifies Baghameer and Kukatpally mandal. The supplied evidence does not resolve the revenue-village entry in the RERA land fields. RERA record RERA filing

The supplied location record gives the Financial District (Nanakramguda) as 1.2 km from the cadastral parcel centroid. No other independently measured distances or travel times are supplied. Location record

9. Developer & development status

The registered promoter is CYBERCITY BLUE EDGE LLP, an LLP, with GSTIN 36AASFC8858J1ZK. The project record gives the promoter address as CYBERCITY, GREEN HILLS ROAS, IDL ROAD, IDL ROAD TO BALANAGAR, Medchal-Malkajgiri, 500033. A promoter website is recorded as https://www.villaverde.in/; the supplied record does not provide a separate official contact number or email address. Corporate record Parties record RERA record

GHMC plan documents identify CYBERCITY BUILDERS & DEVELOPERS PVT.LTD. as applicant/developer, while TG-RERA names CYBERCITY BLUE EDGE LLP as the registered promoter. The Form B affidavit is made by authorised signatory K. Kiran Kumar Reddy for CYBERCITY BLUE EDGE LLP and states a completion undertaking of 9 October 2027.

No independent construction-progress verification, completion certificate or occupancy certificate is included. The GHMC permit states that an Occupancy Certificate is required before occupation.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200009074; valid 09/10/2024–09/10/2027
What the supplied evidence establishesForm C certificate for VILLA VERDE BY CYBERCITY naming CYBERCITY BLUE EDGE LLP as promoter.
GHMC Layout with Housing Permit Order
Identifier / date3079/GHMC/KPL/2024-LO, 09 October 2024; file 008197/GHMC/3825/KPL1/2024-LO
What the supplied evidence establishesPermit and stated conditions for the development on the identified survey lands.
GHMC layout plan
Identifier / dateFile reference TS/039154/2024, dated 24-07-2024 in the plan extraction
What the supplied evidence establishesDrawing-derived layout, land-use statement, villa/plot arrangement and site provisions.
GHMC plan / floor-plan material
Identifier / dateRERA documents 510233 and 515120
What the supplied evidence establishesPlan extractions describe residential buildings, clubhouse, roads, open space, utilities and parking provision.
Promoter Form B declaration
Identifier / date6t day of October 2024
What the supplied evidence establishesPromoter’s title-basis, encumbrance, separate-account and completion declarations, including the undertaking to complete by 9 October 2027.
Occupancy / completion records
Identifier / dateNot supplied
What the supplied evidence establishesNo completion or occupancy certificate is in the reviewed materials; the GHMC permit requires an Occupancy Certificate before occupation.

The supplied approval material records conditions concerning, among other matters, completion notice and Occupancy Certificate, utility and open-space handover, fire-safety provisions, and use of the sanctioned plan. The detailed conditions are recorded in the GHMC permit and plan documents.

Frequently asked questions

Is VILLA VERDE BY CYBERCITY registered with Telangana RERA?

Yes. VILLA VERDE BY CYBERCITY is registered with the Telangana Real Estate Regulatory Authority as P02200009074; the registration status is New Project.

Who is the developer of VILLA VERDE BY CYBERCITY?

The promoter named in the RERA registration is CYBERCITY BLUE EDGE LLP.

Where is VILLA VERDE BY CYBERCITY located?

VILLA VERDE BY CYBERCITY is in IDL ROAD TO BALANAGAR, Medchal-Malkajgiri, Telangana (500033).

When will VILLA VERDE BY CYBERCITY be completed?

The promoter's proposed date of completion filed with RERA is 09/02/2028. This is the promoter's declaration, not a guarantee.

More projects in Medchal-Malkajgiri